Professional Documents
Culture Documents
: CV/PHSNH/001, Revision - R1
Page No._______
Job No.: L167000
& p4 = gw.h1 = 1.05 × (2.5 – -2) 4.73 T/m² considering full height
Calculation No.: CV/PHSNH/001, Revision - R1
Page No._______
Job No.: L167000
Intermediate frame in
5.25 3.15 7.88 10.50 22.05
Cross direction
End frame in
Longitudinal 2.5 1.50 3.75 5.00 10.50
direction
Calculation No.: CV/PHSNH/001, Revision - R1
Page No._______
Job No.: L167000
Max. intensity of
triangular load p4 at
bottom
T/m
11.03
22.05
10.50
Calculation No.: CV/PHSNH/001, Revision - R1
Page No._______
Job No.: L167000
F I X E D
F I X E D
b
Height of backfill = h = 1.50 m
\ h / b = 0.333
i.e., between h / b = 0.333 & 0.667 F I X E D
X
Support Condition : Fixed at bottom & sides, hinged at top.
Calculation of moment coefficients for uniformly varying load from Moody's Charts
Sign convention : + ve moment causes tension at the face on which load is acting
Table of Horizontal Moment Coefficients for Uniformly Varying Load (Mx in Moody's Chart)
Coefficient of Horizontal Coefficient of Horizontal Coefficient of Horizontal
Moment for 2b/3 uiformly Moment for b/3 uiformly Moment for 0.333b uiformly
varying load (refer Fig. 14 of varying load (refer Fig. 15 of varying load (by linear
Location Moody's Chart) Moody's Chart) interpolation)
At At At At At At
At a/b = 0.583
a/b = 0.5 a/b = 0.75 a/b=0.583 a/b = 0.5 a/b = 0.75 a/b=0.583
x/a = 0, y/b = 0 0 0 0 0 0 0 0
x/a = 0, y/b = 0.2 0.0119 0.0109 0.0116 0.005 0.0041 0.0047 0.0047
At Support
x/a = 0, y/b = 0.4 0.0163 0.0176 0.0167 0.0035 0.0038 0.0036 0.0036
x/a = 0, y/b = 0.6 0.0112 0.0142 0.0122 0.0018 0.0024 0.0020 0.0020
x/a = 0, y/b = 0.8 0.0048 0.0072 0.0056 0.0007 0.0011 0.0008 0.0008
y/b = 1 0 0 0 0 0 0 0
x/a = 1, y/b = 0 0.0047 0.0067 0.0054 0.002 0.0025 0.0022 0.0022
x/a = 1, y/b = 0.2 -0.004 -0.0024 -0.0035 -0.0015 -0.001 -0.0013 -0.0013
At Span
x/a = 1, y/b = 0.4 -0.007 -0.0062 -0.0067 -0.0015 -0.0012 -0.0014 -0.0014
x/a = 1, y/b = 0.6 -0.0053 -0.0056 -0.0054 -0.0009 -0.001 -0.0009 -0.0009
x/a = 1, y/b = 0.8 -0.0025 -0.003 -0.0027 -0.0004 -0.0005 -0.0004 -0.0004
y/b = 1 0 0 0 0 0 0 0
Table of Vertical Moment Coefficients for Uniformly Varying Load (My in Moody's Chart)
Coefficient of Vertical
Coefficient of Vertical Moment Coefficient of Vertical Moment
Moment for 0.333b uiformly
for 2b/3 uiformly varying load for b/3 uiformly varying load
varying load (by linear
Location (refer Fig. 14 of Moody's Chart) (refer Fig. 15 of Moody's Chart)
interpolation)
At At At At At At
At a/b = 0.583
a/b = 0.5 a/b = 0.75 a/b=0.583 a/b = 0.5 a/b = 0.75 a/b=0.583
x/a = 0, y/b = 0 0 0 0 0 0 0 0
x/a = 0.2, y/b = 0 0.0056 0.0106 0.0073 0.0031 0.0052 0.0038 0.0038
At Support
x/a = 0.4, y/b = 0 0.0129 0.0214 0.0157 0.0063 0.0091 0.0072 0.0072
x/a = 0.6, y/b = 0 0.0187 0.0285 0.0220 0.0085 0.0111 0.0094 0.0094
x/a = 0.8, y/b = 0 0.0222 0.0323 0.0256 0.0097 0.0121 0.0105 0.0105
x/a = 1, y/b = 0 0.0234 0.0335 0.0268 0.0101 0.0124 0.0109 0.0109
x/a = 1, y/b = 0 0.0234 0.0335 0.0268 0.0101 0.0124 0.0109 0.0109
x/a = 1, y/b = 0.2 -0.0056 -0.0043 -0.0052 -0.0033 -0.0032 -0.0033 -0.0033
At Span
x/a = 1, y/b = 0.4 -0.0078 -0.0125 -0.0094 -0.0013 -0.0023 -0.0016 -0.0016
x/a = 1, y/b = 0.6 -0.0031 -0.0082 -0.0048 -0.0001 -0.001 -0.0004 -0.0004
x/a = 1, y/b = 0.8 -0.0002 -0.0031 -0.0012 0.0001 -0.0003 0.0000 0.0000
At Span
Calculation No.: CV/PHSNH/001, Revision - R1
Page No._______
Job No.: L167000
x/a = 1, y/b = 1 0 0 0 0 0 0 0
At At At At At At
At a/b = 0.583
a/b = 0.5 a/b = 0.75 a/b=0.583 a/b = 0.5 a/b = 0.75 a/b=0.583
x/a = 0, y/b = 0 0 0 0 0 0 0 0
x/a = 0, y/b = 0.2 0.0226 0.0224 0.0225 0.0131 0.0113 0.0125 0.0125
At Support
x/a = 0, y/b = 0.4 0.0425 0.0472 0.0441 0.0124 0.0132 0.0127 0.0127
x/a = 0, y/b = 0.6 0.039 0.0472 0.0417 0.0065 0.0088 0.0073 0.0073
x/a = 0, y/b = 0.8 0.0184 0.0255 0.0208 0.0026 0.0042 0.0031 0.0031
y/b = 1 0 0 0 0 0 0 0
x/a = 1, y/b = 0 0.0091 0.0148 0.0110 0.0049 0.0065 0.0054 0.0054
x/a = 1, y/b = 0.2 -0.0082 -0.0045 -0.0070 -0.0043 -0.0027 -0.0038 -0.0038
At Span
x/a = 1, y/b = 0.4 -0.0187 -0.0172 -0.0182 -0.0053 -0.0045 -0.0050 -0.0050
x/a = 1, y/b = 0.6 -0.018 -0.0187 -0.0182 -0.0033 -0.0035 -0.0034 -0.0034
x/a = 1, y/b = 0.8 -0.0091 -0.0105 -0.0096 -0.0014 -0.0019 -0.0016 -0.0016
y/b = 1 0 0 0 0 0 0 0
Table of Vertical Moment Coefficients for Uniform Load (My in Moody's Chart)
At At At At At At
At a/b = 0.583
a/b = 0.5 a/b = 0.75 a/b=0.583 a/b = 0.5 a/b = 0.75 a/b=0.583
x/a = 0, y/b = 0 0 0 0 0 0 0 0
x/a = 0.2, y/b = 0 0.0091 0.019 0.0124 0.0066 0.0012 0.0048 0.0048
At Support
x/a = 0.4, y/b = 0 0.0229 0.0427 0.0295 0.0144 0.0222 0.0170 0.0170
x/a = 0.6, y/b = 0 0.0351 0.0605 0.0436 0.0202 0.0284 0.0229 0.0229
x/a = 0.8, y/b = 0 0.0429 0.0708 0.0522 0.0236 0.0314 0.0262 0.0262
x/a = 1, y/b = 0 0.0456 0.0741 0.0551 0.0246 0.0323 0.0272 0.0272
x/a = 1, y/b = 0 0.0456 0.0741 0.0551 0.0246 0.0323 0.0272 0.0272
x/a = 1, y/b = 0.2 -0.006 -0.0012 -0.0044 -0.0084 -0.0078 -0.0082 -0.0082
At Span
x/a = 1, y/b = 0.4 -0.019 -0.0318 -0.0233 -0.0055 -0.0091 -0.0067 -0.0067
x/a = 1, y/b = 0.6 -0.0155 -0.0322 -0.0211 -0.0007 -0.004 -0.0018 -0.0018
x/a = 1, y/b = 0.8 -0.0034 -0.0135 -0.0068 0.0003 -0.0014 -0.0003 -0.0003
x/a = 1, y/b = 1 0 0 0 0 0 0 0
F I X E D
F I X E D
b
Depth of water in pit = h = 4.50 m considering full height
\ h / b = 1.000
i.e., between h / b = 0.667 & 1.000 F I X E D
X
Support Condition : Fixed at bottom & sides, hinged at top.
Calculation of moment coefficients for uniformly varying load from Moody's Charts
Sign convention : + ve moment causes tension at the face on which load is acting
Table of Horizontal Moment Coefficients for Uniformly Varying Load (Mx in Moody's Chart)
Coefficient of Horizontal Coefficient of Horizontal Coefficient of Horizontal
Moment for uiformly varying Moment for 2b/3 uiformly Moment for 1b uiformly
load (refer Fig. 13 of Moody's varying load (refer Fig. 14 of varying load (by linear
Location Chart) Moody's Chart) interpolation)
At At At At At At
At a/b = 0.778
a/b = 0.75 a/b = 1 a/b=0.778 a/b = a/b = 1 a/b=0.778
x/a = 0, y/b = 0 0 0 0 0.75
0 0 0 0
x/a = 0, y/b = 0.2 0.0159 0.0155 0.0159 0.0119 0.0109 0.0118 0.0159
At Support
x/a = 0, y/b = 0.4 0.0269 0.0302 0.0273 0.0163 0.0176 0.0164 0.0273
x/a = 0, y/b = 0.6 0.0245 0.0301 0.0251 0.0112 0.0142 0.0115 0.0251
x/a = 0, y/b = 0.8 0.0139 0.0181 0.0144 0.0048 0.0072 0.0051 0.0144
y/b = 1 0 0 0 0 0 0 0
x/a = 1, y/b = 0 0.0064 0.0101 0.0068 0.0047 0.0067 0.0049 0.0068
x/a = 1, y/b = 0.2 -0.0057 -0.0032 -0.0054 -0.004 -0.0024 -0.0038 -0.0054
At Span
x/a = 1, y/b = 0.4 -0.0119 -0.0109 -0.0118 -0.007 -0.0062 -0.0069 -0.0118
x/a = 1, y/b = 0.6 -0.0114 -0.0119 -0.0115 -0.0053 -0.0056 -0.0053 -0.0115
x/a = 1, y/b = 0.8 -0.0067 -0.0074 -0.0068 -0.0025 -0.003 -0.0026 -0.0068
y/b = 1 0 0 0 0 0 0 0
Table of Vertical Moment Coefficients for Uniformly Varying Load (My in Moody's Chart)
Coefficient of Vertical
Coefficient of Vertical Moment Coefficient of Vertical Moment
Moment for 1b uiformly
for uiformly varying load (refer for 2b/3 uiformly varying load
varying load (by linear
Location Fig. 13 of Moody's Chart) (refer Fig. 14 of Moody's Chart)
interpolation)
At At At At At At
At a/b = 0.778
a/b = 0.75 a/b = 1 a/b=0.778 a/b = a/b = 1 a/b=0.778
x/a = 0, y/b = 0 0 0 0 0.75
0 0 0 0
x/a = 0.2, y/b = 0 0.0068 0.0138 0.0076 0.0056 0.0106 0.0062 0.0076
At Support
x/a = 0.4, y/b = 0 0.0167 0.0299 0.0182 0.0129 0.0214 0.0138 0.0182
x/a = 0.6, y/b = 0 0.025 0.0417 0.0269 0.0187 0.0285 0.0198 0.0269
x/a = 0.8, y/b = 0 0.0302 0.0484 0.0322 0.0222 0.0323 0.0233 0.0322
x/a = 1, y/b = 0 0.032 0.0505 0.0341 0.0234 0.0335 0.0245 0.0341
x/a = 1, y/b = 0 0.032 0.0505 0.0341 0.0234 0.0335 0.0245 0.0341
x/a = 1, y/b = 0.2 -0.0052 -0.0021 -0.0049 -0.0056 -0.0043 -0.0055 -0.0049
At Span
x/a = 1, y/b = 0.4 -0.0116 -0.0198 -0.0125 -0.0078 -0.0125 -0.0083 -0.0125
x/a = 1, y/b = 0.6 -0.0089 -0.0196 -0.0101 -0.0031 -0.0082 -0.0037 -0.0101
x/a = 1, y/b = 0.8 -0.0044 -0.0013 -0.0041 -0.0002 -0.0031 -0.0005 -0.0041
At Span
Calculation No.: CV/PHSNH/001, Revision - R1
Page No._______
Job No.: L167000
x/a = 1, y/b = 1 0 0 0 0 0 0 0
Calculation of Moments
Moment = (coefficient) × (pb²)
Design Moments
Max Horizontal Moment causing tension at Max Vertical Moment causing tension at
Variation
Outer Face Inner Face Outer Face Inner Face
in height
Tm/m Tm/m Tm/m Tm/m
y/b = 0 0.312 -0.652 1.562 -3.258
y/b = 0.2 0.706 -1.517 0.465 -0.471
y/b = 0.4 1.128 -2.609 1.197 -0.341
y/b = 0.6 1.096 -2.404 0.965 -0.090
y/b = 0.8 0.649 -1.375 0.388 -0.012
y/b = 1 0 0 0 0
Permissible stresses
6M
& Doverall reqd = scbt . b
Vertical Reinforcements
Outer Face :
Provide 12 @ 200 c/c (= 5.65 cm²/m) from base to top
Inner Face :
Provide 16 @ 200 c/c (= 10.05 cm²/m) from base up to 2.0 m above base
& 12 @ 200 c/c (= 5.65 cm²/m) from 2.0 m above base to top
Horizontal Reinforcements
Outer Face :
Provide 12 @ 200 c/c (= 5.65 cm²/m)
Inner Face :
Provide 12 @ 200 c/c (= 5.65 cm²/m) from base up to 0.8 m above base
16 @ 200 c/c (= 10.05 cm²/m) from 0.8 m above base up to 3.6 m above base
Calculation No.: CV/PHSNH/001, Revision - R1
Page No._______
Job No.: L167000
& 12 @ 200 c/c (= 5.65 cm²/m) from 3.6 m above base to top
Calculation No.: CV/PHSNH/001, Revision - R1
Page No._______
Job No.: L167000
Calculation No.: CV/PHSNH/001, Revision - R1
Page No._______
Job No.: L167000
Design Moments
Max Horizontal Moment causing tension at Max Vertical Moment causing tension at
Variation in height Outer Face Inner Face Outer Face Inner Face
Tm/m Tm/m Tm/m Tm/m
y/b = 0 0.312 -0.652 1.562 -3.258
y/b = 0.2 0.706 -1.517 0.465 -0.471
y/b = 0.4 1.128 -2.609 1.197 -0.341
y/b = 0.6 1.096 -2.404 0.965 -0.090
y/b = 0.8 0.649 -1.375 0.388 -0.012
y/b = 1 0 0 0 0
Permissible stresses
M
& d effective reqd =
Q.b
where, Q = ½ ´ scbc ´ j ´ k
j = lever arm factor = 1 – k/3
m.scbc
k= neutral axis depth factor =
m.scbc + sst
280
m= modular ratio =
3scbc
For sst = 1500 kg/cm², k= 0.384 j= 0.872 Q= 1.422 N/mm²
For sst = 1900 kg/cm², k= 0.329 j= 0.890 Q= 1.246 N/mm²
Variation in height (from base Max Moment Overall thickness reqd Thickness provided
Remarks
to top) T-m/m mm mm
y/b = 0 3.258 194.70 400 OK
y/b = 0.2 1.517 143.33 370 OK
y/b = 0.4 2.609 177.68 340 OK
y/b = 0.6 2.404 171.88 310 OK
y/b = 0.8 1.375 138.02 280 OK
y/b = 1 0 0 250 OK
M
Ast = sst.j.d
Vertical Reinforcements
Outer Face :
Provide 12 @ 200 c/c (= 5.65 cm²/m) from base to top
Inner Face :
Provide 16 @ 200 c/c (= 10.05 cm²/m) from base up to 2.0 m above base
& 12 @ 200 c/c (= 5.65 cm²/m) from 2.0 m above base to top
Horizontal Reinforcements
Outer Face :
Provide 12 @ 200 c/c (= 5.65 cm²/m)
Calculation No.: CV/PHSNH/001, Revision - R1
Page No._______
Job No.: L167000
Inner Face :
Provide 12 @ 200 c/c (= 5.65 cm²/m) from base up to 0.8 m above base
16 @ 200 c/c (= 10.05 cm²/m) from 0.8 m above base up to 3.6 m above base
& 12 @ 200 c/c (= 5.65 cm²/m) from 3.6 m above base to top
Calculation No.: CV/PHSNH/001, Revision - R1
Page No._______
Job No.: L167000