You are on page 1of 2

TASK SHEET 4.

1
AC and DC Voltage Measurement

Task Sheet 4.1


Measure AC and DC Voltage Measurement

Performance Objective:
Given the necessary materials and tools, you will be able to use the VOM
accurately without damage on the tester within the specified time.

Supplies and Materials:


1. Basic Hand Tools
2. Reference Materials

Tools and Equipment


1. Multi-Tester
2. Battery
3. Regulated Power Supply

Procedures:

1. Prepare all materials, tools and equipment needed.


2. Read and analyze this task sheet.
3. Get an AC/DC power source
4. Set the VOM Setting on desired range.
5. Calibrate the meter
6. Read and Interpret the meter reading
7. Record the reading on the answer sheet provided
8. Switch off the tester after use.
9. Store the tools, materials and equipment after use.
Performance Criteria Checklist 4.1

Name of Trainee _______________________________ Date______________

Did the candidate YES NO

1. Prepare all materials, tools and equipment needed.

2. Read and analyze this task sheet.

3. Get an AC/DC power source

4. Set the VOM Setting on desired range.

5. Calibrate the meter

6. Read and Interpret the meter reading

7. Record the reading on the answer sheet provided

8. Switch off the tester after use.

9. Store the tools, materials and equipment after use.

______________________________ __________________
Name and Signature of Trainee Date

You might also like