You are on page 1of 16

HOJA DE METRADOS

Obra HOSPITAL SAN FRANCISCO


Subppto ESTRUCTURAS
Cliente GOBIERNO REGIONAL AYACUCHO FECHA: 12/08/2016
Ubicacion AYNA-LA MAR-AYACUCHO

MEDIDAS
ITEM DESCRIPCION UND. CANT. REP. PARCIAL TOTAL
B (m) L (m) H (m)
02.03.04 COLUMNAS

02.03.04.01 COLUMNAS - CONCRETO PREMEZCLADO, f'c=210kgf/cm³

Sotano
C-02 m3 4 0.70 0.70 2.45 4.80
C-03 m3 13 0.70 0.70 2.45 15.61
C-04 m3 2 0.50 1.00 2.45 2.45
C-05 m3 4 0.55 0.55 2.45 2.96
C-06 m3 2 0.50 0.50 2.45 1.23
C-07 m3 5 0.70 0.70 2.45 6.00
C-08 m3 14 0.70 0.70 2.45 16.81
C-09 m3 2 0.50 1.00 2.45 2.45
C-10 m3 1 0.70 0.70 2.45 1.20
C-11 m3 4 0.60 1.00 2.45 5.88
C-12 m3 3 0.60 1.00 2.45 4.41
C-13 m3 1 0.60 1.00 2.45 1.47
Primer Piso
C-01 m3 2 1.00 0.60 4.40 5.28
C-02 m3 7 0.70 0.70 4.40 15.09
C-03 m3 13 0.70 0.70 4.40 28.03
C-04 m3 2 0.50 1.00 4.40 4.40
C-05 m3 4 0.55 0.55 4.40 5.32
C-06 m3 2 0.50 0.50 4.40 2.20
C-07 m3 7 0.70 0.70 4.40 15.09
C-08 m3 14 0.70 0.70 4.40 30.18
C-09 m3 2 0.50 1.00 4.40 4.40
C-10 m3 1 0.70 0.70 4.40 2.16
C-11 m3 6 0.60 1.00 4.40 15.84
C-12 m3 4 0.60 1.00 4.40 10.56
C-13 m3 1 0.60 1.00 4.40 2.64
C-14 m3 2 0.60 0.60 4.40 3.17
C-15 m3 1 0.29 4.40 1.28
C-16 m3 8 0.40 0.60 4.40 14.08
C-17 m3 1 0.53 4.40 2.32
C-18 m3 1 0.40 0.40 4.40 1.76
C-19 m3 2 0.30 0.40 4.40 2.64
C-20 m3 1 0.30 0.40 4.40 1.32
C-21 m3 3 0.25 0.30 4.40 3.30
C-22 m3 7 0.15 0.25 4.40 4.62 175.68
Segundo Piso
C-01 m3 2 1.00 0.60 4.40 5.28
C-02 m3 7 0.70 0.70 4.40 15.09
C-03 m3 13 0.70 0.70 4.40 28.03
C-04 m3 2 0.50 1.00 4.40 4.40
C-05 m3 4 0.55 0.55 4.40 5.32
C-06 m3 2 0.50 0.50 4.40 2.20
C-07 m3 7 0.70 0.70 4.40 15.09
C-08 m3 14 0.70 0.70 4.40 30.18
C-09 m3 2 0.50 1.00 4.40 4.40
C-10 m3 1 0.70 0.70 4.40 2.16
C-11 m3 6 0.60 1.00 4.40 15.84
C-12 m3 4 0.60 1.00 4.40 10.56
C-13 m3 1 0.60 1.00 4.40 2.64 141.20
Tercer Piso
HOJA DE METRADOS

Obra HOSPITAL SAN FRANCISCO


Subppto ESTRUCTURAS
Cliente GOBIERNO REGIONAL AYACUCHO FECHA: 12/08/2016
Ubicacion AYNA-LA MAR-AYACUCHO

MEDIDAS
ITEM DESCRIPCION UND. CANT. REP. PARCIAL TOTAL
B (m) L (m) H (m)
C-01 m3 2 1.00 0.60 4.40 5.28
C-02 m3 7 0.70 0.70 4.40 15.09
C-03 m3 13 0.70 0.70 4.40 28.03
C-04 m3 2 0.50 1.00 4.40 4.40
C-05 m3 4 0.55 0.55 4.40 5.32
C-06 m3 2 0.50 0.50 4.40 2.20
C-07 m3 7 0.70 0.70 4.40 15.09
C-08 m3 14 0.70 0.70 4.40 30.18
C-09 m3 2 0.50 1.00 4.40 4.40
C-10 m3 1 0.70 0.70 4.40 2.16
C-11 m3 6 0.60 1.00 4.40 15.84
C-12 m3 4 0.60 1.00 4.40 10.56
C-13 m3 1 0.60 1.00 4.40 2.64 141.20
Cuarto Piso
C-01 m3 2 1.00 0.60 4.40 5.28
C-02 m3 7 0.70 0.70 4.40 15.09
C-03 m3 13 0.70 0.70 4.40 28.03
C-04 m3 2 0.50 1.00 4.40 4.40
C-05 m3 4 0.55 0.55 4.40 5.32
C-06 m3 2 0.50 0.50 4.40 2.20
C-07 m3 7 0.70 0.70 3.40 11.66
C-08 m3 14 0.70 0.70 4.40 30.18
C-09 m3 2 0.50 1.00 4.40 4.40
C-10 m3 1 0.70 0.70 4.40 2.16
C-11 m3 6 0.60 1.00 4.40 15.84
C-12 m3 4 0.60 1.00 4.50 10.80
C-13 m3 1 0.60 1.00 4.40 2.64
C adicional 1 50x50 m3 1 0.50 0.50 3.40 0.85
C adicional 2 50x50 m3 1 0.50 0.50 4.50 1.13 139.98
Quinto Piso
C-05 m3 4 0.55 0.55 4.20 5.08
C-06 m3 2 0.50 0.50 4.20 2.10
C-07 m3 7 0.70 0.70 4.20 14.41 21.59
Dados Sotano
C-02 m3 4 1.00 1.00 0.75 3.00
C-03 m3 13 1.00 1.00 0.75 9.75
C-04 m3 2 1.00 1.00 0.75 1.50
C-05 m3 4 1.00 1.00 0.75 3.00
C-06 m3 2 1.00 1.00 0.75 1.50
C-07 m3 5 1.00 1.00 0.75 3.75
C-08 m3 15 1.00 1.00 0.75 11.25
C-09 m3 2 1.00 1.00 0.75 1.50
C-10 m3 1 1.00 1.00 0.75 0.75
C-11 m3 4 1.00 1.00 0.75 3.00
C-12 m3 3 1.00 1.00 0.75 2.25
C-13 m3 1 1.00 1.00 0.75 0.75
C-14 m3 2 1.00 1.00 0.75 1.50 43.50
Dados Zapata
C-01 m3 2 1.00 1.00 0.40 0.80
C-02 m3 3 1.00 1.00 0.40 1.20
C-07 m3 2 1.00 1.00 0.40 0.80
C-11 m3 2 1.00 1.00 0.40 0.80
C-12 m3 1 1.00 1.00 0.40 0.40 4.00
Dados Primer Piso
C-01 m3 2 1.00 1.00 0.90 1.80
C-02 m3 7 1.00 1.00 0.90 6.30
HOJA DE METRADOS

Obra HOSPITAL SAN FRANCISCO


Subppto ESTRUCTURAS
Cliente GOBIERNO REGIONAL AYACUCHO FECHA: 12/08/2016
Ubicacion AYNA-LA MAR-AYACUCHO

MEDIDAS
ITEM DESCRIPCION UND. CANT. REP. PARCIAL TOTAL
B (m) L (m) H (m)
C-03 m3 13 1.00 1.00 0.90 11.70
C-04 m3 2 1.00 1.00 0.90 1.80
C-05 m3 4 1.00 1.00 0.90 3.60
C-06 m3 2 1.00 1.00 0.90 1.80
C-07 m3 7 1.00 1.00 0.90 6.30
C-08 m3 15 1.00 1.00 0.90 13.50
C-09 m3 2 1.00 1.00 0.90 1.80
C-10 m3 1 1.00 1.00 0.90 0.90
C-11 m3 6 1.00 1.00 0.90 5.40
C-12 m3 4 1.00 1.00 0.90 3.60
C-13 m3 1 1.00 1.00 0.90 0.90
C-14 m3 2 1.00 1.00 0.90 1.80 61.20

TOTAL (m³) 728.34

02.03.04.02 COLUMNAS - ENCOFRADO Y DESENCOFRADO

Sotano
C-02 m2 4 0.70 0.70 2.45 27.44
C-03 m2 13 0.70 0.70 2.45 89.18
C-04 m2 2 0.50 1.00 2.45 14.70
C-05 m2 4 0.55 0.55 2.45 21.56
C-06 m2 2 0.50 0.50 2.45 9.80
C-07 m2 5 0.70 0.70 2.45 34.30
C-08 m2 14 0.70 0.70 2.45 96.04
C-09 m2 2 0.50 1.00 2.45 14.70
C-10 m2 1 0.70 0.70 2.45 6.86
C-11 m2 4 0.60 1.00 2.45 31.36
C-12 m2 3 0.60 1.00 2.45 23.52
C-13 m2 1 0.60 1.00 2.45 7.84
Primer Piso
C-01 m2 2 1.00 0.60 3.60 23.04
C-02 m2 7 0.70 0.70 3.60 70.56
C-03 m2 13 0.70 0.70 3.60 131.04
C-04 m2 2 0.50 1.00 3.60 21.60
C-05 m2 4 0.55 0.55 3.60 31.68
C-06 m2 2 0.50 0.50 3.60 14.40
C-07 m2 7 0.70 0.70 3.80 74.48
C-08 m2 14 0.70 0.70 3.80 148.96
C-09 m2 2 0.50 1.00 3.60 21.60
C-10 m2 1 0.70 0.70 3.60 10.08
C-11 m2 6 0.60 1.00 3.60 69.12
C-12 m2 4 0.60 1.00 3.60 46.08
C-13 m2 1 0.60 1.00 3.60 11.52
C-14 m2 2 0.60 0.60 3.60 17.28
C-15 m2 1 2.53 3.60 9.11
C-16 m2 8 0.40 0.60 3.60 57.60
C-17 m2 1 3.93 3.60 14.15
C-18 m2 1 0.40 0.40 3.60 5.76
C-19 m2 2 0.30 0.40 3.60 10.08
C-20 m2 1 0.30 0.40 3.60 5.04
C-21 m2 3 0.25 0.30 3.60 11.88
C-22 m2 7 0.15 0.25 3.60 20.16 825.22
Segundo Piso
C-01 m2 2 1.00 0.60 3.60 23.04
C-02 m2 7 0.70 0.70 3.60 70.56
C-03 m2 13 0.70 0.70 3.60 131.04
HOJA DE METRADOS

Obra HOSPITAL SAN FRANCISCO


Subppto ESTRUCTURAS
Cliente GOBIERNO REGIONAL AYACUCHO FECHA: 12/08/2016
Ubicacion AYNA-LA MAR-AYACUCHO

MEDIDAS
ITEM DESCRIPCION UND. CANT. REP. PARCIAL TOTAL
B (m) L (m) H (m)
C-04 m2 2 0.50 1.00 3.60 21.60
C-05 m2 4 0.55 0.55 3.60 31.68
C-06 m2 2 0.50 0.50 3.60 14.40
C-07 m2 7 0.70 0.70 3.80 74.48
C-08 m2 14 0.70 0.70 3.80 148.96
C-09 m2 2 0.50 1.00 3.60 21.60
C-10 m2 1 0.70 0.70 3.60 10.08
C-11 m2 6 0.60 1.00 3.60 69.12
C-12 m2 4 0.60 1.00 3.60 46.08
C-13 m2 1 0.60 1.00 3.60 11.52 674.16
Tercer Piso
C-01 m2 2 1.00 0.60 3.60 23.04
C-02 m2 7 0.70 0.70 3.60 70.56
C-03 m2 13 0.70 0.70 3.60 131.04
C-04 m2 2 0.50 1.00 3.60 21.60
C-05 m2 4 0.55 0.55 3.60 31.68
C-06 m2 2 0.50 0.50 3.60 14.40
C-07 m2 7 0.70 0.70 3.80 74.48
C-08 m2 14 0.70 0.70 3.80 148.96
C-09 m2 2 0.50 1.00 3.60 21.60
C-10 m2 1 0.70 0.70 3.60 10.08
C-11 m2 6 0.60 1.00 3.60 69.12
C-12 m2 4 0.60 1.00 3.60 46.08
C-13 m2 1 0.60 1.00 3.60 11.52 674.16
Cuarto Piso
C-01 m2 2 1.00 0.60 3.60 23.04
C-02 m2 7 0.70 0.70 3.60 70.56
C-03 m2 13 0.70 0.70 3.60 131.04
C-04 m2 2 0.50 1.00 3.60 21.60
C-05 m2 4 0.55 0.55 3.60 31.68
C-06 m2 2 0.50 0.50 3.60 14.40
C-07 m2 7 0.70 0.70 3.40 66.64
C-08 m2 14 0.70 0.70 3.80 148.96
C-09 m2 2 0.50 1.00 3.60 21.60
C-10 m2 1 0.70 0.70 3.60 10.08
C-11 m2 6 0.60 1.00 3.60 69.12
C-12 m2 4 0.60 1.00 4.50 57.60
C-13 m2 1 0.60 1.00 3.60 11.52
C adicional 1 50x50 m3 1 0.50 0.50 3.40 6.80
C adicional 2 50x50 m3 1 0.50 0.50 4.50 9.00 693.64
Quinto Piso
C-05 m2 4 0.55 0.55 3.60 31.68
C-06 m2 2 0.50 0.50 3.60 14.40
C-07 m2 7 0.70 0.70 3.80 74.48 120.56
Dados Sotano
C-02 m2 4 1.00 1.00 0.75 12.00
C-03 m2 13 1.00 1.00 0.75 39.00
C-04 m2 2 1.00 1.00 0.75 6.00
C-05 m2 4 1.00 1.00 0.75 12.00
C-06 m2 2 1.00 1.00 0.75 6.00
C-07 m2 5 1.00 1.00 0.75 15.00
C-08 m2 14 1.00 1.00 0.75 42.00
C-09 m2 2 1.00 1.00 0.75 6.00
C-10 m2 1 1.00 1.00 0.75 3.00
C-11 m2 4 1.00 1.00 0.75 12.00
C-12 m2 3 1.00 1.00 0.75 9.00
C-13 m2 1 1.00 1.00 0.75 3.00
HOJA DE METRADOS

Obra HOSPITAL SAN FRANCISCO


Subppto ESTRUCTURAS
Cliente GOBIERNO REGIONAL AYACUCHO FECHA: 12/08/2016
Ubicacion AYNA-LA MAR-AYACUCHO

MEDIDAS
ITEM DESCRIPCION UND. CANT. REP. PARCIAL TOTAL
B (m) L (m) H (m)
C-14 m2 2 1.00 1.00 0.75 6.00 171.00
Dados Zapata
C-01 m3 2 1.00 1.00 0.40 3.20
C-02 m3 3 1.00 1.00 0.40 4.80
C-07 m3 2 1.00 1.00 0.40 3.20
C-11 m3 2 1.00 1.00 0.40 3.20
C-12 m3 1 1.00 1.00 0.40 1.60 16.00
Dados Primer Piso
C-01 m2 2 1.00 1.00 0.90 7.20
C-02 m2 7 1.00 1.00 0.90 25.20
C-03 m2 13 1.00 1.00 0.90 46.80
C-04 m2 2 1.00 1.00 0.90 7.20
C-05 m2 4 1.00 1.00 0.90 14.40
C-06 m2 2 1.00 1.00 0.90 7.20
C-07 m2 7 1.00 1.00 0.90 25.20
C-08 m2 15 1.00 1.00 0.90 54.00
C-09 m2 2 1.00 1.00 0.90 7.20
C-10 m2 1 1.00 1.00 0.90 3.60
C-11 m2 6 1.00 1.00 0.90 21.60
C-12 m2 4 1.00 1.00 0.90 14.40
C-13 m2 1 1.00 1.00 0.90 3.60
C-14 m2 2 1.00 1.00 0.90 7.20 244.80
TOTAL (m²) 3419.54
HOJA DE METRADOS

Obra HOSPITAL SAN FRANCISCO


Subppto ESTRUCTURAS
Cliente GOBIERNO REGIONAL AYACUCHO FECHA: 12/08/2016
Ubicación AYNA-LA MAR-AYACUCHO

Ø NUM. NUM. LONGITUD X PIEZA (m)


ITEM DESCRIPCION TIP.
(in) ELEM. PIEZA a b c d TOTAL 3/8" 1/2" 5/8" 3/4" 1"

02.03.04.03 COLUMNAS - ACERO DE REFUERZO, fy=4200kgf/cm²

Sotano
C-02 Acero A 3/4 4 8 3.35 1.00 0.95 169.60 169.60
A 1 4 10 3.35 1.10 1.05 220.00 220.00

Estribo B 3/8 4 28 2.20 2.00 0.20 582.40 582.40


B 3/8 4 28 2.07 2.00 0.20 553.28 553.28

C-03 Acero A 3/4 13 8 3.35 1.00 0.95 551.20 551.20


A 1 13 10 3.35 1.10 1.05 715.00 715.00

Estribo B 3/8 13 28 2.20 2.00 0.20 1892.80 1,892.80


B 3/8 13 28 2.07 2.00 0.20 1798.16 1,798.16

C-04 Acero A 3/4 2 6 3.35 1.00 0.95 63.60 63.60


A 1 2 12 3.35 1.10 1.05 132.00 132.00

Estribo B 3/8 2 30 2.00 2.00 0.20 288.00 288.00


B 3/8 2 30 2.35 2.00 0.20 330.00 330.00

C-05 Acero A 1 4 20 3.35 1.10 1.05 440.00 440.00

Estribo B 3/8 4 27 1.54 4.00 0.20 838.08 838.08

C-06 Acero A 1 2 12 3.35 1.10 1.05 132.00 132.00

Estribo B 3/8 2 27 1.54 4.00 0.20 419.04 419.04

C-07 Acero A 3/4 4 20 3.35 1.00 0.95 17.60 494.40 494.40

Estribo B 3/8 4 28 2.07 4.00 0.20 1106.56 1,106.56

C-08 Acero A 1 15 24 3.35 1.10 1.05 27.20 2388.00 2,388.00

Estribo B 3/8 15 28 2.07 4.00 0.20 4149.60 4,149.60

C-09 Acero A 3/4 2 12 3.35 1.00 0.95 2.40 132.00 132.00


HOJA DE METRADOS

Obra HOSPITAL SAN FRANCISCO


Subppto ESTRUCTURAS
Cliente GOBIERNO REGIONAL AYACUCHO FECHA: 12/08/2016
Ubicación AYNA-LA MAR-AYACUCHO

Ø NUM. NUM. LONGITUD X PIEZA (m)


ITEM DESCRIPCION TIP.
(in) ELEM. PIEZA a b c d TOTAL 3/8" 1/2" 5/8" 3/4" 1"
A 1 2 16 3.35 1.10 1.05 4.00 184.00 184.00

Estribo B 3/8 2 30 2.35 2.00 0.20 330.00 330.00


B 3/8 2 30 2.00 2.00 0.20 288.00 288.00

C-10 Acero A 3/4 1 8 3.35 1.00 0.95 2.40 44.80 44.80


A 1 1 16 3.35 1.10 1.05 4.00 92.00 92.00

Estribo B 3/8 1 30 2.07 4.00 0.20 296.40 296.40

C-11 Acero A 3/4 4 16 3.35 1.00 0.95 2.40 348.80 348.80


A 1 4 12 3.35 1.10 1.05 4.00 280.00 280.00

Estribo B 3/8 4 30 2.55 2.00 0.20 708.00 708.00


B 3/8 4 30 2.25 2.00 0.20 636.00 636.00

C-12 Acero A 3/4 3 10 3.35 1.00 0.95 2.40 166.20 166.20


A 1 3 18 3.35 1.10 1.05 4.00 309.00 309.00

Estribo B 3/8 3 30 2.70 2.00 0.20 558.00 558.00


B 3/8 3 30 2.20 2.00 0.20 468.00 468.00

C-13 Acero A 1 1 36 3.35 1.10 1.05 2.40 200.40 200.40

Estribo B 3/8 1 30 2.55 2.00 0.20 177.00 177.00


B 3/8 1 30 2.25 2.00 0.20 159.00 159.00

Primer Piso
C-01 Acero A 3/4 2 8 5.10 0.30 0.30 91.20 91.20
A 1 2 8 5.10 0.40 0.40 94.40 94.40

Estribo B 3/8 2 39 2.20 2.00 0.20 405.60 405.60


B 3/8 2 39 2.07 2.00 0.20 385.32 385.32

C-02 Acero A 3/4 7 8 5.10 0.30 0.30 319.20 319.20


A 1 7 8 5.10 0.40 0.40 330.40 330.40

Estribo B 3/8 7 35 2.20 2.00 0.20 1274.00 1,274.00


B 3/8 7 35 2.07 2.00 0.20 1210.30 1,210.30

C-03 Acero A 3/4 13 10 5.10 0.30 0.30 741.00 741.00


A 1 13 8 5.10 0.40 0.40 613.60 613.60

Estribo B 3/8 13 35 2.20 2.00 0.20 2366.00 2,366.00


B 3/8 13 35 2.07 2.00 0.20 2247.70 2,247.70
HOJA DE METRADOS

Obra HOSPITAL SAN FRANCISCO


Subppto ESTRUCTURAS
Cliente GOBIERNO REGIONAL AYACUCHO FECHA: 12/08/2016
Ubicación AYNA-LA MAR-AYACUCHO

Ø NUM. NUM. LONGITUD X PIEZA (m)


ITEM DESCRIPCION TIP.
(in) ELEM. PIEZA a b c d TOTAL 3/8" 1/2" 5/8" 3/4" 1"
C-04 Acero A 3/4 2 8 5.10 0.30 0.30 91.20 91.20
A 1 2 8 5.10 0.40 0.40 94.40 94.40

Estribo B 3/8 2 39 2.00 2.00 0.20 374.40 374.40


B 3/8 2 39 2.35 2.00 0.20 429.00 429.00

C-05 Acero A 1 4 20 5.10 0.40 0.40 472.00 472.00

Estribo B 3/8 4 35 1.54 4.00 0.20 1086.40 1,086.40

C-06 Acero A 1 2 12 5.10 0.40 0.40 141.60 141.60

Estribo B 3/8 2 35 1.54 4.00 0.20 543.20 543.20

C-07 Acero A 3/4 7 16 5.10 0.30 0.30 638.40 638.40

Estribo B 3/8 7 35 2.07 4.00 0.20 2420.60 2,420.60

C-08 Acero A 1 15 24 5.10 0.40 0.40 2124.00 2,124.00

Estribo B 3/8 15 35 2.07 4.00 0.20 5187.00 5,187.00

C-09 Acero A 3/4 2 10 5.10 0.30 0.30 114.00 114.00


A 1 2 16 5.10 0.40 0.40 188.80 188.80

Estribo B 3/8 2 39 2.35 2.00 0.20 429.00 429.00


B 3/8 2 39 2.00 2.00 0.20 374.40 374.40

C-10 Acero A 3/4 1 8 5.10 0.30 0.30 45.60 45.60


A 1 1 12 5.10 0.40 0.40 70.80 70.80

Estribo B 3/8 1 35 2.07 4.00 0.20 345.80 345.80

C-11 Acero A 3/4 6 12 5.10 0.30 0.30 410.40 410.40


A 1 6 8 5.10 0.40 0.40 283.20 283.20

Estribo B 3/8 6 30 2.55 2.00 0.20 1062.00 1,062.00


B 3/8 6 30 2.25 2.00 0.20 954.00 954.00
HOJA DE METRADOS

Obra HOSPITAL SAN FRANCISCO


Subppto ESTRUCTURAS
Cliente GOBIERNO REGIONAL AYACUCHO FECHA: 12/08/2016
Ubicación AYNA-LA MAR-AYACUCHO

Ø NUM. NUM. LONGITUD X PIEZA (m)


ITEM DESCRIPCION TIP.
(in) ELEM. PIEZA a b c d TOTAL 3/8" 1/2" 5/8" 3/4" 1"
C-12 Acero A 3/4 4 8 5.10 0.30 0.30 182.40 182.40
A 1 4 18 5.10 0.40 0.40 424.80 424.80

Estribo B 3/8 4 30 2.25 2.00 0.20 636.00 636.00


B 3/8 4 30 2.70 2.00 0.20 744.00 744.00

C-13 Acero A 1 1 36 5.10 0.30 0.30 205.20 205.20

Estribo B 3/8 1 30 2.25 2.00 0.20 159.00 159.00


B 3/8 1 30 2.55 2.00 0.20 177.00 177.00

C-15 Acero A 5/8 1 5 5.40 0.25 0.25 29.50 29.50


A 3/4 1 7 5.40 0.30 0.30 42.00 42.00

Estribo B 3/8 1 30 1.55 2.00 0.20 117.00 117.00

C-16 Acero A 5/8 8 8 5.40 0.25 0.25 377.73 377.73


A 3/4 8 8 5.40 0.30 0.30 384.00 384.00

Estribo B 3/8 8 30 1.34 2.00 0.20 835.20 835.20

C-17 Acero A 5/8 1 10 5.40 0.25 0.25 59.00 59.00


A 3/4 1 10 5.40 0.30 0.30 60.00 60.00

Estribo B 3/8 1 30 1.67 1.00 0.20 62.10 62.10


B 3/8 1 30 2.62 1.00 0.20 90.60 90.60
B 3/8 1 30 1.85 1.00 0.20 67.50 67.50

C-18 Acero A 5/8 1 8 5.40 0.25 0.25 47.20 47.20


3/4 1 4 5.40 0.30 0.30 24.00 24.00

Estribo B 3/8 1 30 1.06 2.00 0.20 87.60 87.60

C-19 Acero A 5/8 2 6 5.40 0.25 0.25 70.80 70.80

Estribo B 3/8 2 27 1.05 1.00 0.20 78.30 78.30

C-20 Acero A 5/8 1 8 5.40 0.25 0.25 47.20 47.20

Estribo B 3/8 1 27 1.05 1.00 0.20 39.15 39.15


HOJA DE METRADOS

Obra HOSPITAL SAN FRANCISCO


Subppto ESTRUCTURAS
Cliente GOBIERNO REGIONAL AYACUCHO FECHA: 12/08/2016
Ubicación AYNA-LA MAR-AYACUCHO

Ø NUM. NUM. LONGITUD X PIEZA (m)


ITEM DESCRIPCION TIP.
(in) ELEM. PIEZA a b c d TOTAL 3/8" 1/2" 5/8" 3/4" 1"
C-21 Acero A 5/8 3 6 5.40 0.25 0.25 106.20 106.20

Estribo B 3/8 3 27 0.75 1.00 0.20 93.15 93.15

C-22 Acero A 1/2 7 4 5.40 0.20 0.20 162.40 162.40

Estribo B 3/8 7 27 0.58 1.00 0.20 185.22 185.22

Segundo Piso
C-01 Acero A 3/4 2 8 4.40 70.40 70.40
A 1 2 8 4.40 70.40 70.40

Estribo B 3/8 2 36 1.36 3.00 0.20 380.16 380.16


0.00

C-02 Acero A 3/4 7 8 4.40 246.40 246.40


A 1 7 8 4.40 246.40 246.40

Estribo B 3/8 7 32 1.74 4.00 0.20 1917.44 1,917.44

C-03 Acero A 3/4 13 8 4.40 457.60 457.60


A 1 13 10 4.40 572.00 572.00

Estribo B 3/8 13 32 1.78 2.00 0.20 1813.76 1,813.76


13 32 1.74 2.00 0.20 1780.48 1,780.48

C-04 Acero A 3/4 2 8 4.40 70.40 70.40


A 1 2 8 4.40 70.40 70.40

Estribo B 3/8 2 36 1.36 4.00 0.20 506.88 506.88

C-05 Acero A 1 4 20 4.40 352.00 352.00

Estribo B 3/8 4 1.54 4.00 0.20 0.00 0.00

C-06 Acero A 1 2 12 4.40 105.60 105.60

Estribo B 3/8 4 32 1.38 4.00 0.20 911.36 911.36


HOJA DE METRADOS

Obra HOSPITAL SAN FRANCISCO


Subppto ESTRUCTURAS
Cliente GOBIERNO REGIONAL AYACUCHO FECHA: 12/08/2016
Ubicación AYNA-LA MAR-AYACUCHO

Ø NUM. NUM. LONGITUD X PIEZA (m)


ITEM DESCRIPCION TIP.
(in) ELEM. PIEZA a b c d TOTAL 3/8" 1/2" 5/8" 3/4" 1"
C-07 Acero A 3/4 7 16 4.40 0.70 0.65 644.00 644.00

Estribo B 3/8 7 32 1.80 4.00 0.20 1971.20 1,971.20

C-08 Acero A 1 15 24 4.40 1584.00 1,584.00

Estribo B 3/8 15 32 1.74 4.00 0.20 4108.80 4,108.80

C-09 Acero A 3/4 2 10 4.40 88.00 88.00


A 1 2 16 4.40 140.80 140.80

Estribo B 3/8 2 36 1.36 3.00 0.20 380.16 380.16

C-10 Acero A 3/4 1 8 4.40 35.20 35.20


A 1 1 12 4.40 52.80 52.80

Estribo B 3/8 1 32 1.72 4.00 0.20 271.36 271.36

C-11 Acero A 3/4 6 12 4.40 316.80 316.80


A 1 6 8 4.40 211.20 211.20

Estribo B 3/8 6 35 2.28 2.00 0.20 1125.60 1,125.60


B 3/8 6 35 2.03 2.00 0.20 1020.60 1,020.60

C-12 Acero A 3/4 4 18 4.40 316.80 316.80


A 1 4 8 4.40 140.80 140.80

Estribo B 3/8 4 35 2.28 2.00 0.20 750.40 750.40


B 3/8 4 35 2.03 2.00 0.20 680.40 680.40

C-13 Acero A 1 1 36 4.40 158.40 158.40

Estribo B 3/8 1 35 2.21 2.00 0.20 182.70 182.70


B 3/8 1 35 2.03 2.00 0.20 170.10 170.10

Tercer Piso
C-01 Acero A 3/4 2 16 4.40 0.30 150.40 150.40

Estribo B 3/8 2 36 1.36 3.00 0.20 380.16 380.16


0.00

C-02 Acero A 3/4 7 16 4.40 492.80 492.80


HOJA DE METRADOS

Obra HOSPITAL SAN FRANCISCO


Subppto ESTRUCTURAS
Cliente GOBIERNO REGIONAL AYACUCHO FECHA: 12/08/2016
Ubicación AYNA-LA MAR-AYACUCHO

Ø NUM. NUM. LONGITUD X PIEZA (m)


ITEM DESCRIPCION TIP.
(in) ELEM. PIEZA a b c d TOTAL 3/8" 1/2" 5/8" 3/4" 1"
Estribo B 3/8 7 32 1.74 4.00 0.20 1917.44 1,917.44

C-03 Acero A 3/4 13 18 4.40 1029.60 1,029.60

Estribo B 3/8 13 32 1.78 2.00 0.20 1813.76 1,813.76


13 32 1.74 2.00 0.20 1780.48 1,780.48

C-04 Acero A 3/4 2 12 4.40 105.60 105.60


A 1 2 4 4.40 35.20 35.20

Estribo B 3/8 2 36 1.36 4.00 0.20 506.88 506.88

C-05 Acero A 3/4 4 8 4.40 140.80 140.80


A 1 4 12 4.40 211.20 211.20

Estribo B 3/8 4 1.54 4.00 0.20 0.00 0.00

C-06 Acero A 3/4 4 8 4.40 140.80 140.80


A 1 4 4 4.40 70.40 70.40

Estribo B 3/8 4 32 1.38 4.00 0.20 911.36 911.36

C-07 Acero A 3/4 7 16 4.40 492.80 492.80

Estribo B 3/8 7 32 1.80 4.00 0.20 1971.20 1,971.20

C-08 Acero A 3/4 15 20 4.40 1320.00 1,320.00

Estribo B 3/8 15 32 1.74 4.00 0.20 4108.80 4,108.80

C-09 Acero A 3/4 2 22 4.40 193.60 193.60

Estribo B 3/8 2 36 1.36 3.00 0.20 380.16 380.16


HOJA DE METRADOS

Obra HOSPITAL SAN FRANCISCO


Subppto ESTRUCTURAS
Cliente GOBIERNO REGIONAL AYACUCHO FECHA: 12/08/2016
Ubicación AYNA-LA MAR-AYACUCHO

Ø NUM. NUM. LONGITUD X PIEZA (m)


ITEM DESCRIPCION TIP.
(in) ELEM. PIEZA a b c d TOTAL 3/8" 1/2" 5/8" 3/4" 1"
C-10 Acero A 3/4 1 20 4.40 88.00 88.00

Estribo B 3/8 1 32 1.72 4.00 0.20 271.36 271.36

C-11 Acero A 3/4 6 20 4.40 528.00 528.00

Estribo B 3/8 6 35 2.28 2.00 0.20 1125.60 1,125.60


B 3/8 6 35 2.03 2.00 0.20 1020.60 1,020.60

C-12 Acero A 3/4 4 24 4.40 422.40 422.40

Estribo B 3/8 4 35 2.28 2.00 0.20 750.40 750.40


B 3/8 4 35 2.03 2.00 0.20 680.40 680.40

C-13 Acero A 3/4 1 12 4.40 52.80 52.80


A 1 1 12 4.40 52.80 52.80

Estribo B 3/8 1 35 2.21 2.00 0.20 182.70 182.70


B 3/8 1 35 2.03 2.00 0.20 170.10 170.10

Cuarto Piso
C-02 Acero A 3/4 7 16 4.40 0.30 526.40 526.40

Estribo B 3/8 7 32 1.74 4.00 0.20 1917.44 1,917.44

C-03 Acero A 3/4 13 18 4.40 0.30 1099.80 1,099.80

Estribo B 3/8 13 32 1.78 2.00 0.20 1813.76 1,813.76


13 32 1.74 2.00 0.20 1780.48 1,780.48

C-04 Acero A 3/4 2 12 4.40 0.30 112.80 112.80


A 1 2 4 4.40 0.40 38.40 38.40

Estribo B 3/8 2 36 1.36 4.00 0.20 506.88 506.88

C-05 Acero A 3/4 4 8 4.40 0.30 150.40 150.40


A 1 4 12 4.40 0.40 230.40 230.40

Estribo B 3/8 4 1.54 4.00 0.20 0.00 0.00


HOJA DE METRADOS

Obra HOSPITAL SAN FRANCISCO


Subppto ESTRUCTURAS
Cliente GOBIERNO REGIONAL AYACUCHO FECHA: 12/08/2016
Ubicación AYNA-LA MAR-AYACUCHO

Ø NUM. NUM. LONGITUD X PIEZA (m)


ITEM DESCRIPCION TIP.
(in) ELEM. PIEZA a b c d TOTAL 3/8" 1/2" 5/8" 3/4" 1"
C-06 Acero A 3/4 4 8 4.40 0.30 150.40 150.40
A 1 4 4 4.40 0.40 76.80 76.80

Estribo B 3/8 4 32 1.38 4.00 0.20 911.36 911.36

C-07 Acero A 3/4 3 16 7.40 0.30 369.60 369.60

Estribo B 3/8 3 32 1.80 4.00 0.20 844.80 844.80

C-08 Acero A 3/4 15 20 4.40 0.30 1410.00 1,410.00

Estribo B 3/8 15 32 1.74 4.00 0.20 4108.80 4,108.80

C-09 Acero A 3/4 2 22 4.40 0.30 206.80 206.80

Estribo B 3/8 2 36 1.36 3.00 0.20 380.16 380.16

C-10 Acero A 3/4 1 20 4.40 88.00 88.00

Estribo B 3/8 1 32 1.72 4.00 0.20 271.36 271.36

C-11 Acero A 3/4 6 20 4.40 0.30 564.00 564.00

Estribo B 3/8 6 35 2.28 2.00 0.20 1125.60 1,125.60


B 3/8 6 35 2.03 2.00 0.20 1020.60 1,020.60

C-12 Acero A 3/4 4 24 7.40 0.30 739.20 739.20

Estribo B 3/8 4 35 2.28 2.00 0.20 750.40 750.40


B 3/8 4 35 2.03 2.00 0.20 680.40 680.40

C-13 Acero A 3/4 1 12 4.40 0.30 56.40 56.40


A 1 1 12 4.40 0.40 57.60 57.60

Estribo B 3/8 1 35 2.21 2.00 0.20 182.70 182.70


B 3/8 1 35 2.03 2.00 0.20 170.10 170.10
HOJA DE METRADOS

Obra HOSPITAL SAN FRANCISCO


Subppto ESTRUCTURAS
Cliente GOBIERNO REGIONAL AYACUCHO FECHA: 12/08/2016
Ubicación AYNA-LA MAR-AYACUCHO

Ø NUM. NUM. LONGITUD X PIEZA (m)


ITEM DESCRIPCION TIP.
(in) ELEM. PIEZA a b c d TOTAL 3/8" 1/2" 5/8" 3/4" 1"
C adicional 1 50x50 Acero A 3/4 4 8 4.40 0.30 150.40 150.40
A 1 4 4 4.40 0.40 76.80 76.80

Estribo B 3/8 4 32 1.38 4.00 0.20 911.36 911.36

C adicional 2 50x50 Acero A 3/4 4 8 4.40 0.30 150.40 150.40


A 1 4 4 4.40 0.40 76.80 76.80

Estribo B 3/8 4 32 1.38 4.00 0.20 911.36 911.36

Quinto piso
C-02 Acero A 3/4 2 16 4.40 0.30 150.40 150.40

Estribo B 3/8 2 32 1.74 4.00 0.20 547.84 547.84

C-03 Acero A 3/4 2 18 4.40 0.30 169.20 169.20

Estribo B 3/8 2 32 1.78 2.00 0.20 279.04 279.04


2 32 1.74 2.00 0.20 273.92 273.92

C-05 Acero A 3/4 4 8 4.40 0.30 150.40 150.40


A 1 4 12 4.40 0.40 230.40 230.40

Estribo B 3/8 4 1.54 4.00 0.20 0.00 0.00

C-06 Acero A 3/4 2 8 4.40 0.30 75.20 75.20


A 1 2 4 4.40 0.40 38.40 38.40

Estribo B 3/8 2 32 1.38 4.00 0.20 455.68 455.68

C-07 Acero A 3/4 1 16 4.40 0.30 75.20 75.20

Estribo B 3/8 1 32 1.80 4.00 0.20 281.60 281.60

C-08 Acero A 3/4 1 20 4.40 0.30 94.00 94.00

Estribo B 3/8 1 32 1.74 4.00 0.20 273.92 273.92


HOJA DE METRADOS

Obra HOSPITAL SAN FRANCISCO


Subppto ESTRUCTURAS
Cliente GOBIERNO REGIONAL AYACUCHO FECHA: 12/08/2016
Ubicación AYNA-LA MAR-AYACUCHO

Ø NUM. NUM. LONGITUD X PIEZA (m)


ITEM DESCRIPCION TIP.
(in) ELEM. PIEZA a b c d TOTAL 3/8" 1/2" 5/8" 3/4" 1"
C-10 Acero A 3/4 1 20 4.40 0.30 94.00 94.00

Estribo B 3/8 1 32 1.72 4.00 0.20 271.36 271.36

Dados Sótano
Estribo tipo vuelta y 3/4 B 3/8 57 8 5.52 1.00 2517.12 2,517.12

Estribo tipo U B 3/8 57 11 5.52 1.00 3461.04 3,461.04

Ganchos B 3/8 57 8 1.33 1.00 606.48 606.48

Dados Zapata
Estribo tipo vuelta y 3/4 B 3/8 57 8 5.52 1.00 2517.12 2,517.12

Estribo tipo U B 3/8 57 11 5.52 1.00 3461.04 3,461.04

Ganchos B 3/8 57 8 1.33 1.00 606.48 606.48

Dados Primer Piso


Estribo tipo vuelta y 3/4 B 3/8 10 4 5.52 1.00 220.80 220.80

Estribo tipo U B 3/8 10 11 5.52 1.00 607.20 607.20

Ganchos B 3/8 10 8 1.33 1.00 106.40 106.40

Longitud total por diámetro (m) 96,658.58 14,266.08 737.63 19,100.20 15,035.60
Peso en kg por metro lineal 0.62 1.09 1.71 2.46 4.37
Peso total por diámetro 59,541.69 15,592.83 1,259.13 46,967.39 65,705.57
TOTAL 189066.61 kgf