Design of A.P.M.

Name of work :- pkn


Name of outlet :- gip

TECHNICAL DATA

Sn. Item CANAL OUTLET


1 DISCHARGE 0.1179 0.0254 Cumec
2 F.S.D 0.38 --- Cumec
3 F. B. in canal 0.20 --- meter
4 SIDE SLOPE 1 :1
5 N.S.L. 271.72 271.72 meter
6 CBL 260.63 260.630 meter
7 FSL 261.01 --- meter
8 TBL 261.21 --- meter

Design summary :-
Opning of gate bt x y = 0.10 x 0.22 mtr
Water head Hs = 0.11

C.C. coping R.C.C.slab


A.P.M. cast iron gate
0.58 1.60 4.80
fb= 0.20 4.00
fsd= fsd= 0.38
d 0.11
R.R. stone masonry super
Apm sill level 0.22 1 IN 15
Bed level 260.63 0.05
R.R.Stone masonry foundation
0.50

0.30 C.C1:3:6

center line x-section

A.P.M. cast iron gate


8.38
0.40 0.40
0.40 0.40
0.60 4.00 1.00
0.58 0.60 0.40

0.10 0.30
0.30
0.40
0.30 0.80
0
Plan
U/S x- section of canal pk_nandwanayahoo.co.in
DESIGN of A.P.M.

Name of work :- pkn


Name of outlet :- gip

TECHNICAL DATA
Sn. Item CANAL OUTLET
1 DISCHARGE 0.1179 0.0254 Cumec
2 F.S.D 0.38 --- Cumec
3 F. B. in canal 0.20 --- meter
4 SIDE SLOPE 1 :1
5 N.S.L. 271.72 271.72 meter
6 CBL 260.63 260.630 meter
7 FSL 261.01 --- meter
8 TBL 261.21 --- meter
9 W/C length 15 meter
10 Foundation Depth (below CB 0.50 meter

for proportionality
Hs/D = 0.30
or Hs =0.30xD = 0.30 x 0.38 = 0.11

Now q= 4.04*Bt*Y*(Hs)1/2 or Bt*Y = q/4.04/Hs^1/2


from discharge equation Bt*Y= 0.0254 / 4.04 /( 0.11 )^0.5 = 0.01896

Keeping Bt= 0.045


Y= 0.01896 / 0.045 = 0.42 > 0.09 to 0.14
Keep Bt= Y / 2.50
or Y2 = 2.5 x 0.01896 = 0.047
Y=( 0.047 )2= 0.22
then Bt= 0.220 / 2.5 = 0.088

Say Bt= 0.10 m

Minimum Modular Head =0.82Hs-Bt/2 = 0.82 x 0.110 - 0.10 /2 = 0.040

Hs - Hm = 0.110 - 0.040
= 0.0698 < 0.15 hence ok

Check for passing descharge = 4.04 x 0.10 x 0.22 x( 0.11


= 0.02948 Cumec

Passing discharge is grater than required discharge


0.02948 > 0.0254 Hence OK.

Design Sill level of out let = 260.680


Hs = 0.11
Bt = 0.10
Y = 0.22

pk_nandwana@yahoo.co.in
NAME OF WORK :-APM FOR CHAK 0 0

RCC 1:1.5:3
TBL 0.58 1.60
fb= 0.20 TBL W/C
fsd= 0.38 4.80 FSL W/C 0.15
0.11
0.58 1 :1 0.050 0.30
APM sill level 0.22 1 IN 15
3 :1
0.05 0.50
CBL 260.63
0.50
Foundation level 0.30
0.30

CROSS SECTION X-X

8.38
A
###

###
###
0.58 0.60 0.60 4.00 1.00
0
15 m

###
0.60
0.40 0.40

###
0.10
0.30
0.40

###
###

0.60
A
1 :5

###

###
0.60 0.60
Data
B.W.

1 :1 bt 0.58 APM
1 NSL #REF!
f.s.d.+ f.b. 1 :1 1.00 1.00 0.08 2 BL 260.63
0.50 3 FSL 260.85
*.*.*.*.*.*.*.*.*.*.*.*..* 0.30 4 TBL 261.21
1.5 2.00 + bt 5 Foundation lev #REF!
U/S X section of canal X- section at AA

pk_nandwana@yahoo.co.in
DETAIL

NAME OF WORK :-APM FOR CHAK 0 0

Sno. Item Detail qty


1 Excavation including loading unloading
disposal and dressing of excavated earth
within initial lead of 50m and lift upto 1.5m in
dry or moist including drsssing of excaveted
area, dewatering wherever required and all
applicable taxes and levies etc. complete in all
respect.

canal Sides slope 1 x 0.58 x 2.00 x 1.43 / 2 = 0.83


Bank top 1 x 1.60 x 2.00 x 1.43 = 4.58
Berral 1 x 4.00 x 2.00 x 1.43 = 11.44
expantion 1 x 1.00 x 2.00 x 1.43 = 2.86
D/s wing wall 1 x 0.40 x 1.90 x 1.43 / 2 = 1.09
connecting to water course 1 x 15.00 x 2.00 x 1.43 / 2 = 42.90
total 63.69
For 1.00 No = 63.70
A.Hard soil mixed with kanker/ boulders , cum
morrum . 25 % qty taken 16.00

2 Earth work in excavation including loading


unloading, disposal and dressing of excavated
rock within initial lead of 50 m and lift upto 1.50
m indry or moist including dressing of
excavated area wirh cost of dewatering
wherever required and all applicable taxes and
. levies etc. complete in all respect.
(B)Soft disintegreted rock. 25 % qty taken 16.00
(C)Hard rock not rquirding blasting 25 % qty taken 16.00
(D) Phylites & other hard rockrequiring nominal 25 % qty taken 16.00
blasting cum

2 Cement Concrete in (1:3:6) M10 well mixed


and laid in position complete including all leads
of all construction materiasl Including Curing
and finishing having well graded broken stone
aggregate of maximum size upto 20mm

canal Sides slope 1 x 0.58 x 2.00 x 0.30 = 0.35


Bank top 1 x 1.60 x 2.00 x 0.30 = 0.96
Barrel 1 x 4.00 x 2.00 x 0.30 = 2.40
expansion 1 x 1.00 x 2.00 x 0.30 = 0.60
D/s wing wall 1 x 0.40 x 1.90 x 0.30 = 0.23
connecting to water course 1 x 15.00 x 2.00 x 0.30 = 9.00
total 13.54
For 1.00 No = 13.60
cum
3 R.R. Stone masonry (using R.R stones where
75% stone to be not less than 15 cm in size in
any direction and weighing not less than 23
kg.) for Foundation including curing all leads
of construction materials & all taxes and with
initial lift /delift of 5 m from G.L.etc complete .In
cement sand mortar 1:5

canal Sides slope 1 x 0.58 x 2.00 x 0.50 = 0.58


Bank top 1 x 1.60 x 2.00 x 0.50 = 1.60
Barrel 1 x 4.00 x 2.00 x 0.50 = 4.00
D/s wing wall 1 x 1.40 x 2.00 x 0.50 = 1.40
connecting to water course 1 x 15.00 x 2.00 x 0.50 = 15.00
total 22.58
For 1.00 No = 22.60
4 R.R. Stone masonry (using R.R stones where
75% stone to be not less than 15 cm in size in
any direction and weighing not less than 23
kg.) for Superstructure including curing all
leads of construction materials & all taxes and
with initial lift /delift of 5 m from G.L.etc
complete .In cement sand mortar 1:5

canal Sides slope 2 x 0.58 x( 1.00 + 0.40 )x 0.66 = 0.27


2 2
Bank top 1 x 1.60 x( 1.00 + 0.40 )x 0.66 = 0.73
2
Barrel 1 x 4.00 x( 1.00 + 0.40 )x 0.45 = 1.26
2
D/s wing wall 1 x 1.40 x( 1.00 + 0.40 )x 0.45 = 0.44
2
connecting to water course 1 x 15.00 x( 1.00 + 0.40 )x 0.45 = 4.73
2 total 7.43
For 1.00 No = 7.50
cum
5 Cement Concrete in (1:2:4) M15 well mixed
and laid in position complete including all leads
of all construction materials Including Curing
and finishing having well graded broken stone
aggregate of maximum size upto 20mm

APM length + Berral 1 x 7.58 x 0.66 x 0.050 = 0.25


connecting to water course 1 x 15.00 x 0.66 x 0.050 = 0.49
total 0.74
For 1.00 No = 0.80
cum
6 Plaster in cement sand mortar (1:4) including
raking of joint ,smooth finishing with & curing
etc. including all leads of all construction
matarials complete of thickness, 20mm
u/s inside 2 x 0.58 x 0.66 / 2 = 0.38
2 x 1.60 x 0.66 = 2.10
Barrel inside 2 x 4.00 x 0.45 = 3.60
Expansion inside 2 x 1.40 x 0.45 = 1.26
D/s wing wall inside 2 x 0.80 x 0.45 = 0.72
connecting to water course inside 2 x 15.00 x 0.45 = 13.50
total 21.56
For 1.00 No = 21.60
7 Flush and ruled pointing on stone masonry sqm
including raking of joint and curing etc.
complete including of all leads of all
construction materials in cement mortar 1:3
connecting to water course out side 2 x 15.00 x 0.30 = 9.0
total 9.00
For 1.00 No = 9.00
sqm
8 Providing and laying cement concrete copping
in (1:2:4) with maximum size of crusher broken
aggregate upto 20mm including shuttering etc
with all leads of material complete in all
respect.in thickness of 50 mm

u/s 2 x 0.82 x 0.40 = 0.66


U/p& d/s wing wall 4 x 0.60 x 0.40 = 0.96
side wall 2 x 8.18 x 0.40 = 6.54
total 8.16
Centering and shuttering for slabs, beams, For 1.00 No = 8.20
9 lintels,columns,trough with or with out caps sqm
and base including proping and remove.
(Rates as per BSR 2006 page 44 item 2)

for slab 2 x 4.80 x 0.15 = 1.44


2 x 0.90 x 0.15 = 0.27
1 x 4.80 x 0.30 = 1.44
Total = 3.15
For 1.00 No = 3.20
sqm

10
Cement concrete (1:11/2:3 ) M-20 well mixed
and laid in position complete including of all
leads of all construction materials including
curing and finishing having well graded broken
stone aggrigate of maximum size upto

for slab 1 x 4.80 x 0.90 x 0.15 = 0.65


total = 0.65
For 1.00 No = 0.70
cum
11
Supplying of M.S. reinforcement including
labour charges for bending binding and placing
in position all reinforcement as per drawing
including cost of binding wire and all leads and
lifts using .
(II) Tor or ribed bars (IS:1139 &IS: 1786)
Nos length wt/m
for slab main 12mm F @300c/c 17 x 0.90 x 0.888 = 13.59
distribution 8mmF @300c/c 4 x 4.80 x 0.395 = 7.58
total = 21.17
10 %cutting & over lapping = 2.12
total = 23.29
For 1.00 No = 24.00
Kg
12 Extra labour charges for obstruction in laying
and placing the reinforced cement concrete as per item no 10 = 0.70
due to reinforecement.for slab cum

13 Supplying and fixing in Position of APM block


made of C.I. as per standard specification with
adjustable arrangment and required fixture
including transportation to site second stage
concreting in C.C.(1:2:4) centreing shuttering
painting with red oxide finishing etc. complete
in all respect cost of A.P.M. block (all size) per
block. = 1
Nos
for out let

14 Re-handling of excavated material including


loading unloading and dressing within initial
leads of 50 m and lift 1.5 m with cost of de-
watering wherever required and all applicable 50 % of item no 1 = 32.00
taxes and levies etc complete in all respect. cum
ABSTRACT OF COST

NAME OF WORK :-APM FOR CHAK 0 0

Sno. Item Qty Rate Unit Amount


1 Excavtion including loading unloading , disposal and
dressing of excavated earth with in initial leads of 50 m and
lift upto 1.50 m in dry or moist including dressing of
excavated area, de-watering wherever required and all
applicable taxes and levies etc. complete in all respect.
(Rates as per BSR 2008 page 13 item No1)
A.Hard soil mixed with kanker/ boulders,morrum . 63.70 47.00 Cum 2994.00

2 Earth work in excavation including loading unloading,


disposal and dressing of excavated rock within initial lead of
50 m and lift upto 1.50 m indry or moist including dressing of
excavated area wirh cost of dewatering wherever required
and all applicable taxes and . levies etc. complete in all
respect.

(Rates as per BSR 2008 page 13 item No1)


(B)Soft disintegreted rock. 16.00 78.00 Cum 1248.00
(C)Hard rock not rquirding blasting 16.00 121.00 Cum 1936.00
16.00 166.00 Cum 2656.00
(D) Phylites & other hard rock requiring nominal blasting

3 Cement concrete (1:3:6 ) M-10 well mixed and laid in position


complete including of all leads of all construction materials
including curing and finishing having well graded broken
stone aggrigate of maximum size upto 20mm
(Rates as per BSR 2008 page 22 item no 6d) 13.60 2105.00 Cum 28628.00

4 Random rubble stone masonry kharanja (Using R.R. stones


where 75% stones to be not less than 15 cm in siz in any
direction and weighing not less 23 kg) for foundation
including curing all leads of all construction materials & all
taxes and with initial lift / de lift of 5 m from ground level etc.
complete .in 1:5 cement mortar.

(Rate as per BSR 2008 page 29 item 4) 22.60 1618.00 Cum 36567.00

5 Random rubble stone masonry kharanja (Using R.R. stones


where 75% stones to be not less than 15 cm in siz in any
direction and weighing not less 23 kg) for superstructure
including curing all leads of all construction materials & all
taxes and with initial lift / de lift of 5 m from ground level etc.
complete .in 1:6 cement mortar.
7.50 1660.00 Cum 12450.00
(Rate as per BSR 2008 page 29+31 item 4+13a)

6 Cement concrete (1:2:4 ) M-15 well mixed and laid in position


complete including of all leads of all construction materials
including curing and finishing having well graded broken
stone aggrigate of maximum size upto
Cement concrete (1:2:4 ) M-15 well mixed and laid in position
complete including of all leads of all construction materials
including curing and finishing having well graded broken
stone aggrigate of maximum size upto
(Rates as per BSR 2008 page 22 ch 7 item no 5d) 0.80 2509.00 Cum 2007.00

7 Plaster in cement sand mortar ( 1:4 ) including raking of


joints, smooth finishing with sandla & curing etc.complete
including of all leads of all construction materials : thickness :
20mm
(Rate as per BSR 2008 page no 34 item 4c) 21.60 94.00 Sqm 2030.00

8 Flush and ruled pointing on stone masonry including raking


of joints and curing etc.complete including all leads of all
construction materials in mortar ratio.
(Rate as per BSR 2008 page no 35 item 15c) 9.00 52.00 Sqm 468.00

9 Providing and laying cement concrete copping in (1:2:4) with


maximum size of crusher broken aggregate upto 20mm
including shuttring etc. with all leads of material complete in
all respect in thickness of:75mm 8.20 185.00 p sqm 1517.00
(Rate as per BSR 2008 page 43 ch 12 item 17a)

10 Centering and shuttering for slabs, beams,


lintels,columns,trough with or with out caps and base
including proping and remove.
(Rates as per BSR 2008 page 36 item 2) 3.20 131.00 Sqm 419.00

11 Cement concrete (1:1 :3 ) M-20 well mixed and laid in


1/2
position complete including of all leads of all construction
materials including curing and finishing having well graded
broken stone aggrigate of maximum size upto
(Rates as per BSR 2008 page 22 ch 7 item no 4d) 0.70 2951.00 Cum 2066.00

12 Supplying of M.S. reinforcement including labour charges for


bending binding and placing in position all reinforcement as
per drawing including cost of binding wire and all leads and
lifts using
(II) Tor or ribed bars (IS:1139 &IS: 1786) 24.00 55.00 Kg. 1320.00
.(Rates as per BSR 2008 page 37 item 10(b)

13 Extra labour charges for obstruction in laying and placing the


reinforced cement concrete due to reinforecement.
Columns, slabs, cantilevers, projections, stairscase, lintels,
beams, chajjas, retaining walls, piers, abutments, galleries,
arch covers bed plates sluice capastan bases etc. 0.70 111.00 Sqm 78.00
(Rates as per BSR 2008 page 37 item 11b)

14 Supplying and fixing in Position of APM block made of C.I.


as per standard specification with adjustable arrangment and
required fixture including transportation to site second stage
concreting in C.C.(1:2:4) centreing shuttering painting with
red oxide finishing etc. complete in all respect cost of A.P.M.
block (all size) per block.
Supplying and fixing in Position of APM block made of C.I.
as per standard specification with adjustable arrangment and
required fixture including transportation to site second stage
concreting in C.C.(1:2:4) centreing shuttering painting with
red oxide finishing etc. complete in all respect cost of A.P.M.
block (all size) per block.
1 5966.00 per block 5966.00
(Rate as BSR 2008 page 44 ch 12 item 22)

15 Re-handling of excavated material including loading


unloading and dressing within initial leads of 50 m and lift 1.5
m with cost of de-watering wherever required and all
applicable taxes and levies etc complete in all respect.
(Rates as per BSR 2008 page14 ch 5 item 8)
Mixed Strata muck 32.00 52.00 Cum 1664.00
Total 104014.00
Add 3 % contengency 3120.00
G Total 107134.00
Say Rs. 1.08 lacs
29 350 44 64 64 64
ABSTRACT OF COST

NAME OF WORK :-APM FOR CHAK 0 0

1 NIT No. 7/2008-09 S.No.32


2 NIT Amount Rs. 1.05
3 Earnest money 1.Regd. Contractor @1/2%Rs. 530.00
2.Other Contractor @ 2%Rs. 2100.00
4 Tender cost Rs. 200
5 Date of Selling Tender 15.09.08 to22.09.08
6 Date of Receiving Tender 24.09.08 upto 3.00 PM
7 Date of Opening Tender 24.09.08 At 4.00 PM
8 Time of completion 4 Month
9 B.S.R. Irrigation BSR 2008

Sno. Item Qty Rate Unit Amount


1 Excavtion including loading unloading , disposal and
dressing of excavated earth with in initial leads of 50 m
and lift upto 1.50 m in dry or moist including dressing of
excavated area, de-watering wherever required and all
applicable taxes and levies etc. complete in all respect.
(Rates as per BSR 2008 page 13 item No1)
A.Hard soil mixed with kanker/ boulders,morrum . 63.70 47.00 Cum 2994.00

2 Earth work in excavation including loading unloading,


disposal and dressing of excavated rock within initial
lead of 50 m and lift upto 1.50 m indry or moist including
dressing of excavated area wirh cost of dewatering
wherever required and all applicable taxes and . levies
etc. complete in all respect.

(Rates as per BSR 2008 page 13 item No1)


(B)Soft disintegreted rock. 16.00 78.00 Cum 1248.00
(C)Hard rock not rquirding blasting 16.00 121.00 Cum 1936.00
16.00 166.00 Cum 2656.00
(D) Phylites & other hard rock requiring nominal blasting

3 Cement concrete (1:3:6 ) M-10 well mixed and laid in


position complete including of all leads of all
construction materials including curing and finishing
having well graded broken stone aggrigate of maximum
size upto 20mm 13.60 2105.00 Cum 28628.00
(Rates as per BSR 2008 page 22 item no 6d)

4 Random rubble stone masonry kharanja (Using R.R.


stones where 75% stones to be not less than 15 cm in
siz in any direction and weighing not less 23 kg) for
foundation including curing all leads of all construction
materials & all taxes and with initial lift / de lift of 5 m
from ground level etc. complete .in 1:5 cement mortar.

(Rate as per BSR 2008 page 29 item 4) 22.60 1618.00 Cum 36567.00
5 Random rubble stone masonry kharanja (Using R.R.
stones where 75% stones to be not less than 15 cm in
siz in any direction and weighing not less 23 kg) for
superstructure including curing all leads of all
construction materials & all taxes and with initial lift / de
lift of 5 m from ground level etc. complete .in 1:6 cement
mortar.
7.50 1660.00 Cum 12450.00
(Rate as per BSR 2008 page 29+31 item 4+13a)
Cement concrete (1:2:4 ) M-15 well mixed and laid in
6 position complete including of all leads of all
construction materials including curing and finishing
having well graded broken stone aggrigate of maximum
size upto
(Rates as per BSR 2008 page 22 ch 7 item no 5d) 0.80 2509.00 Cum 2007.00

7 Plaster in cement sand mortar ( 1:4 ) including raking of


joints, smooth finishing with sandla & curing
etc.complete including of all leads of all construction
materials : thickness : 20mm
(Rate as per BSR 2008 page no 34 item 4c) 21.60 94.00 Sqm 2030.00

8 Flush and ruled pointing on stone masonry including


raking of joints and curing etc.complete including all
leads of all construction materials in mortar ratio.
(Rate as per BSR 2008 page no 35 item 15c) 9.00 52.00 Sqm 468.00

9 Providing and laying cement concrete copping in (1:2:4)


with maximum size of crusher broken aggregate upto
20mm including shuttring etc. with all leads of material
complete in all respect in thickness of:75mm 8.20 185.00 p sqm 1517.00
(Rate as per BSR 2008 page 43 ch 12 item 17a)

10 Centering and shuttering for slabs, beams,


lintels,columns,trough with or with out caps and base
including proping and remove.
(Rates as per BSR 2008 page 36 item 2) 3.20 131.00 Sqm 419.00
Cement concrete (1:11/2:3 ) M-20 well mixed and laid in
11 position complete including of all leads of all
construction materials including curing and finishing
having well graded broken stone aggrigate of maximum
size upto
(Rates as per BSR 2008 page 22 ch 7 item no 4d) 0.70 2951.00 Cum 2066.00

12 Supplying of M.S. reinforcement including labour


charges for bending binding and placing in position all
reinforcement as per drawing including cost of binding
wire and all leads and lifts using
(II) Tor or ribed bars (IS:1139 &IS: 1786) 24.00 55.00 Kg. 1320.00
.(Rates as per BSR 2008 page 37 item 10(b)
13 Extra labour charges for obstruction in laying and
placing the reinforced cement concrete due to
reinforecement.
Columns, slabs, cantilevers, projections, stairscase,
lintels, beams, chajjas, retaining walls, piers, abutments,
galleries, arch covers bed plates sluice capastan bases 0.70 111.00 Sqm 78.00
etc.
(Rates as per BSR 2008 page 37 item 11b)

14 Supplying and fixing in Position of APM block made of


C.I. as per standard specification with adjustable
arrangment and required fixture including transportation
to site second stage concreting in C.C.(1:2:4) centreing
shuttering painting with red oxide finishing etc. complete
in all respect cost of A.P.M. block (all size) per block.
1 5966.00 per block 5966.00
(Rate as BSR 2008 page 44 ch 12 item 22)

15 Re-handling of excavated material including loading


unloading and dressing within initial leads of 50 m and
lift 1.5 m with cost of de-watering wherever required and
all applicable taxes and levies etc complete in all
respect.
(Rates as per BSR 2008 page14 ch 5 item 8)
Mixed Strata muck 32.00 52.00 Cum 1664.00
Total 104014.00
Say Rs. 1.05 lacs
DESIGN OF OUTLET
Name of work:-Construction of L.M.C. from 25 km to 38.715 km.

CANAL DATA Design of outlet Head (Hs)= Fixing


Name of G.C.A. in C.C.A. in Discharge of
S.No. R.D. out let in q2/(4.04*bt*y)2 R.L.(outlet
out let hact. hact. C.B.L. F.S.L. N.S.L. Bt Ya =q2/0.0036 bed level)
cusec
1 26295 7L 85.95 82.446 0.0288 270.78 271.64 271.72 0.1 0.15 0.23 271.26
2 27480 8L 70.909 60.675 0.0212 270.55 271.41 272.27 0.1 0.15 0.12 271.14
3 28255 9L 95.525 88.126 0.0308 270.46 271.25 271.5 0.1 0.15 0.26 270.84
4 28845 10L 90.255 82.433 0.0288 270.34 271.13 271.4 0.1 0.15 0.23 270.75
5 30245 11L 98.48 78.25 0.0273 269.9 270.68 269.81 0.1 0.15 0.20 270.33
6 31035 12L 103.65 88.26 0.0308 269.67 270.45 270.22 0.1 0.15 0.26 270.04
7 32055 13L 74.44 61.85 0.0216 269.33 270.11 270.94 0.1 0.15 0.13 269.83
8 32825 14L 74.96 73.5 0.0257 269.07 269.85 269.6 0.1 0.15 0.18 269.52
9 33330 15L 67.59 67.29 0.0235 268.9 269.68 269.4 0.1 0.15 0.15 269.38
10 33810 16L 72.49 71.46 0.0249 268.83 269.52 270.07 0.1 0.15 0.17 269.20
11 34495 17L 80.197 76.125 0.0266 268.6 269.28 269.38 0.1 0.15 0.19 268.94
12 34785 18L 86.434 80.03 0.0279 268.58 269.19 269.09 0.1 0.15 0.21 268.83
13 36245 19L 79.109 69.18 0.0241 267.09 267.7 267.25 0.1 0.15 0.16 267.39
14 36995 20L 68.888 55.065 0.0192 266.84 267.45 267.15 0.1 0.15 0.10 267.20
15 38020 21L 97.506 90.087 0.0314 264 264.61 264.16 0.1 0.15 0.27 264.19
16 38700 22L 73.776 72.009 0.0251 263.77 264.38 264.7 0.1 0.15 0.17 264.06
DESIGN OF OUTLET (APM)
Name of work:-Construction of Ram nagar minor of L.M.C. .

CANAL DATA Design of outlet Fixing Proposed


Name of G.C.A. in C.C.A. in Discharge of
S.No. R.D.
out let hact. hact. out let in R.L.(outlet foundation level
cusec
C.B.L. F.S.L. N.S.L. Hs Bt Ya bed level) for APM
1 1845 1RNM(L) 122.037 88.656 0.0309 260.63 260.97 271.72 0.11 0.10 0.22 260.64 259.83
2 2625 2RNM(L) 85.486 74.511 0.0260 259.38 259.67 272.27 0.00 0.00 0.00 259.67 258.58
3 3060 3RNMR) 84.059 88.126 0.0308 258.95 259.24 271.5 0.00 0.00 0.00 259.24 258.15
4 3787 4RNM(L) 89.566 77.501 0.0270 257.32 257.52 271.4 0.00 0.00 0.00 257.52 256.52

DESIGN OF OUTLET
Name of work:-Construction of Ram nagar minor of L.M.C. .

CANAL DATA Design of outlet Head (Hs)= Fixing Proposed


Name of G.C.A. in C.C.A. in Discharge of
S.No. R.D.
out let hact. hact. out let in q2/(4.04*bt*y)2 R.L.(outlet foundation level
cusec
C.B.L. F.S.L. N.S.L. Bt Ya hs=q2/0.0036 bed level) for APM
1 1845 1RNM(L) 122.037 88.656 0.0309 260.63 260.97 271.72 0.10 0.22 0.12 260.63 259.83
2 2625 2RNM(L) 85.486 74.511 0.0260 259.38 259.67 272.27 0.10 0.20 0.10 259.37 258.58
3 3060 3RNMR) 84.059 88.126 0.0308 258.95 259.24 271.5 0.15 0.25 0.04 258.95 258.15
4 3787 4RNM(L) 89.566 77.501 0.0270 257.32 257.52 271.4 0.30 0.20 0.01 257.31 256.52
REQUIRED
FSD DEPTH
0.34 0.34
0.29 0.30
0.29 0.29
0.20 0.21