Target Full Capacity of Existing SLF will be on Feb 29, 2020 #REF! days Target Plan 12 days @ February 11, 2020
Target Finished of Excavated Cell atleast 1 of 20x20x20m and right of way and
hustling of materials 20.00 days Equipement Needed
Backhoe 4.00 nos.
For the Hustling of Soil 20 cbm capacity 34.00 trips / day Bulldozer w/ Reefer 1.00 no.
Soil that need to haul 680.00 cu.m. / day Trucks 20 cbm / 7 trips/day 6.00 nos. say 42 trips / day
840.00 cu.m./DAY
Equipement Needed 10,080.00
Backhoe 3.00 nos.
Bulldozer 2.00 nos.
Trucks 20 cbm / 7 trips/day 5.00 nos. Base on Actual Hauling = 40 trips / 1 Truck of 20CBM
Capacity Total
Trucks Trips cu.m. Volume Cu.m/Day Days @ 10800 cu.m.
Volume Hauled September 12 - Jan 13 2020 135,866.00 cu.m.
Existing SLF as of January 13 2020 72,979.00 cu.m. 1 40 20 800 840 1.05 13.5
Total Volume per day including Metro Waste (1,095 cu.m. + 450 cu.m.) 47.2355987 days = say 48 days 2 40 20 1600 840 0.525 6.75
3 40 20 2400 840 0.35 4.5
4 40 20 3200 840 0.2625 3.375
New SLF 1 Cell ( 20x20x20) 8,000.00 cu.m. 5 40 20 4000 840 0.21 2.7
Site Clearing 2,000.00 cu.m. 6 40 20 4800 840 0.175 2.25
Rough Estimate 10,000.00 cu.m.
Truck ( 20 CBM capacity ) 20.00 cu.m.
sub-total 500.00 Trips
Target Plan 15.00 days
sub-total 33.33 Trips / day
say 34.00 Trips / day Prepared by : JAY GENER
8,000.00 5.18
9.16
Phase 2 16,858.13
Description Area Depth Total cbm/dy
Phase 2A 3,663.09 20.00 73,261.80 800.00
Phase 2B 4,786.90 20.00 95,738.00 800.00
Phase 2C 3,492.96 20.00 69,859.20 800.00
Phase 2D 4,915.18 20.00 98,303.60 800.00
16,858.13 337,162.60
Phase 2 16,858.13
Description Area Depth Total cbm/dy
Phase 2A 3,663.09 20.00 73,261.80 1,200.00
Phase 2B 4,786.90 20.00 95,738.00 1,200.00
Phase 2C 3,492.96 20.00 69,859.20 1,200.00
Phase 2D 4,915.18 20.00 98,303.60 1,200.00
16,858.13 337,162.60
Phase 2 16,858.13
Description Area Depth Total cbm/dy
Phase 2A 3,663.09 20.00 73,261.80 1,800.00
Phase 2B 4,786.90 20.00 95,738.00 1,800.00
Phase 2C 3,492.96 20.00 69,859.20 1,800.00
Phase 2D 4,915.18 20.00 98,303.60 1,800.00
16,858.13 337,162.60
Dumping
Description Area Depth Total cbm/dy
Phase 1 existing 7,611.00 20.00 152,220.00 800.00
7,611.00 15.00 114,165.00 800.00
7,611.00 266,385.00
130,519.00
84.48 days
29.00 january 13 - feb 23
55.48 days 172.48
6.52
172.48
117.00
55.48
15.53
19,739.00
8,000.00
144,000.00
480,000.00
8000 20 400
480.00
12.00
1.04
9,600.00
10,000.00
9,600.00
1.04
Development 10,000.00 sq.m.
Target Completion 3.00 months
Hours of Work 8.00 hrs.
Backhoe Capacity per day 400.00 cu.m/day
Height 25.00 l.m.
Volume 250,000.00 cu.m.
Equipment Needed
Buldozzer 2.00 nos
Backhoe 7.00 nos 2 RG 1 WCI
Dumptruck 6.00 nos
AAM 1
RG 2
Caguioa 1
RGY 1
Development 20,000.00 sq.m.
Target Completion 3.00 months
Hours of Work 8.00 hrs.
Backhoe Capacity per day 400.00 cu.m/day
Height 25.00 l.m.
Volume 500,000.00 cu.m.
Equipment Needed
Buldozzer 4.00 nos
Backhoe 13.00 nos
Dumptruck 11.00 nos
Development 30,000.00 sq.m.
Target Completion 3.00 months
Hours of Work 8.00 hrs.
Backhoe Capacity per day 400.00 cu.m/day
Height 25.00 l.m.
Volume 750,000.00 cu.m.
Equipment Needed
Buldozzer 4.00 nos
Backhoe 20.00 nos
Dumptruck 16.00 nos
Development 30,000.00 sq.m.
Target Completion 3.00 months
Hours of Work 8.00 hrs.
Backhoe Capacity per day 400.00 cu.m/day
Height 30.00 l.m.
Volume 900,000.00 cu.m.
Equipment Needed
Buldozzer 1.00 nos
Backhoe 4.00 nos
Dumptruck 6.00 nos
Development 2,025.00 sq.m.
Target Completion 25.00 days
Hours of Work 8.00 hrs.
Backhoe Capacity per day 400.00 cu.m/day
Height 20.00 l.m.
Volume 40,500.00 cu.m.
Equipment Needed
Buldozzer 1.00 nos
Backhoe 5.00 nos
Dumptruck 6.00 nos