Professional Documents
Culture Documents
("jfgL
b'/L lsld.sf]if nf]sn ;fdfg
k|s]hL k| s"n
;hLnf] b'/L 1.56
c;lhnf] u')ff 3.73
1 HofdL hjfg 560 2.19 560.00
2 l;kfn' hjfg 900 900.00
kDk ef++*f #G^f #REF!
102 kmnfd] lu|n 3x20 dL=dL= -k|lt jld 16=14 s]hL_ jld 1856.10 25.18 1881.28
103 kmnfd] lu|n 4=5x20 dL=dL=-k|lt jld 21=50 s]hL_ jld 2472.50 33.54 2506.04
104 kmnfd] lu|n agfO{ hf]*g] s]hL 115.00 1.56 116.56
105 ljleGg k|sf/sf] Rofgnx? s]hL 94.00 1.56 95.56
106 ljleGg ;fO{hsf]] cfO{ ljdx? s]hL 94.00 1.56 95.56
107 kmnfd] sf]nfK;Lan u]^ -h*Fg ;d]t_ jld 4800.00 62.40 4862.40 40 kg/m²
108 kmnfd] u]^ 18 u]h -h*Fg ;d]t_ s]hL 120.00 1.56 121.56
109 ;^/ 16.18 u]h -h*Fg ;d]t_ jld 1560.20 62.40 1622.60 18 gauge, 40 kg/m²
lh=cfO{= sf+(]tf/ -jf/ j]* jfo/ 7 dL= j/fj/ 1 s]]]hL
110 dfg]sf]_ ldl*od /ld 17.14 0.22 17.37 12 u]h
*fouf]gn sf+(]tf/ -jf/ j]* jfo/ 7 dL= j/fj/ 1 s]]]hL
111 dfg]sf]_ /ld 17.14 0.22 17.37 ,,
112 P]n'dLlgod em\ofn 9f]sf 0.00
Supply and fixing of aluminium sliding window j=dL=
without ventilator section size 88*38.1*1.3mm Imagine aluminium 2800 kg/m³
113 including 4mm glass and gasket all complete 7524.00 17.47 7541.47 (glass density)
Supply and fixing of aluminium sliding window ,,
with ventilator section size 88*38.1*1.3mm
114 including 4mm glass and gasket all complete 7970.00 17.47 7987.47
Supply and fixing of aluminium sliding window ,,
without ventilator section size 101*45*1.8mm
115 including 4mm glass and gasket all complete 7920.00 17.47 7937.47
Supply and fixing of aluminium sliding window ,,
with ventilator section size 101*45*1.8mm
116 including 4mm glass and gasket all complete 8762.00 17.47 8779.47
Supply and fixing of aluminium sliding Door with ,,
naturally anodized color. Section size section size
117 101*45*1.8mm 9207.00 17.47 9224.47
Supply and fixing of Casement double panel ,,
aluminium Windows with ventilation. Section size
118 (54*33*1.5)mm, (101*45*1.5)mm and 5mm glass. 6237.00 21.84 6258.84
Supply and fixing of Casement door of aluminium ,,
section in naturally anodized color. Section size
119 (101*45*1.5)mm and 5mm glass. 9742.00 21.84 9763.84
Supply and fixing of Swing door of aluminium ,,
section in naturally anodized color. Section size
120 (101*45*1.5)mm and 5mm glass. 9851.00 21.84 9872.84
Supply and fixing of Sliding windows 2 track in ,,
naturally anodized color. Section size
121 (88*38*1.3)mm and 5mm glass. 6683.00 21.84 6704.84
Supply and fixing of Fixed windows and partitions ,,
with fixed ventilators from 9mm board and section
122 (101*45*1.5)mm. 6227.00 21.84 6248.84
1 ;fx|f] k|sf/sf] Sn], g/d d'/d 9'+uf -#) ;]=dL=;Dd_ ld;]sf] df6f] ;a} lsl;dsf]
@–@ vGg] sfd !) dL6/ af]sgL l8:kf]hn / !=% dL6/;Dd lnˆ6 ;d]t
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
>lds Hofld 0.80 hjfg 560.00 448.00 448.00
oflGqs pks/0f Hofldsf] Hofnfsf] #Ü n] 13.44
?= 530.65 k}=
2 ;fdfGo df6f]n] k'g]{ sfd !%, !% ;]=dL= sf] txdf km}nfpg], kfgL 5g]{ /
@ -@%_s Hofldåf/f sDk}S6 ug]{ sfd ;d]t -!) dL= b"/Laf6 cf];fg]{_
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
>lds Hofld 0.50 hjfg 560.00 280.00 280.00
jf:tljs b//]6 280.00
b/ k|lt 3=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 42.00
?= 322.00 k}= hDdf b/ /]6 322.00
Rajpur , Doti rate 2074-75
14
* –$ s Wooden Posts KnfOjf]8{ k|of]u u/L km;{ / :nfjsf] nflu kmdf{ agfpg] sfd .
b/ ljZn]if0fsf] nflu !)) j=ld= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 17.20 hjfg 900.00
15480.00
>lds
v_ HofdL 25.70 hjfg 560.00 14392.00 29872.00
!( dL=dL= jf]8{ 16.5 j=dL= 1709.00 28198.50
sf7 -;Nnf]_ 0.232 3=dL= 32986.80 7652.93
lgdf{0f ;fdu|L
Wooden Posts 0.275 ;+Vof 425.00 116.87
lsnf sfF6L 25.00 s]=hL= 116.56 2914.00 38882.30
jf:tljs b//]6 68754.30
b/ k|lt j=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 10313.14
100
gf]6 M sf7 M ^ k6s;dd k|of]u ug{ ;lsg] To;kl5 @%Ü d"No afFsL /xg] lx;fan] ul/Psf]
1.6875x1.1x0.7516= 0.232
M KNffO{ M ^ k6s;dd k|of]u ug{ ;lsg] To;kl5 !)Ü d"No afFsL /xg] lx;fan] ul/Psf]
100x1.1x0.9/6=16.5
M kfO{k M !% k6s;Dd k|of]u ug{ ;lsg] To;kl5 @%Ü d"No afFsL /xg] lx;fan] ul/Psf]
88/15x0.75 =4.4
Rajpur , Doti rate 2074-75
%) X &% dL=dL= ;fO{hsf] ;Nnf] s' sf7sf] ^)) X ()) dL= dL= sf]
sf]7f agfO{ ljleGg lsl;dsf] kmN; l;lnË 7f]Sg]
#REF! ^ dL=dL= KnfO{p8
!)–!^ s b/ ljZn]if0fsf] nflu (=&% X #=^% Ö #%=%* j=ld= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 23 hjfg 860.00 19780.00
>lds
v_ HofdL 2.30 hjfg 525.00 1207.50 20987.50
;Nnf] s' sf7 0.45 3=dL= 31950.63 14377.78
^ dL=dL= KnfOp8 37.50 j=dL= 387.15 14517.93
lgdf{0f ;fdu|L
lni6L 100 /=dL= 32.00 3200.00
lsnf 0.50 s]=hL= 113.52 56.75 32152.46
jf:tljs b//]6 53139.96
b/ k|lt j=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 7970.99
61110.95 ?= 1717.56 k}= hDdf b/ /]6 61110.95
35.58
Rajpur , Doti rate 2074-75
#REF! %) dL=dL= -@Æ_ afSnf] l;d]G6 s+qmL6 -!M@M$_ ˆnf]/ 9nfg u/L
!!–! Uf l;d]G6 3f]6L tof/ ug]{ .
b/ ljZn]if0fsf] nflu !) j=dL= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 1.25 hjfg 860.00 1075.00
>lds
v_ HofdL 2.50 hjfg 525.00 1312.50 2387.50
l;d]G6 0.17 d]=6= 20515.00 3487.55
lgdf{0f ;fdu|L jfn'jf 0.23 3=dL= 1520.48 349.71
!@ dL=dL /f]8f 0.46 3=dL= 2250.36 1035.16 4872.42
jf:tljs b//]6 7259.92
b/ k|lt j=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 1088.98
8348.90 ?= 834.89 k}= hDdf b/ /]6 8348.90
10
@% dL=dL= afSnf] df]hfos ˆnf]l/Ë !( dL=dL= l;d]G6 Knfi6/ !M@ efudf u/L
#REF! To; dfly ^ dL=dL= dfj{n lrK; ;]tf] l;d]G6 !M! efudf nufO{
!!–# 3f]6\g] / kflnz ug]{ .
b/ ljZn]if0fsf] nflu !) j=dL= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 3.50 hjfg 860.00 3010.00
>lds
v_ HofdL 36 hjfg 525.00 18900.00 21910.00
l;d]G6 0.121 d]=6= 20515.00 2482.31
afn'jf vf]nfsf] 0.165 3=dL= 1520.48 250.87
;]tf] l;d]G6 0.069 d]=6= 38777.80 2675.66
# dL=dL= dfj{n lrK; 0.047 3=dL= 33772.50 1587.30
lgdf{0f ;fdu|L
-cShflns_ P;L8 0.34 s]=hL= 161.52 54.91
d}g kflnz 0.11 s]=hL= 583.52 64.18
tf/k]G6fOg 0.50 nL= 187.52 93.75
sfaf]{/08d 9'+uf cGbfhL – 120.00 7328.98
jf:tljs b//]6 29238.98
b/ k|lt j=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 4385.84
33624.82 ?= 3362.48 k}= hDdf b/ /]6 33624.82
10
Rajpur , Doti rate 2074-75
10
Rajpur , Doti rate 2074-75
#REF! #* dL=dL= -!Æ_ afSnf] l;d]G6 s+qmL6 -!M@M$_ ˆnf]/ 9nfg u/L
!!–! v l;d]G6 3f]6L tof/ ug]{ .
b/ ljZn]if0fsf] nflu !) j=dL= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 1.25 hjfg 900.00 1125.00
>lds
v_ HofdL 2 hjfg 560.00 1120.00 2245.00
l;d]G6 0.13 d]=6= 18560.00 2412.80
lgdf{0f ;fdu|L jfn'jf 0.18 3=dL= 4657.20 838.29
!@ dL=dL /f]8f 0.36 3=dL= 5397.20 1942.99 5194.08
10
### !@=% dL=dL= afSnf] l;d]G6 afn'jf Knfi6/ -!M#_ efudf l;lnËdf ug]{ .
!@–! s b/ ljZn]if0fsf] nflu !)) j=dL= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 15 hjfg 900.00 13500.00
>lds
v_ HofdL 20 hjfg 560.00 11200.00 24700.00
l;d]G6 0.625 d]=6= 18560.00 11600.00
lgdf{0f ;fdu|L
afn'jf vf]nfsf] 1.28 3=dL= 4657.20 5961.21 17561.21
Rajpur , Doti rate 2074-75
#REF! @) dL=dL= afSnf] l;d]G6 afn'jf Knfi6/ -!M#_ efudf sfd ug]{ .
!@–$ s b/ ljZn]if0fsf] nflu !)) j=dL= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 14 hjfg 860.00 12040.00
>lds
v_ HofdL 19 hjfg 525.00 9975.00 22015.00
#REF! Ps sf]6 c:t/ u/L b'O{ sf]6 Pk]S; k]G6 ug]{ sfd .
!#–% v,u b/ ljZn]if0fsf] nflu !)) J.=dL= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
l;kfn' 9 hjfg 900.00 8100.00
>lds
HofdL 5 hjfg 560.00 2800.00 10900.00
c:t/ 8.0 nL= 414.56 3316.48
lgdf{0f ;fdu|L Pk]S; k]G6 16.00 nL= 1261.56 20184.96
23501.44
jf:tljs b//]6 34401.44
b/ k|lt j=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 5160.21
39561.65 ?= 395.61 k}= hDdf b/ /]6 39561.65
100
Rajpur , Doti rate 2074-75
$=% X
#REF! @) dL=dL= kmnfd] lu|n agfO{ vfS;L nufO{ /]8cS;fO8 k]G6 ;d]t u/L hf]8\g]
@$–! v b/ ljZn]if0fsf] nflu !) j=dL= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
$=% X @) hDdf
dL=dL= kmnfd]
lgdf{0f ;fdu|L lu|n agfO{ 10 j=dL= 2506.04 25060.40
hf]8\g] 25060.40
jf:tljs b//]6 25060.40
b/ k|lt j=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 3759.06
28819.46 ?= 2881.94 k}= hDdf b/ /]6 28819.46
10
#REF! # ld6/ b"/Ldf vDaf ufl8 % tx tyf @ j6f 8fouf]gn sf9]tf/ nufpg] sfd .
@$–&
b/ ljZn]if0fsf] nflu #) /=dL= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
l;kfn' 1 ;+Vof 860.00 860.00
>lds
HofdL 2 ;+Vof 525.00 1050.00 1910.00
Supply and fixing of Fixed windows and partitions with fixed ventilators from 9mm board and section
#REF! (101*45*1.5)mm.
b/ ljZn]if0fsf] nflu ! Jf= dL= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
cfNd'lgodsf cfNd'lgodsf
lgdf{0f ;fdu|L swing door
#REF! sfnf] kmnfd] kfO{ksf] 6«; agfO{ k|fOd/ k]G6 ;lxt ;fO6df
lgb]{zfg';f/ h8fg ug]{ sfd .
b/ ljZn]if0fsf] nflu %(=#$ s]=hL= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
l;kfn' 3 ;+Vof 860.00 2580.00
>lds
HofdL 4 ;+Vof 525.00 2100.00 4680.00
kmnfd] sfnf]
kfO{k 59.34 s]=hL= 118.52 7032.68
;;fgf g6 jf]N6; 54.00 uf]6f 14.73 795.15
k|fOd/ k]G6 cGbfhL – – 110.00 7937.83
#REF! sfnf] kmnfd] kfO{ksf] kln{Ë agfO{ k|fOd/ k]G6 ;lxt h8fg ug]{ sfd .
b/ ljZn]if0fsf] nflu !*=($ s]=hL= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
l;kfn' 0.687 ;+Vof 900.00 618.30
>lds
HofdL 0.781 ;+Vof 560.00 437.36 1055.66
;j} k|sf/sf]
sfnf] kfO{k
lgdf{0f ;fdu|L kln{g
jgfO{ hf]8\g] 18.94 s]=hL= 121.56 2302.34
k|fOd/ k]G6 cGbfhL – – 110.00 2412.34
#REF! ljleGg ;fO{hsf] kmnfd] PËn km]lj|s]zg u/L k|fOd/ k]G6 ;lxt ug]{ sfd .
b/ ljZn]if0fsf] nflu !*=($ s]=hL== lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
>lds l;kfn' 0.687 hjfg 860.00 590.82
HofdL 0.781 hjfg 525.00 410.02 1000.84
;j} k|sf/sf]
lgdf{0f ;fdu|L kmnfd] PËn 18.940 s]=hL= 93.52 1771.17
k|fOd/ k]G6 - cGbfhL 110.00 1881.17
jf:tljs b//]6 2882.01
b/ k|lt s]=hL= sf] !%Ü 7]s]bf/ cf]e/x]8 432.30
3314.31 ?= 174.99 k}= hDdf b/ /]6 3314.31
18.94
Rajpur , Doti rate 2074-75
#REF! Fabrication of steel railing with 3 row of stainless steel pipe(2"/1"/1" with support 1.5ø steel pipe for 1
Rm
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
steel railing with
3 row of stainless
steel pipe(2"/1"/1"
with support 1.5ø
steel pipe all
1.00 dL= 2825.32 2825.31 2825.31
jf:tljs b//]6 2825.31
b/ k|lt j=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 423.79
3249.10 ?= 3249.10 k}= hDdf b/ /]6 3249.10
#REF! Ps sf]6 c:t/ u/L b'O{ sf]6 Pk]S; k]G6 ug]{ sfd .
!#–% v,u b/ ljZn]if0fsf] nflu !)) J.=dL= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
l;kfn' 9 hjfg 860.00 7740.00
>lds
HofdL 5 hjfg 525.00 2625.00 10365.00
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 5.80 hjfg 900.00 5220.00
>lds
v_ HofdL 5.80 hjfg 560.00 3248.00 8468.00
c:t/ 8.0 nL= 414.56 3316.48
lgdf{0f ;fdu|L
jf;]jn l8:6]Dk/ 16.00 nL= 265.56 4248.96 7565.44
jf:tljs b//]6 16033.44
b/ k|lt j=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 2405.01
18438.45 ?= 184.38 k}= hDdf b/ /]6 18438.45
100
31 leQf Pjd\ l;lnËdf @ ld=ld= Kn]g XjfO{6 k'§L Knfi6/ ug]{ sfo{ .
I 17 b/ ljZn]if0fsf] nflu !) j=dL= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 1.00 hjfg 860.00 860.00
>lds
v_ HofdL 1.00 hjfg 525.00 525.00 1385.00
lgdf{0f ;fdu|L XjfO{6 k'§L 10.640 s]=hL= 80.52 856.67 856.67
1 l;d]G6 jf jh| Knfi6/ eTsfO{ To;af6 cfPsf] w'nf] !) dL=k/ x6fpg] sfd .
L5 b/ ljZn]if0fsf] nflu ! Jf=dL= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
>lds HofdL 0.108 ;+Vof 525.00 56.70 56.70
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 10.75 hjfg 860.00 9245.00
>lds
v_ HofdL 10.75 hjfg 525.00 5643.75 14888.75
0.00
lgdf{0f ;fdu|L Pno"ldlgod k]G6 10.76 nL= 603.52 6493.82
vfS;L 4.00 uf]6f 503.52 2014.06 8507.88
###
Rajpur , Doti rate 2074-75
L 16 s'+b]sf] 9'Ëf, dfj{n jf lk|sfi6 s+lqm6 -l;d]G6 d;nfdf_ eTsfpg] sfd .
b/ ljZn]if0fsf] nflu ! 3=dL= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
l;kfn' 0.10 hjfg 860.00 86.00
>lds
HofdL 2.70 hjfg 525.00 1417.50 1503.50
oflGqs pks/0f 8f]/L cflb 75.18
#* dL=dL= afSnf] lr/fg cu|fv sf7sf] k|m]d xfnL l8nfvfkf agfO{ h8fg ug]{ .
64 -vfkfsf] gfk !=)& dL=X !=(*@ dL== @=!!$ j= dL=_
G4 b/ ljZn]if0fsf] nflu @=!!$ j=ld= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 10.00 hjfg 900.00 9000.00
>lds
v_ HofdL 1.00 hjfg 560.00 560.00 9560.00
cu|fv sf7 0.084 3=dL= 157701.60 13246.93
!)) dL=dL= sAhf 6.00 uf]6f 90.06 540.37
!%) dL=dL=5]:sLgL 1.00 uf]6f 100.08 100.07
#))dL=dL= 5]:sLgL 1.00 uf]6f 0.00 0.00
lgdf{0f ;fdu|L
#)) dL=dL=nlsË ;]6 1.00 uf]6f 1060.78 1060.78
-;fwf/0f_
Rajpur , Doti rate 2074-75
lgdf{0f ;fdu|L
#REF! Supply and fixing of two/ three paneled Sliding window with fixed ventilation (101*50*1.3)mm and 5mm
glass including mosquito proof net panel.
b/ ljZn]if0fsf] nflu ! Jf= dL= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
lgdf{0f ;fdu|L cfNd'lgodsf
-Hofnf ;lxt_ casement door 1.00 j=dL= 9228.84 9228.84
sf ;/;fdfgx? 9228.84
1 Single/Double panel casement hinge door ofSection size (54*33*1.5)mm, (101*45*1.5)mm and 5mm
glass.
b/ ljZn]if0fsf] nflu ! Jf= dL= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
lgdf{0f ;fdu|L cfNd'lgodsf
-Hofnf ;lxt_ Sliding door sf 1.00 j=dL= 6258.84 6258.84
;fdfg 6258.84
Items/Description Amount
A Civil Works Rs. #NAME?
2 Insurance premium for the insurance of owner and 1.00 Job 40,005.00 40,005.00
consultant staff (named) Rs. 10,00,000.00 per person for
20 persons with unlimited number of occurances for two
years.
3 Insurance Premium for construction equipments and 1.00 Job 8,125.00 8,125.00
machines with value of Rs.20,00,000.00 for 2 years.
4 Insurance Premium for third party liability personal only 1.00 Job 12,125.00 12,125.00
per person Rs.2,00,000.00 for 10 persons for 2 years
with unlimited number of occurance.
Total #NAME?
B Laboratory Test Provision
Carrying out diferrent laboratory tests of construction 1.00 Job 15000.00 15,000.00
material like cement, rod, bricks, sand, aggregate,
concrete cubes etc. during construction work as per
specification and direction.
2 Insurance premium for the insurance of owner and consultant staff (named) Rs. 10,00,000.00 per person
for 10 persons with unlimited number of occurances per annum
Personnel accident of 10,00,000.00 for 10 Rs.2.00 per thousand Rs 40,000.00
Do for Terrorism Rs.0.50 per thousand Rs
Premium Rs 40,000.00
For stamp duty Rs 5.00
Premium with stamp duty Rs 40,005.00
3 Insurance Premium for construction equipments and machines with value of Rs.20,00,000.00 for 2 years
Insurance premium of Rs. 20,00,000.00 Rs.2.03 per thousand Rs 8120.00
Do for Terrorism Rs.1.49 per thousand Rs
Premium Rs 8120.00
For stamp duty Rs 5.00
Premium with stamp duty Rs 8125.00
4 Insurance Premium for third party liability personal only per person Rs.2,00,000.00 for 10 persons for 2
years
P.A. of third party 10 per.=20,00,000.00 Rs. 3.03 per thousand Rs 12120.00
Do for Terrorism Rs. 1.49 per thousand Rs
Premium Rs 12120.00
For stamp duty Rs 5.00
Premium with stamp duty Rs 12125.00
51,617.42
Total Rs 147,793.47
Remarks
Remarks
a) Main Building
a) Toe wall
Grid 1 1.00 3.30 3.30
Grid 2,3,4 3.00 7.95 23.85
Foundation trench
( H=1.5+0.075+0.15= 1.725 m)
Footing
bottom square/rectangular portion
F1 (1.5 x 1.5) 7.00 1.50 10.50 1.50 0.20 3.15
CF1(3.0 x 1.5) 4.00 3.00 12.00 1.50 0.45 8.10
trapezoidal portion {V = (A1+A2+sqrt(A1*A2)*h/3}
F1 (1.5 x 1.5) 7.00 1.13 0.25 1.97
Column up to tie beam 15.00 0.30 4.50 0.30 1.35 1.82
GF Column 15.00 0.30 4.50 0.30 2.88 3.88
Attic column 4.00 0.30 1.20 0.30 2.40
Foundation Beam (0.25 x 0.30)
Grid 1 1.00 3.30 3.30
Grid 2,3,4 3.00 7.80 23.40
Grid A,B,C 3.00 9.45 28.35
Grid D 1.00 7.50 7.50
62.55 0.20 0.21 2.62
Tie Beam (0.25 x 0.30)
Grid 1 1.00 3.30 3.30
Grid 2,3,4 3.00 7.80 23.40
Grid A,B,C 3.00 9.45 28.35
Grid D 1.00 7.50 7.50
62.55 0.20 0.21 2.62
GF Main Beam (0.25 x 0.225)
Grid 1 1.00 3.30 3.30
Grid 2,3,4 3.00 7.80 23.40
Grid A,B,C 3.00 9.45 28.35
Grid D 1.00 7.50 7.50
62.55 0.20 0.21 2.62
sill band
GF Sill Band
Grid 1 1.00 3.30 3.30 0.35 0.08
Grid 2,4 2.00 6.60 13.20 0.35 0.08
Grid 3 1.00 3.30 3.30 0.35 0.08
Grid A 1.00 9.45 9.45 0.35 0.08
Grid B,C,D 3.00 5.70 17.10 0.35 0.08
For partition wall
Toilet wall 1.00 0.45 0.45 0.35 0.08
Lintel band
Grid 1 1.00 3.30 3.30 0.35 0.15
6.0 FORMWORKS
Formwork centering & shuttering with approved
material such as shuttering plywood, local wood
or plain steel etc. for all RCC works of any shape,
size & at any level with necessary steel propping,
scaffolding, staging, supporting, cutting holes for
utilization works etc.including providing final
surface and oil & removal of forms all complete.
Column
Column up to tie beam 15.00 1.20 18.00 1.35 24.30
GF Column 15.00 1.20 18.00 2.88 51.75
Attic Piller 4.00 1.20 4.80 2.40 11.52
Total 87.57
in Beam
Foundation Beam (0.25 x 0.30)
Grid 1 3.00 3.30 9.90
Grid 2,3,4 6.00 7.80 46.80
Grid A,B,C 6.00 9.45 56.70
Grid D 2.00 7.50 15.00
128.40 0.25 0.30 9.63
Tie Beam (0.25 x 0.30)
Grid 1 2.00 3.30 6.60
Grid 2,3,4 6.00 7.80 46.80
Grid A,B,C 6.00 9.45 56.70
Grid D 2.00 7.50 15.00
125.10 0.25 0.30 9.38
GF Main Beam (0.25 x 0.225)
Grid 1 2.00 3.30 6.60
Grid 2,3,4 6.00 7.80 46.80
Grid A,B,C 6.00 9.45 56.70
Grid D 2.00 7.50 15.00
125.10 0.25 0.48 15.01
GF Sill Band
Government of Province
Sudurpaschim Province
Ministry of Physical Infrastrucutre Development
Urban Development & Building Office
Rajpur , Doti
ABSTRACT OF COST
Name of project :-Construction of Sangalo Community Building F/Y: 2077-078
Location :-Badikedar-02,Doti
Rate/unit
S. N. Description Unit Quantity Rate/Unit Without Amount Remarks
Overhead
A CIVIL WORKS
1.0 Site clearance before and after completion
of work all complete as per instruction of
site engineer.
Job 1.00 5,000.00 5,000.00 5,000.00
2.0 EXCAVATION AND FILLING
E/W in Excavation in all kind of soils in
foundation including 10 m hauling distance
& 1.5m lift all complete work as per inst.
Sqm - -
Beam Sqm 34.02 1098.18 954.94 32,487.03
Column Sqm 87.57 601.76 523.27 45,822.86
Slab and other Sqm 24.89 833.54 724.82 18,040.70
B Lab Test Job 1.00 10000.00 10,000.00 10,000.00
Sub-Total 1,994,128.46
a) Main Building
a) Toe wall
Grid 1,2,3 3.00 6.40 19.20
Grid A,B,C 3.00 8.40 25.20
44.40 0.35 0.75 11.65
For partition wall trench
a) Main Building
Foundation trench
( H=1.5+0.075+0.15= 1.725 m)
F1 (1.5 x 1.5) 9.00 1.50 13.50 1.50 0.08 1.51
Toe wall trench
( H=0.60+0.075+0.15=0.825 m )
Grid 1,2,3 3.00 6.40 19.20
Column
bottom square/rectangular portion
F1 (1.5 x 1.5) 9.00 1.50 13.50 1.50 0.20 4.05
trapezoidal portion {V = (A1+A2+sqrt(A1*A2)*h/3}
F1 (1.5 x 1.5) 9.00 1.13 0.25 2.53
Column up to tie beam
C - 1 no. 9.00 0.30 2.70 0.30 1.50 1.21
GF Column -9 nos. 9.00 0.30 2.70 0.30 2.72 2.19
FF Column - 9 nos. 9.00 0.30 2.70 0.30 2.72
Parapet pillar- FF 1.00 0.30 0.30 0.30 0.90
Parapet pillar- above FF 9.00 0.30 2.70 0.30 0.90
in Beam
a) Main Building
Foundation Beam (0.25 x 0.30)
Grid 1,2,3 3.00 7.00 21.00
Grid A,B,C 3.00 8.40 25.20
46.20 0.25 0.30 3.46
Tie Beam (0.25 x 0.30)
Grid 1,2,3 3.00 7.00 21.00
Grid A,B,C 3.00 8.40 25.20
between grid A&B for Stair case 1.00 4.20 4.20
50.40 0.25 0.30 3.78
GF Main Beam (0.25 x 0.225)
Grid 1,2,3 3.00 7.30 21.90
Grid A,B,C 3.00 8.40 25.20
between grid A&B for Stair case 1.00 4.20 4.20
51.30 0.25 0.23 2.88
FF Main Beam (0.25 x 0.225)
Grid 1,2,3 3.00 7.30 21.00
Grid A,B,C 3.00 8.40 25.20
between grid A&B for Stair case 1.00 4.20 4.20
50.40 0.25 0.23
GF &FFSill Band
Grid 1,3 4.00 11.70 46.80 0.23 0.08
Grid 2 2.00 6.40 12.80 0.23 0.08
Grid A 2.00 4.20 8.40 0.23 0.08
Grid B 2.00 4.20 8.40 0.23 0.08
6.0 FORMWORKS
6.1 Formwork centering & shuttering with approved
material such as shuttering plywood, local wood
or plain steel etc. for all RCC works of any shape,
size & at any level with necessary steel propping,
scaffolding, staging, supporting, cutting holes for
utilization works etc.including providing final
surface and oil & removal of forms all complete.
A) Column
bottom square/rectangular portion
F1 (1.5 x 1.5) 9.00 6.00 54.00 0.20 10.80
Column up to tie beam
C1 - 9 no. 9.00 1.20 10.80 1.50 16.20
GF Column -9 nos. 9.00 1.20 10.80 2.72 29.37
FF Column -9 nos. 9.00 1.20 10.80 2.72
Parapet pillar- FF 1.00 1.20 1.20 0.90
Parapet pillar- above FF 8.00 1.20 9.60 0.90
Total 56.37 Sqm
B) Beam
Foundation Beam (0.25 x 0.30)
Grid 1,2,3 3.00 7.00 21.00
Grid A,B,C 3.00 8.40 25.20
46.20 0.60
Tie Beam (0.25 x 0.30)
Grid 1,2,3 3.00 7.00 21.00
Grid A,B,C 3.00 8.40 25.20
Slab 1.00 4.20 4.20
50.40 0.60
GF Main Beam (0.25 x 0.225)
Grid 1,2,3 3.00 8.15 24.45
Grid A,B,C 3.00 8.40 25.20
Slab 1.00 4.20 4.20
53.85 0.70 37.70
FF Main Beam (0.25 x 0.225)
Grid 1,2,3 3.00 8.15 21.00
Grid A,B,C 3.00 8.40 25.20
between grid A&B for Stair case 1.00 4.20 4.20
50.40 0.70
Government of Province
Sudurpaschim Province
Ministry of Physical Infrastrucutre Development
Urban Development & Building Office
Rajpur , Doti
ABSTRACT OF COST
Name of project :-Dhami Gaun Community Building
Location :-Tijali,Doti
S. N. Description Unit Quantity Rate/Unit Amount Remarks
CIVIL WORKS
1.0 Site Clearance & layout
1.1 E/W in Excavation in all kind of soils in for the site
develoment work including 10 m hauling distance & 1.5m
lift all complete work as per inst.
Cum 21.00 461.44 9,690.24
2.0 EXCAVATION AND FILLING -
2.1 E/W in Excavation in all kind of soils in foundation including
10 m hauling distance & 1.5m lift all complete work as per
inst.
Cum 47.63 461.44 21,978.39
3.0 MASONRY WORK -
3.1 Stone soling in pillar foundation in line level with
compaction 10.00m lead Cum 5.58 6,248.64 34,867.41
3.2 Stone masonry work (1:6) sub-structure in cement sand
mortar with approved quality stones in perfect line &
level with necessary scaffolding including wetting the
bricks, properly packing the joints & curing the works with
all complete.
Cum 12.31 13,264.16 163,281.81
3.3
a) Main Building
a) Toe wall
Grid 1,2,3 3.00 6.60 19.80
Grid A,B,C 3.00 8.50 25.50
45.30 0.45 0.75 15.28
For partition wall trench
between grid A&B for Stair case 1.00 4.30 4.30 0.45 0.75 1.45
Total 16.73 cum
a) Main Building
Foundation trench
Column
bottom square/rectangular portion
F1 (1.5 x 1.5) 9.00 1.50 13.50 1.50 0.20 4.05
trapezoidal portion {V = (A1+A2+sqrt(A1*A2)*h/3}
F1 (1.5 x 1.5) 9.00 1.17 0.25 2.63
Column up to tie beam
C - 1 no. 9.00 0.30 2.70 0.30 0.70 0.56
GF Column -9 nos. 9.00 0.30 2.70 0.30 2.72 2.19
in Beam
a) Main Building
Foundation Beam (0.25 x 0.30)
Grid 1,2,3 3.00 7.00 21.00
Grid A,B,C 3.00 8.40 25.20
46.20 0.26 0.31 3.72
Tie Beam (0.25 x 0.30)
Grid 1,2,3 3.00 7.00 21.00
Grid A,B,C 3.00 8.40 25.20
between grid A&B for Stair case 1.00 4.20 4.20
50.40 0.26 0.31 4.06
GF& Staircase
steps 16.00 0.98 15.60 0.02
landing slab 1.00 1.08 1.08 2.33 0.13 0.31
waist slab 2.00 2.51 5.02 0.98 0.13 0.61
Total 18.13 cum
5.0 REINFORCEMENT
6.0 FORMWORKS
6.1 Formwork centering & shuttering with approved
material such as shuttering plywood, local wood
or plain steel etc. for all RCC works of any shape,
size & at any level with necessary steel propping,
scaffolding, staging, supporting, cutting holes for
utilization works etc.including providing final
surface and oil & removal of forms all complete.
A) Column
bottom square/rectangular portion
F1 (1.5 x 1.5) 9.00 6.00 54.00 0.20 10.80
Column up to tie beam
C1 - 9 no. 9.00 1.20 10.80 0.75 8.10
GF Column -9 nos. 9.00 1.20 10.80 2.72 29.37
Total 48.27 Sqm
B) Beam
Foundation Beam (0.25 x 0.30)
Grid 1,2,3 3.00 7.00 21.00
Grid A,B,C 3.00 8.40 25.20
46.20 0.32 14.78
Tie Beam (0.25 x 0.30)
Grid 1,2,3 3.00 7.00 21.00
Grid A,B,C 3.00 8.40 25.20
#REF! 1.00 4.20 4.20
50.40 0.62 31.25
GF&FF Staircase
steps 32.00 0.98 31.20 0.43 13.42
landing slab 2.00 1.20 2.41 2.58 6.21
waist slab 4.00 2.51 10.04 1.23 12.30
Total Quantity 126.22 Sqm
Doti, Rajpur
REBAR MEASUREMENT
Name of office : Urban Development & Building Office Doti
Name of project :-Construction of Dhami Gaun Community Building
Location :-Tijali,Doti
Item Weight/m
Description of works No. Length Dia.of bar Quantity Unit Remarks
No. kgs
1 Foundation mat
Government of Province
Sudurpaschim Province
Ministry of Physical Infrastrucutre Development
Urban Development & Building Office
Rajpur , Doti
BOQ
Name of project :-Construction of Sangalo Community Building
Location :-Badikedar-02,Doti
Rate per unit(excluding VAT) in Nrs.
S. N. Description Unit Quantity Total Amount Nrs.
In Figure In words
A CIVIL WORKS
1.0 Site clearance before and after completion of work all
complete as per instruction of site engineer. Job 1.00
2.0 EXCAVATION AND FILLING
E/W in Excavation in all kind of soils in foundation including
10 m hauling distance & 1.5m lift all complete work as per
inst.
Cum 150.93
3.0 MASONRY WORK
3.1 Stone soling in pillar foundation in line level with
compaction 10.00m lead Cum 7.19
3.2 Stone masonry work (1:6) sub-structure in cement sand
mortar with approved quality stones in perfect line &
level with necessary scaffolding including wetting the
bricks, properly packing the joints & curing the works with
all complete.
Cum 20.21
3.3 #NAME? Cum 0.00
4.0 CEMENT CONCRETE WORKS
4.1 Plane cement concrete ( 1:3:6)concrete Using River Bed
aggregate under wall, floor & column foundation etc.
including protection of sides, laying compacting, curing
with all complete.
Cum 3.59
4.2 #NAME? Sqm #NAME?
4.3 Structural concrete (1:1.5:3 or M20 grade ) using River Bed
Aggregates, in any form, size, shape and level for all
reinforced cement concrete including mixing, laying,
compacting, curing and finishing excluding centering
shuttering and cost of reinforcement all complete.
Cum 39.96
5.0 Fixing Mild steel reinforcement grade 1 conforming to I.S.
1786-1985 in RCC work including cleaning, cutting,
bending, placing in position and binding with no.16 swg
annealed binding wire all complete.
Kgs 5645.67
6.0 Formwork centering & shuttering with approved material
such as shuttering plywood, local wood or plain steel etc.
for all RCC works of any shape, size & at any level with
necessary steel propping, scaffolding, staging, supporting,
cutting holes for utilization works etc.including providing
final surface and oil & removal of forms all complete.
Sqm 146.48
7.0 PLASTERING & POINTING WORKS
7.1 12.5mm thick Plaster Work in 1:4 in wall Sqm 262.52
7.2 12.5mm thick Plaster Work in 1:3 in Ceiling Sqm 0.00
8.0 38mm thick PCC 1:2:4 with Punning Work all complete as
per specification and instruction of site engineer. Sqm 0.00
9.0 PAINTING WORKS
9.1 Two coats of ready made enamel painting work over one
coats of primer painting over porperly sanded metal
surface all complete.
Sqm 0.00
9.2 Colouring with two coat Distemper paint of approved
color over one coat primer to give uniform colouring after
rendering the surface all complete.
Sqm 0.00
9.3 Coloring with two coats of weather coat paint (Apex or
eqvt.) of approved color over one coat primer to give
uniform coloring after rendering the surface clean and
moist as per specification and instruction all complete
Sqm 0.00
10.0 DOORS AND WINDOWS WORKS
10.1 Providing and fixing of Sal wood chowkhats of approved
size and section including 6-nos of Holdfast per frames all
complete as per the approval of the site engineer.
Cum 0.56
10.2 Supplying & fixing Aluminium casement / swing/ double
swing door as per drawing with ventilation from naturally
anodized aluminium (section 101.6mm *44mm*1.2mm)
with 5mm thick clear glass / 9mm thick laminated board all
complete.
Sqm 0.00
10.3 Supplying and fixing in position sal wood panneled
Door/window shutter including all necessary hardware and
fixtures all complete as per specification and instruction of
site engineer.
Sqm 0.00
10.4 #NAME? Sqm #NAME?
10.5 Supplying, making and fixing 12x12mm sq. solid pipe M.S.
grill with 4.5x20mm iron plate boarder grill having weight
21.5 kg per sq.m with Red oxide paints as per design and
instruction all complete.
Kgs 0.00
11.0 MISCELLANEOUS WORKS
11.1 Fitting and fixing of Stain less steel railing 3 row 2" Support
and Hand Rail and 1.5" Horizonta three layer as per design
drawing & specification & instruction site in charge.
Rm 0.00
11.2 Supplying and fixing in Position MS black pipe purlins for
roofing work including necessary nut-bolts,j-hooks etc all
complete as per specification and instruction of site
engineer.
Kgs 167.87
11.3 24 Gauge Colour CGI sheet for roofing work. Sqm 8.75
B SANITARY WORKS Job 1.00
C ELECTRICAL WORKS Job 1.00
PROVISIONAL SUM
1.0 Insurance for contract of work, third party, tools and plant
amd personal staff as perattached shteet(detail insurance
sheet)
PS 1.00 #NAME?
2.0 Carrying out diferrent laboratory tests of construction
material like cement, rod, bricks, sand, aggregate, concrete
cubes etc. during construction work as per specification
and direction.
PS 1.00 15,000.00
Total(A+B+C+PS)
VAT 13%
Grand Total
A. The rate quoted here under shall be inclusive of :
1. Supplying the materials along with accessories to the site.
2. Fixinf and erecting them in poition as per general practice, specification and instruction of the site engineer.
3. Test and maintenance up to the period, specified in the agreement.
B. The itemwise rate should be quoted without VAT.
a) Main Building
a) Toe wall
Grid 1 1.00 3.30 3.30
Grid 2,3,4 3.00 7.95 23.85
Foundation trench
( H=1.5+0.075+0.15= 1.725 m)
Footing
bottom square/rectangular portion
F1 (1.5 x 1.5) 7.00 1.50 10.50 1.50 0.20 3.15
CF1(3.0 x 1.5) 4.00 3.00 12.00 1.50 0.45 8.10
trapezoidal portion {V = (A1+A2+sqrt(A1*A2)*h/3}
F1 (1.5 x 1.5) 7.00 1.13 0.25 1.97
Column up to tie beam 15.00 0.30 4.50 0.30 1.35 1.82
GF Column 15.00 0.30 4.50 0.30 2.88 3.88
Attic column 4.00 0.30 1.20 0.30 2.40
Foundation Beam (0.25 x 0.30)
Grid 1 1.00 3.30 3.30
Grid 2,3,4 3.00 7.80 23.40
Grid A,B,C 3.00 9.45 28.35
Grid D 1.00 7.50 7.50
62.55 0.25 0.30 4.69
Tie Beam (0.25 x 0.30)
Grid 1 1.00 3.30 3.30
Grid 2,3,4 3.00 7.80 23.40
Grid A,B,C 3.00 9.45 28.35
Grid D 1.00 7.50 7.50
62.55 0.25 0.30 4.69
GF Main Beam (0.25 x 0.225)
Grid 1 1.00 3.30 3.30
Grid 2,3,4 3.00 7.80 23.40
Grid A,B,C 3.00 9.45 28.35
Grid D 1.00 7.50 7.50
62.55 0.25 0.23 3.51
sill band
GF Sill Band
Grid 1 1.00 3.30 3.30 0.35 0.08
Grid 2,4 2.00 6.60 13.20 0.35 0.08
Grid 3 1.00 3.30 3.30 0.35 0.08
Grid A 1.00 9.45 9.45 0.35 0.08
Grid B,C,D 3.00 5.70 17.10 0.35 0.08
For partition wall
Toilet wall 1.00 0.45 0.45 0.35 0.08
Lintel band
Grid 1 1.00 3.30 3.30 0.35 0.15
6.0 FORMWORKS
Formwork centering & shuttering with approved
material such as shuttering plywood, local wood
or plain steel etc. for all RCC works of any shape,
size & at any level with necessary steel propping,
scaffolding, staging, supporting, cutting holes for
utilization works etc.including providing final
surface and oil & removal of forms all complete.
Column
Column up to tie beam 15.00 1.20 18.00 1.35 24.30
GF Column 15.00 1.20 18.00 2.88 51.75
Attic Piller 4.00 1.20 4.80 2.40 11.52
Total 87.57
in Beam
Foundation Beam (0.25 x 0.30)
Grid 1 3.00 3.30 9.90
Grid 2,3,4 6.00 7.80 46.80
Grid A,B,C 6.00 9.45 56.70
Grid D 2.00 7.50 15.00
128.40 0.25 0.30 9.63
Tie Beam (0.25 x 0.30)
Grid 1 2.00 3.30 6.60
Grid 2,3,4 6.00 7.80 46.80
Grid A,B,C 6.00 9.45 56.70
Grid D 2.00 7.50 15.00
125.10 0.25 0.30 9.38
GF Main Beam (0.25 x 0.225)
Grid 1 2.00 3.30 6.60
Grid 2,3,4 6.00 7.80 46.80
Grid A,B,C 6.00 9.45 56.70
Grid D 2.00 7.50 15.00
125.10 0.25 0.48 15.01
GF Sill Band
Grid 1 2.00 3.30 6.60 0.08
Government of Province
Sudurpaschim Province
Ministry of Physical Infrastrucutre Development
Urban Development & Building Office
Rajpur , Doti
ABSTRACT OF COST
Name of project :-Construction of Sangalo Community Building F/Y: 2077-078
Location :-Badikedar-02,Doti
Rate/unit
S. N. Description Unit Quantity Without Amount Remarks
Overhead
A CIVIL WORKS
1.0 Site clearance before and after completion
of work all complete as per instruction of
site engineer.
Job 1.00 5,000.00 5,000.00
2.0 EXCAVATION AND FILLING
E/W in Excavation in all kind of soils in
foundation including 10 m hauling distance
& 1.5m lift all complete work as per inst.
Sqm - -
Beam Sqm 34.02 954.94 32,487.03
Column Sqm 87.57 523.27 45,822.86
Slab and other Sqm 124.20 724.82 90,022.32
B Lab Test Job 1.00 10,000.00 10,000.00
Sub-Total 2,236,354.14
First Floor
Column(12mm) 15 60 6.5 12 0.888 346.32
Column(16mm) 15 60 6.5 16 1.580 616.2
Stirrups 15 510 1.03 8 0.395 207.49
15 510 0.77 8 0.395 155.11
Foundation Beam
Grid A/B/C 3 18 9.3 12 1.580 264.49
Stirrups 3 180 0.67 8 0.395 47.63
Grid D 1 6 5.8 12 0.888 30.9
Stirrups 1 36 0.67 8 0.395 9.52
Grid 1 1 6 8.3 12 0.888 44.22
Stirrups 1 54 0.67 8 0.395 14.29
Grid2/3/4 3 18 10.5 12 0.888 167.83
Stirrups 3 204 0.67 8 0.395 53.98
Plinth Beam
Grid A/B/C 3 18 9.3 12 0.395 66.12
Stirrups 3 180 0.67 8 0.395 47.63
Grid D 1 6 5.8 12 0.888 30.9
Stirrups 1 36 0.67 8 0.395 9.52
Grid 1 1 6 8.3 12 0.888 44.22
Stirrups 1 54 0.67 8 0.395 14.29
Grid2/3/4 3 18 10.5 12 0.888 167.83
Stirrups 3 204 0.67 8 0.395 53.98
First Floor Beam
Grid A/B/C 3 12 9.3 16 1.580 176.32
3 6 9.3 12 0.888 49.55
Stirrups 3 180 1.11 8 0.395 78.92
Grid D 1 4 5.8 16 1.580 36.65
1 2 5.8 12 0.888 10.3
Stirrups 1 36 1.11 8 0.395 15.78
Grid 1 1 4 8.3 16 1.580 52.45
1 2 8.3 12 0.888 14.74
Stirrups 1 54 1.11 8 0.395 23.67
Grid2/3/4 3 12 10.5 16 1.580 199.08
3 6 10.5 12 0.888 55.94
Stirrups 3 204 1.11 8 0.395 89.44
Slab(Bottom mesh)
Main Bar 1 61 8.7 8 0.395 209.62
Distribution bar 1 58 9 8 0.395 206.19
Slab (Top Mesh)
Main Bar 1 61 8.7 8 0.395 209.62
Distribution bar 1 58 9 8 0.395 206.19
Chair 1 25 0.763 8 0.395 7.53
Total 4803.81 Kg