SESSION 1
BRIDGE CONSTRUCTION METHOD
TOPICS
1. Cast Insitu Method
1.1 Cast in situ by Shoring
1.2 Cast in situ by Form Traveller
1.3. Cast in itu by Movable Scaffolding System
1.4. Incremental Launching Method
Cast In-situ
Incremental
Overhead Form Traveler x x x x
Equipment /
Methods
Cast in situ
by Form
Traveller
PRECAST METHOD
Precast Application
Cast-in- Precast
situ
Cast-in-situ Precast
1 Pier *
2 Crosshead *
1 Pier *
3 Beam * 2 Crosshead Normally not required
4 Deck slab diaphragm * 3 Girder * *
Precast
PRECAST
SEGMENTAL
BOX GIRDER
LIFTING
CRANE GANTRIES SHORING GANTRIES
FRAMES
SPAN BY
CANTILEVER SPAN
LIFTING
CRANE GANTRIES SHORING GANTRIES
FRAMES
CANTILEVE SPAN BY
R SPAN
LIFTING
CRANE GANTRIES SHORING GANTRIES
FRAMES
SPAN BY
CANTILEVER SPAN
LIFTING
CRANE GANTRIES SHORING GANTRIES
FRAMES
Balance
Cantilever by
Gantry
Balance
Cantilever by
Gantry
Balance Cantilever by
Gantry
Balance
Cantilever by
Gantry
PRECAST
SEGMENTAL
DECKS
SPAN BY
CANTILEVER SPAN
LIFTING
CRANE GANTRIES SHORING GANTRIES
FRAMES
Span-by-span by Gantry
PRECAST
SEGMENTAL
DECKS
SPAN BY
CANTILEVER SPAN
LIFTING
CRANE GANTRIES SHORING GANTRIES
FRAMES
Span-by-span by Gantry
Span-by-span by Gantry
Span-by-span by Gantry
Span-by-span by Gantry
Span-by-span by Gantry
Span-by-span by Gantry
6. TENDON DISTRESSING
Span-by-span by Gantry
Span-by-span by Gantry
Span-by-span by Gantry
Span-by-span
by Gantry
Span-by-span
by Gantry
Span-by-span by Gantry
Span-by-span by Gantry
Summary
Cast In Situ – Precast
False work Segmental
Quality of Bridge Deck * **
Construction period * **
Interuption to traffic in urban area * **
Initial Cost ** *
Environmental impact * **
Level of Technical Expertise ** *
Project Cost ** **
Load introduction during
construction
** *
Prestressing ** *
Interuption due to Weather
/climatic condition
* **
Crane requirement * *
ILM
MSS
Segmental FCM
Segmental
Span by span