Professional Documents
Culture Documents
SHEAR FORCE
BENDING MOMENT
TRUSS PROBLEM
Z
L
AXIAL FORCE
.
FRAME PROBLEM
SHEAR FORCE
BENDING MOMENT
N
BY DIRECT STIFFNESS METHOD
ANALYSIS OF BEAM
20KN 5OKN
P1)
STIFFNESS
3
1 l2 12 1
KAB
6 4 -6 2 2
-12 6 12 3
6 2 4
KAB 12 6 -12 1
6 4 6 2
-12 6 12 3
2 6
3 5
K 1. 2- -12 3
6
12
6
KBc 12 12 3
6
12 12 -6
b 4
GLOBAL STIFFNESS K
K=
TRANSFORM MATRIX
3.75
K-1 0.125
A=K"F
0.47
CALCULATION OF FORCE IN MEMBERS
F=K*A+FEM
FAB 12 -12 10
6 -6 2.5
-12 12 6 10
6 -6 4 -0.47 -2.5
FAB -2.8125 10
-0.9375 2.5
2.8125 10
-1.875 -2.5
FAB= 7.1875
1.5625
12.8125
-4.375
FBC 12 6 -12
6 4
25
6 2 X -0.47 6.25
-12 -6 12 -6
6 2
25
-6 0.00 -6.25
FBC= -2.8125 25
1.875 6.25
2.8125 25
-0.9375 -6.25
FBC 22.1875
4.375
27.8125
7.1875
P2 2000KN
DOF= 5,6
2 6
0.50 0.50 -0.50 0.50
K1 Ac 0.50 0.50 -0.50 -0.50
-0.50 -0.50 0.50 0.50
-0.50 -0.50 0.50 0.50
4 6
o50
K 1 F
1
1000
2000
A=KF
AS -1000
A6 5000
Forces in members
FAc -0.71
-0.71 0.71 0.71
1000
5000
FAC 2828.43
1000
5000
1000.00
30,
FRAME PROBLEM
****
BENDING MOMENT
**
IL
L
3
SHEAR FC
DESION OF ONE WAY SIMPLY SUPPORTED SLAB
1Dimenslons of room 7 m
long length
m short length
2 Thickness of support Longer 0.23 m
13 Area of steel
Ast 294.4 mm2
use dia ofbr 8 mm2
spacing requiredd 1707.74 mm/cc
check spacing<3d 3d 405 TRUE
300 mm c/c
therefore provide minimum above 3 values
spacing provided 17074 mm c/c
area of steel Ast pro 294 mm2
check Ast min 62 mm2
Astprov>Astmin TRUE mm2
it is unsafe
1 Dimenslons of roomn m
b 1000 mm
6 Effective length 4.25 m
Y 3.52 m
200 mm
8 Total factoted load /m area on slab
self weight of siab Ws 5 KN/m assume in range 0.5 to 1
weight of floor finish Wf 1 KN/m From IS 875 part 2
live load on slab WI 3 KN/m live load for floor slab live load for roof slab
Res buildir 2 to9 KN/mm2 if access p 1.5KN/mm
Pub buildit 4 to 5KN/mm access not 0.75 KN/mm
Totalload on slab 9 KN/m
total factored load on slab Wu 13.5 KN/m
effective length leff 4.25 m
Factored bending moment
1.4706 KN/m Wxlet2/8 for 5 S
Mx 24.994 KN/m Wxleft/2 for cantilevr
My 11.583 KN/m W xLef/2 for SS
Max.Bm 24.994 KN/m
11 factored shear force V 28.688 KN
12 check for depth of slab
dreq 95.162 mm
dreqedpro TRUE
dprov :175 mm
D 200 MM
13 Area of tension of steel
mm
d 2b
S00
437.5 mm
D-span/12
mm
le/d=20
262.S
0.5
500 mm
loed calculation
DESIGN SUMMARY
depth D
breadth SS0 mm
Ast 250 mm
no.of bars 1256.6 mm2
dia 4
nos
acting of vertical stirrup 20
300
mm c/c
DOUBLY REINFORCED BEAM
600 0.5
m
length of beam 7000 mm 7
effective cover mm
effectlve depth ck S50 mm
grade of concrete 20 N/mm
grade of steel 415 N/mm
Ast1 14313253
Ast2 370.58579 nm2
Ast 1807.911 mm2
dia 25 mm2
no of bars 3.6709314 nos
nos
actual Ast 1963.437Ss mm
design for shear
nominal shear stress
1.1454545 N/mm2
permissible shear stress
t 1.4279545 N/mm2
0.706 N/mm2
TC<T TRUE
hence provide 2 legged 8mm dia
ASV 100.528 mm
spacing of stirrups Sv 330.36986 nm c/c
minimum shear reinforcment
362.95634 mm c/c
maximum spacing 0.75d or 300nm
412.5 mm c/c
300 m c/c
stirrups spacing 300 m c/¢
hence provide 2L 8mm Vertical
stirrups 300 mm c/c
actual /d 26 continuous
/d 12.727273
(/dkik2*ka)>ljd TRUE
SAFE
1 DIMENSION OF COLUMN
600 mmn
B 300 mm
er vIce 'load P 1200 KN
3 Bearing capacity of soil SBC 200 KN/m
4 Grade of concrete fck 20 N/m
s Grade of steel fy 415 N/m
Size of footing
Column working load 1200 KN
Self weight of footing 120 KN
1320 KN
C Area of steel
Along long direction diameter
spacing
Provide 12mm dia at 90mm c/c
V
141 KN
shear force
211.5 KN
Vu
Nominal shear stress TV 0.2763 N/mm2
Permissible shear stress Ks TC 1.118 N/mm2
TC < TV
FALSE
SAFE
Punching shear
b 0.38 m
critical section
L1 1.36 m
B1 1.06 m
4.84 mn
Perimeter Po
983.76 KN
shear force
1475.6 KN
Vy
Nominal shear stress TV 0.4012 N/mm2
Permissible shear stress ksTC 1.18 N/mm2
TC <TV FALSE
SAFE