WEPCO

AMERYA LPG PLANT


E & I SECTOR WEPCO
INSTRUMENT DEPARTMENT

WORK ORDER FOR CONTROL VALVE

To: TEAM Location:

Tag: Work Order No.:

Start Date: / / Completion Date: / /

Maintenance Duration:

Labors: 1- 2-

Spare Parts:

No. Description Part No. Item Code Qty.


1

All the steps of the check list were performed except steps :
STEP No. REASON
Test the I / P response by changing the DCS valve opening output and record the O/P preesure readings.

Scale 0% 25% 50% 75% 100% 75% 50% 25% 0%


Applied (mA)
Measured (PSI)

Adjust the I / P if it is needed then record readings again.

Scale 0% 25% 50% 75% 100% 75% 50% 25% 0%


Applied (mA)
Measured (PSI)