Design Conditions

Sl.No Product Import/Export Product state Pipe Dia Pressure MoC Origin Termination
(Inch)   Rating
Pressure (Bar) Max Temperature Min Temperature
(°C) (°C)

1 Butadiene Export Compressed liquid   24 15 46 5 CS Petrochem Complex Jetty

2 MEG Export Liquid 24 8 46 5 CS Petrochem Complex Jetty

3 Styrene Export Gas     24 8 46 5 SS Petrochem Complex Jetty

4 Polyols Export Liquid 14 8 80 CS Petrochem Complex Jetty

5 VAM Import Liquid 10 8 46 5 SS Jetty Petrochem Complex

6 Benzene Import Liquid 14 8 46 5 CS Jetty Petrochem Complex

7 Multi-product Both Liquid 10 8 46 5 CS Petrochem Complex Jetty

8 Crude Pipeline (**) Import Liquid 48 46 5 CS Jetty COT

9 Refinery Product Both   (Assumed) Liquid 32 46 5 CS Refinery Jetty (*)

10 Refinery Product Both (Assumed) Liquid 32 46 5 CS Refinery Jetty (*)

11 Refinery Product Both (Assumed) Liquid 32 46 5 CS Refinery Jetty (*)

CS +
Sea Water Supply   INTERNAL New Intake facility adjacent to Refinery & Petrochem
12 Import Liquid 52 8 25 5 CEMENT Existing Intake Facility Complex
LINED
CS +
13 Sea Water Return Export Liquid 40 8 35 5 INTERNAL Refinery & Petrochem Sea water discharge point via
CEMENT Complex Jetty
LINED

14 Naphtha Import Liquid 40 8 46 5 CS Jetty Petrochem Complex

15 LPG   Import Liquid 24 8 46 -60 SS Jetty Petrochem Complex