You are on page 1of 1

Doc.No.

:6660-004-C0241-F02

PREVENTIVE MAINTENANCE CHECK SHEET Effective Date:01-07-2020

Rev.No./Date.: 00

DATE :

START TIME: PM SPARE USED

END TIME : DURATION

Model Activity Method / Use of tools


S.No Line Name Portion Machine name Checkpoints Specification Observation Action Taken Remarks
Number Frequency & tackles

Daily Check Panel Electrical Check for Looseness & Screw Driver
1
Connection Tight ,Visually
2 Daily Machine 6S Should be Cleaned Manually
3 Dailly Any Abnormal Sound No abnormal sound Hearing
a Should not be any Leakage
4 Dailly N2 & Air Leakage of Air & N2 in the Hearing
machine

Monthly hose pipe & Coupler Hose pipe & Coupler Visually
5
FA Helium machine NA Condition should not be damage

Monthly vacuum pump oil level Check oil level , should be Visually, Manually
6
ok

Monthly recovery gauges/pressure should be connected Visually


7
b switch properly ,no any damage

Should be Proper Screw Driver,


8 Monthly valves mounting & Coil be fixed Visually
Properly

PREPARED BY: SANDEEP THAPLIYAL Approved by (Dept. Head): PRADEEP CHAUDHARI

You might also like