Professional Documents
Culture Documents
DAY 1
1.01: e
1.02: b
1.03: c
1.04: I: 5.15872 ~ 5.2 bbl; II: 13 std; III: 107.5 bbl; IV: 227.5 psi; V: 10.7 bbl
1.05: b
1.06: a
1.07: d
1.11: I: 5.45 bbl; II: no effect until slug exits the bit.
1.12: a – f – g
1.13: a – d – e
1.15: b –f – i
1.17: b
1.18: a – b – f
1.19: e
1.20: a
1.21: a – b – c
1.22: a – d
1.23: d
1.24: d
1.25: c
1.26: b – b
1.27: b
1.28: d)1- j)2- h)3- g)4 – I) 5
1.29: b – c – e – f
1.30: a – c – e – f
1.31: a
1.32: a – c – d
1.33: b
1.34: c
1.37: b
1.38: d – e
1.40: primary barrier in side track is the fluid column Primary barrier in original hole: casing
cement, casing, mechanical plug and in- situ formation Secondary: in-situ formation, casing
cement, casing , production packer, well head, tubing hanger, surface tree, high pressure riser
(if surface) BOP. (No need to do)
1.41: primary:- mud / secondary: in-situ formation, casing cmt, wellhead, HP riser (if
installed) , BOP. (No need to do)
1.43: b
1.44: b
1.45: annular, in-situ formation, casing cement,casing, well head, HP riser (if applicable), casing
ram (if applicable),casing float valves (2pcs inflow tested able to withstand max differential
pressureinc. Safety factor ), X/O with DPSV.
1.46: c
1.47: b
1.48: c, e
1.49: a – b – c – e – g – h
1.50: b – g – h – k
1.51: b – d – g
1.52: c
1.53: d
1.54: d
2.02: b
2.03: b
2.04: b – d – e
2.05: c
2.06: a – b
2.07: a – b – c
2.08: c – f
2.09: c - b - b
2.11: d
2.12: a, d
2.13: c
2.14: a
2.15: a
2.16: c
2.17: c
2.18: d – b – c
2.19: c – e
2.21:b
2.22: c
2.24: c
2.25: a
2.26: b – c – f
2.27: b
2.28: d
2.29: a) ↑ → b) ↓ → c) ↓ ↓ d) ↑ ↑ e) ↓ →
2.30: c
2.31: a) → → ↑ ↑ ↓ ↑ → ↑ b) → → ↑ ↓ ↓ ↑ ↑ ↑ c) → → ↑ → ↓ ↑ ↑ ↑ d) → → ↓ →
↓ ↓ ↓ ↓ 2.32: a) → ↓ → → → ↑ b) → → ↓ ↓ → ↑ c) → → ↓ → ↓ ↑ d) → → → → →
2.33: c – e – c – e –d – d– b – c
2.34: a
2.35: a) 1230 psi b) 1551 stk c) 962 stk d) 130 min e) 1638 stk f) 11.0 ppg g) 1460 psi h) 968 psi
i) 750 psi j) 1616 psi k) 31.7 psi/100stk
2.36: a – d – h – i – j
2.38: b
2.39: a – b – c – e – f
2.40: a – c- d- d
DAY 3
3.01: a – b– a – b
3.02: a – b – b – a
3.03: d
3.04: c
3.05: a
3.06: b
3.07: a – d
3.08: a
3.09: a
3.10: a – e
3.11: a – c
3.12: a
3.13: c
3.14: b
3.15: a
3.16: a
3.17: b – d
3.18: I) 1500 psi
II) 625 +/- psi
III) 850 +/- psi
IV) 1100 +/- psi
3.19: a – b – c
3.20: c
3.23: a – c – d
3.24: a – b
3.25: d – e
3.26: a – c – d – e
3.27: e
3.29: d
3.30: c – d – e
3.31: a
3.32: c
3.33: c
3.34: a
3.35: d
3.36: d – b
3.38: c
3.39: b
3.40: c
3.41: c
3.42: b
3.43: c
3.44: a – c
3.45: a
3.46: d
3.47: a
3.48: a
3.49: b – d
3.50: b
3.51: d
3.52: b
3.53: e
3.54: a – b – d – e – g – h – i – k – l – m – n
3.55: b
3.56: b
3.57: c
3.58: a
3.59: c
3.61: b
3.62: c
3.63: a
3.64: a
DAY 4
4.01: d
4.02: b
4.03: a)4 b)5 c)1 d)2 e)3 f)6 (No need to do)
4.05:b
4.06: c
4.07: b
4.08: b
4.09: c
4.10: a
4.11: a)10 b)3 c)1 d)12 e)4 f).11 g)8 h)7 i)6 j)2 k).5 l)9 (No need to do)
4.12: a – c – e
4.14: a
4.16: a - d
4.17: a - e
4.18: b – d
4.19: a
4.20: a
4.21: c
4.22: b
4.23: c
4.24: a – d – e
4.25: a
4.26: a
4.28: a
4.29: a & c
4.30: 1) Mini panel 2) Battery backup / emergency power bank. 3) Drillers control panel 4)
Guide wires / pod retrieval wire 5) Control hose bundle / umbilical 6) Control hose reel (blue)
7) Flex joint 8) Stack accumulators 9) Control Pod 10) Hose clamp 11) Sheave 12) control hose
reel
4.31: a
4.32: a
4.33: b
4.34: c
4.35: a – c – g – h
4.36: a
4.37: b
4.38: c
4.39: a
4.40: 1000 psi a) Loss of power c) No e) No f) on control unit next to 3 position 4 way valve g)
opened Classified as Internal
4.41: a
4.42: a
4.43: d
4.44: b
4.45: b
4.47: b
4.48: d
4.49: d
4.50: c
4.51: b – c – f
4.52: c
4.53: c
4.54: b
4.56: a
4.57: d
4.58