SUMMARY
This idocument iis ibased ion ithe iproject iplan iof ia iwastewater itreatment iplant ithat iengineering
istudents ihave ibeen itasked ito ido iin iconstructing iand icommissioning ito imeet imunicipal ieffluent
istandards. iThis iwater itreatment imust iservice ithe ineeds iof ia ibrewery, ipaper imill iand irefinery. iIt
ihas ibeen igiven ithat ithe iplant imust icater ifor i100000 ilitres iof ieffluent iwhich iwill ienter iit iper
iweek. iIn ithis iproject iyou imust ishowcase ibasic iprinciples iof iproject imanagement iand imake iuse
iof iMS iProject. iA itechnical ireport ion ithe iprocess iof iwastewater itreatment ihas ibeen idetailed iin
ithis ireport.MS iProject iwill ibe iused ito ishow ithe iduration iand idifferent istages ifrom iplanning ito
ithe icompletion iof ithis iproject. iCost ihave ialso ibeen ioutlined iin iMS iProject.
Page | 2
TABLE OF CONTENTS
i i
PAGE iNO.
SUMMARY 2
DECLARATION 4
INTRODUCTION 5
CONCLUSION 9
RECOMMENDATIONS 9
REFERENCES 10
APPENDICES 11-12
Page | 3
DECLARATION
I, ithe iundersigned iMikho iCingo iwith iregistration ino. i21914487 ideclare ithat ithe icontents iof ithis
idocument isubmitted iby ime ito iDr iM. iChetty iin ithe iDepartment iof iChemical iEngineering iat ithe
iDurban iUniversity iof iTechnology iin ipartial ifulfilment iof ithe irequirements ifor iProject
iManagement i101 iwas icarried iout iby ime iunder ithe iguidance iof iDr iM. iChetty. iI ifurther ideclare
ithat ithe iwork ireported iin ithis iassignment ihas inot ibeen isubmitted iand iwill inot ibe isubmitted ito
iany iother iinstitution, ieither iin ifull ior ipart, ifor ithe iaward iof iany iother iqualification. iInformation
ifrom iother isources ihas ibeen igiven icredit ifor iin ithe ireference ilist.
X
Mikho Cingo
Author
Page | 4
INTRODUCTION
This iproject iis iabout iproposing ia iwastewater itreatment iplant ithat iwill iservice ithe ineeds iof ia
irefinery, ibrewery iand ipaper imill. iThe icapacity iof ithis iplant imust ibe ifor i100000 ilitres iof ieffluent
iwhich iwill ienter iper iweek. iThis iproject ishould ioccur iover ia iperiod iof itwo iyears.MS iproject
isoftware iwill ibe iput iinto iuse ito ishowcase ithe iplan ifor ithe iproject iin idetail iand iprovide icost
iestimation ifor ithe iconstruction iof ithe iplant. iA iprocess iflow idiagram iwill ialso ibe ipresented ito
Page | 5
THEORY AND DISCUSSION
i i
Water iis ione iof ithe imost ivital inatural iresources ifor iall ilife ion iEarth. iThe iavailability iand iquality
iof iwater ialways ihave iplayed ian iimportant ipart iin idetermining inot ionly iwhere ipeople ican ilive,
ibut ialso itheir iquality iof ilife. iIndustrial iwater iuse iis ia ivaluable iresource ito ithe ination's iindustries
ifor isuch ipurposes ias iprocessing, icleaning, itransportation, idilution, iand icooling iin
imanufacturing ifacilities. iMajor iwater-using iindustries iinclude isteel, ichemical, ipaper, iand
ipetroleum irefining. iIndustries ioften ireuse ithe isame iwater iover iand iover ifor imore ithan ione
ipurpose.
itreatment iis ian iimportant iinitiative iwhich imust ibe itaken imore iseriously ifor ithe ibetterment iof
ithe isociety iand iour ifuture. iWastewater itreatment iis ia iprocess, iwherein ithe icontaminants iare
iremoved ifrom iwastewater ias iwell ias ihousehold isewage, ito iproduce iwaste istream ior isolid iwaste
ifrom iit. iThese iplants iare iused iby iall icompanies ifor ienvironment iprotection. iAn iETP iis ia iplant
iwhere ithe itreatment iof iindustrial ieffluents iand iwaste iwaters iis idone. iThe iETP iplants iare iused
Page | 6
Treatment iLevels i& iMechanisms iof iETP i–
i Treatment ilevels:
• Preliminary
• Primary
• Secondary
• Tertiary
Mechanisms:
• Physical
• Chemical
• Biological
Treatment iSteps
ipressed iand idisposed iof iin ia ilandfill. iThe iscreened iwastewater iis ithen ipumped ito ithe inext istep:
igrit iremoval.
ibottom iand ithe iwastewater iexit ithe itank ifrom ithe itop. iFloating idebris isuch ias igrease iis
iskimmed ioff ithe itop iand isent iwith ithe isettled imaterial ito idigesters. iIn ithis istep, ichemicals iare
initrogen. iThe ibiological iactivity ioccurring iin ithis istep iis ivery isimilar ito iwhat ioccurs iat ithe
ibottom iof ilakes iand irivers, ibut iin ithese iareas ithe idegradation itakes iyears ito iaccomplish.
Page | 7
Step i5: iSecondary iSettling
Large icircular itanks icalled isecondary iclarifiers iallow ithe itreated iwastewater ito iseparate ifrom
ithe ibiology ifrom ithe iaeration itanks iat ithis istep, iyielding ian ieffluent, iwhich iis inow iover i90%
itreated. iThe ibiology i(activated isludge) iis icontinuously ipumped ifrom ithe ibottom iof ithe
iclarifiers iand ireturned ito ithe iaeration itanks iin istep ifour.
Page | 8
In iputting itogether ithis iproject iplan iI igained imore iknowledge ion ihow ito iuse iMS iprojects ito
ishowcase ithe idesign iand iconstruction iof ia iplant ifrom ithe iinitiation istage iup ito iits icompletion.
iWastewater itreatment iis ivery iimportant iin iindustries ibecause iit ihelps ithem ito icut icosts ion
ipaying ifines iand iusing ipotable iwater ifrom imunicipal isystems, iso irecycling itheir iown ieffluent
iwill ibe ivery ibeneficial. iThe ion-site iconstruction iof ithis iplant iis ivery iwise icause iit ialso icut icost
ion itransportation iof ieffluent ito iother itreatment iplants ithat imay ibe iavailable.
I iwould irecommend ithat ifor ithe iconstruction iof ithis iplant ito ihappen ipeople ishould istick ito
imaking isure ithat ithey isubmit itheir ideliverables ion itime ito imake isure ithe iproject igoes