Contents
Introduction………………………………………………………………………3
Work Breakdown Structure(WBS) .……………………………………4
Project Charter………………………………………………………………….5
Preliminary Effort Estimation…………………………………………….6
Preliminary Budget……………………………………………………………7
Action Plan………………………………………………………………………..8
Gantt chart for ‘Action Plan. ……………………………………………..9
Conclusion……………………………………………………………………….10
References……………………………………………………………………….11
Appendices……………………………………………............................12
Introduction
(2)Food
(2)Foodand
and (3)venue
(3)venueand
and
(1)entertainment
(1)entertainment location (4)decoration
(4)decoration
beverage
beverage location
(3.1)
(3.1)Convenient
Convenient
location
locationfor
for
everyone
everyone
(3.2)
(3.2)search
searchfor
for
Venues
Venueswith
with50pax
50pax
capacity
capacity
(3.3)
(3.3)Location
Locationoutoutof ofthe
the
red
redzones
zonesinin
InIncoVID19
coVID19
(3.4)
(3.4)Get
Getprice
price
quotations
quotationsfrom
fromthe
thelist
list
above
above
((3.5)
3.5)Get
Getapproval
approvalfrom
from
the
the Team andReserve
Team and Reservethe
the
Venue
Venue
Project charter
Project Charter
Project Title Synergy’20
Project Start Date 02nd December 2020 Project End Date 10th February 2021
Our aim is to organize a awards ceremony for Veracity Technology along with a sit-down dinner which would be
a formal event which would be held indoor as a token of appreciation with the annual awards for the employees
of Veracity for their hard work and dedication shown throughout the year. This event will also build stronger
bond between the employees. Finally Thanking all those who worked hard for the betterment of the company
appreciating their efforts for those who will be leaving soon.
Project Purpose / Business Justification Why is the project being undertaken? Describe the need this project addresses.
The main purpose of the project is to appreciate the employees for their dedication and hard work throughout
the year and appreciate those who plan to leave the company for their efforts.
Project Scope List what the project will address Scope Exclusions List what will not be covered by project
Goals / Objectives Describe the measurable outcomes of the project, e.g., reduce cost by xxxx
1. Employee Motivation
2. Employee Satisfaction
3. Employee bonding
Constraints List conditions that may limit options for resources, Dependencies Will success depend on other parties? Is there
personnel, or schedule something that needs to happen before project can be completed?
1. Ministry of Health imposing a curfew due to 1. Everyone responds back on time as scheduled on
COVID19 the timeline
2. The venue, cutleries to be cleaned according to 2. Expecting Good weather throughout the day for a
the health regulations. smooth arrangement of the event
Project Budget Main expenses and/or total budget
03/02/2021 05/02/2021
Key Stakeholders
Approval Signatures
Effort estimation
Budget template
Action plan
N Action / task Related WBS Proposed Target End Notes / Special
o item no Start Date date resources required
1. • Convenient location for 3.1 December December
everyone 1st week 2nd week
Gantt chart
Conclusion
In conclusion, this project is a team bonding session for Veracity Employees that which will be held
on the 10th February 2020.
This will be organized by our project management team where we have divided the event into 6 sub
components equally.
I think this event would be great success which would bring together all the employees and even our
team members.
References
https://www.booking.com/country/lk.en.html?
aid=1610687;label=lk-
JEPwfUfBYcS3mg*fI_h81AS438058935550:pl:ta:p1:p2:ac:ap:neg:fi:tik
wd-
311675701577:lp1009919:li:dec:dm:ppccp=UmFuZG9tSVYkc2RlIyh9Y
fpWGnRw6lOGgfEoJVv7zYo;ws=&gclid=Cj0KCQiAifz-
BRDjARIsAEElyGL6KYddtHTm4eU9Pl9VYF-
bMUJLbWskJVZoafPaEWX6uf6PsO03Ha4aAiz4EALw_wcB
Appendices
Please refer the below 1 appendices’ WBS (work brake down structure)
WBS yeshmi.docx
Project_Charter_Yes
hmi.docx
Preliminary_Effort_E
stimation_template_v2.0.xlsx 2 (1).xls (1).xlsx
Preliminary Budget
template v2.0 (3).xlsx
Preliminary Budget
template v2.0 (3).xlsx
Action Plan
template v0.8 (1) (3).docx
Permission proceed
__________________________ (client name) wishes to proceed with the
project as detailed in this report.
________________________ _______________
Client signature Date
________________________ _______________
Project Manager signature Date