You are on page 1of 127

DESIGN OF PROPOSED

OFFICE BUILDING AT
BWEYA,BUSILO COUNTY,
WAKISO DISTRICT, PLOT
676, 400, 590, 1257 &
1339,BLOCK 396 WAKISO
DISTRICT

CLIENT: BAR AVIATION LTD & ORLAND BARAK


P.O.BOX 12093 KAMPALA

STRUCTURAL ANALYSIS REPORT

AUG 2021
DESIGN INFORMATION
Job Title DESIGN OF PROPOSED OFFICE BUILDING AT BWEYA,BUSILO
COUNTY, WAKISO DISTRICT, PLOT 676, 400, 590, 1257 &
1339,BLOCK 396 WAKISO DISTRICT
Client BAR AVIATION LTD & ORLAND BARAK
P.O.BOX 12093 KAMPALA
Building Regulation Authority WAKISO DISTRICT
Intended use of structures OFFICE
Design Codes BS: 8110, PARTS 1 & 3:1997, 'STUCTURAL USE OF CONCRETE’
BS: 5950, PART 1: 2000, 'STRUCTURAL USE OF STEEL'
BS: 6399: 1996, 'LOADINGS FOR BUILDINGS’
PART 1: CODE OF PRACTICE FOR DEAD AND IMPOSED LOADS
PART 2: CODE OF PRACTICE FOR WIND LOADS
PART 3: CODE OF PRACTICE FOR IMPOSED ROOF LOADS
BS 5628: PART 2: 1978 ‘STRUCTURAL USE OF REINFORCED MASONRY’
Fire Resistance Requirements 1 HOUR FIRE RESISTANCE FOR ALL ELEMENTS
Exposure Conditions EXTERNAL : MODERATE
INTERNAL : MILD
Sub-Soil Conditions SAFE BEARING PRESSURE = 150 kN/m2 AT 1.0M
WATER TABLE > 2M BELOW GROUND SURFACE
Foundation Type REINFORCED CONCRETE PAD FOOTINGS, TO R.C COLUMNS.
Wind Loading Condition BASIC WIND SPEED, V = 30m/s
Materials CONCRETE
REINFORCED : GRADE C30
CONCRETE CONTAINING NO EMBEDED METAL: GRADE C15
BLINDING : GRADE C7.5
MAX AGGREGATE SIZE : 20 mm
REINFORCEMENT
HIGH TENSILE : fy = 460 N/mm2
MILD STEEL : fy = 250 N/mm2
STRUCTURAL STEEL
GRADE 43 Steel
Other Relevant Information UNIT WEIGHTS OF MATERIALS
CONCRETE : 24 kN/m3
CONCRETE BLOCKS : 20 kN/m3
STEEL : 77 kN/m3
DESIGN PHILOSOPHY
GENERAL The building is reinforced concrete structure.

ROOF Roof is galvanised iron sheets on steel trusses on steel tie beam on
wall plate

STABILITY Lined side-by-side reinforced concrete columns act as portal frame


provide stability in X and Y directions.

The RC columns act as vertical cantilevers transferring lateral load to


the RC pad foundations

FOUNDATIONS Allowable bearing pressure of the soil estimated to be 150 kN/m2

Foundations to be reinforced concrete pad footings to support


column members of frame structures, and strip footings for load
bearing walls

GROUND BEARING SLAB

Sub-grade Strong

Concrete Slab 150 mm

Reinforcement A142
LOADING DATA
DEAD IMPOSED DESIGN
LOADING 1.4Gk+ 1.6Qk
2 2 2
(kN/m ) (kN/m ) (kN/m )
ROOFING TILES ON TRUSS
- Self-weight of tiles 1.2 1.68
- Trusses 0.3 0.42
- Purlins 0.03 0.042
- Ceiling and services 0.5 0.7
- Imposed (Residential) 0.25 0.4

SUSPENDED FLOOR SLAB (SOLID)


- Self-weight (200mm thick) 4.8 6.72
- Finishes (Floor screed & Ceiling) 1.0 1.4
- Ceramic Tiles 0.3 0.42
- Demountable Partitions 1.0 1.6
- Imposed (Residential) 1.5 2.4
6.1 2.5
SUSPENDED FLOOR SLAB (RIBBED)
- Self-weight (200mm/250mm thick) 2.88/3.12 4.032/4.368
- Finishes (Floor screed & Ceiling) 1.0 1.4
- Ceramic Tiles 0.3 0.42
- Demountable Partitions 1.0 1.6
- Imposed (Residential) 1.5 2.4
4.18/4.42 2.5
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-1

Axis: 1 Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B1 L=2700mm 1B2 L=4800mm 1B3 L=4700mm
BwxH (mm) 200 x 450 200 x 450 200 x 450
Flange BfxHf --- --- ---

6.93 6.93
6.93 6.93
3.77 3.77
3.77 3.77

Loads 0.1 4.70.1 4.6


UDL G=2.25 Q=0 kN/m UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m
50.999
44.037

11.991
Shear
Force -1.988
(Env.)
-45.148 -50.397
44.322 44.54
26.863 26.095
21.07
4.22
Moment
4.202
(Env.) -3.568

-27.158 -25.572

Bending (Top Edge) ...


M (kN.m) 4.7 13.5 21.1 26.9 4.0 44.3 44.5 5.0 26.1
d (mm) 409.0 409.0 409.0 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.04 0.10 0.16 0.21 0.03 0.34 0.34 0.04 0.20
x (mm) 45.44 45.44 45.44 45.44 45.44 57.10 57.40 45.44 45.44
As (mm2) 33.59 97.49 152.10 193.92 29.12 324.33 326.05 36.11 188.37
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 3.6 5.1 27.2 1.1 0.4 25.6 5.2
d (mm) 409.0 392.0 409.0 392.0 392.0 409.0 392.0
K/K' 0.03 0.04 0.21 0.01 0.00 0.20 0.04
x (mm) 45.44 43.56 45.44 43.56 43.56 45.44 43.56
As (mm2) 25.75 38.60 196.05 8.28 2.81 184.60 39.16
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 6.8 12.0 45.1 51.0 50.4 44.0
v (N/mm2) 0.08 0.15 0.55 0.62 0.62 0.54
vc (N/mm2) 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 89.7 89.7
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d --- 11.74 < 59.32 OK 11.49 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16 2Y16
Top SupBar 2Y16 2Y16 2Y16 2Y16 2Y16

Top SupBar

Bottom Bar 2Y16 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-2

Axis: 1 Storey: 1 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B4 L=2475mm
BwxH (mm) 200 x 450
Flange BfxHf ---

Loads
UDL G=2.58 Q=0.5 kN/m

2.641
Shear
Force
(Env.) -14.029

21.174
3.914
Moment
3.853
(Env.) -3.89

Bending (Top Edge) ...


M (kN.m) 21.2 13.3 4.1
d (mm) 409.0 409.0 409.0
K/K' 0.16 0.10 0.03
x (mm) 45.44 45.44 45.44
As (mm2) 152.85 95.85 29.57
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 0.6 3.9
d (mm) 409.0 409.0
K/K' 0.00 0.03
x (mm) 45.44 45.44
As (mm2) 4.09 28.08
As' (mm2) 0.00 0.00
As-min 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 14.0 7.4
v (N/mm2) 0.17 0.09
vc (N/mm2) 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00
Vnom (kN) 89.7
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 6.05 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar 2Y16

Top SupBar

Bottom Bar 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-3

Axis: 1 Storey: 1 (/ 2) Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B5 L=4700mm
BwxH (mm) 200 x 450
Flange BfxHf ---

G=8.13 8.13
Q=3.01 3.01

Loads 0.1 1.61 3.09 4.6


UDL G=2.58 Q=0.4 kN/m
34.512

Shear
Force
(Env.)
-34.596

14.10 13.944
Moment
(Env.)

-36.716
Bending (Top Edge) ...
M (kN.m) 14.1 13.9
d (mm) 409.0 409.0
K/K' 0.11 0.11
x (mm) 45.44 45.44
As (mm2) 101.78 100.66
As' (mm2) 0.00 0.00
As-min 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 13.3 36.7 13.4
d (mm) 409.0 409.0 409.0
K/K' 0.10 0.28 0.10
x (mm) 45.44 46.73 45.44
As (mm2) 96.15 265.45 96.85
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 34.6 34.5
v (N/mm2) 0.42 0.42
vc (N/mm2) 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00
Vnom (kN) 89.7
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 11.49 < 40.78 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar

Top SupBar

Bottom Bar 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-4

Axis: 1 Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B75 L=2700mm 2B76 L=4800mm 2B77 L=4700mm
BwxH (mm) 200 x 450 200 x 450 200 x 450
Flange BfxHf --- --- ---

6.25 6.25 6.25 6.25


G=5.19 2.26 2.26 2.26 2.26
Q=1.88

Loads 0.1 1.35 2.6 0.1 1.61 3.19 4.70.1 1.61 3.09 4.6
UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m
31.896
26.794
17.967

Shear
Force
(Env.) -9.235

-27.877 -31.424
30.593 30.644
16.665 19.064 17.828

2.227
Moment
(Env.) 0.372
-5.396

-20.617 -19.379

Bending (Top Edge) ...


M (kN.m) 2.2 6.9 16.7 19.1 2.4 30.6 30.6 3.0 17.8
d (mm) 409.0 409.0 409.0 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.02 0.05 0.13 0.15 0.02 0.23 0.23 0.02 0.14
x (mm) 45.44 45.44 45.44 45.44 45.44 45.44 45.44 45.44 45.44
As (mm2) 16.07 49.64 120.30 137.62 17.06 220.85 221.21 21.84 128.70
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 3.5 5.4 3.1 20.6 0.1 19.4 3.1
d (mm) 409.0 409.0 392.0 409.0 392.0 409.0 392.0
K/K' 0.03 0.04 0.03 0.16 0.00 0.15 0.03
x (mm) 45.44 45.44 43.56 45.44 43.56 45.44 43.56
As (mm2) 25.08 38.95 23.43 148.83 0.60 139.89 23.64
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 9.2 18.0 27.9 31.9 31.4 26.8
v (N/mm2) 0.11 0.22 0.34 0.39 0.38 0.33
vc (N/mm2) 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 89.7 89.7
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 6.6 < 59.32 OK 11.74 < 59.32 OK 11.49 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16 2Y16
Top SupBar 2Y16 2Y16 2Y16 2Y16 2Y16

Top SupBar

Bottom Bar 2Y16 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-5

Axis: 1 Storey: 2 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B78 L=2475mm
BwxH (mm) 200 x 450
Flange BfxHf ---

G=4.72
Q=1.71

Loads 0.1 1.24 2.38


UDL G=2.58 Q=0.3 kN/m

7.277
Shear
Force
(Env.) -16.376

15.355
1.795
Moment
(Env.) 0.552
-3.853

Bending (Top Edge) ...


M (kN.m) 15.4 7.0 1.8
d (mm) 409.0 409.0 409.0
K/K' 0.12 0.05 0.01
x (mm) 45.44 45.44 45.44
As (mm2) 110.84 50.60 12.96
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 3.9 2.5
d (mm) 409.0 409.0
K/K' 0.03 0.02
x (mm) 45.44 45.44
As (mm2) 27.82 17.93
As' (mm2) 0.00 0.00
As-min 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 16.4 7.3
v (N/mm2) 0.20 0.09
vc (N/mm2) 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00
Vnom (kN) 89.7
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 6.05 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar 2Y16

Top SupBar

Bottom Bar 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-6

Axis: 1 Storey: 2 (/ 2) Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B79 L=4700mm
BwxH (mm) 200 x 450
Flange BfxHf ---

G=6.25 6.25
Q=2.26 2.26

Loads 0.1 1.61 3.09 4.6


UDL G=2.58 Q=0.3 kN/m
28.277

Shear
Force
(Env.)
-28.37

7.853 7.631
Moment
(Env.)

-32.504
Bending (Top Edge) ...
M (kN.m) 7.9 7.6
d (mm) 409.0 409.0
K/K' 0.06 0.06
x (mm) 45.44 45.44
As (mm2) 56.69 55.08
As' (mm2) 0.00 0.00
As-min 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 13.0 32.5 13.1
d (mm) 409.0 409.0 409.0
K/K' 0.10 0.25 0.10
x (mm) 45.44 45.44 45.44
As (mm2) 93.82 234.64 94.82
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 28.4 28.3
v (N/mm2) 0.35 0.35
vc (N/mm2) 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00
Vnom (kN) 89.7
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 11.49 < 44.8 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar

Top SupBar

Bottom Bar 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-7

Axis: 1a Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B75 L=2525mm
BwxH (mm) 200 x 450
Flange BfxHf ---

Loads
UDL G=2.58 Q=0.5 kN/m
5.617

Shear
Force
(Env.)
-5.55

Moment
(Env.)

-3.457
Bending (Top Edge) ...
M (kN.m) 0.0 0.1
d (mm) 409.0 409.0
K/K' 0.00 0.00
x (mm) 45.44 45.44
As (mm2) 0.36 0.97
As' (mm2) 0.00 0.00
As-min 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 2.0 3.5 2.0
d (mm) 409.0 409.0 409.0
K/K' 0.02 0.03 0.02
x (mm) 45.44 45.44 45.44
As (mm2) 14.53 24.96 14.22
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 5.6 5.6
v (N/mm2) 0.07 0.07
vc (N/mm2) 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00
Vnom (kN) 89.7
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 6.17 < 45.63 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar

Top SupBar

Bottom Bar 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-8

Axis: 1a Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B80 L=2525mm
BwxH (mm) 200 x 450
Flange BfxHf ---

G=2.83 2.83
Q=1.02 1.02

Loads 0.1 0.78 1.74 2.43


UDL G=2.58 Q=0.3 kN/m
9.816

Shear
Force
(Env.)
-9.734

Moment
(Env.)

-7.031
Bending (Top Edge) ...
M (kN.m) 0.0 0.1
d (mm) 409.0 409.0
K/K' 0.00 0.00
x (mm) 45.44 45.44
As (mm2) 0.23 0.88
As' (mm2) 0.00 0.00
As-min 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 3.9 7.0 3.8
d (mm) 409.0 409.0 409.0
K/K' 0.03 0.05 0.03
x (mm) 45.44 45.44 45.44
As (mm2) 28.18 50.76 27.65
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 9.7 9.8
v (N/mm2) 0.12 0.12
vc (N/mm2) 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00
Vnom (kN) 89.7
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 6.17 < 45.63 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar

Top SupBar

Bottom Bar 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-9

Axis: 1c Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B6 L=4800mm 1B7 L=4700mm 1B8 L=2475mm
BwxH (mm) 200 x 450 200 x 450 200 x 450
Flange BfxHf --- --- ---

G=13.86 13.86
13.86 13.86
Q=7.53 7.53
7.53 7.53

Loads 0.1 4.70.1 4.6


UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m
97.405
78.456

4.771
Shear
Force
-22.661
(Env.)
-72.633
-91.124
86.884 83.854
46.944 38.40
18.99
5.226
Moment
(Env.) 3.912
-4.173
-46.118
-60.934

Bending (Top Edge) ...


M (kN.m) 19.0 7.5 86.9 83.9 13.2 46.9 38.4 25.8 7.8
d (mm) 409.0 409.0 388.0 388.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.15 0.06 0.74 0.71 0.10 0.36 0.29 0.20 0.06
x (mm) 45.44 45.44 130.26 124.78 45.44 60.74 49.01 45.44 45.44
As (mm2) 137.09 54.26 739.87 708.76 94.98 344.99 278.35 186.36 56.02
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 29.2 60.9 1.7 1.3 46.1 11.3 4.2
d (mm) 407.0 407.0 392.0 392.0 409.0 392.0 392.0
K/K' 0.23 0.47 0.01 0.01 0.35 0.09 0.03
x (mm) 45.22 81.23 43.56 43.56 59.59 43.56 43.56
As (mm2) 212.02 461.37 13.01 9.95 338.46 85.26 31.43
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 72.6 97.4 91.1 78.5 22.7 15.3
v (N/mm2) 0.89 1.26 1.17 0.96 0.28 0.19
vc (N/mm2) 0.58 0.58 0.70 0.70 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 95.8 89.7 89.7
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 11.79 < 41.27 OK 11.49 < 43.1 OK ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 1030.44 1030.44 402.12 402.12 402.12 402.12 402.12
Bottom Edge 628.32 628.32 628.32 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16 2Y16
Top SupBar 2Y20 2Y20 2Y16 2Y16 2Y16

Top SupBar 2Y16 2Y16

Bottom Bar 2Y20 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-10

Axis: 1c Storey: 1 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B9 L=2525mm 1B10 L=4700mm
BwxH (mm) 200 x 450 200 x 450
Flange BfxHf --- ---

16.27 16.27
6.03 6.03

Loads 0.1 1.61 3.09 4.6


UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.4 kN/m

47.857
23.06
Shear
Force
(Env.)
-69.566

42.434 52.624

Moment
(Env.) -4.141

-62.21

Bending (Top Edge) ...


M (kN.m) 9.5 28.2 42.4 52.6 0.7
d (mm) 409.0 409.0 409.0 409.0 409.0
K/K' 0.07 0.22 0.33 0.40 0.01
x (mm) 45.44 45.44 54.50 68.74 45.44
As (mm2) 68.50 203.90 309.57 390.41 5.28
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 4.1 4.7 62.2 33.8
d (mm) 392.0 392.0 407.0 407.0
K/K' 0.03 0.04 0.48 0.26
x (mm) 43.56 43.56 83.12 45.22
As (mm2) 31.19 35.61 472.12 245.15
As' (mm2) 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 16.8 23.1 69.6 47.9
v (N/mm2) 0.21 0.28 0.85 0.59
vc (N/mm2) 0.50 0.50 0.50 0.50 0.58 0.58
v-max (N/mm2) 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 95.8
Td (kN.m) 0.0 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d --- 11.55 < 40.5 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 628.32 628.32 628.32
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y16 2Y16 2Y16

Top SupBar

Bottom Bar 2Y16 2Y20


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-11

Axis: 1c Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B81 L=2700mm 2B82 L=4800mm 2B83 L=4700mm
BwxH (mm) 200 x 450 200 x 450 200 x 450
Flange BfxHf --- --- ---

12.5 12.5 12.5 12.5


G=10.38 4.52 4.52 4.52 4.52
Q=3.75

Loads 0.1 1.35 2.6 0.1 1.61 3.19 4.70.1 1.61 3.09 4.6
UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m
51.386 51.72
28.888

Shear
Force
-14.343
(Env.)
-48.521 -49.58
54.351
47.265 48.332
29.358 36.354

Moment 1.638
(Env.) 0.903
-9.324
-37.553 -31.781

Bending (Top Edge) ...


M (kN.m) 2.0 15.1 29.4 36.4 2.3 47.3 48.3 8.9 54.4
d (mm) 409.0 409.0 409.0 409.0 409.0 409.0 409.0 409.0 407.0
K/K' 0.02 0.12 0.23 0.28 0.02 0.36 0.37 0.07 0.42
x (mm) 45.44 45.44 45.44 46.25 45.44 61.19 62.68 45.44 71.62
As (mm2) 14.66 109.27 211.93 262.67 16.29 347.53 356.01 63.92 406.78
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 5.0 9.3 4.1 37.6 2.3 2.3 31.8 0.8
d (mm) 409.0 409.0 392.0 409.0 392.0 392.0 409.0 392.0
K/K' 0.04 0.07 0.03 0.29 0.02 0.02 0.24 0.01
x (mm) 45.44 45.44 43.56 47.86 43.56 43.56 45.44 43.56
As (mm2) 35.98 67.31 31.25 271.85 17.39 17.19 229.42 6.36
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 14.3 28.9 48.5 51.4 49.6 51.7
v (N/mm2) 0.18 0.35 0.59 0.63 0.61 0.64
vc (N/mm2) 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.58
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 89.7 89.7
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 6.6 < 59.32 OK 11.74 < 52.03 OK 11.49 < 59.21 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 628.32
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16 2Y16
Top SupBar 2Y16 2Y16 2Y16 2Y16 2Y20

Top SupBar

Bottom Bar 2Y16 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-12

Axis: 1c Storey: 2 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B84 L=5000mm 2B85 L=4700mm
BwxH (mm) 200 x 450 200 x 450
Flange BfxHf --- ---

12.5 12.5
G=9.44
9.44 9.08
9.08 4.52 4.52
Q=3.41
3.41 6.25
6.25 3.28
3.28 5.65
2.26
2.26 2.04

Loads 0.1 1.24 2.38 3.26 4.22 4.90.1 1.61 3.09 4.6
UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m
54.787
37.258

Shear
Force
(Env.)
-54.47 -59.247
54.348 57.151 59.72

Moment
(Env.)
-41.634 -47.182

Bending (Top Edge) ...


M (kN.m) 54.3 6.7 57.2 59.7 5.6 0.5
d (mm) 407.0 409.0 407.0 407.0 409.0 409.0
K/K' 0.42 0.05 0.44 0.46 0.04 0.00
x (mm) 71.61 45.44 75.67 79.44 45.44 45.44
As (mm2) 406.75 48.16 429.82 451.19 40.32 3.87
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 1.0 41.6 0.3 0.6 47.2 26.1
d (mm) 392.0 409.0 392.0 392.0 409.0 409.0
K/K' 0.01 0.32 0.00 0.00 0.36 0.20
x (mm) 43.56 53.41 43.56 43.56 61.07 45.44
As (mm2) 7.77 303.35 2.59 4.31 346.87 188.26
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 54.5 54.8 59.2 37.3
v (N/mm2) 0.67 0.67 0.73 0.46
vc (N/mm2) 0.58 0.50 0.58 0.58 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 89.7
Td (kN.m) 0.0 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 12.22 < 47.53 OK 11.49 < 42.12 OK
Provided Steel Areas (mm2)
Top Edge 628.32 402.12 628.32 628.32 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y20 2Y20 2Y20

Top SupBar

Bottom Bar 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-13

Axis: 2 Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B11 L=2700mm 1B12 L=2700mm 1B13 L=6800mm
BwxH (mm) 200 x 450 200 x 450 200 x 450
Flange BfxHf --- --- ---

14.69 14.69
14.69 14.69
7.98 7.98
7.98 7.98
6.93 6.93
6.93 7.76
7.76
3.77 3.77
3.77 4.22
4.22

Loads 0.1 2.7 2 6.7


UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m
122.109
64.725

5.361
Shear
Force -10.108 -7.642 -43.957
(Env.) -51.487

-119.905
115.053 114.743
94.231

5.531
Moment
(Env.) -9.553 -12.036

-93.971

Bending (Top Edge) ...


M (kN.m) 5.5 0.1 9.0 56.8 94.2 115.1 114.7
d (mm) 409.0 409.0 409.0 407.0 387.0 387.0 387.0
K/K' 0.04 0.00 0.07 0.44 0.81 0.98 0.98
x (mm) 45.44 45.44 45.44 75.16 144.53 187.84 187.14
As (mm2) 39.93 0.44 65.13 426.92 820.93 1066.91 1062.92
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 4.5 9.3 9.6 12.0 2.0 7.1 94.0 2.1
d (mm) 409.0 409.0 392.0 392.0 409.0 392.0 407.0 392.0
K/K' 0.03 0.07 0.08 0.10 0.02 0.06 0.73 0.02
x (mm) 45.44 45.44 43.56 43.56 45.44 43.56 133.82 43.56
As (mm2) 32.15 67.36 71.95 90.65 14.68 53.69 760.06 16.04
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 10.1 5.4 33.5 64.7 119.9 122.1
v (N/mm2) 0.12 0.07 0.41 0.84 1.55 1.58
vc (N/mm2) 0.50 0.50 0.50 0.50 0.58 0.75 0.75 0.66 0.75
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 96.2 102.6
Td (kN.m) 0.0 0.0 0.1
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 1800.0 1800.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-200 Y8-300 Y8-200
Deflection Check ...
L/d 6.6 < 59.32 OK 6.6 < 62.6 OK 16.71 < 33.3 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 628.32 1256.64 1256.64 402.12 1256.64
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 942.48 942.48 942.48
Steel Bars ...
Top Bar 2Y16 2Y20 2Y16
Top SupBar 2Y16 2Y16 2Y20 2Y20 2Y20

Top SupBar 2Y20 2Y20 2Y20

Bottom Bar 2Y16 2Y16 3Y20


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-14

Axis: 2 Storey: 1 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B14 L=2475mm 1B15 L=2525mm 1B16 L=4700mm
BwxH (mm) 200 x 450 200 x 450 200 x 450
Flange BfxHf --- --- ---

15.9 15.9
7.23 7.23
G=7.76 7.76 7.767.76 7.76
Q=4.22 4.22 4.224.22 4.22

Loads 0.1 2.48 2.430.1 1.61 3.09 4.6


UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m

66.719
45.631
14.616
Shear
Force -24.373
(Env.) -64.565
-82.447

94.308
48.564 58.551
12.396 12.929 20.622
Moment
11.044 8.028
(Env.) -2.922 -6.752
-61.885

Bending (Top Edge) ...


M (kN.m) 94.3 60.1 18.6 12.9 27.8 48.6 58.6 20.6
d (mm) 387.0 407.0 409.0 409.0 409.0 407.0 407.0 409.0
K/K' 0.81 0.47 0.14 0.10 0.21 0.38 0.45 0.16
x (mm) 144.68 80.00 45.44 45.44 45.44 63.36 77.72 45.44
As (mm2) 821.77 454.38 133.99 93.33 200.81 359.90 441.45 148.86
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 2.9 5.8 6.8 3.8 61.9 27.0
d (mm) 392.0 392.0 409.0 392.0 407.0 407.0
K/K' 0.02 0.05 0.05 0.03 0.48 0.21
x (mm) 43.56 43.56 45.44 43.56 82.64 45.22
As (mm2) 22.01 43.94 48.74 28.70 469.38 195.86
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 64.6 33.2 24.4 45.6 82.4 66.7
v (N/mm2) 0.83 0.41 0.30 0.56 1.01 0.82
vc (N/mm2) 0.75 0.58 0.50 0.50 0.50 0.58 0.58 0.58 0.58
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 96.2 89.7 95.8
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d --- 6.17 < 59.32 OK 11.55 < 40.7 OK
Provided Steel Areas (mm2)
Top Edge 1256.64 628.32 402.12 402.12 402.12 628.32 628.32 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 628.32 628.32 628.32
Steel Bars ...
Top Bar 2Y20 2Y16 2Y16
Top SupBar 2Y20 2Y16 2Y16 2Y20 2Y20

Top SupBar 2Y20

Bottom Bar 2Y16 2Y16 2Y20


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-15

Axis: 2 Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B86 L=2700mm 2B87 L=2700mm 2B88 L=6800mm
BwxH (mm) 200 x 450 200 x 450 200 x 450
Flange BfxHf --- --- ---

13.25 13.25
12.5
8.51 10.3810.38 4.79 4.79
4.52
G=6.64 3.08 6.64 3.75 3.75 6.257.89
6.25
6.25 7.887 7
Q=2.4 2.4 2.262.85
2.26
2.26 2.85
2.53
2.53

Loads 0.1 0.9 1.35 1.8 2.6 0.1 1.35 1.61 2.6 1.792 3.71 5.01 6.7
UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m
79.562
51.858
20.015
Shear
Force -17.093 -8.30
(Env.)
-82.319
82.464 93.381
70.682

2.713 8.049
Moment
(Env.) -12.651
-0.215

-73.516

Bending (Top Edge) ...


M (kN.m) 2.7 8.0 12.3 42.9 70.7 82.5 1.6 93.4
d (mm) 409.0 409.0 409.0 409.0 388.0 388.0 409.0 388.0
K/K' 0.02 0.06 0.09 0.33 0.60 0.70 0.01 0.80
x (mm) 45.44 45.44 45.44 55.20 102.04 122.30 45.44 142.35
As (mm2) 19.58 58.11 89.13 313.52 579.55 694.67 11.36 808.55
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 6.1 12.7 5.3 0.0 0.2 2.9 73.5 0.2
d (mm) 409.0 409.0 392.0 392.0 409.0 392.0 407.0 392.0
K/K' 0.05 0.10 0.04 0.00 0.00 0.02 0.57 0.00
x (mm) 45.44 45.44 43.56 43.56 45.44 43.56 100.33 43.56
As (mm2) 44.01 91.33 40.23 0.05 1.55 22.04 569.85 1.52
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 17.1 20.0 18.9 51.9 82.3 79.6
v (N/mm2) 0.21 0.24 0.23 0.67 1.06 1.03
vc (N/mm2) 0.50 0.50 0.50 0.50 0.50 0.70 0.70 0.58 0.70
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 89.7 95.8
Td (kN.m) 0.0 0.0 0.1
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 6.6 < 59.32 OK 6.6 < 59.32 OK 16.71 < 34.49 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 1030.44 1030.44 402.12 1030.44
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 628.32 628.32 628.32
Steel Bars ...
Top Bar 2Y16 2Y16 2Y16
Top SupBar 2Y16 2Y16 2Y20 2Y20 2Y20

Top SupBar 2Y16 2Y16 2Y16

Bottom Bar 2Y16 2Y16 2Y20


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-16

Axis: 2 Storey: 2 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B89 L=5000mm 2B90 L=4700mm
BwxH (mm) 200 x 450 200 x 450
Flange BfxHf --- ---

13.25
G=12.5 13.25
12.5 13.25
12.5 13.25
12.5
4.79
Q=4.52 4.79
4.52 4.79
4.52 4.79
4.52

Loads 0.1 1.61 3.21 4.90.1 1.61 2.91 4.6


UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m

51.974 42.29

Shear
Force
(Env.)
-62.467 -57.605

84.151
53.485 55.21
11.162
Moment
(Env.) 4.528
-33.306
-47.833

Bending (Top Edge) ...


M (kN.m) 84.2 25.7 53.5 55.2 3.8 11.2
d (mm) 388.0 409.0 407.0 407.0 409.0 409.0
K/K' 0.72 0.20 0.41 0.43 0.03 0.09
x (mm) 125.32 45.44 70.37 72.86 45.44 45.44
As (mm2) 711.79 185.59 399.69 413.82 27.58 80.57
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 33.3 2.2 2.9 47.8 21.0
d (mm) 409.0 392.0 392.0 409.0 409.0
K/K' 0.26 0.02 0.02 0.37 0.16
x (mm) 45.44 43.56 43.56 61.98 45.44
As (mm2) 240.43 16.23 21.80 352.04 151.82
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 62.5 52.0 57.6 42.3
v (N/mm2) 0.80 0.64 0.71 0.52
vc (N/mm2) 0.70 0.50 0.58 0.58 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 89.7
Td (kN.m) 0.0 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 12.22 < 57.2 OK 11.49 < 41.53 OK
Provided Steel Areas (mm2)
Top Edge 1030.44 402.12 628.32 628.32 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y20 2Y20 2Y20

Top SupBar 2Y16

Bottom Bar 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-17

Axis: 3 Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B17 L=2700mm
BwxH (mm) 200 x 450
Flange BfxHf ---

Loads
UDL G=2.58 Q=0.5 kN/m
5.948

Shear
Force
(Env.)
-5.994

Moment
(Env.)

-4.027
Bending (Top Edge) ...
M (kN.m) 0.1
d (mm) 409.0
K/K' 0.00
x (mm) 45.44
As (mm2) 0.43
As' (mm2) 0.00
As-min 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 2.3 4.0 2.3
d (mm) 409.0 409.0 409.0
K/K' 0.02 0.03 0.02
x (mm) 45.44 45.44 45.44
As (mm2) 16.77 29.07 16.95
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 6.0 5.9
v (N/mm2) 0.07 0.07
vc (N/mm2) 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00
Vnom (kN) 89.7
Td (kN.m) 0.1
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 6.6 < 45.63 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar

Top SupBar

Bottom Bar 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-18

Axis: 3 Storey: 1 (/ 2) Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B18 L=2700mm
BwxH (mm) 200 x 450
Flange BfxHf ---

Loads
UDL G=2.25 Q=0 kN/m
6.007

Shear
Force
(Env.)
-6.478
5.092
3.242

Moment
(Env.) -2.147
-2.675
-3.44

Bending (Top Edge) ...


M (kN.m) 5.1 1.1 3.2
d (mm) 409.0 409.0 409.0
K/K' 0.04 0.01 0.02
x (mm) 45.44 45.44 45.44
As (mm2) 36.76 8.00 23.40
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 3.4 3.4 2.7
d (mm) 409.0 409.0 409.0
K/K' 0.03 0.03 0.02
x (mm) 45.44 45.44 45.44
As (mm2) 24.80 24.20 19.31
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 6.5 6.0
v (N/mm2) 0.08 0.07
vc (N/mm2) 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00
Vnom (kN) 89.7
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 6.6 < 45.63 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar

Top SupBar

Bottom Bar 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-19

Axis: 3 Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B91 L=2700mm
BwxH (mm) 200 x 450
Flange BfxHf ---

G=3.32 3.32
Q=1.2 1.2

Loads 0.1 0.9 1.8 2.6


UDL G=2.58 Q=0.3 kN/m
11.072

Shear
Force
(Env.)
-11.163

Moment
(Env.)

-8.694
Bending (Top Edge) ...
M (kN.m) 0.1
d (mm) 409.0
K/K' 0.00
x (mm) 45.44
As (mm2) 0.80
As' (mm2) 0.00
As-min 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 4.7 8.7 4.7
d (mm) 409.0 409.0 409.0
K/K' 0.04 0.07 0.04
x (mm) 45.44 45.44 45.44
As (mm2) 33.75 62.76 34.25
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 11.2 11.1
v (N/mm2) 0.14 0.14
vc (N/mm2) 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00
Vnom (kN) 89.7
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 6.6 < 45.63 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar

Top SupBar

Bottom Bar 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-20

Axis: 3 Storey: 2 (/ 2) Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B92 L=2700mm
BwxH (mm) 200 x 450
Flange BfxHf ---

G=3.27 3.27
Q=1.18 1.18

Loads 0.1 0.89 1.81 2.6


UDL G=2.58 Q=0.3 kN/m
10.43

Shear
Force
(Env.)
-11.888

3.273

Moment
(Env.)

-7.738
Bending (Top Edge) ...
M (kN.m) 3.3 0.1
d (mm) 409.0 409.0
K/K' 0.03 0.00
x (mm) 45.44 45.44
As (mm2) 23.63 0.69
As' (mm2) 0.00 0.00
As-min 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 3.6 7.7 4.3
d (mm) 409.0 409.0 409.0
K/K' 0.03 0.06 0.03
x (mm) 45.44 45.44 45.44
As (mm2) 26.26 55.86 31.14
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 11.9 10.4
v (N/mm2) 0.15 0.13
vc (N/mm2) 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00
Vnom (kN) 89.7
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 6.6 < 45.63 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar

Top SupBar

Bottom Bar 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-21

Axis: 4 Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B24 L=2700mm 1B25 L=6800mm 1B26 L=5000mm
BwxH (mm) 200 x 450 200 x 450 200 x 450
Flange BfxHf --- --- ---

13.11 13.11 13.11


7.13 7.13 7.13
9.43 9.43
5.13 5.13

Loads 0.1 2.1 6.70.1 4.9


UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m
115.549

55.333
40.136
Shear
Force
(Env.)
-80.073
-113.598
107.582 118.617 106.726
88.639
32.171
Moment
(Env.) -6.916
-32.526

-91.089

Bending (Top Edge) ...


M (kN.m) 18.9 61.3 88.6 107.6 1.4 118.6 106.7 36.9 32.2
d (mm) 407.0 407.0 388.0 388.0 409.0 387.0 387.0 409.0 409.0
K/K' 0.15 0.47 0.75 0.92 0.01 1.02 0.91 0.28 0.25
x (mm) 45.22 81.79 133.48 170.73 45.44 191.88 169.65 46.95 45.44
As (mm2) 137.29 464.57 758.15 969.74 10.20 1105.16 963.61 266.65 232.24
As' (mm2) 0.00 0.00 0.00 0.00 0.00 15.32 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 6.9 4.6 91.1 0.4 32.5 12.2
d (mm) 409.0 392.0 407.0 392.0 409.0 392.0
K/K' 0.05 0.04 0.70 0.00 0.25 0.10
x (mm) 45.44 43.56 128.89 43.56 45.44 43.56
As (mm2) 49.92 34.62 732.07 3.21 234.80 91.63
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 180.00 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 32.6 40.1 113.6 115.5 80.1 55.3
v (N/mm2) 0.40 0.52 1.46 1.49 1.03 0.68
vc (N/mm2) 0.58 0.58 0.70 0.70 0.66 0.75 0.75 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 96.2 102.6 89.7
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 1800.0 1800.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-225 Y8-300 Y8-225 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d --- 16.71 < 34.26 OK 12.22 < 58.22 OK
Provided Steel Areas (mm2)
Top Edge 628.32 628.32 1030.44 1030.44 402.12 1256.64 1256.64 402.12 402.12
Bottom Edge 402.12 402.12 402.12 942.48 942.48 942.48 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y20 2Y16 2Y16
Top SupBar 2Y20 2Y20 2Y20 2Y20 2Y16

Top SupBar 2Y16 2Y16 2Y20 2Y20

Bottom Bar 2Y16 3Y20 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-22

Axis: 4 Storey: 1 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B27 L=4700mm
BwxH (mm) 200 x 450
Flange BfxHf ---

Loads
UDL G=2.58 Q=0.5 kN/m

10.546
Shear
Force -15.702
(Env.)

25.842
5.57
Moment
(Env.) -8.632 0.616

Bending (Top Edge) ...


M (kN.m) 25.8 11.6 5.6
d (mm) 409.0 409.0 409.0
K/K' 0.20 0.09 0.04
x (mm) 45.44 45.44 45.44
As (mm2) 186.55 83.91 40.21
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 3.7 8.6 4.8
d (mm) 392.0 409.0 409.0
K/K' 0.03 0.07 0.04
x (mm) 43.56 45.44 45.44
As (mm2) 28.21 62.31 34.36
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 15.7 10.5
v (N/mm2) 0.19 0.13
vc (N/mm2) 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00
Vnom (kN) 89.7
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 11.49 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar 2Y16

Top SupBar

Bottom Bar 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-23

Axis: 4 Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B101 L=2700mm
BwxH (mm) 200 x 450
Flange BfxHf ---

G=5.19
Q=1.88

Loads 0.1 1.35 2.6


UDL G=2.58 Q=0.3 kN/m
11.227

Shear
Force
(Env.)
-14.187

2.587
Moment
(Env.)

-11.511
Bending (Top Edge) ...
M (kN.m) 2.6
d (mm) 409.0
K/K' 0.02
x (mm) 45.44
As (mm2) 18.68
As' (mm2) 0.00
As-min 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 5.2 11.5 8.7
d (mm) 409.0 409.0 409.0
K/K' 0.04 0.09 0.07
x (mm) 45.44 45.44 45.44
As (mm2) 37.38 83.10 62.60
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 14.2 11.2
v (N/mm2) 0.17 0.14
vc (N/mm2) 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00
Vnom (kN) 89.7
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 6.6 < 45.63 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar

Top SupBar

Bottom Bar 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-24

Axis: 4 Storey: 2 (/ 2) Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B102 L=5000mm 2B103 L=4700mm
BwxH (mm) 200 x 450 200 x 450
Flange BfxHf --- ---

G=8.51 8.51 8.51 8.51


Q=3.08 3.08 3.08 3.08

Loads 0.1 2.15 2.85 4.90.1 2.15 4.6


UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m
42.03
24.182

Shear
Force
(Env.)
-27.389
-39.05
45.056 44.286

5.10 4.303
Moment
(Env.)
-26.781
-32.546

Bending (Top Edge) ...


M (kN.m) 5.1 3.3 45.1 44.3 6.6 4.3
d (mm) 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.04 0.03 0.35 0.34 0.05 0.03
x (mm) 45.44 45.44 58.12 57.05 45.44 45.44
As (mm2) 36.82 24.07 330.09 324.05 47.63 31.06
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 17.5 32.5 0.1 26.8 13.0
d (mm) 409.0 409.0 392.0 409.0 409.0
K/K' 0.13 0.25 0.00 0.21 0.10
x (mm) 45.44 45.44 43.56 45.44 45.44
As (mm2) 126.35 234.94 0.99 193.32 93.65
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 27.4 42.0 39.0 24.2
v (N/mm2) 0.33 0.51 0.48 0.30
vc (N/mm2) 0.50 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 89.7
Td (kN.m) 0.0 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 12.22 < 58.19 OK 11.49 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y16 2Y16

Top SupBar

Bottom Bar 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-25

Axis: 4' Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B62 L=4900mm
BwxH (mm) 200 x 450
Flange BfxHf ---

5.4
G=3.52 3.52 2
Q=1.31 1.31

Loads 0.1 0.75 3.45 3.8 4.8


UDL G=2.58 Q=0.4 kN/m
25.641

Shear
Force
(Env.)
-24.939

Moment
(Env.)

-33.62
Bending (Top Edge) ...
M (kN.m) 0.2 0.2
d (mm) 409.0 409.0
K/K' 0.00 0.00
x (mm) 45.44 45.44
As (mm2) 1.65 1.48
As' (mm2) 0.00 0.00
As-min 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 17.7 33.6 18.3
d (mm) 409.0 409.0 409.0
K/K' 0.14 0.26 0.14
x (mm) 45.44 45.44 45.44
As (mm2) 127.88 242.69 132.26
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 24.9 25.6
v (N/mm2) 0.30 0.31
vc (N/mm2) 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00
Vnom (kN) 89.7
Td (kN.m) 0.1
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 11.98 < 43.69 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar

Top SupBar

Bottom Bar 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-26

Axis: 4' Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B133 L=4900mm
BwxH (mm) 200 x 450
Flange BfxHf ---

4.15
G=2.71 2.71 1.5
Q=0.98 0.98

Loads 0.1 0.75 3.45 3.8 4.8


UDL G=2.58 Q=0.3 kN/m
21.664

Shear
Force
(Env.)
-21.084

Moment
(Env.)

-28.058
Bending (Top Edge) ...
M (kN.m) 0.3 0.3
d (mm) 409.0 409.0
K/K' 0.00 0.00
x (mm) 45.44 45.44
As (mm2) 1.83 2.48
As' (mm2) 0.00 0.00
As-min 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 14.8 28.1 15.2
d (mm) 409.0 409.0 409.0
K/K' 0.11 0.22 0.12
x (mm) 45.44 45.44 45.44
As (mm2) 106.87 202.55 109.68
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 21.1 21.7
v (N/mm2) 0.26 0.26
vc (N/mm2) 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00
Vnom (kN) 89.7
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 11.98 < 45.63 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar

Top SupBar

Bottom Bar 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-27

Axis: 5 Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B19 L=2700mm 1B20 L=6800mm 1B21 L=5000mm
BwxH (mm) 200 x 450 200 x 450 200 x 450
Flange BfxHf --- --- ---

17.19 17.19
17.19 17.19
9.34 9.34
9.34 9.34

Loads 0.1 6.70.1 4.9


UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m
148.623
100.554
47.212
Shear
Force
(Env.)
-123.952
-143.458
159.789 144.789
134.723
106.918
73.117

Moment
(Env.) -7.048
-56.949
-114.933

Bending (Top Edge) ...


M (kN.m) 23.2 74.6 106.9 134.7 3.0 159.8 144.8 41.1 73.1
d (mm) 407.0 407.0 384.3 384.3 409.0 383.3 383.3 409.0 407.0
K/K' 0.18 0.58 0.93 1.17 0.02 1.39 1.26 0.32 0.57
x (mm) 45.22 102.08 172.09 190.51 45.44 190.02 190.02 52.73 99.71
As (mm2) 168.53 579.79 977.45 1250.23 21.72 1469.26 1339.90 299.49 566.33
As' (mm2) 0.00 0.00 0.00 168.14 0.00 389.98 260.63 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 7.0 9.1 114.9 0.1 56.9 15.7
d (mm) 409.0 392.0 384.3 392.0 407.0 392.0
K/K' 0.05 0.08 1.00 0.00 0.44 0.13
x (mm) 45.44 43.56 189.97 43.56 75.38 43.56
As (mm2) 50.88 68.55 1079.03 0.45 428.15 118.51
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 180.00 152.64 180.00 180.00 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 39.8 47.2 143.5 148.6 124.0 100.6
v (N/mm2) 0.49 0.61 1.87 1.94 1.62 1.24
vc (N/mm2) 0.58 0.58 0.78 0.78 0.86 0.82 0.82 0.58 0.58
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 96.2 116.1 95.8
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 1650.0 1650.0 1200.0 1250.0
Links Y8-300 Y8-300 Y8-300 Y8-150 Y8-275 Y8-150 Y8-200 Y8-300 Y8-250
Deflection Check ...
L/d --- 17.7 < 33.02 OK 12.29 < 43.78 OK
Provided Steel Areas (mm2)
Top Edge 628.32 628.32 1383.87 1383.87 402.12 1610.07 1610.07 402.12 628.32
Bottom Edge 402.12 402.12 402.12 1472.62 1874.75 1472.62 628.32 628.32 628.32
Steel Bars ...
Top Bar 2Y20 2Y16 2Y16
Top SupBar 2Y25 2Y25 2Y25 2Y25 2Y20

Top SupBar 2Y16 2Y16 2Y20 2Y20

Bottom Bar 2Y16 3Y25 2Y20


Bottom Bar 2Y16
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-28

Axis: 5 Storey: 1 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B22 L=4700mm
BwxH (mm) 200 x 450
Flange BfxHf ---

G=7.76 7.76
Q=4.22 4.22

Loads 0.1 4.6


UDL G=2.58 Q=0.5 kN/m

45.569
Shear
Force
(Env.) -62.369

67.378
12.855
Moment
(Env.)
-37.965

Bending (Top Edge) ...


M (kN.m) 67.4 16.2 12.9
d (mm) 407.0 409.0 409.0
K/K' 0.52 0.12 0.10
x (mm) 90.88 45.44 45.44
As (mm2) 516.21 117.17 92.80
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 2.8 38.0 17.7
d (mm) 392.0 409.0 409.0
K/K' 0.02 0.29 0.14
x (mm) 43.56 48.42 45.44
As (mm2) 21.40 275.01 127.42
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 62.4 45.6
v (N/mm2) 0.77 0.56
vc (N/mm2) 0.58 0.50 0.50
v-max (N/mm2) 4.00 4.00
Vnom (kN) 89.7
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 11.49 < 51.55 OK
Provided Steel Areas (mm2)
Top Edge 628.32 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar 2Y20

Top SupBar

Bottom Bar 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-29

Axis: 5 Storey: 1 (/ 2) Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B59 L=2200mm 1B60 L=5000mm 1B61 L=5500mm
BwxH (mm) 200 x 450 200 x 450 200 x 450
Flange BfxHf --- --- ---

G=5.4
Q=2

Loads 0.1 1.1 2.1


UDL G=2.58 Q=0.4 kN/m UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m
12.834 11.585 11.399

Shear
Force
(Env.)
-10.631 -11.346
-13.161
11.946
10.016 8.839
5.825 7.073 8.157

Moment
(Env.)
-5.097
-6.721
-9.433

Bending (Top Edge) ...


M (kN.m) 5.8 1.6 7.1 8.2 1.1 10.0 11.9 0.3 8.8
d (mm) 409.0 409.0 409.0 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.04 0.01 0.05 0.06 0.01 0.08 0.09 0.00 0.07
x (mm) 45.44 45.44 45.44 45.44 45.44 45.44 45.44 45.44 45.44
As (mm2) 42.05 11.49 51.06 58.89 7.67 72.31 86.24 1.84 63.81
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 4.0 5.1 2.5 1.3 6.7 1.4 0.7 9.4 4.6
d (mm) 409.0 409.0 392.0 392.0 409.0 392.0 392.0 409.0 409.0
K/K' 0.03 0.04 0.02 0.01 0.05 0.01 0.01 0.07 0.04
x (mm) 45.44 45.44 43.56 43.56 45.44 43.56 43.56 45.44 45.44
As (mm2) 29.12 36.80 18.86 9.99 48.52 10.36 5.22 68.10 33.12
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 10.6 12.8 11.3 11.6 13.2 11.4
v (N/mm2) 0.13 0.16 0.14 0.14 0.16 0.14
vc (N/mm2) 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 89.7 89.7
Td (kN.m) 0.2 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 5.38 < 59.32 OK 12.22 < 59.32 OK 13.45 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16 2Y16
Top SupBar 2Y16 2Y16 2Y16 2Y16

Top SupBar

Bottom Bar 2Y16 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-30

Axis: 5 Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B93 L=2700mm 2B94 L=6800mm 2B95 L=5000mm
BwxH (mm) 200 x 450 200 x 450 200 x 450
Flange BfxHf --- --- ---

15.51
14.01 15.51 14
G=10.38 9.9611.98 11.989.96 5.065.61 5.615.06
Q=3.75 3.6 4.33 4.33 3.6

Loads 0.1 1.35 2.60.1 1.3 5.01 5.5 6.70.1 1.79 2.85 4.9
UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m
77.58
53.727
41.946

Shear
Force -6.899
(Env.)
-74.222 -65.032
92.419 85.297
77.029
63.57
51.733

Moment -0.916
(Env.) -2.522 0.391
-37.01
-72.189

Bending (Top Edge) ...


M (kN.m) 9.9 38.6 63.6 77.0 1.7 92.4 85.3 23.7 51.7
d (mm) 409.0 409.0 407.0 407.0 409.0 388.0 388.0 409.0 409.0
K/K' 0.08 0.30 0.49 0.60 0.01 0.79 0.73 0.18 0.40
x (mm) 45.44 49.31 85.15 105.85 45.44 140.53 127.38 45.44 67.47
As (mm2) 71.20 280.06 483.63 601.21 12.22 798.20 723.51 171.19 383.23
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 1.9 2.5 2.6 72.2 0.1 37.0 2.7
d (mm) 409.0 409.0 392.0 407.0 392.0 409.0 392.0
K/K' 0.01 0.02 0.02 0.56 0.00 0.28 0.02
x (mm) 45.44 45.44 43.56 98.27 43.56 47.13 43.56
As (mm2) 13.84 18.21 19.29 558.14 0.63 267.69 20.28
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 17.8 41.9 74.2 77.6 65.0 53.7
v (N/mm2) 0.22 0.52 0.91 1.00 0.84 0.66
vc (N/mm2) 0.50 0.50 0.58 0.58 0.58 0.70 0.70 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 95.8 89.7
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 6.6 < 59.32 OK 16.71 < 35.13 OK 12.22 < 52.66 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 628.32 628.32 402.12 1030.44 1030.44 402.12 402.12
Bottom Edge 402.12 402.12 402.12 628.32 628.32 628.32 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16 2Y16
Top SupBar 2Y20 2Y20 2Y20 2Y20 2Y16

Top SupBar 2Y16 2Y16

Bottom Bar 2Y16 2Y20 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-31

Axis: 5 Storey: 2 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B96 L=4700mm 2B97 L=2700mm 2B98 L=2200mm
BwxH (mm) 200 x 450 200 x 450 200 x 450
Flange BfxHf --- --- ---

15.5115.51 14
G=14.01
Q=5.065.61 5.61 5.06
6.53 8.46 6.53
2.36 3.06 2.36 4.15
1.5

Loads 0.1 1.79 4.6 0.1 0.89 1.35 1.81 2.6 0.1 1.1 2.1
UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m

51.338

13.222 15.634
Shear
Force -10.121
(Env.) -28.187
-53.764

49.997 39.891 34.165


12.875 13.572 19.424
Moment
6.925 8.771
(Env.) -3.258 -1.012
-39.287

Bending (Top Edge) ...


M (kN.m) 50.0 3.4 39.9 34.2 18.7 12.9 13.6 13.2 19.4
d (mm) 409.0 409.0 409.0 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.38 0.03 0.31 0.26 0.14 0.10 0.10 0.10 0.15
x (mm) 65.02 45.44 51.03 45.44 45.44 45.44 45.44 45.44 45.44
As (mm2) 369.29 24.74 289.84 246.63 135.17 92.94 97.98 95.10 140.22
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 2.9 39.3 5.0 3.3 1.1 1.0
d (mm) 392.0 409.0 392.0 409.0 392.0 409.0
K/K' 0.02 0.30 0.04 0.02 0.01 0.01
x (mm) 43.56 50.21 43.56 45.44 43.56 45.44
As (mm2) 21.98 285.18 37.79 23.52 8.32 7.31
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 53.8 51.3 28.2 13.2 10.1 15.6
v (N/mm2) 0.66 0.63 0.34 0.16 0.12 0.19
vc (N/mm2) 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 89.7 89.7
Td (kN.m) 0.0 0.0 0.1
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 11.49 < 50.05 OK 6.6 < 59.32 OK 5.38 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16 2Y16
Top SupBar 2Y16 2Y16 2Y16 2Y16 2Y16 2Y16

Top SupBar

Bottom Bar 2Y16 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-32

Axis: 5 Storey: 2 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B99 L=5000mm 2B100 L=5500mm
BwxH (mm) 200 x 450 200 x 450
Flange BfxHf --- ---

G=9.96 11
Q=3.6 3.98

Loads 0.1 2.5 4.90.1 2.75 5.4


UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m

40.295 33.753

Shear
Force
(Env.) -31.435
-47.955

48.75 50.834
21.953
8.096
Moment
(Env.)
-25.054
-44.711

Bending (Top Edge) ...


M (kN.m) 22.0 10.3 48.7 50.8 1.3 8.1
d (mm) 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.17 0.08 0.37 0.39 0.01 0.06
x (mm) 45.44 45.44 63.26 66.20 45.44 45.44
As (mm2) 158.47 74.11 359.33 376.00 9.21 58.45
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 4.8 25.1 0.4 44.7 19.9
d (mm) 392.0 409.0 392.0 409.0 409.0
K/K' 0.04 0.19 0.00 0.34 0.15
x (mm) 43.56 45.44 43.56 57.64 45.44
As (mm2) 36.17 180.86 2.84 327.39 143.45
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 31.4 40.3 48.0 33.8
v (N/mm2) 0.38 0.49 0.59 0.41
vc (N/mm2) 0.50 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 89.7
Td (kN.m) 0.0 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 12.22 < 59.32 OK 13.45 < 44.44 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y16 2Y16 2Y16

Top SupBar

Bottom Bar 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-33

Axis: 5a Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B144 L=6800mm
BwxH (mm) 200 x 450
Flange BfxHf ---

G=4.98 4.98
Q=1.8 1.8

Loads 0.1 1.3 5.5 6.7


UDL G=2.58 Q=0.3 kN/m
40.524

Shear
Force
(Env.)
-40.505

Moment
(Env.)

-77.222
Bending (Top Edge) ...
M (kN.m) 0.4 0.5
d (mm) 409.0 409.0
K/K' 0.00 0.00
x (mm) 45.44 45.44
As (mm2) 2.78 3.29
As' (mm2) 0.00 0.00
As-min 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 39.7 77.2 39.6
d (mm) 407.0 407.0 407.0
K/K' 0.31 0.60 0.31
x (mm) 50.99 106.16 50.94
As (mm2) 289.64 602.95 289.35
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 40.5 40.5
v (N/mm2) 0.50 0.50
vc (N/mm2) 0.58 0.58 0.58
v-max (N/mm2) 4.00 4.00
Vnom (kN) 95.8
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 16.71 < 25.2 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 628.32 628.32 628.32
Steel Bars ...
Top Bar 2Y16
Top SupBar

Top SupBar

Bottom Bar 2Y20


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-34

Axis: 5c Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B23 L=2700mm
BwxH (mm) 200 x 450
Flange BfxHf ---

3.95 3.95
1.46 1.46

G=0.43
Q=0.16

Loads 0.1 0.75 2.7


UDL G=2.58 Q=0.4 kN/m
18.007

Shear
Force
(Env.)
-12.311

8.339

Moment
(Env.)

-8.923
Bending (Top Edge) ...
M (kN.m) 0.1 0.1 8.3
d (mm) 409.0 409.0 409.0
K/K' 0.00 0.00 0.06
x (mm) 45.44 45.44 45.44
As (mm2) 0.61 0.49 60.20
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 5.2 8.9 5.0
d (mm) 409.0 409.0 409.0
K/K' 0.04 0.07 0.04
x (mm) 45.44 45.44 45.44
As (mm2) 37.34 64.41 36.15
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 12.3 18.0
v (N/mm2) 0.15 0.22
vc (N/mm2) 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00
Vnom (kN) 89.7
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 6.6 < 45.63 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar

Top SupBar

Bottom Bar 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-35

Axis: 5c Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B132 L=2700mm
BwxH (mm) 200 x 450
Flange BfxHf ---

8.22
5.75 2.97
2.08 3.04
3.04
G=0.33 1.11.1
Q=0.12
Loads 0.1 0.75 1.35 2.6
UDL G=2.58 Q=0.3 kN/m
21.074

Shear
Force
(Env.)
-17.049

4.307
Moment
(Env.)

-13.612
Bending (Top Edge) ...
M (kN.m) 0.2 4.3
d (mm) 409.0 409.0
K/K' 0.00 0.03
x (mm) 45.44 45.44
As (mm2) 1.10 31.09
As' (mm2) 0.00 0.00
As-min 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 7.3 13.6 6.1
d (mm) 409.0 409.0 409.0
K/K' 0.06 0.10 0.05
x (mm) 45.44 45.44 45.44
As (mm2) 52.94 98.27 44.34
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 17.0 21.1
v (N/mm2) 0.21 0.26
vc (N/mm2) 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00
Vnom (kN) 89.7
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 6.6 < 45.63 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar

Top SupBar

Bottom Bar 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-36

Axis: 6 Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B63 L=5000mm 1B64 L=5500mm
BwxH (mm) 200 x 450 200 x 450
Flange BfxHf --- ---

Loads
UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m
11.191 12.648

Shear
Force
(Env.)
-11.482 -12.241
11.554
9.952
7.529 8.924

Moment
(Env.)
-7.438 -8.611

Bending (Top Edge) ...


M (kN.m) 10.0 0.2 7.5 8.9 0.3 11.6
d (mm) 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.08 0.00 0.06 0.07 0.00 0.09
x (mm) 45.44 45.44 45.44 45.44 45.44 45.44
As (mm2) 71.84 1.77 54.35 64.42 2.02 83.40
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 3.5 7.4 2.7 2.4 8.6 3.2
d (mm) 409.0 409.0 392.0 392.0 409.0 409.0
K/K' 0.03 0.06 0.02 0.02 0.07 0.02
x (mm) 45.44 45.44 43.56 43.56 45.44 45.44
As (mm2) 24.95 53.70 20.57 18.04 62.16 23.42
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 11.5 11.2 12.2 12.6
v (N/mm2) 0.14 0.14 0.15 0.15
vc (N/mm2) 0.50 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 89.7
Td (kN.m) 0.0 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 12.22 < 59.32 OK 13.45 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y16 2Y16

Top SupBar

Bottom Bar 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-37

Axis: 6 Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B134 L=5000mm 2B135 L=5500mm
BwxH (mm) 200 x 450 200 x 450
Flange BfxHf --- ---

G=19.92 22
Q=7.2 7.95

Loads 0.1 2.5 4.90.1 2.75 5.4


UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m
73.796
58.024

Shear
Force
(Env.)
-46.688
-83.404
89.797 92.583

10.372 14.543
Moment
(Env.)
-57.116
-79.915
Bending (Top Edge) ...
M (kN.m) 10.4 16.6 89.8 92.6 2.7 14.5
d (mm) 409.0 409.0 388.0 388.0 409.0 409.0
K/K' 0.08 0.13 0.76 0.79 0.02 0.11
x (mm) 45.44 45.44 135.62 140.84 45.44 45.44
As (mm2) 74.87 119.99 770.31 799.95 19.59 104.98
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 25.3 57.1 1.1 79.9 34.1
d (mm) 407.0 407.0 392.0 407.0 407.0
K/K' 0.20 0.44 0.01 0.62 0.26
x (mm) 45.22 75.62 43.56 110.45 45.22
As (mm2) 183.73 429.54 8.33 627.35 247.35
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 46.7 73.8 83.4 58.0
v (N/mm2) 0.57 0.95 1.07 0.71
vc (N/mm2) 0.58 0.58 0.70 0.70 0.58 0.58
v-max (N/mm2) 4.00 4.00 4.00 4.00
Vnom (kN) 95.8 95.8
Td (kN.m) 0.0 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 12.29 < 43.67 OK 13.51 < 31.56 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 1030.44 1030.44 402.12 402.12
Bottom Edge 628.32 628.32 628.32 628.32 628.32 628.32
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y20 2Y20

Top SupBar 2Y16 2Y16

Bottom Bar 2Y20 2Y20


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-38

Axis: 7 Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B65 L=5000mm 1B66 L=5500mm
BwxH (mm) 200 x 450 200 x 450
Flange BfxHf --- ---

Loads
UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m
12.21 11.524

Shear
Force
(Env.)
-10.456
-13.51
12.352
10.601
8.269 9.017

Moment
(Env.)
-7.223
-8.828

Bending (Top Edge) ...


M (kN.m) 8.3 0.3 10.6 12.4 0.2 9.0
d (mm) 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.06 0.00 0.08 0.09 0.00 0.07
x (mm) 45.44 45.44 45.44 45.44 45.44 45.44
As (mm2) 59.69 1.83 76.52 89.17 1.54 65.09
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 4.5 7.2 0.3 0.8 8.8 5.1
d (mm) 409.0 409.0 392.0 392.0 409.0 409.0
K/K' 0.03 0.06 0.00 0.01 0.07 0.04
x (mm) 45.44 45.44 43.56 43.56 45.44 45.44
As (mm2) 32.48 52.14 2.57 5.96 63.73 36.73
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 10.5 12.2 13.5 11.5
v (N/mm2) 0.13 0.15 0.17 0.14
vc (N/mm2) 0.50 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 89.7
Td (kN.m) 0.1 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 12.22 < 59.32 OK 13.45 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y16 2Y16

Top SupBar

Bottom Bar 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-39

Axis: 7 Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B136 L=5000mm 2B137 L=5500mm
BwxH (mm) 200 x 450 200 x 450
Flange BfxHf --- ---

G=9.96 11
Q=3.6 3.98

Loads 0.1 2.5 4.90.1 2.75 5.4


UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m
43.096
33.663

Shear
Force
(Env.)
-27.546
-48.614
51.318 53.645

5.925 8.124
Moment
(Env.)
-32.09
-44.489

Bending (Top Edge) ...


M (kN.m) 5.9 9.3 51.3 53.6 1.6 8.1
d (mm) 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.05 0.07 0.39 0.41 0.01 0.06
x (mm) 45.44 45.44 66.88 70.19 45.44 45.44
As (mm2) 42.77 66.91 379.89 398.68 11.36 58.64
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 14.7 32.1 0.1 44.5 19.7
d (mm) 409.0 409.0 392.0 409.0 409.0
K/K' 0.11 0.25 0.00 0.34 0.15
x (mm) 45.44 45.44 43.56 57.33 45.44
As (mm2) 105.83 231.65 1.07 325.64 142.17
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 27.5 43.1 48.6 33.7
v (N/mm2) 0.34 0.53 0.59 0.41
vc (N/mm2) 0.50 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 89.7
Td (kN.m) 0.0 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 12.22 < 58.8 OK 13.45 < 44.65 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y16 2Y16

Top SupBar

Bottom Bar 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-40

Axis: A Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B31 L=4300mm 1B32 L=3575mm 1B33 L=3212.5mm
BwxH (mm) 200 x 450 200 x 450 200 x 450
Flange BfxHf --- --- ---

11.5 11.5
6.25 6.25
G=5.75 5.75
5.75 5.75
Q=3.13 3.13
3.13 3.13

Loads 0.1 4.20.1 1.88 3.48


UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m
42.526 47.249

3.394
Shear
Force
(Env.) -13.631
-31.639
-42.312
33.934 33.319
20.193 18.226
9.137
Moment 0.112
(Env.) -3.589

-22.973 -20.55

Bending (Top Edge) ...


M (kN.m) 9.1 2.5 33.9 33.3 6.0 20.2 18.2 9.4 0.1
d (mm) 409.0 409.0 409.0 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.07 0.02 0.26 0.26 0.05 0.15 0.14 0.07 0.00
x (mm) 45.44 45.44 45.44 45.44 45.44 45.44 45.44 45.44 45.44
As (mm2) 65.96 18.19 244.96 240.52 43.23 145.77 131.57 67.81 0.81
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 11.2 23.0 0.1 0.2 20.5 5.7 3.0 3.6
d (mm) 409.0 409.0 392.0 392.0 409.0 392.0 409.0 392.0
K/K' 0.09 0.18 0.00 0.00 0.16 0.05 0.02 0.03
x (mm) 45.44 45.44 43.56 43.56 45.44 43.56 45.44 43.56
As (mm2) 81.12 165.84 0.41 1.24 148.35 43.14 22.01 27.03
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 31.6 42.5 42.3 47.2 13.6 5.1
v (N/mm2) 0.39 0.52 0.52 0.58 0.17 0.06
vc (N/mm2) 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 89.7 89.7
Td (kN.m) 0.0 0.0 0.1
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 10.51 < 59.32 OK 8.74 < 59.32 OK 7.85 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16 2Y16
Top SupBar 2Y16 2Y16 2Y16 2Y16 2Y16

Top SupBar

Bottom Bar 2Y16 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-41

Axis: A Storey: 1 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B34 L=3212.5mm
BwxH (mm) 200 x 450
Flange BfxHf ---

Loads
UDL G=2.58 Q=0.5 kN/m

8.512
Shear
Force -6.789
(Env.)

1.318 5.243
Moment
(Env.) -5.545

Bending (Top Edge) ...


M (kN.m) 1.3 0.1 5.2
d (mm) 409.0 409.0 409.0
K/K' 0.01 0.00 0.04
x (mm) 45.44 45.44 45.44
As (mm2) 9.51 0.51 37.85
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 4.4 5.5 3.7
d (mm) 392.0 409.0 409.0
K/K' 0.04 0.04 0.03
x (mm) 43.56 45.44 45.44
As (mm2) 32.91 40.03 26.55
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 6.8 8.5
v (N/mm2) 0.08 0.10
vc (N/mm2) 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00
Vnom (kN) 89.7
Td (kN.m) 0.1
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 7.85 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar 2Y16

Top SupBar

Bottom Bar 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-42

Axis: A Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B107 L=4300mm 2B108 L=3575mm 2B109 L=3212.5mm
BwxH (mm) 200 x 450 200 x 450 200 x 450
Flange BfxHf --- --- ---

10.3811.4410.37
3.75 4.13 3.75
G=5.19 5.19 5.19 5.19 6.64 6.64
Q=1.88 1.88 1.88 1.88 2.4 2.4

Loads 0.1 1.35 2.95 4.20.1 1.35 1.88 2.23 2.68 3.480.1 1.35 3.11
UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m
27.903 28.331 24.989

0.792
Shear
Force 0.629
-0.187
(Env.)
-19.782
-27.281 -28.248
23.28 23.12
19.977 19.925
15.993

4.504
Moment
(Env.)
-14.874 -12.60
-18.094

Bending (Top Edge) ...


M (kN.m) 4.5 0.9 23.3 23.1 4.2 20.0 19.9 3.7 16.0
d (mm) 409.0 409.0 409.0 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.03 0.01 0.18 0.18 0.03 0.15 0.15 0.03 0.12
x (mm) 45.44 45.44 45.44 45.44 45.44 45.44 45.44 45.44 45.44
As (mm2) 32.51 6.36 168.05 166.90 30.41 144.21 143.84 26.59 115.45
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 8.4 18.1 0.0 14.9 0.6 12.6 2.8
d (mm) 409.0 409.0 392.0 409.0 392.0 409.0 392.0
K/K' 0.06 0.14 0.00 0.11 0.01 0.10 0.02
x (mm) 45.44 45.44 43.56 45.44 43.56 45.44 43.56
As (mm2) 60.93 130.62 0.18 107.38 4.70 90.96 21.37
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 19.8 27.9 27.3 28.3 28.2 25.0
v (N/mm2) 0.24 0.34 0.33 0.35 0.35 0.31
vc (N/mm2) 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 89.7 89.7
Td (kN.m) 0.0 0.1 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 10.51 < 59.32 OK 8.74 < 59.32 OK 7.85 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16 2Y16
Top SupBar 2Y16 2Y16 2Y16 2Y16 2Y16

Top SupBar

Bottom Bar 2Y16 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-43

Axis: A Storey: 2 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B110 L=3212.5mm
BwxH (mm) 200 x 450
Flange BfxHf ---

11.4410.37
G=10.38
Q=3.754.13 3.75

Loads 0.1 1.35 3.11


UDL G=2.58 Q=0.3 kN/m
22.419

Shear
Force
(Env.)
-29.38
16.545

3.185
Moment
(Env.)

-19.005

Bending (Top Edge) ...


M (kN.m) 16.5 0.1 3.2
d (mm) 409.0 409.0 409.0
K/K' 0.13 0.00 0.02
x (mm) 45.44 45.44 45.44
As (mm2) 119.44 0.38 22.99
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 4.5 19.0 9.0
d (mm) 392.0 409.0 409.0
K/K' 0.04 0.15 0.07
x (mm) 43.56 45.44 45.44
As (mm2) 34.15 137.20 64.72
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 29.4 22.4
v (N/mm2) 0.36 0.27
vc (N/mm2) 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00
Vnom (kN) 89.7
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 7.85 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar 2Y16

Top SupBar

Bottom Bar 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-44

Axis: A' Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B28 L=1800mm 1B29 L=3212.5mm 1B30 L=3212.5mm
BwxH (mm) 200 x 450 200 x 450 200 x 450
Flange BfxHf --- --- ---

G=5.75 5.75
Q=3.13 3.13

Loads 0.1 1.7


UDL G=2.58 Q=0.5 kN/m UDL G=2.25 Q=0 kN/m UDL G=2.25 Q=0 kN/m
34.75

6.494
Shear
Force -5.322
(Env.) -15.057

36.559
29.316

0.93 4.156
Moment -4.267
(Env.) -4.113 -4.339 -4.308

Bending (Top Edge) ...


M (kN.m) 3.6 20.1 36.6 29.3 18.3 2.9 0.9 0.1 4.2
d (mm) 411.0 411.0 409.0 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.03 0.15 0.28 0.22 0.14 0.02 0.01 0.00 0.03
x (mm) 45.67 45.67 46.52 45.44 45.44 45.44 45.44 45.44 45.44
As (mm2) 25.95 144.69 264.25 211.63 132.30 21.09 6.71 0.47 30.00
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 0.00 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 0.1 4.1 3.6 4.3 3.7
d (mm) 392.0 392.0 392.0 409.0 409.0
K/K' 0.00 0.03 0.03 0.03 0.03
x (mm) 43.56 43.56 43.56 45.44 45.44
As (mm2) 0.38 30.98 26.77 31.32 26.44
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 0.00 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 13.5 34.7 15.1 9.1 5.3 6.5
v (N/mm2) 0.16 0.42 0.18 0.11 0.07 0.08
vc (N/mm2) 0.34 0.34 0.50 0.50 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 76.3 89.7 89.7
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 4.4 < 14.32 OK --- 7.85 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge X 0.00 X 0.00 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y16 2Y16 2Y16 2Y16

Top SupBar

Bottom Bar 2Y16 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-45

Axis: A' Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B104 L=1800mm 2B105 L=3212.5mm 2B106 L=3212.5mm
BwxH (mm) 200 x 450 200 x 450 200 x 450
Flange BfxHf --- --- ---

5.19 5.19 5.19 5.19


G=3.32 1.88 1.88 1.88 1.88
Q=1.2

Loads 0.1 0.9 1.7 0.1 1.35 1.86 3.110.1 1.35 1.86 3.11
UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m
23.683

10.97 13.725

Shear
Force
(Env.)
-18.177
-22.304
31.229 27.416

8.661 9.333
2.073
Moment 4.712
(Env.) -1.268
-11.346

Bending (Top Edge) ...


M (kN.m) 5.1 19.5 31.2 27.4 15.1 8.7 9.3 0.1 2.1
d (mm) 411.0 411.0 409.0 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.04 0.15 0.24 0.21 0.12 0.07 0.07 0.00 0.02
x (mm) 45.67 45.67 45.44 45.44 45.44 45.44 45.44 45.44 45.44
As (mm2) 36.62 139.95 225.44 197.91 109.04 62.52 67.37 0.45 14.97
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 0.00 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 0.0 1.3 2.6 11.3 5.9
d (mm) 392.0 409.0 392.0 409.0 409.0
K/K' 0.00 0.01 0.02 0.09 0.05
x (mm) 43.56 45.44 43.56 45.44 45.44
As (mm2) 0.36 9.15 19.66 81.90 42.80
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 0.00 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 13.9 23.7 22.3 11.0 18.2 13.7
v (N/mm2) 0.17 0.29 0.27 0.13 0.22 0.17
vc (N/mm2) 0.34 0.34 0.50 0.50 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 76.3 89.7 89.7
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 4.4 < 15.97 OK 7.85 < 59.32 OK 7.85 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge X 0.00 X 0.00 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y16 2Y16 2Y16 2Y16

Top SupBar

Bottom Bar 2Y16 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-46

Axis: B Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B35 L=900mm 1B36 L=4300mm 1B37 L=3575mm
BwxH (mm) 200 x 450 200 x 450 200 x 450
Flange BfxHf --- --- ---

5.75 5.75
5.75 5.75
3.13 3.13
3.13 3.13

Loads 0.1 4.20.1 3.48


UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m
40.295
26.362

3.971
Shear
Force
(Env.)
-34.035 -36.228
27.504 26.84

13.172
6.841
1.787
Moment
(Env.)
-17.579
-24.067
Bending (Top Edge) ...
M (kN.m) 0.1 0.8 1.8 13.2 0.4 27.5 26.8 4.9 6.8
d (mm) 411.0 411.0 409.0 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.00 0.01 0.01 0.10 0.00 0.21 0.21 0.04 0.05
x (mm) 45.67 45.67 45.44 45.44 45.44 45.44 45.44 45.44 45.44
As (mm2) 0.66 5.73 12.90 95.09 2.97 198.55 193.76 35.66 49.38
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 0.00 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 9.6 24.1 2.3 1.4 17.6 9.4
d (mm) 392.0 409.0 392.0 392.0 409.0 409.0
K/K' 0.08 0.18 0.02 0.01 0.13 0.07
x (mm) 43.56 45.44 43.56 43.56 45.44 45.44
As (mm2) 72.64 173.74 16.97 10.44 126.90 67.90
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 0.00 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 1.1 4.0 34.0 40.3 36.2 26.4
v (N/mm2) 0.01 0.05 0.42 0.49 0.44 0.32
vc (N/mm2) 0.34 0.34 0.50 0.50 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 76.3 89.7 89.7
Td (kN.m) 0.0 0.0 0.1
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 2.2 < 15.97 OK 10.51 < 59.32 OK 8.74 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge X 0.00 X 0.00 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y16 2Y16 2Y16 2Y16

Top SupBar

Bottom Bar 2Y16 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-47

Axis: B Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B112 L=4300mm 2B113 L=3575mm
BwxH (mm) 200 x 450 200 x 450
Flange BfxHf --- ---

12.19
9.96
9.96 10.37 4.41 10.38
3.6
3.6 3.75 3.75
G=5.19 5.19
Q=1.88 1.88

Loads 0.1 1.35 1.8 2.95 4.20.1 1.35 1.79 2.23 3.48
UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m
56.641

23.442

Shear
Force
(Env.)
-44.966 -42.094

46.26 44.751

9.227 3.376
Moment
(Env.)
-20.215

-56.338
Bending (Top Edge) ...
M (kN.m) 9.2 0.5 46.3 44.8 12.6 3.4
d (mm) 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.07 0.00 0.35 0.34 0.10 0.03
x (mm) 45.44 45.44 59.79 57.69 45.44 45.44
As (mm2) 66.61 3.61 339.58 327.70 90.80 24.37
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 24.1 56.3 0.4 20.2 10.3
d (mm) 407.0 407.0 392.0 409.0 409.0
K/K' 0.19 0.44 0.00 0.15 0.08
x (mm) 45.22 74.49 43.56 45.44 45.44
As (mm2) 174.69 423.11 2.74 145.93 74.60
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 45.0 56.6 42.1 23.4
v (N/mm2) 0.55 0.69 0.51 0.29
vc (N/mm2) 0.58 0.58 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00
Vnom (kN) 95.8 89.7
Td (kN.m) 0.3 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 10.57 < 44.18 OK 8.74 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 628.32 628.32 628.32 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y16 2Y16

Top SupBar

Bottom Bar 2Y20 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-48

Axis: B' Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B38 L=3212.5mm 1B39 L=3212.5mm
BwxH (mm) 200 x 450 200 x 450
Flange BfxHf --- ---

Loads
UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m
21.387

Shear 0.394
Force
(Env.)
-17.867
45.786
34.86

Moment
(Env.) -3.778

Bending (Top Edge) ...


M (kN.m) 8.7 29.2 45.8 34.9 22.6 5.7
d (mm) 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.07 0.22 0.35 0.27 0.17 0.04
x (mm) 45.44 45.44 59.13 45.44 45.44 45.44
As (mm2) 62.68 210.49 335.84 251.65 163.46 40.82
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 0.2 3.8
d (mm) 409.0 409.0
K/K' 0.00 0.03
x (mm) 45.44 45.44
As (mm2) 1.15 27.27
As' (mm2) 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 11.9 21.4 17.9 9.7
v (N/mm2) 0.15 0.26 0.22 0.12
vc (N/mm2) 0.50 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 89.7
Td (kN.m) 0.1 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d --- ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y16 2Y16

Top SupBar

Bottom Bar 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-49

Axis: B' Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B114 L=3212.5mm 2B115 L=3212.5mm
BwxH (mm) 200 x 450 200 x 450
Flange BfxHf --- ---

G=12.5 12.5
Q=4.52 4.52

Loads 0.1 1.61 3.110.1 1.61 3.11


UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m
40.341

14.315
Shear
Force
(Env.) -11.385

-38.227
48.567 42.996

2.224
Moment
(Env.) -7.445 -9.35

Bending (Top Edge) ...


M (kN.m) 0.7 19.9 48.6 43.0 20.3 2.2
d (mm) 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.01 0.15 0.37 0.33 0.16 0.02
x (mm) 45.44 45.44 63.01 55.28 45.44 45.44
As (mm2) 5.34 143.33 357.87 313.96 146.46 16.05
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 5.6 7.4 9.4 6.5
d (mm) 409.0 409.0 409.0 409.0
K/K' 0.04 0.06 0.07 0.05
x (mm) 45.44 45.44 45.44 45.44
As (mm2) 40.66 53.75 67.50 47.16
As' (mm2) 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 11.4 40.3 38.2 14.3
v (N/mm2) 0.14 0.49 0.47 0.18
vc (N/mm2) 0.50 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 89.7
Td (kN.m) 0.1 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 7.85 < 59.32 OK 7.85 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y16 2Y16

Top SupBar

Bottom Bar 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-50

Axis: C Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B40 L=900mm 1B41 L=4300mm 1B42 L=3575mm
BwxH (mm) 200 x 450 200 x 450 200 x 450
Flange BfxHf --- --- ---

Loads
UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m

8.448 11.651
3.971
Shear
Force
(Env.) -7.418
-11.438

10.373 11.11

1.787 3.257 2.675


Moment
(Env.)
-7.004 -5.056

Bending (Top Edge) ...


M (kN.m) 0.1 0.8 1.8 10.4 0.7 3.3 2.7 2.8 11.1
d (mm) 411.0 411.0 409.0 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.00 0.01 0.01 0.08 0.01 0.02 0.02 0.02 0.09
x (mm) 45.67 45.67 45.44 45.44 45.44 45.44 45.44 45.44 45.44
As (mm2) 0.66 5.73 12.90 74.88 4.96 23.51 19.31 20.40 80.20
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 0.00 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 1.6 7.0 4.6 4.1 5.1 0.9
d (mm) 392.0 409.0 392.0 392.0 409.0 392.0
K/K' 0.01 0.05 0.04 0.03 0.04 0.01
x (mm) 43.56 45.44 43.56 43.56 45.44 43.56
As (mm2) 12.16 50.56 34.44 30.67 36.50 6.49
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 0.00 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 1.1 4.0 11.4 8.4 7.4 11.7
v (N/mm2) 0.01 0.05 0.14 0.10 0.09 0.14
vc (N/mm2) 0.34 0.34 0.50 0.50 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 76.3 89.7 89.7
Td (kN.m) 0.0 0.0 0.1
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 2.2 < 15.97 OK 10.51 < 59.32 OK 8.74 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge X 0.00 X 0.00 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y16 2Y16 2Y16 2Y16 2Y16

Top SupBar

Bottom Bar 2Y16 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-51

Axis: C Storey: 1 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B43 L=3212.5mm 1B44 L=3212.5mm
BwxH (mm) 200 x 450 200 x 450
Flange BfxHf --- ---

G=5.23 5.235.23 5.23


Q=2.84 2.842.84 2.84

Loads 0.1 3.110.1 3.11


UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m
27.496
22.622

Shear
Force
(Env.)
-24.765
-28.831
16.834 16.566
11.255
7.215

Moment
(Env.)
-10.235
-12.854

Bending (Top Edge) ...


M (kN.m) 11.3 2.7 16.8 16.6 1.5 7.2
d (mm) 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.09 0.02 0.13 0.13 0.01 0.06
x (mm) 45.44 45.44 45.44 45.44 45.44 45.44
As (mm2) 81.25 19.77 121.52 119.59 10.77 52.08
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 3.9 10.2 0.9 2.0 12.9 7.3
d (mm) 392.0 409.0 392.0 392.0 409.0 409.0
K/K' 0.03 0.08 0.01 0.02 0.10 0.06
x (mm) 43.56 45.44 43.56 43.56 45.44 45.44
As (mm2) 29.26 73.88 6.79 14.72 92.79 52.35
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 24.8 27.5 28.8 22.6
v (N/mm2) 0.30 0.34 0.35 0.28
vc (N/mm2) 0.50 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 89.7
Td (kN.m) 0.1 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 7.85 < 59.32 OK 7.85 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y16 2Y16 2Y16

Top SupBar

Bottom Bar 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-52

Axis: C Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B116 L=4300mm 2B117 L=3575mm 2B118 L=3212.5mm
BwxH (mm) 200 x 450 200 x 450 200 x 450
Flange BfxHf --- --- ---

14.01 12.5
9.96 9.96 5.06 4.52
G=7.063.6 3.6
Q=2.55

Loads 0.1 1.8 3 4.20.1 1.79 3.480.1 1.61 3.11


UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m
59.158

28.91 28.711

Shear
Force
(Env.) -26.706
-47.47 -40.285

46.148 44.332
18.848 18.569 20.789
8.927
Moment
(Env.) 1.906
-15.924 -14.161

-60.506
Bending (Top Edge) ...
M (kN.m) 8.9 0.2 46.1 44.3 13.9 18.8 18.6 3.2 20.8
d (mm) 409.0 409.0 409.0 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.07 0.00 0.35 0.34 0.11 0.14 0.14 0.02 0.16
x (mm) 45.44 45.44 59.63 57.12 45.44 45.44 45.44 45.44 45.44
As (mm2) 64.44 1.78 338.70 324.41 100.30 136.06 134.05 23.25 150.07
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 24.2 60.5 3.6 15.9 3.2 3.3 14.2 0.6
d (mm) 407.0 407.0 392.0 409.0 392.0 392.0 409.0 392.0
K/K' 0.19 0.47 0.03 0.12 0.03 0.03 0.11 0.00
x (mm) 45.22 80.60 43.56 45.44 43.56 43.56 45.44 43.56
As (mm2) 175.69 457.77 27.38 114.96 24.38 25.18 102.23 4.35
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 47.5 59.2 40.3 28.9 26.7 28.7
v (N/mm2) 0.58 0.72 0.49 0.35 0.33 0.35
vc (N/mm2) 0.58 0.58 0.50 0.50 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 95.8 89.7 89.7
Td (kN.m) 0.3 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 10.57 < 41.53 OK 8.74 < 59.32 OK 7.85 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 628.32 628.32 628.32 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16 2Y16
Top SupBar 2Y16 2Y16 2Y16 2Y16 2Y16

Top SupBar

Bottom Bar 2Y20 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-53

Axis: C Storey: 2 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B119 L=3212.5mm
BwxH (mm) 200 x 450
Flange BfxHf ---

G=9.44 10.97 9.44


Q=3.41 3.97 3.41

Loads 0.1 1.24 1.61 1.98 3.11


UDL G=2.58 Q=0.3 kN/m

21.435
Shear
Force
(Env.) -30.341

20.442
3.815
Moment
(Env.)
-17.193

Bending (Top Edge) ...


M (kN.m) 20.4 0.6 3.8
d (mm) 409.0 409.0 409.0
K/K' 0.16 0.00 0.03
x (mm) 45.44 45.44 45.44
As (mm2) 147.57 4.19 27.54
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 2.0 17.2 8.4
d (mm) 392.0 409.0 409.0
K/K' 0.02 0.13 0.06
x (mm) 43.56 45.44 45.44
As (mm2) 15.24 124.11 60.99
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 30.3 21.4
v (N/mm2) 0.37 0.26
vc (N/mm2) 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00
Vnom (kN) 89.7
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 7.85 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar 2Y16

Top SupBar

Bottom Bar 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-54

Axis: C' Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B45 L=3212.5mm 1B46 L=3212.5mm
BwxH (mm) 200 x 450 200 x 450
Flange BfxHf --- ---

G=10.58 10.58
10.58 10.58
Q=5.75 5.755.75 5.75
5.23 5.23
2.84 2.84

Loads 0.1 3.110.1 1.46 3.11


UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m
52.412

25.983

Shear
Force
(Env.)
-36.54
-48.639
31.764 31.503

4.757 7.713
Moment
(Env.)
-18.352
-23.931

Bending (Top Edge) ...


M (kN.m) 4.8 2.9 31.8 31.5 5.2 7.7
d (mm) 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.04 0.02 0.24 0.24 0.04 0.06
x (mm) 45.44 45.44 45.44 45.44 45.44 45.44
As (mm2) 34.34 20.95 229.30 227.41 37.50 55.68
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 14.4 23.9 1.6 0.7 18.4 8.5
d (mm) 409.0 409.0 392.0 392.0 409.0 409.0
K/K' 0.11 0.18 0.01 0.01 0.14 0.07
x (mm) 45.44 45.44 43.56 43.56 45.44 45.44
As (mm2) 103.72 172.76 11.89 5.08 132.48 61.62
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 36.5 52.4 48.6 26.0
v (N/mm2) 0.45 0.64 0.59 0.32
vc (N/mm2) 0.50 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 89.7
Td (kN.m) 0.0 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 7.85 < 59.32 OK 7.85 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y16 2Y16

Top SupBar

Bottom Bar 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-55

Axis: C' Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B120 L=3212.5mm
BwxH (mm) 200 x 450
Flange BfxHf ---

G=5.65 5.65
Q=2.04 2.044.72 4.72
1.71 1.71

Loads 0.1 0.78 1.24 1.98 3.11


UDL G=2.58 Q=0.3 kN/m
22.809

Shear
Force
(Env.)
-21.52

5.918
Moment
(Env.)

-21.436
Bending (Top Edge) ...
M (kN.m) 0.0 5.9
d (mm) 409.0 409.0
K/K' 0.00 0.05
x (mm) 45.44 45.44
As (mm2) 0.05 42.72
As' (mm2) 0.00 0.00
As-min 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 11.0 21.4 6.5
d (mm) 409.0 409.0 409.0
K/K' 0.08 0.16 0.05
x (mm) 45.44 45.44 45.44
As (mm2) 79.18 154.74 47.23
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 21.5 22.8
v (N/mm2) 0.26 0.28
vc (N/mm2) 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00
Vnom (kN) 89.7
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 7.85 < 45.63 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar

Top SupBar

Bottom Bar 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-56

Axis: D Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B47 L=4300mm 1B48 L=3575mm 1B49 L=3212.5mm
BwxH (mm) 200 x 450 200 x 450 200 x 450
Flange BfxHf --- --- ---

13.48
G=10.35 10.35 5.92
Q=5.63 5.63 5.35 5.35
2.91 2.91

Loads 0.1 4.2 0.1 1.61 3.11


UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m
62.203
42.419

7.36
Shear
Force
-14.566
(Env.)
-36.148
-53.855

33.989
27.099 25.197
16.02
10.238 13.821
Moment 8.061
(Env.)
-20.314

-41.406
Bending (Top Edge) ...
M (kN.m) 16.0 34.0 27.1 16.3 10.2 13.8 0.3 25.2
d (mm) 409.0 409.0 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.12 0.26 0.21 0.13 0.08 0.11 0.00 0.19
x (mm) 45.44 45.44 45.44 45.44 45.44 45.44 45.44 45.44
As (mm2) 115.64 245.36 195.62 117.97 73.90 99.77 2.49 181.89
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 18.6 41.4 7.5 6.9 20.3 1.8
d (mm) 409.0 409.0 392.0 392.0 409.0 392.0
K/K' 0.14 0.32 0.06 0.06 0.16 0.02
x (mm) 45.44 53.10 43.56 43.56 45.44 43.56
As (mm2) 134.44 301.58 56.65 51.89 146.64 13.77
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 53.9 62.2 14.6 7.4 36.1 42.4
v (N/mm2) 0.66 0.76 0.18 0.09 0.44 0.52
vc (N/mm2) 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 89.7 89.7
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 10.51 < 47.77 OK --- 7.85 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16 2Y16
Top SupBar 2Y16 2Y16 2Y16 2Y16 2Y16

Top SupBar

Bottom Bar 2Y16 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-57

Axis: D Storey: 1 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B50 L=3212.5mm
BwxH (mm) 200 x 450
Flange BfxHf ---

12.71
5.63
8.13
7.36
G=5.35 3.01
2.73
Q=2.91

Loads 0.1 1.46 3.11


UDL G=2.58 Q=0.5 kN/m

22.439
Shear 0.556
Force
(Env.)
-40.897

24.664
8.462
Moment
(Env.)
-18.815

Bending (Top Edge) ...


M (kN.m) 24.7 0.4 8.5
d (mm) 409.0 409.0 409.0
K/K' 0.19 0.00 0.06
x (mm) 45.44 45.44 45.44
As (mm2) 178.05 2.69 61.09
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 2.8 18.8 7.2
d (mm) 392.0 409.0 409.0
K/K' 0.02 0.14 0.05
x (mm) 43.56 45.44 45.44
As (mm2) 20.87 135.82 51.80
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 40.9 22.4
v (N/mm2) 0.50 0.27
vc (N/mm2) 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00
Vnom (kN) 89.7
Td (kN.m) 0.1
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 7.85 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar 2Y16

Top SupBar

Bottom Bar 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-58

Axis: D Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B121 L=4300mm 2B122 L=3575mm 2B123 L=3212.5mm
BwxH (mm) 200 x 450 200 x 450 200 x 450
Flange BfxHf --- --- ---

G=17.02
Q=6.15 14.01 12.5
5.06 4.52

Loads 0.1 2.15 4.20.1 1.79 3.480.1 1.61 3.11


UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m
50.346
29.816 24.672

Shear
Force
(Env.)
-29.111
-37.858 -35.698

38.553 35.534
20.909 21.776
8.985 13.541
Moment
(Env.) 1.328
-15.386 -13.777

-40.298
Bending (Top Edge) ...
M (kN.m) 9.0 0.3 38.6 35.5 10.0 20.9 21.8 4.3 13.5
d (mm) 409.0 409.0 409.0 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.07 0.00 0.30 0.27 0.08 0.16 0.17 0.03 0.10
x (mm) 45.44 45.44 49.21 45.44 45.44 45.44 45.44 45.44 45.44
As (mm2) 64.86 2.43 279.53 256.52 72.37 150.94 157.20 31.17 97.75
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 16.8 40.3 1.8 15.4 1.3 0.6 13.8 3.1
d (mm) 409.0 409.0 392.0 409.0 392.0 392.0 409.0 392.0
K/K' 0.13 0.31 0.01 0.12 0.01 0.00 0.11 0.03
x (mm) 45.44 51.58 43.56 45.44 43.56 43.56 45.44 43.56
As (mm2) 121.19 292.99 13.26 111.07 10.14 4.26 99.45 23.49
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 37.9 50.3 35.7 29.8 29.1 24.7
v (N/mm2) 0.46 0.62 0.44 0.36 0.36 0.30
vc (N/mm2) 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 89.7 89.7
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 10.51 < 48.95 OK 8.74 < 59.32 OK 7.85 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16 2Y16
Top SupBar 2Y16 2Y16 2Y16 2Y16 2Y16

Top SupBar

Bottom Bar 2Y16 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-59

Axis: D Storey: 2 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B124 L=3212.5mm
BwxH (mm) 200 x 450
Flange BfxHf ---

G=5.65 6.25
5.66
Q=2.04 2.26
2.04

Loads 0.1 0.78 1.46 3.11


UDL G=2.58 Q=0.3 kN/m

20.274

Shear
Force
(Env.) -27.033

13.492
4.488
Moment
(Env.)
-19.045

Bending (Top Edge) ...


M (kN.m) 13.5 4.5
d (mm) 409.0 409.0
K/K' 0.10 0.03
x (mm) 45.44 45.44
As (mm2) 97.40 32.40
As' (mm2) 0.00 0.00
As-min 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 6.2 19.0 7.1
d (mm) 392.0 409.0 409.0
K/K' 0.05 0.15 0.05
x (mm) 43.56 45.44 45.44
As (mm2) 46.66 137.49 51.27
As' (mm2) 0.00 0.00 0.00
As-min 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 27.0 20.3
v (N/mm2) 0.33 0.25
vc (N/mm2) 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00
Vnom (kN) 89.7
Td (kN.m) 0.1
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 7.85 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar 2Y16

Top SupBar

Bottom Bar 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-60

Axis: E Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B51 L=900mm 1B52 L=4300mm 1B53 L=1775mm
BwxH (mm) 200 x 450 200 x 450 200 x 450
Flange BfxHf --- --- ---

12.54
6.44 10.35 10.35
5.63 5.63
G=3.52 2.73
2.19
Q=1.31 1.01
0.81

Loads 0.1 0.75 0.9 0.51 4.2


UDL G=2.58 Q=0.4 kN/m UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m
57.97
31.968
11.86
Shear
Force -6.556
(Env.)
-70.654
34.379
25.032 28.194
21.702 17.507
16.935
Moment
(Env.)

-37.179
Bending (Top Edge) ...
M (kN.m) 5.1 15.9 25.0 34.4 0.2 28.2 21.7 19.2 17.5
d (mm) 411.0 411.0 409.0 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.04 0.12 0.19 0.26 0.00 0.22 0.17 0.15 0.13
x (mm) 45.67 45.67 45.44 45.44 45.44 45.44 45.44 45.44 45.44
As (mm2) 36.33 114.41 180.70 248.18 1.12 203.53 156.66 138.79 126.38
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 0.00 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 0.1 10.7 37.2 9.5
d (mm) 392.0 392.0 409.0 392.0
K/K' 0.00 0.09 0.28 0.08
x (mm) 43.56 43.56 47.36 43.56
As (mm2) 0.44 80.42 268.99 71.55
As' (mm2) 0.00 0.00 0.00 0.00
As-min 0.00 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 26.6 32.0 70.7 58.0 6.6 11.9
v (N/mm2) 0.32 0.39 0.86 0.71 0.08 0.14
vc (N/mm2) 0.34 0.34 0.50 0.50 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 76.3 89.7 89.7
Td (kN.m) 0.2 0.0 0.1
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 2.2 < 15.97 OK 10.51 < 52.46 OK ---
Provided Steel Areas (mm2)
Top Edge X 0.00 X 0.00 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y16 2Y16 2Y16 2Y16 2Y16

Top SupBar

Bottom Bar 2Y16 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-61

Axis: E Storey: 1 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B54 L=1800mm 1B55 L=3525mm 1B56 L=2900mm
BwxH (mm) 200 x 450 200 x 450 200 x 450
Flange BfxHf --- --- ---

8.13 8.13
3.01 3.01
1.15
0.43

Loads 0.1 1.61 3.11 1.29 2.8


UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.4 kN/m UDL G=2.58 Q=0.4 kN/m
67.433

12.026
Shear
Force -14.751
(Env.) -21.123 -26.922

22.797 21.921
17.599
6.125 5.397
Moment
(Env.) -2.999 -7.38
-16.437

Bending (Top Edge) ...


M (kN.m) 17.6 11.8 5.8 6.1 22.8 21.9 6.5 5.4
d (mm) 409.0 409.0 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.13 0.09 0.04 0.05 0.17 0.17 0.05 0.04
x (mm) 45.44 45.44 45.44 45.44 45.44 45.44 45.44 45.44
As (mm2) 127.05 85.24 41.74 44.21 164.57 158.25 46.59 38.96
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 3.0 6.7 16.4 5.6 7.4 5.7
d (mm) 392.0 392.0 409.0 392.0 409.0 409.0
K/K' 0.03 0.06 0.13 0.05 0.06 0.04
x (mm) 43.56 43.56 45.44 43.56 45.44 45.44
As (mm2) 22.59 50.17 118.66 42.50 53.28 41.24
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 14.8 9.4 21.1 67.4 26.9 12.0
v (N/mm2) 0.18 0.11 0.26 0.82 0.33 0.15
vc (N/mm2) 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 89.7 89.7
Td (kN.m) 0.1 0.7 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d --- 8.62 < 59.32 OK 7.09 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16 2Y16
Top SupBar 2Y16 2Y16 2Y16 2Y16 2Y16

Top SupBar

Bottom Bar 2Y16 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-62

Axis: E Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B125 L=900mm 2B126 L=4300mm 2B127 L=3575mm
BwxH (mm) 200 x 450 200 x 450 200 x 450
Flange BfxHf --- --- ---

13.7
12.89
4.95
4.66 10.38
3.75 6.53 6.537
G=2.71 2.1 2.51
1.68 1.68 2.36 2.53
2.36
Q=0.98 0.76 0.91
0.61 0.61

Loads 0.1 0.75 0.9 0.51 1.96 2.95 4.20.1 0.89 1.68 3.48
UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m
42.692
27.212 25.898

Shear
Force
(Env.)
-32.287
-51.325
30.856 28.877
26.27
21.291 18.877

Moment
(Env.)
-15.749

-30.883
Bending (Top Edge) ...
M (kN.m) 4.3 13.5 21.3 26.3 0.4 30.9 28.9 7.6 18.9
d (mm) 411.0 411.0 409.0 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.03 0.10 0.16 0.20 0.00 0.24 0.22 0.06 0.14
x (mm) 45.67 45.67 45.44 45.44 45.44 45.44 45.44 45.44 45.44
As (mm2) 30.77 97.24 153.69 189.64 2.65 222.75 208.46 55.13 136.27
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 0.00 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 0.0 6.7 30.9 2.6 0.1 15.7 0.7
d (mm) 392.0 392.0 409.0 392.0 392.0 409.0 392.0
K/K' 0.00 0.06 0.24 0.02 0.00 0.12 0.01
x (mm) 43.56 43.56 45.44 43.56 43.56 45.44 43.56
As (mm2) 0.31 50.18 222.94 19.66 0.72 113.69 4.97
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 0.00 152.64 152.64 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 22.6 27.2 51.3 42.7 32.3 25.9
v (N/mm2) 0.28 0.33 0.63 0.52 0.39 0.32
vc (N/mm2) 0.34 0.34 0.50 0.50 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00 4.00 4.00
Vnom (kN) 76.3 89.7 89.7
Td (kN.m) 0.3 0.1 0.1
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 2.2 < 15.97 OK 10.51 < 59.32 OK 8.74 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge X 0.00 X 0.00 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y16 2Y16 2Y16 2Y16 2Y16

Top SupBar

Bottom Bar 2Y16 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-63

Axis: E Storey: 2 ... Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B128 L=3525mm 2B129 L=2900mm
BwxH (mm) 200 x 450 200 x 450
Flange BfxHf --- ---

G=6.25 6.25
Q=2.26 0.88 2.26
0.32
Loads 0.1 1.61 3.11 1.29 2.8
UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m
47.351

11.414
Shear
Force
(Env.) -22.298 -20.512

18.567
14.632 13.67
2.346
Moment
(Env.)
-10.769 -7.773

Bending (Top Edge) ...


M (kN.m) 18.6 3.6 14.6 13.7 3.3 2.3
d (mm) 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.14 0.03 0.11 0.10 0.03 0.02
x (mm) 45.44 45.44 45.44 45.44 45.44 45.44
As (mm2) 134.03 25.81 105.63 98.68 23.75 16.93
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 10.8 5.4 7.8 4.5
d (mm) 409.0 392.0 409.0 409.0
K/K' 0.08 0.05 0.06 0.03
x (mm) 45.44 43.56 45.44 45.44
As (mm2) 77.74 40.84 56.12 32.44
As' (mm2) 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 22.3 47.4 20.5 11.4
v (N/mm2) 0.27 0.58 0.25 0.14
vc (N/mm2) 0.50 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 89.7
Td (kN.m) 0.5 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 8.62 < 59.32 OK 7.09 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y16 2Y16 2Y16

Top SupBar

Bottom Bar 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-64

Axis: E' Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B57 L=3695mm 1B58 L=1775mm
BwxH (mm) 200 x 450 200 x 450
Flange BfxHf --- ---

G=5.95 5.95
Q=2.21 2.21

0.55
0.21

Loads 2.59 3.59


UDL G=2.58 Q=0.4 kN/m UDL G=2.25 Q=0 kN/m
26.249

2.021
Shear
Force
(Env.) -10.355

-27.528
13.529
9.144 10.358
5.094
Moment 4.342
(Env.) -3.769

-17.488
Bending (Top Edge) ...
M (kN.m) 9.1 13.5 10.4 6.5 5.1
d (mm) 409.0 409.0 409.0 409.0 409.0
K/K' 0.07 0.10 0.08 0.05 0.04
x (mm) 45.44 45.44 45.44 45.44 45.44
As (mm2) 66.01 97.66 74.77 47.18 36.77
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 9.6 17.5 3.2 0.7 3.8
d (mm) 409.0 409.0 392.0 409.0 409.0
K/K' 0.07 0.13 0.03 0.01 0.03
x (mm) 45.44 45.44 43.56 45.44 45.44
As (mm2) 69.04 126.24 23.90 5.00 27.20
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 27.5 26.2 10.4 7.5
v (N/mm2) 0.34 0.32 0.13 0.09
vc (N/mm2) 0.50 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 89.7
Td (kN.m) 0.0 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 9.03 < 59.32 OK 4.34 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y16 2Y16

Top SupBar

Bottom Bar 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-65

Axis: E' Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B130 L=3695mm 2B131 L=1775mm
BwxH (mm) 200 x 450 200 x 450
Flange BfxHf --- ---

9.76 9.768.73
3.53 3.533.15
G=4.58
4.58 3.27
Q=1.65
1.65 1.18
0.43
0.15
Loads 1.35 2.35 2.6 3.6 0.1 0.89 1.67
UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m
35.077

1.578
Shear
Force
(Env.) -14.785

-32.276

18.088 15.899

5.228
Moment
(Env.) -1.019

-25.675
Bending (Top Edge) ...
M (kN.m) 5.2 18.1 15.9 9.4 3.6
d (mm) 409.0 409.0 409.0 409.0 409.0
K/K' 0.04 0.14 0.12 0.07 0.03
x (mm) 45.44 45.44 45.44 45.44 45.44
As (mm2) 37.74 130.57 114.77 68.08 26.03
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 13.2 25.7 4.5 0.5 1.0
d (mm) 409.0 409.0 392.0 409.0 409.0
K/K' 0.10 0.20 0.04 0.00 0.01
x (mm) 45.44 45.44 43.56 45.44 45.44
As (mm2) 95.20 185.34 34.10 3.96 7.35
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 32.3 35.1 14.8 5.9
v (N/mm2) 0.39 0.43 0.18 0.07
vc (N/mm2) 0.50 0.50 0.50 0.50 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 89.7
Td (kN.m) 0.0 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 9.03 < 59.32 OK 4.34 < 59.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y16 2Y16

Top SupBar

Bottom Bar 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-66

Axis: F Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B67 L=6000mm 1B68 L=6000mm
BwxH (mm) 200 x 450 200 x 450
Flange BfxHf --- ---

16.44 16.44
G=11.04 11.04
11.04 11.04 8 8 11.04
Q=6 66 6 6

Loads 0.1 5.9


0.1 0.9 1.9 4.9 5.9
UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m
104.654 100.215

Shear
Force
(Env.) -72.967

-144.775
135.968 146.747

27.157 41.297
Moment
(Env.)
-69.011
-104.343

Bending (Top Edge) ...


M (kN.m) 27.2 27.4 136.0 146.7 3.2 41.3
d (mm) 409.0 409.0 384.3 384.3 409.0 409.0
K/K' 0.21 0.21 1.18 1.27 0.02 0.32
x (mm) 45.44 45.44 190.51 190.51 45.44 52.95
As (mm2) 196.04 198.02 1260.94 1353.61 22.77 300.73
As' (mm2) 0.00 0.00 178.85 271.52 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 31.8 69.0 104.3 43.5
d (mm) 407.0 407.0 404.5 404.5
K/K' 0.25 0.53 0.82 0.34
x (mm) 45.22 93.37 153.65 56.71
As (mm2) 230.34 530.34 872.71 322.11
As' (mm2) 0.00 0.00 0.00 0.00
As-min 152.64 152.64 180.00 180.00 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 73.0 104.7 144.8 100.2
v (N/mm2) 0.89 1.36 1.88 1.23
vc (N/mm2) 0.58 0.58 0.78 0.78 0.67 0.67
v-max (N/mm2) 4.00 4.00 4.00 4.00
Vnom (kN) 95.8 102.9
Td (kN.m) 0.0 0.2
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 1575.0 1500.0 0.0
Links Y8-300 Y8-300 Y8-225 Y8-150 Y8-300 Y8-300
Deflection Check ...
L/d 14.74 < 36.74 OK 14.83 < 30.5 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 1383.87 1383.87 402.12 402.12
Bottom Edge 628.32 628.32 628.32 981.75 981.75 981.75
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y25 2Y25

Top SupBar 2Y16 2Y16

Bottom Bar 2Y20 2Y25


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-67

Axis: F Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B138 L=6000mm 2B139 L=6000mm
BwxH (mm) 200 x 450 200 x 450
Flange BfxHf --- ---

14.11 14.11
G=9.96 9.96 11.62 5.1 5.1
4.2 8.3
Q=3.6 3.6 3
3.32
1.2

Loads 0.1 2.5 3.5 5.9


0.1 0.9 1.9 2.5 3.5 4.9 5.9
UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m

58.465 57.329

Shear
Force
(Env.) -36.463

-91.063
88.052 94.288

13.442 21.426
Moment
(Env.)
-46.089
-75.995

Bending (Top Edge) ...


M (kN.m) 13.4 18.7 88.1 94.3 1.5 21.4
d (mm) 409.0 409.0 388.0 388.0 409.0 409.0
K/K' 0.10 0.14 0.75 0.80 0.01 0.16
x (mm) 45.44 45.44 132.40 144.08 45.44 45.44
As (mm2) 97.03 134.82 752.00 818.37 11.14 154.67
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 18.8 46.1 0.0 76.0 30.0
d (mm) 409.0 409.0 392.0 407.0 407.0
K/K' 0.14 0.35 0.00 0.59 0.23
x (mm) 45.44 59.55 43.56 104.22 45.22
As (mm2) 136.04 338.24 0.05 591.93 217.92
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 36.5 58.5 91.1 57.3
v (N/mm2) 0.45 0.75 1.17 0.70
vc (N/mm2) 0.50 0.50 0.70 0.70 0.58 0.58
v-max (N/mm2) 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 95.8
Td (kN.m) 0.0 0.3
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 14.67 < 43.13 OK 14.74 < 33.32 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 1030.44 1030.44 402.12 402.12
Bottom Edge 402.12 402.12 402.12 628.32 628.32 628.32
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y20 2Y20

Top SupBar 2Y16 2Y16

Bottom Bar 2Y16 2Y20


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-68

Axis: G Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B69 L=6000mm 1B70 L=6000mm
BwxH (mm) 200 x 450 200 x 450
Flange BfxHf --- ---

G=23.23 23.23
23.23 23.23
Q=12.63 12.63
12.63 12.63

Loads 0.1 5.9


0.1 5.9
UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m
195.381
145.955

Shear
Force
(Env.)
-146.179
-195.589
226.277 226.753

57.023 56.195
Moment
(Env.)
-143.285 -143.502

Bending (Top Edge) ...


M (kN.m) 57.0 27.8 226.3 226.8 27.9 56.2
d (mm) 407.0 407.0 378.0 378.0 407.0 407.0
K/K' 0.44 0.22 2.03 2.03 0.22 0.43
x (mm) 75.49 45.22 187.41 187.41 45.22 74.28
As (mm2) 428.77 201.56 2070.99 2075.15 202.74 421.93
As' (mm2) 0.00 0.00 1006.50 1010.66 0.00 0.00
As-min 152.64 180.00 152.64 152.64 180.00 152.64
Bending (Bottom Edge) ...
M (kN.m) 61.5 143.3 0.0 143.5 62.1
d (mm) 401.0 401.0 392.0 401.0 401.0
K/K' 0.49 1.14 0.00 1.14 0.50
x (mm) 83.65 198.82 43.56 198.82 84.56
As (mm2) 475.11 1269.20 0.04 1270.89 480.29
As' (mm2) 0.00 139.94 0.00 141.63 0.00
As-min 152.64 152.64 180.00 180.00 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 146.2 195.4 195.6 146.0
v (N/mm2) 1.80 2.58 2.59 1.79
vc (N/mm2) 0.79 0.80 0.92 0.92 0.80 0.79
v-max (N/mm2) 4.00 4.00 4.00 4.00
Vnom (kN) 127.8 127.8
Td (kN.m) 0.0 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 1575.0 1500.0 1500.0 1575.0
Links Y8-175 Y8-225 Y8-100 Y8-100 Y8-225 Y8-175
Deflection Check ...
L/d 14.96 < 30.02 OK 14.96 < 29.99 OK
Provided Steel Areas (mm2)
Top Edge 628.32 628.32 2236.81 2236.81 628.32 628.32
Bottom Edge 1608.50 1608.50 1608.50 1608.50 1608.50 1608.50
Steel Bars ...
Top Bar 2Y20 2Y20
Top SupBar 2Y32 2Y32

Top SupBar 2Y20 2Y20

Bottom Bar 2Y32 2Y32


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-69

Axis: G Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B140 L=6000mm 2B141 L=6000mm
BwxH (mm) 200 x 450 200 x 450
Flange BfxHf --- ---

20.9620.96
G=19.92 19.92 20.9620.96
19.92 19.92
7.58 7.58
Q=7.2 7.2 7.58 7.58
7.2 7.2

Loads 0.1 2.5 5.9


0.1 2.5 5.9
UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m
97.092
67.366

Shear
Force
(Env.)
-67.537
-97.247
127.549 127.874

27.631 26.985
Moment
(Env.)
-91.732 -91.913

Bending (Top Edge) ...


M (kN.m) 27.6 12.3 127.5 127.9 12.4 27.0
d (mm) 409.0 409.0 387.0 387.0 409.0 409.0
K/K' 0.21 0.09 1.09 1.09 0.09 0.21
x (mm) 45.44 45.44 191.88 191.88 45.44 45.44
As (mm2) 199.47 88.59 1181.31 1184.08 89.31 194.80
As' (mm2) 0.00 0.00 91.47 94.24 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 33.7 91.7 0.0 91.9 34.2
d (mm) 407.0 407.0 392.0 407.0 407.0
K/K' 0.26 0.71 0.00 0.71 0.26
x (mm) 45.22 129.98 43.56 130.29 45.22
As (mm2) 244.70 738.28 0.02 740.03 248.22
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 180.00 180.00 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 67.5 97.1 97.2 67.4
v (N/mm2) 0.83 1.25 1.26 0.82
vc (N/mm2) 0.66 0.66 0.75 0.75 0.66 0.66
v-max (N/mm2) 4.00 4.00 4.00 4.00
Vnom (kN) 102.6 102.6
Td (kN.m) 0.0 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 14.74 < 34.04 OK 14.74 < 33.98 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 1256.64 1256.64 402.12 402.12
Bottom Edge 942.48 942.48 942.48 942.48 942.48 942.48
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y20 2Y20

Top SupBar 2Y20 2Y20

Bottom Bar 3Y20 3Y20


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-70

Axis: H Storey: 1 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B71 L=6000mm 1B72 L=6000mm
BwxH (mm) 200 x 450 200 x 450
Flange BfxHf --- ---

G=12.19 12.19
12.19 12.19
Q=6.63 6.63
6.63 6.63

Loads 0.1 5.9


0.1 5.9
UDL G=2.58 Q=0.5 kN/m UDL G=2.58 Q=0.5 kN/m
109.903
81.66

Shear
Force
(Env.)
-81.899
-110.103
127.157 127.62

30.97 30.097
Moment
(Env.)
-80.504 -80.728

Bending (Top Edge) ...


M (kN.m) 31.0 15.0 127.2 127.6 15.2 30.1
d (mm) 409.0 409.0 387.0 387.0 409.0 409.0
K/K' 0.24 0.12 1.09 1.09 0.12 0.23
x (mm) 45.44 45.44 191.88 191.88 45.44 45.44
As (mm2) 223.57 108.56 1177.97 1181.91 109.94 217.27
As' (mm2) 0.00 0.00 88.13 92.07 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 35.4 80.5 0.0 0.0 80.7 37.0
d (mm) 407.0 407.0 392.0 392.0 407.0 407.0
K/K' 0.27 0.62 0.00 0.00 0.62 0.29
x (mm) 45.25 111.40 43.56 43.56 111.76 47.32
As (mm2) 257.04 632.74 0.03 0.06 634.78 268.80
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 180.00 180.00 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 81.9 109.9 110.1 81.7
v (N/mm2) 1.00 1.42 1.42 1.00
vc (N/mm2) 0.66 0.66 0.75 0.75 0.66 0.66
v-max (N/mm2) 4.00 4.00 4.00 4.00
Vnom (kN) 102.6 102.6
Td (kN.m) 0.0 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 1575.0 1575.0 0.0
Links Y8-300 Y8-300 Y8-225 Y8-225 Y8-300 Y8-300
Deflection Check ...
L/d 14.74 < 38.12 OK 14.74 < 38.03 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 1256.64 1256.64 402.12 402.12
Bottom Edge 942.48 942.48 942.48 942.48 942.48 942.48
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y20 2Y20

Top SupBar 2Y20 2Y20

Bottom Bar 3Y20 3Y20


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-71

Axis: H Storey: 2 Material: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B142 L=6000mm 2B143 L=6000mm
BwxH (mm) 200 x 450 200 x 450
Flange BfxHf --- ---

G=11 11 11 11
Q=3.983.98 3.98 3.98

Loads 0.1 2.75 5.9


0.1 2.75 5.9
UDL G=2.58 Q=0.3 kN/m UDL G=2.58 Q=0.3 kN/m
56.321
38.946

Shear
Force
(Env.)
-39.126
-56.453
72.906 73.206

14.921 14.247
Moment
(Env.)
-51.757 -51.943

Bending (Top Edge) ...


M (kN.m) 14.9 6.7 72.9 73.2 6.8 14.2
d (mm) 409.0 409.0 407.0 407.0 409.0 409.0
K/K' 0.11 0.05 0.56 0.57 0.05 0.11
x (mm) 45.44 45.44 99.38 99.85 45.44 45.44
As (mm2) 107.71 48.44 564.47 567.11 49.37 102.85
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Bending (Bottom Edge) ...
M (kN.m) 19.9 51.8 51.9 20.5
d (mm) 409.0 409.0 409.0 409.0
K/K' 0.15 0.40 0.40 0.16
x (mm) 45.44 67.51 67.77 45.44
As (mm2) 143.98 383.42 384.92 147.64
As' (mm2) 0.00 0.00 0.00 0.00
As-min 152.64 152.64 152.64 152.64 152.64 152.64
Shear and Torsion Design ...
Vd (kN) 39.1 56.3 56.5 38.9
v (N/mm2) 0.48 0.69 0.69 0.48
vc (N/mm2) 0.50 0.50 0.58 0.58 0.50 0.50
v-max (N/mm2) 4.00 4.00 4.00 4.00
Vnom (kN) 89.7 89.7
Td (kN.m) 0.0 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 14.67 < 38.17 OK 14.67 < 38.02 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 628.32 628.32 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y20 2Y20

Top SupBar

Bottom Bar 2Y16 2Y16


Bottom Bar
Bot SupBar

Side Bars

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-72

Project: Av_Offices_2
540
705
1410

964
705
1410

964
540

780
540
540

735
735

540

780
540
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-1

1C1 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 31.5 0.0 0.1 27.1 -0.1 -0.4
2 31.0 0.0 0.1 26.6 0.1 -0.3
3 32.2 -0.2 -0.1 27.8 0.1 -0.1
4 17.1 0.0 0.1 12.7 -0.1 -0.3
5 23.3 0.3 0.3 18.9 -0.3 -0.5
6 22.9 0.1 0.2 18.4 -0.2 -0.3
7 24.2 0.0 0.1 19.8 -0.1 -0.3
8 18.3 0.0 0.1 13.9 -0.1 -0.3
9 30.0 0.3 0.3 25.6 -0.4 -0.5
10 31.1 -0.1 0.1 26.7 0.2 -0.2
11 32.8 -0.3 -0.1 28.4 0.2 -0.1
12 23.3 2.7 -0.2 19.5 -2.6 0.0
13 30.3 -2.7 0.5 26.5 2.5 -0.7
14 29.3 -0.2 2.4 25.5 0.2 -2.5
15 24.3 0.3 -2.2 20.6 -0.3 1.8
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 31.5 - 31.5
M1 (kN.m) -0.1 -0.3 0.0 200
M2 (kN.m) -0.4 -0.3 -0.7
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.032 Le1/b1 = 10.2 < 15.0 200
Beta = 0.96 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.7 / 1.5 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.74 / 0.74 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.05 / 0.05 N/mm2
Links = Y8-125

1C2 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 135.9 -1.1 0.3 131.5 2.2 -0.7
2 90.3 -0.2 0.4 85.9 0.6 -0.8
3 122.5 -1.4 0.0 118.1 2.5 -0.3
4 131.9 -1.4 0.3 127.5 2.6 -0.5
5 137.6 -0.8 0.4 133.1 2.0 -0.8
6 140.5 -1.2 0.4 136.1 2.4 -0.7
7 136.8 -1.1 0.3 132.4 2.3 -0.7
8 127.0 -1.1 0.2 122.5 2.3 -0.5
9 124.5 -0.8 0.3 120.1 1.9 -0.6
10 90.2 -0.4 0.4 85.8 0.7 -0.8
11 134.7 -1.4 0.1 130.3 2.5 -0.5
12 114.8 1.8 -0.1 111.0 -0.9 -0.3
13 111.0 -3.7 0.5 107.2 4.5 -0.9
14 115.0 -1.2 2.6 111.2 2.1 -2.8
15 110.8 -0.7 -2.1 107.0 1.6 1.7
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 135.9 - 135.9
M1 (kN.m) 2.2 1.4 3.4 200
M2 (kN.m) -0.7 -1.4 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.136 Le1/b1 = 10.2 < 15.0 200
Beta = 0.84 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.6 / 0.1 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.85 / 0.77 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.08 / 0.00 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-2

1C3 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 180.7 0.0 -0.3 176.3 -0.1 0.4
2 125.2 -0.6 -0.4 120.8 1.3 0.7
3 167.4 -0.3 -0.3 163.0 0.2 0.6
4 139.7 0.7 0.0 135.3 -1.6 0.0
5 182.9 0.3 -0.3 178.5 -0.4 0.5
6 140.6 0.9 0.1 136.2 -1.7 -0.2
7 181.0 0.0 -0.2 176.6 -0.1 0.4
8 167.1 0.0 -0.4 162.7 -0.1 0.8
9 182.1 0.3 -0.3 177.7 -0.3 0.5
10 125.2 -0.7 -0.4 120.7 1.5 0.7
11 167.9 -0.3 -0.3 163.5 0.2 0.6
12 149.3 2.7 -0.4 145.5 -2.7 0.5
13 149.8 -2.7 0.0 146.0 2.5 0.2
14 152.2 -0.2 2.3 148.4 0.2 -2.0
15 146.9 0.3 -2.7 143.1 -0.3 2.7
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 180.7 - 180.7
M1 (kN.m) -0.1 -1.8 0.0 200
M2 (kN.m) 0.4 1.8 3.2
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.181 Le1/b1 = 10.2 < 15.0 200
Beta = 0.79 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.6 / 0.0 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.84 / 0.72 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.02 / 0.00 N/mm2
Links = Y8-125

1C4 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 146.0 0.9 0.7 141.6 -1.9 -1.6
2 130.6 1.2 0.3 126.2 -2.3 -0.6
3 137.4 0.6 1.0 133.0 -1.6 -1.9
4 92.6 0.1 0.5 88.2 -0.4 -1.1
5 134.4 1.2 0.1 130.0 -2.2 -0.6
6 92.3 0.3 0.5 87.9 -0.6 -1.1
7 146.9 0.9 0.7 142.5 -1.9 -1.5
8 127.2 0.9 0.4 122.8 -1.9 -0.9
9 136.4 1.2 0.6 132.0 -2.2 -1.5
10 138.8 1.0 0.3 134.4 -2.1 -0.7
11 134.4 0.6 0.5 130.0 -1.6 -1.0
12 118.5 3.5 0.5 114.8 -4.2 -1.2
13 123.5 -2.0 0.7 119.7 1.2 -1.4
14 123.8 0.5 3.3 120.0 -1.3 -3.8
15 118.2 1.0 -2.0 114.4 -1.8 1.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 146.0 - 146.0
M1 (kN.m) -1.9 -1.5 -3.2 200
M2 (kN.m) -1.6 -1.5 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.146 Le1/b1 = 10.2 < 15.0 200
Beta = 0.83 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.2 / 0.5 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.79 / 0.80 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.01 / 0.02 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-3

1C5 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 57.7 -0.1 0.5 53.3 0.1 -1.2
2 42.6 0.0 0.7 38.2 0.1 -1.4
3 42.6 -0.3 0.2 38.2 0.3 -0.3
4 62.0 -0.1 0.5 57.6 0.0 -1.1
5 52.9 0.2 0.5 48.5 -0.1 -1.4
6 64.9 0.1 0.5 60.5 -0.1 -1.1
7 57.8 -0.1 0.6 53.4 0.1 -1.2
8 40.4 -0.1 0.6 36.0 0.2 -1.3
9 50.6 0.2 0.5 46.2 -0.2 -1.4
10 57.0 -0.1 0.6 52.6 0.2 -1.4
11 43.8 -0.3 0.2 39.3 0.3 -0.4
12 51.7 2.6 0.4 48.0 -2.5 -0.9
13 44.8 -2.7 0.5 41.0 2.6 -1.1
14 50.0 -0.3 3.2 46.2 0.3 -3.5
15 46.5 0.2 -2.3 42.7 -0.2 1.5
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 57.7 - 57.7
M1 (kN.m) 0.1 0.6 0.0 200
M2 (kN.m) -1.2 -0.6 -1.8
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.058 Le1/b1 = 10.2 < 15.0 200
Beta = 0.93 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.7 / 2.1 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.77 / 0.77 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.05 / 0.07 N/mm2
Links = Y8-125

1C6 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 111.2 -2.5 1.0 106.8 5.0 -2.1
2 110.9 -2.3 1.0 106.5 4.8 -2.0
3 94.3 -2.8 0.8 89.9 5.2 -1.4
4 78.6 -1.4 0.9 74.2 2.7 -1.9
5 112.7 -2.2 0.7 108.3 4.7 -1.9
6 111.7 -2.4 1.0 107.3 4.9 -2.2
7 114.0 -2.5 1.1 109.5 4.9 -2.3
8 79.6 -1.3 1.0 75.2 2.6 -2.0
9 91.3 -2.2 0.2 86.9 4.8 -1.0
10 109.3 -2.4 0.9 104.8 4.9 -1.8
11 112.1 -2.8 1.3 107.7 5.2 -2.4
12 90.6 0.6 0.8 86.8 1.6 -1.8
13 94.7 -4.7 0.8 91.0 6.6 -1.7
14 95.6 -2.3 3.6 91.8 4.4 -4.4
15 89.7 -1.8 -2.0 85.9 3.9 0.9
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 111.2 - 111.2
M1 (kN.m) 5.0 1.1 6.8 200
M2 (kN.m) -2.1 -1.1 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.111 Le1/b1 = 10.3 < 15.0 200
Beta = 0.87 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.6 / 2.5 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.82 / 0.83 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.11 / 0.08 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-4

1C7 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 91.6 2.4 0.2 87.2 -5.0 -0.6
2 81.3 2.6 0.0 76.9 -5.2 -0.2
3 85.9 2.2 0.4 81.5 -4.7 -0.5
4 53.1 1.2 0.1 48.7 -2.6 -0.3
5 86.2 2.7 -0.2 81.8 -5.3 -0.3
6 81.2 2.5 0.0 76.8 -5.1 -0.2
7 84.4 2.5 0.0 80.0 -5.0 -0.1
8 52.4 1.3 0.1 48.0 -2.7 -0.3
9 91.7 2.7 -0.3 87.3 -5.2 -0.1
10 81.4 2.5 0.0 77.0 -5.0 -0.1
11 87.6 2.2 0.7 83.2 -4.7 -1.1
12 78.6 4.7 0.3 74.8 -6.6 -0.6
13 74.2 -0.6 0.1 70.4 -1.7 -0.4
14 79.4 1.8 3.1 75.6 -3.9 -3.3
15 73.4 2.3 -2.8 69.6 -4.4 2.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 91.6 - 91.6
M1 (kN.m) -5.0 -0.9 -5.8 200
M2 (kN.m) -0.6 -0.9 0.0
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.092 Le1/b1 = 10.3 < 15.0 200
Beta = 0.89 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.6 / 0.0 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.80 / 0.73 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.11 / 0.00 N/mm2
Links = Y8-125

1C8 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 44.3 0.0 -0.3 39.9 -0.2 0.6
2 40.6 0.0 -0.1 36.1 -0.2 0.3
3 34.4 -0.1 -0.6 30.0 -0.2 0.9
4 25.9 -0.1 -0.1 21.5 -0.1 0.2
5 39.9 0.1 0.1 35.5 -0.1 0.1
6 34.2 0.0 -0.1 29.8 -0.2 0.2
7 34.2 0.0 -0.3 29.8 -0.2 0.5
8 26.8 0.0 -0.1 22.4 -0.1 0.3
9 49.6 0.1 0.0 45.1 -0.1 0.1
10 40.3 0.0 -0.2 35.9 -0.2 0.3
11 34.9 -0.1 -0.6 30.5 -0.2 0.9
12 36.7 1.5 -0.7 32.9 -0.6 0.9
13 38.2 -1.6 0.1 34.4 0.3 0.1
14 37.5 -0.1 2.1 33.7 -0.1 -1.9
15 37.4 0.1 -2.7 33.6 -0.2 2.9
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 44.3 - 44.3
M1 (kN.m) -0.2 -0.4 0.0 200
M2 (kN.m) 0.6 0.4 1.0
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.044 Le1/b1 = 12.0 < 15.0 200
Beta = 0.95 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.0 / 1.8 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.71 / 0.76 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.00 / 0.05 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-5

1C9 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 211.2 -4.1 -0.3 206.8 8.2 0.5
2 183.8 -4.5 -0.2 179.4 9.2 0.4
3 197.8 -4.3 -0.3 193.4 8.3 0.4
4 168.8 -1.4 -0.1 164.4 2.6 0.3
5 194.9 -3.9 -0.2 190.5 8.0 0.4
6 215.6 -3.9 -0.1 211.2 7.9 0.3
7 196.0 -4.1 -0.3 191.6 8.2 0.6
8 163.2 -1.4 -0.2 158.8 2.8 0.4
9 193.7 -3.9 -0.1 189.3 8.0 0.2
10 184.8 -4.6 -0.2 180.4 9.2 0.4
11 214.1 -4.2 -0.4 209.7 8.3 0.5
12 174.3 -0.7 -0.5 170.5 4.2 0.7
13 175.7 -6.0 0.1 171.9 9.2 0.1
14 174.2 -3.5 2.2 170.5 6.8 -2.1
15 175.8 -3.2 -2.7 172.0 6.6 2.8
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 211.2 - 211.2
M1 (kN.m) 8.2 2.1 9.8 200
M2 (kN.m) 0.5 2.1 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.211 Le1/b1 = 10.3 < 15.0 200
Beta = 0.76 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.8 / 0.0 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.92 / 0.73 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.15 / 0.00 N/mm2
Links = Y8-125

1C10 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 409.1 0.4 2.1 404.7 -0.9 -4.3
2 327.8 2.1 2.2 323.4 -4.1 -4.5
3 391.5 0.2 2.1 387.1 -0.7 -4.4
4 273.0 -1.5 1.0 268.6 2.8 -1.9
5 389.8 0.6 2.0 385.4 -1.1 -4.1
6 325.2 0.5 1.0 320.8 -0.9 -2.0
7 408.2 0.4 2.1 403.8 -0.9 -4.3
8 344.6 -1.3 2.1 340.2 2.5 -4.4
9 390.0 0.6 1.9 385.6 -1.1 -4.1
10 322.7 1.9 2.2 318.3 -3.9 -4.5
11 392.5 0.2 2.1 388.1 -0.7 -4.4
12 338.3 3.2 1.5 334.6 -3.5 -3.3
13 336.9 -2.5 1.9 333.1 2.1 -3.7
14 335.6 0.2 4.3 331.8 -0.5 -6.0
15 339.7 0.5 -0.9 335.9 -0.9 -1.0
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 409.1 - 409.1
M1 (kN.m) -0.9 -4.1 0.0 200
M2 (kN.m) -4.3 -4.1 -6.4
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.409 Le1/b1 = 10.2 < 15.0 200
Beta = 0.52 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.4 / 0.0 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 1.02 / 0.73 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.04 / 0.00 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-6

1C11 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 307.4 1.8 0.1 303.0 -3.7 -0.2
2 207.1 0.6 0.1 202.7 -1.2 -0.3
3 281.7 1.6 0.0 277.3 -3.5 0.1
4 256.3 1.9 0.1 251.9 -4.0 -0.2
5 275.3 2.0 0.2 270.9 -3.8 -0.7
6 247.2 1.8 0.0 242.8 -3.6 -0.1
7 296.1 1.8 0.1 291.7 -3.6 -0.3
8 260.6 2.0 0.1 256.2 -4.0 -0.3
9 274.3 2.0 -0.3 269.9 -3.8 0.4
10 235.2 0.6 0.2 230.8 -1.2 -0.4
11 293.0 1.6 0.5 288.6 -3.5 -0.9
12 253.2 4.3 0.0 249.5 -5.7 -0.1
13 254.8 -1.3 0.1 251.1 -0.3 -0.3
14 253.0 1.3 2.8 249.2 -2.8 -2.9
15 255.1 1.6 -2.7 251.3 -3.2 2.5
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 307.4 - 307.4
M1 (kN.m) -3.7 -3.1 -5.6 200
M2 (kN.m) -0.2 -3.1 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.307 Le1/b1 = 10.2 < 15.0 200
Beta = 0.64 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.3 / 0.0 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.86 / 0.82 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.01 / 0.00 N/mm2
Links = Y8-125

1C12 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 87.1 0.0 0.0 82.7 -0.1 -0.2
2 94.5 0.4 0.0 90.1 -0.6 -0.2
3 61.8 -0.2 0.7 57.4 0.1 -1.3
4 87.8 -0.4 0.1 83.4 0.6 -0.3
5 58.5 0.2 -0.8 54.1 -0.3 1.2
6 82.9 -0.1 0.1 78.5 0.1 -0.3
7 85.1 0.0 0.0 80.7 -0.2 -0.2
8 77.1 -0.1 0.1 72.7 0.1 -0.2
9 58.5 0.2 -0.8 54.1 -0.3 1.2
10 108.2 0.1 0.0 103.8 -0.2 -0.2
11 65.1 -0.2 0.7 60.7 0.1 -1.2
12 71.7 2.9 0.0 67.9 -3.0 -0.1
13 72.0 -2.9 0.1 68.2 2.8 -0.2
14 71.3 -0.2 2.9 67.6 0.1 -3.0
15 72.4 0.2 -2.9 68.6 -0.3 2.8
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 87.1 - 87.1
M1 (kN.m) -0.1 -0.9 0.0 200
M2 (kN.m) -0.2 -0.9 -1.7
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.087 Le1/b1 = 10.1 < 15.0 200
Beta = 0.90 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.9 / 0.0 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.81 / 0.74 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.06 / 0.00 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-7

1C13 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 341.3 -2.5 0.1 336.9 5.0 -0.4
2 311.3 -2.3 0.1 306.9 4.7 -0.2
3 313.3 -2.7 0.8 308.9 5.1 -1.4
4 272.8 -1.4 0.2 268.3 2.7 -0.5
5 303.6 -2.3 -0.6 299.2 4.8 0.8
6 343.9 -2.4 0.1 339.4 4.9 -0.3
7 309.2 -2.4 -0.2 304.8 4.9 0.4
8 311.4 -2.4 0.2 306.9 4.8 -0.5
9 305.0 -2.3 0.1 300.6 4.8 -0.6
10 270.1 -1.3 0.1 265.7 2.7 -0.3
11 342.0 -2.7 0.4 337.5 5.2 -0.7
12 284.4 0.7 0.1 280.6 1.4 -0.3
13 281.6 -4.9 0.1 277.8 6.8 -0.3
14 281.7 -2.2 3.0 278.0 4.3 -3.2
15 284.2 -1.9 -2.8 280.4 4.0 2.6
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 341.3 - 341.3
M1 (kN.m) 5.0 3.4 7.0 200
M2 (kN.m) -0.4 -3.4 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.341 Le1/b1 = 10.2 < 15.0 200
Beta = 0.60 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.2 / 0.2 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.81 / 0.96 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.01 / 0.01 N/mm2
Links = Y8-125

1C14 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 168.6 0.1 0.4 164.2 -0.3 -0.9
2 135.0 0.2 0.3 130.6 -0.3 -0.7
3 149.3 0.0 1.0 144.9 -0.3 -1.7
4 93.5 0.0 0.2 89.1 -0.2 -0.6
5 153.1 0.2 -0.3 148.7 -0.3 0.0
6 131.4 0.1 0.3 127.0 -0.3 -0.7
7 158.8 0.1 0.6 154.4 -0.3 -1.2
8 135.5 0.1 0.4 131.0 -0.3 -0.9
9 161.9 0.2 -0.1 157.5 -0.3 -0.4
10 95.5 0.1 0.2 91.1 -0.2 -0.5
11 150.2 0.0 0.7 145.8 -0.3 -1.0
12 140.9 2.0 0.4 137.1 -1.1 -0.9
13 139.6 -1.8 0.2 135.8 0.6 -0.6
14 138.6 0.0 3.4 134.8 -0.2 -3.8
15 141.8 0.2 -2.7 138.1 -0.3 2.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 168.6 - 168.6
M1 (kN.m) -0.3 -1.7 0.0 200
M2 (kN.m) -0.9 -1.7 -3.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.169 Le1/b1 = 12.0 < 15.0 200
Beta = 0.80 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.1 / 0.1 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.78 / 0.79 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.00 / 0.00 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-8

1C15 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 127.9 -0.3 1.5 123.5 0.5 -3.1
2 87.5 -0.2 0.8 83.0 0.6 -1.6
3 119.5 -0.3 1.3 115.1 0.4 -3.0
4 73.8 -0.4 0.8 69.4 0.6 -1.6
5 102.8 -0.3 1.1 98.4 0.6 -2.1
6 83.4 -0.3 0.8 79.0 0.6 -1.6
7 127.9 -0.3 1.5 123.5 0.5 -3.2
8 75.9 -0.3 0.8 71.5 0.6 -1.6
9 102.8 -0.3 1.1 98.4 0.6 -2.0
10 87.6 -0.4 0.8 83.2 0.7 -1.6
11 119.5 -0.3 1.3 115.1 0.4 -3.0
12 103.6 2.6 0.9 99.8 -2.2 -2.2
13 109.6 -3.1 1.6 105.8 3.1 -2.9
14 104.5 -0.3 3.5 100.7 0.5 -4.7
15 108.6 -0.2 -1.0 104.9 0.4 -0.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 127.9 - 127.9
M1 (kN.m) 0.5 1.3 0.0 200
M2 (kN.m) -3.1 -1.3 -4.2
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.128 Le1/b1 = 10.2 < 15.0 200
Beta = 0.85 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.3 / 0.2 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.79 / 0.75 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.01 / 0.01 N/mm2
Links = Y8-125

1C16 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 128.8 0.3 0.4 124.4 -0.8 -0.8
2 98.1 0.7 0.4 93.7 -1.3 -0.9
3 94.6 0.3 -0.3 90.2 -0.7 0.2
4 139.4 -0.2 0.5 135.0 0.2 -0.9
5 120.5 0.4 0.7 116.1 -0.8 -1.3
6 152.6 0.0 0.4 148.1 0.0 -0.8
7 114.5 0.4 0.5 110.1 -0.8 -1.0
8 107.5 0.2 0.4 103.1 -0.6 -0.9
9 136.2 0.4 0.6 131.8 -0.8 -1.2
10 99.5 0.6 0.4 95.1 -1.2 -0.9
11 93.2 0.3 -0.3 88.8 -0.7 0.3
12 107.8 3.2 0.0 104.0 -3.5 -0.4
13 106.5 -2.6 0.6 102.7 2.3 -1.0
14 107.1 0.2 2.7 103.3 -0.5 -3.1
15 107.2 0.4 -2.1 103.4 -0.7 1.7
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 128.8 - 128.8
M1 (kN.m) -0.8 -1.3 0.0 200
M2 (kN.m) -0.8 -1.3 -2.4
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.129 Le1/b1 = 10.2 < 15.0 200
Beta = 0.85 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.0 / 0.1 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.71 / 0.78 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.00 / 0.00 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-9

1C17 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 365.5 -4.3 0.8 361.1 8.6 -1.8
2 329.2 -4.3 0.2 324.8 8.9 -0.5
3 354.7 -4.4 1.0 350.3 8.8 -2.1
4 225.1 -1.9 0.7 220.7 3.6 -1.4
5 343.7 -4.2 0.2 339.2 8.4 -0.5
6 225.3 -1.7 0.7 220.8 3.5 -1.5
7 350.3 -4.3 0.3 345.9 8.6 -0.6
8 359.8 -4.3 0.4 355.4 8.6 -0.9
9 358.8 -4.1 0.8 354.4 8.4 -1.6
10 325.1 -4.4 0.2 320.7 9.0 -0.5
11 354.7 -4.4 1.0 350.3 8.8 -2.1
12 303.1 -0.7 0.4 299.3 4.3 -1.2
13 299.9 -6.4 0.9 296.1 9.9 -1.7
14 302.9 -3.6 3.1 299.1 7.1 -3.7
15 300.1 -3.5 -1.8 296.3 7.0 0.8
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 365.5 - 365.5
M1 (kN.m) 8.6 3.7 10.7 200
M2 (kN.m) -1.8 -3.7 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.366 Le1/b1 = 10.2 < 15.0 200
Beta = 0.57 Le2/b2 = 10.3 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.7 / 0.7 kN As (Required): %0.51 202.94 mm2 4Y12
vc'(1/2)= 0.96 / 0.96 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.05 / 0.02 N/mm2
Links = Y8-125

1C18 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 411.6 4.5 -0.1 407.2 -9.2 0.0
2 350.1 4.8 0.1 345.7 -9.6 -0.2
3 385.4 4.4 0.4 381.0 -9.0 -0.7
4 279.2 1.8 0.0 274.8 -3.9 -0.1
5 397.0 4.6 -0.4 392.6 -9.2 0.5
6 269.7 2.0 0.0 265.3 -4.1 -0.1
7 396.3 4.5 -0.1 391.9 -9.1 0.1
8 362.1 4.6 0.1 357.7 -9.4 -0.3
9 398.7 4.6 0.0 394.3 -9.2 -0.2
10 394.5 4.5 0.0 390.1 -9.1 -0.2
11 398.9 4.4 0.0 394.5 -9.0 0.0
12 338.3 6.6 -0.2 334.5 -10.3 0.1
13 340.9 0.8 0.0 337.1 -4.7 -0.1
14 339.2 3.6 2.7 335.4 -7.5 -2.6
15 340.0 3.8 -2.8 336.2 -7.6 2.7
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 411.6 - 411.6
M1 (kN.m) -9.2 -4.1 -11.3 200
M2 (kN.m) -0.1 -4.1 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.412 Le1/b1 = 10.2 < 15.0 200
Beta = 0.52 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.9 / 0.0 kN As (Required): %0.89 356.77 mm2 4Y12
vc'(1/2)= 1.01 / 0.95 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.06 / 0.00 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-10

1C19 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 39.8 -0.4 -1.3 35.4 0.8 2.6
2 34.8 -0.7 -1.3 30.4 1.5 2.6
3 39.7 -0.5 -1.2 35.3 0.9 2.6
4 47.1 0.0 -1.3 42.7 -0.2 2.5
5 19.7 -0.3 -0.8 15.3 0.7 1.2
6 77.5 -0.3 -1.2 73.1 0.5 2.3
7 37.7 -0.4 -1.3 33.3 0.8 2.5
8 22.3 -0.6 -1.3 17.9 1.2 2.6
9 21.3 -0.4 -0.8 16.9 0.8 1.2
10 21.5 -0.2 -1.4 17.1 0.3 2.7
11 40.0 -0.5 -1.2 35.6 0.9 2.6
12 33.4 2.6 -1.1 29.6 -2.3 2.1
13 32.5 -3.3 -1.0 28.8 3.6 2.1
14 31.9 -0.4 1.7 28.1 0.7 -0.6
15 34.1 -0.3 -3.9 30.3 0.6 4.7
Critical Combination:13 - (G+Q-Nx)
Min Design
N (kN) 32.5 - 32.5
M1 (kN.m) 3.6 0.3 5.6 200
M2 (kN.m) 2.1 0.3 0.0
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.033 Le1/b1 = 10.1 < 15.0 200
Beta = 0.96 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.2 / 2.7 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.75 / 0.75 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.07 / 0.08 N/mm2
Links = Y8-125

1C20 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 327.3 -2.3 -0.8 322.9 4.6 1.5
2 250.5 -0.8 -0.8 246.1 1.7 1.5
3 311.0 -2.3 -0.6 306.5 4.6 1.4
4 287.1 -2.7 -0.8 282.7 5.2 1.5
5 303.3 -2.2 -0.6 298.9 4.5 0.8
6 277.3 -1.1 -0.9 272.9 2.1 1.7
7 295.5 -2.3 -0.4 291.0 4.5 0.7
8 300.5 -2.2 -0.8 296.1 4.4 1.6
9 337.7 -2.3 -1.1 333.3 4.6 1.6
10 286.6 -2.4 -0.7 282.2 4.9 1.3
11 308.5 -2.3 -0.6 304.0 4.6 1.4
12 270.6 1.0 -0.7 266.8 0.9 1.2
13 270.8 -4.8 -0.7 267.0 6.6 1.3
14 270.4 -2.0 2.2 266.6 3.8 -1.6
15 271.0 -1.8 -3.6 267.2 3.7 4.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 327.3 - 327.3
M1 (kN.m) 4.6 3.3 6.6 200
M2 (kN.m) 1.5 3.3 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.327 Le1/b1 = 10.2 < 15.0 200
Beta = 0.62 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.0 / 0.8 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.72 / 0.99 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.00 / 0.02 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-11

1C21 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 172.8 4.2 -0.9 168.4 -8.6 1.7
2 117.8 2.1 -0.6 113.4 -4.0 1.2
3 168.1 4.1 -0.4 163.7 -8.5 1.3
4 122.2 4.3 -0.6 117.8 -8.9 1.0
5 149.6 4.3 -1.2 145.2 -8.7 1.8
6 113.9 2.1 -0.7 109.5 -4.2 1.2
7 164.3 4.2 -0.9 159.9 -8.5 1.7
8 148.4 4.2 -0.7 144.0 -8.5 1.3
9 163.2 4.4 -1.4 158.8 -8.8 2.2
10 123.0 4.4 -0.6 118.6 -9.0 1.0
11 165.3 4.1 -0.2 160.9 -8.5 0.8
12 144.5 6.2 -0.6 140.7 -9.6 1.3
13 142.2 0.7 -0.9 138.5 -4.6 1.5
14 144.4 3.4 2.3 140.6 -7.0 -1.5
15 142.3 3.5 -3.8 138.5 -7.1 4.4
Critical Combination:10 - ((G+Q)P51 *F)
Min Design
N (kN) 123.0 - 123.0
M1 (kN.m) -9.0 -1.2 -10.0 200
M2 (kN.m) 1.0 1.2 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.123 Le1/b1 = 10.3 < 15.0 200
Beta = 0.85 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.2 / 0.6 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.84 / 0.84 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.13 / 0.02 N/mm2
Links = Y8-125

1C22 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 23.7 0.2 0.1 19.3 -0.2 -0.1
2 19.5 0.0 0.1 15.1 -0.1 -0.2
3 29.5 0.2 -0.4 25.1 -0.2 0.5
4 26.4 0.3 0.0 22.0 -0.3 0.1
5 21.0 0.1 0.7 16.6 -0.2 -0.7
6 25.2 0.1 0.0 20.7 -0.2 0.1
7 20.0 0.2 0.1 15.6 -0.3 -0.1
8 22.6 0.2 0.2 18.2 -0.3 -0.3
9 20.0 0.1 0.6 15.6 -0.2 -0.6
10 25.8 0.1 0.1 21.4 -0.2 0.0
11 34.6 0.1 -0.4 30.2 -0.2 0.4
12 18.2 -2.8 0.0 14.5 2.7 0.1
13 22.0 3.1 0.2 18.2 -3.1 -0.2
14 19.9 0.2 -3.0 16.1 -0.2 3.0
15 20.3 0.1 3.2 16.5 -0.2 -3.2
Critical Combination:15 - (G+Q-Ny)
Min Design
N (kN) 20.3 - 20.3
M1 (kN.m) -0.2 -0.2 0.0 200
M2 (kN.m) 3.2 0.2 3.4
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.020 Le1/b1 = 10.2 < 15.0 200
Beta = 0.98 Le2/b2 = 10.1 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.0 / 2.0 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.73 / 0.73 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.06 / 0.06 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-12

1C23 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 21.1 0.0 -0.1 16.7 0.1 0.3
2 16.4 -0.2 -0.1 12.0 0.3 0.3
3 19.5 0.0 -0.6 15.1 0.1 0.8
4 15.4 0.1 -0.1 11.0 0.1 0.3
5 19.5 0.0 0.5 15.1 0.1 -0.3
6 15.5 -0.1 0.0 11.1 0.2 0.3
7 20.9 0.0 -0.1 16.5 0.1 0.3
8 17.0 0.0 -0.1 12.6 0.1 0.4
9 24.4 0.0 0.5 20.0 0.0 -0.3
10 15.3 -0.1 -0.1 10.9 0.2 0.3
11 19.4 0.0 -0.6 15.0 0.1 0.8
12 21.0 -2.9 -0.2 17.2 2.8 0.4
13 15.1 2.8 0.1 11.4 -2.6 0.1
14 23.1 0.0 -3.1 19.3 0.1 3.2
15 13.1 0.0 3.0 9.3 0.1 -2.7
Critical Combination:15 - (G+Q-Ny)
Min Design
N (kN) 13.1 - 13.1
M1 (kN.m) 0.1 0.1 0.0 200
M2 (kN.m) 3.0 0.1 3.1
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.013 Le1/b1 = 10.2 < 15.0 200
Beta = 0.98 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.7 / 1.8 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.72 / 0.72 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.05 / 0.06 N/mm2
Links = Y8-125

1C24 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 111.1 1.0 0.0 106.7 -2.2 -0.2
2 138.3 0.4 0.2 133.9 -0.8 -0.4
3 81.7 1.1 0.3 77.3 -2.2 -0.9
4 94.9 1.2 0.1 90.5 -2.6 -0.2
5 75.8 1.0 -0.4 71.3 -2.2 0.8
6 104.4 1.2 0.1 100.0 -2.5 -0.3
7 112.0 1.1 0.1 107.5 -2.2 -0.2
8 96.7 1.2 0.1 92.2 -2.4 -0.3
9 74.9 1.0 -0.4 70.5 -2.1 0.9
10 138.2 0.3 0.2 133.8 -0.7 -0.4
11 81.7 1.1 0.3 77.3 -2.2 -0.9
12 89.0 3.7 -0.3 85.2 -4.5 0.2
13 96.0 -2.1 0.3 92.2 1.0 -0.5
14 92.8 0.9 2.5 89.0 -1.8 -2.6
15 92.2 0.8 -2.4 88.4 -1.7 2.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 111.1 - 111.1
M1 (kN.m) -2.2 -1.1 -3.1 200
M2 (kN.m) -0.2 -1.1 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.111 Le1/b1 = 10.2 < 15.0 200
Beta = 0.87 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.6 / 0.4 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.83 / 0.78 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.08 / 0.01 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-13

1C25 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 476.2 -5.7 0.1 471.8 11.4 -0.3
2 290.4 -2.1 -0.1 286.0 4.3 0.1
3 437.6 -5.7 -0.6 433.1 11.4 1.0
4 421.9 -6.1 0.1 417.5 12.1 -0.3
5 431.1 -5.7 0.6 426.7 11.5 -1.3
6 443.2 -6.0 0.1 438.8 12.0 -0.3
7 458.9 -5.7 0.6 454.5 11.4 -1.2
8 414.7 -5.7 0.0 410.3 11.4 0.0
9 448.3 -5.8 0.2 443.9 11.5 -0.5
10 291.2 -2.2 -0.1 286.8 4.5 0.1
11 437.6 -5.7 -0.6 433.1 11.4 1.0
12 395.8 -1.7 -0.2 392.0 6.4 0.0
13 389.9 -7.7 0.3 386.2 12.3 -0.5
14 392.5 -4.6 2.7 388.8 9.3 -2.8
15 393.2 -4.7 -2.5 389.4 9.4 2.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 476.2 - 476.2
M1 (kN.m) 11.4 4.8 13.6 200
M2 (kN.m) -0.3 -4.8 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.476 Le1/b1 = 10.2 < 15.0 200
Beta = 0.45 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.0 / 0.0 kN As (Required): %1.65 660.05 mm2 4Y16
vc'(1/2)= 1.18 / 0.88 N/mm2 As (Provided): %2.01 804.25 mm2
v (1/2)= 0.06 / 0.00 N/mm2
Links = Y8-175

1C26 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 526.0 3.5 -0.1 521.6 -7.1 0.0
2 399.6 -0.6 -0.2 395.2 1.3 0.3
3 507.3 3.5 -0.1 502.9 -7.1 0.2
4 419.3 5.6 0.0 414.9 -11.5 -0.1
5 492.7 3.5 -0.1 488.3 -7.1 -0.1
6 429.0 5.7 0.0 424.6 -11.6 -0.1
7 523.5 3.5 0.0 519.1 -7.1 -0.2
8 513.3 3.2 0.0 508.9 -6.6 0.0
9 496.3 3.5 -0.3 491.9 -7.1 0.2
10 395.8 -0.5 -0.2 391.4 1.1 0.4
11 506.1 3.5 0.0 501.7 -7.1 0.1
12 433.3 5.8 -0.1 429.5 -8.6 0.1
13 434.4 -0.1 0.0 430.6 -3.0 -0.1
14 434.2 2.9 2.7 430.5 -5.8 -2.7
15 433.4 2.8 -2.8 429.7 -5.8 2.7
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 526.0 - 526.0
M1 (kN.m) -7.1 -5.3 -9.1 200
M2 (kN.m) -0.1 -5.3 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.526 Le1/b1 = 10.2 < 15.0 200
Beta = 0.39 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.9 / 0.0 kN As (Required): %1.50 598.10 mm2 4Y16
vc'(1/2)= 1.18 / 0.95 N/mm2 As (Provided): %2.01 804.25 mm2
v (1/2)= 0.03 / 0.00 N/mm2
Links = Y8-175

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-14

1C27 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 417.4 0.5 1.5 413.0 -1.0 -3.2
2 378.8 2.5 1.6 374.4 -4.9 -3.3
3 397.6 0.5 1.9 393.2 -1.1 -3.6
4 325.6 -1.8 1.5 321.2 3.4 -3.1
5 357.7 0.4 0.2 353.3 -0.9 -0.8
6 324.7 -1.6 1.5 320.3 3.2 -3.2
7 419.9 0.5 1.5 415.4 -1.0 -3.1
8 360.1 1.5 1.5 355.6 -3.1 -3.2
9 355.4 0.4 0.2 351.0 -0.9 -0.9
10 435.2 1.3 1.6 430.8 -2.7 -3.3
11 397.7 0.5 1.9 393.3 -1.1 -3.6
12 343.9 3.4 1.3 340.1 -3.7 -2.6
13 344.9 -2.6 1.2 341.1 2.1 -2.6
14 344.8 0.4 4.1 341.1 -0.9 -5.4
15 343.9 0.3 -1.7 340.2 -0.8 0.3
Critical Combination:10 - ((G+Q)P51 *F)
Min Design
N (kN) 435.2 - 435.2
M1 (kN.m) -2.7 -4.4 0.0 200
M2 (kN.m) -3.3 -4.4 -6.5
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.435 Le1/b1 = 10.2 < 15.0 200
Beta = 0.49 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.5 / 0.6 kN As (Required): %0.51 203.66 mm2 4Y12
vc'(1/2)= 1.08 / 1.01 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.05 / 0.02 N/mm2
Links = Y8-125

1C28 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 256.6 2.0 1.6 252.2 -4.2 -3.4
2 132.0 0.5 0.7 127.6 -1.0 -1.5
3 193.3 2.1 1.3 188.9 -4.3 -2.2
4 187.4 2.7 0.9 183.0 -5.6 -1.8
5 240.7 1.9 1.1 236.3 -4.0 -2.9
6 192.5 2.8 0.8 188.1 -5.7 -1.7
7 245.9 2.0 1.6 241.5 -4.2 -3.4
8 137.0 0.6 0.7 132.6 -1.4 -1.6
9 255.0 1.9 1.1 250.6 -3.9 -2.9
10 172.7 1.9 0.8 168.3 -3.8 -1.7
11 191.9 2.1 1.3 187.5 -4.3 -2.1
12 212.1 4.5 1.5 208.3 -6.0 -2.9
13 212.3 -1.2 1.2 208.5 -0.8 -2.7
14 211.7 1.7 4.4 207.9 -3.4 -5.8
15 212.7 1.6 -1.7 208.9 -3.4 0.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 256.6 - 256.6
M1 (kN.m) -4.2 -2.6 -6.5 200
M2 (kN.m) -3.4 -2.6 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.257 Le1/b1 = 10.3 < 15.0 200
Beta = 0.70 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.1 / 0.7 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.76 / 0.85 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.00 / 0.02 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-15

1C29 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 45.4 1.1 -1.5 41.0 -2.2 2.9
2 63.7 0.5 -1.5 59.3 -0.9 3.0
3 46.8 1.3 -1.8 42.4 -2.5 3.3
4 36.2 1.1 -1.4 31.8 -2.5 2.8
5 18.9 0.9 -0.4 14.5 -2.0 1.0
6 43.6 1.1 -1.4 39.2 -2.4 2.8
7 45.4 1.1 -1.5 41.0 -2.2 2.9
8 37.9 1.2 -1.4 33.4 -2.4 2.9
9 19.0 0.9 -0.5 14.6 -2.1 1.0
10 63.9 0.4 -1.5 59.5 -0.8 3.0
11 46.9 1.3 -1.8 42.5 -2.5 3.3
12 34.4 3.9 -1.5 30.6 -4.6 2.7
13 42.0 -2.1 -0.9 38.2 1.0 2.1
14 36.3 1.0 1.1 32.5 -2.0 0.2
15 40.1 0.7 -3.6 36.3 -1.7 4.6
Critical Combination:12 - (G+Q+Nx)
Min Design
N (kN) 34.4 - 34.4
M1 (kN.m) -4.6 -0.3 -7.2 200
M2 (kN.m) 2.7 0.3 0.0
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.034 Le1/b1 = 10.2 < 15.0 200
Beta = 0.96 Le2/b2 = 10.3 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.7 / 2.6 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.75 / 0.75 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.08 / 0.08 N/mm2
Links = Y8-125

1C30 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 248.7 -4.6 -1.6 244.3 9.1 3.2
2 149.3 -1.7 -0.7 144.9 3.6 1.3
3 233.4 -4.3 -0.7 229.0 8.9 1.3
4 217.6 -4.9 -0.9 213.2 9.6 1.7
5 227.0 -4.8 -1.8 222.5 9.3 3.6
6 236.0 -4.7 -0.8 231.6 9.5 1.7
7 249.9 -4.6 -1.7 245.5 9.1 3.4
8 212.6 -4.6 -0.8 208.2 9.1 1.7
9 225.8 -4.7 -1.7 221.4 9.3 3.4
10 149.4 -1.9 -0.7 144.9 3.7 1.3
11 233.4 -4.3 -0.7 229.0 8.9 1.3
12 208.6 -0.6 -1.6 204.9 4.4 2.8
13 201.5 -6.8 -1.1 197.8 10.5 2.4
14 203.6 -3.5 1.1 199.9 7.3 0.4
15 206.5 -3.9 -3.7 202.8 7.6 4.8
Critical Combination:13 - (G+Q-Nx)
Min Design
N (kN) 201.5 - 201.5
M1 (kN.m) 10.5 2.0 12.3 200
M2 (kN.m) 2.4 2.0 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.202 Le1/b1 = 10.2 < 15.0 200
Beta = 0.77 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 5.5 / 0.2 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.96 / 0.81 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.17 / 0.01 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-16

1C31 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 290.0 3.4 -0.6 285.6 -6.9 1.1
2 216.3 0.3 -0.3 211.9 -0.5 0.6
3 287.2 3.5 -0.2 282.8 -7.0 0.5
4 226.0 4.5 -0.4 221.6 -9.4 0.8
5 266.5 3.2 -0.9 262.1 -6.8 1.5
6 249.0 4.7 -0.4 244.6 -9.6 0.7
7 290.1 3.4 -0.6 285.7 -6.9 1.1
8 262.9 3.2 -0.5 258.5 -6.6 0.9
9 266.2 3.2 -0.9 261.8 -6.8 1.4
10 215.3 0.2 -0.3 210.9 -0.5 0.5
11 287.3 3.5 -0.2 282.9 -7.0 0.5
12 238.3 5.8 -0.6 234.5 -8.5 1.0
13 239.8 -0.3 -0.4 236.1 -2.8 0.8
14 237.1 2.9 2.1 233.3 -5.8 -1.5
15 241.0 2.6 -3.1 237.2 -5.5 3.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 290.0 - 290.0
M1 (kN.m) -6.9 -2.9 -8.8 200
M2 (kN.m) 1.1 2.9 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.290 Le1/b1 = 10.2 < 15.0 200
Beta = 0.66 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.4 / 0.3 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.96 / 0.96 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.14 / 0.01 N/mm2
Links = Y8-125

1C32 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 239.2 0.6 -3.0 234.8 -1.3 6.0
2 227.6 1.6 -3.0 223.2 -3.1 5.9
3 239.3 0.8 -2.7 234.8 -1.5 5.7
4 181.4 -0.7 -2.9 177.0 1.3 5.8
5 193.9 0.4 -1.9 189.5 -1.1 3.3
6 200.8 -0.7 -2.9 196.4 1.3 5.8
7 239.0 0.6 -3.0 234.6 -1.3 5.9
8 213.4 0.8 -2.9 209.0 -1.7 5.8
9 194.1 0.4 -1.9 189.7 -1.1 3.3
10 233.3 1.3 -3.0 228.9 -2.6 6.0
11 239.3 0.8 -2.7 234.9 -1.5 5.7
12 197.4 3.6 -2.5 193.6 -4.0 4.9
13 198.5 -2.6 -2.5 194.7 2.0 4.9
14 195.9 0.6 0.3 192.1 -1.2 2.3
15 200.0 0.3 -5.2 196.2 -0.8 7.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 239.2 - 239.2
M1 (kN.m) -1.3 -2.4 0.0 200
M2 (kN.m) 6.0 2.4 7.7
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.239 Le1/b1 = 10.2 < 15.0 200
Beta = 0.72 Le2/b2 = 10.3 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.5 / 0.6 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.90 / 0.83 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.01 / 0.02 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-17

1C33 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 217.2 0.0 -1.9 212.8 -0.2 3.8
2 150.4 -0.2 -0.4 146.0 0.4 0.8
3 162.6 0.3 0.0 158.2 -0.5 0.3
4 139.2 0.4 -0.9 134.8 -1.0 1.8
5 212.0 -0.2 -2.4 207.6 0.1 4.2
6 173.1 0.5 -0.6 168.7 -1.1 1.0
7 217.8 0.0 -1.9 213.4 -0.2 3.7
8 130.6 -0.2 -0.9 126.2 0.2 1.6
9 211.1 -0.2 -2.5 206.7 0.1 4.3
10 155.4 0.0 -0.5 151.0 0.1 0.9
11 162.7 0.3 0.0 158.3 -0.5 0.3
12 180.6 3.0 -1.4 176.8 -2.9 2.9
13 180.3 -2.9 -1.7 176.5 2.5 3.2
14 178.3 0.2 1.3 174.5 -0.3 0.4
15 182.5 -0.1 -4.5 178.8 0.0 5.7
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 217.2 - 217.2
M1 (kN.m) -0.2 -2.2 0.0 200
M2 (kN.m) 3.8 2.2 5.4
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.217 Le1/b1 = 10.3 < 15.0 200
Beta = 0.75 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.5 / 0.3 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.85 / 0.80 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.01 / 0.01 N/mm2
Links = Y8-125

1C34 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 116.6 -0.5 0.5 112.1 0.9 -1.2
2 113.2 -0.4 0.5 108.8 0.9 -1.2
3 104.6 -0.2 1.1 100.2 0.5 -1.7
4 103.7 -0.4 0.5 99.3 0.7 -1.2
5 86.7 -0.6 -0.4 82.3 1.1 0.0
6 108.2 -0.5 0.5 103.8 0.9 -1.1
7 115.8 -0.5 0.5 111.4 0.9 -1.2
8 116.6 -0.3 0.5 112.2 0.5 -1.2
9 88.1 -0.6 -0.4 83.7 1.1 0.0
10 104.6 -0.5 0.5 100.2 1.0 -1.2
11 104.6 -0.2 1.1 100.2 0.5 -1.7
12 94.4 2.5 0.6 90.7 -2.1 -1.1
13 99.8 -3.3 0.2 96.1 3.5 -0.8
14 95.0 -0.4 3.6 91.2 0.7 -4.1
15 99.3 -0.4 -2.7 95.5 0.7 2.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 116.6 - 116.6
M1 (kN.m) 0.9 1.2 0.0 200
M2 (kN.m) -1.2 -1.2 -2.2
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.117 Le1/b1 = 10.2 < 15.0 200
Beta = 0.86 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.2 / 2.4 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.85 / 0.84 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.07 / 0.08 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-18

1C35 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 107.1 1.0 -1.1 102.7 -2.0 2.1
2 106.1 0.7 -1.1 101.7 -1.3 2.1
3 88.1 0.6 -0.6 83.7 -1.1 1.6
4 88.6 0.3 -1.1 84.2 -0.9 2.1
5 80.7 0.8 -1.2 76.3 -2.0 1.7
6 105.8 0.6 -1.1 101.4 -1.3 2.1
7 107.1 1.0 -1.1 102.7 -2.0 2.1
8 89.3 0.4 -1.1 84.9 -0.9 2.2
9 80.6 0.9 -1.2 76.2 -2.0 1.7
10 105.6 0.6 -1.1 101.2 -1.3 2.0
11 88.1 0.6 -0.6 83.7 -1.1 1.6
12 90.9 3.7 -0.7 87.1 -4.4 1.5
13 87.4 -2.1 -1.1 83.6 1.0 1.9
14 86.7 1.0 2.1 83.0 -1.9 -1.1
15 91.5 0.6 -3.9 87.8 -1.5 4.5
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 107.1 - 107.1
M1 (kN.m) -2.0 -1.1 0.0 200
M2 (kN.m) 2.1 1.1 3.9
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.107 Le1/b1 = 10.2 < 15.0 200
Beta = 0.87 Le2/b2 = 10.3 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.6 / 2.7 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.83 / 0.83 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.08 / 0.08 N/mm2
Links = Y8-125

1C36 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 220.3 -0.4 8.0 215.9 0.7 -16.3
2 217.2 -0.1 8.0 212.7 0.2 -16.3
3 144.1 -0.2 3.7 139.7 0.3 -6.8
4 195.8 -0.6 7.8 191.4 1.0 -15.9
5 223.9 -0.5 8.3 219.5 0.8 -17.5
6 218.9 -0.4 8.0 214.4 0.7 -16.2
7 220.5 -0.4 8.0 216.1 0.7 -16.3
8 194.3 -0.4 7.8 189.9 0.8 -15.9
9 223.6 -0.5 8.3 219.2 0.8 -17.5
10 221.4 -0.2 8.0 217.0 0.4 -16.3
11 144.1 -0.2 3.6 139.7 0.3 -6.8
12 185.5 2.7 6.8 181.7 -2.4 -13.6
13 179.4 -3.3 6.3 175.6 3.5 -13.2
14 183.7 -0.3 9.5 179.9 0.5 -16.0
15 181.2 -0.3 3.6 177.5 0.6 -10.7
Critical Combination:5 - ((G+Q)P22 *F)
Min Design
N (kN) 223.9 - 223.9
M1 (kN.m) 0.8 2.2 0.0 200
M2 (kN.m) -17.5 -2.2 -19.2
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.224 Le1/b1 = 10.2 < 15.0 200
Beta = 0.74 Le2/b2 = 10.4 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.2 / 8.1 kN As (Required): %0.97 389.94 mm2 4Y12
vc'(1/2)= 0.87 / 0.93 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.00 / 0.25 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-19

1C37 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 320.8 -0.2 10.6 316.4 0.2 -21.6
2 292.2 -0.2 10.6 287.8 0.5 -21.6
3 202.5 -0.1 3.8 198.1 0.2 -6.9
4 298.4 0.0 10.6 294.0 -0.2 -21.6
5 334.9 -0.2 11.6 330.5 0.3 -24.4
6 314.8 0.1 10.6 310.4 -0.2 -21.6
7 320.8 -0.2 10.6 316.4 0.2 -21.6
8 304.3 -0.1 10.6 299.9 0.2 -21.6
9 334.9 -0.2 11.6 330.5 0.2 -24.4
10 292.3 -0.3 10.6 287.9 0.6 -21.6
11 202.5 -0.1 3.8 198.1 0.2 -6.9
12 264.6 2.8 9.0 260.8 -2.7 -18.0
13 265.5 -3.1 8.4 261.8 3.1 -17.4
14 266.6 -0.1 11.8 262.9 0.1 -20.5
15 263.5 -0.2 5.6 259.7 0.2 -14.9
Critical Combination:9 - ((G+Q)P42 *F)
Min Design
N (kN) 334.9 - 334.9
M1 (kN.m) 0.2 3.3 0.0 200
M2 (kN.m) -24.4 -3.3 -26.5
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.335 Le1/b1 = 10.2 < 15.0 200
Beta = 0.61 Le2/b2 = 10.4 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.1 / 10.3 kN As (Required): %2.58 1031.41 mm2 4Y20
vc'(1/2)= 1.22 / 1.32 N/mm2 As (Provided): %3.14 1256.64 mm2
v (1/2)= 0.00 / 0.33 N/mm2
Links = Y8-225

1C38 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 165.9 0.6 5.9 161.5 -1.3 -12.1
2 150.0 0.9 5.8 145.6 -1.8 -12.0
3 100.3 0.6 2.6 95.9 -1.3 -4.4
4 162.5 0.1 5.9 158.1 -0.4 -12.1
5 172.9 0.6 5.9 168.5 -1.3 -13.2
6 161.2 0.3 5.8 156.8 -0.6 -12.0
7 165.9 0.6 5.9 161.5 -1.3 -12.1
8 167.2 0.6 5.9 162.8 -1.2 -12.1
9 172.9 0.6 5.9 168.5 -1.3 -13.2
10 149.9 0.8 5.9 145.5 -1.7 -12.0
11 100.3 0.6 2.6 95.9 -1.2 -4.3
12 139.0 3.3 5.3 135.3 -3.7 -10.3
13 135.5 -2.3 4.4 131.7 1.4 -9.5
14 138.9 0.6 8.1 135.1 -1.2 -12.8
15 135.7 0.5 1.6 131.9 -1.1 -6.9
Critical Combination:14 - (G+Q+Ny)
Min Design
N (kN) 138.9 - 138.9
M1 (kN.m) -1.2 -1.4 0.0 200
M2 (kN.m) -12.8 -1.4 -14.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.139 Le1/b1 = 10.3 < 15.0 200
Beta = 0.84 Le2/b2 = 10.4 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.6 / 6.6 kN As (Required): %0.52 208.97 mm2 4Y12
vc'(1/2)= 0.81 / 0.87 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.02 / 0.21 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-20

1C39 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 460.6 -0.8 -2.2 456.2 1.6 4.3
2 465.8 -0.6 -2.2 461.4 1.3 4.3
3 359.8 -0.5 1.8 355.4 1.2 -3.1
4 412.1 -0.8 -1.9 407.7 1.5 3.7
5 380.2 -1.0 -5.6 375.8 1.6 10.4
6 460.6 -0.8 -2.2 456.2 1.6 4.4
7 460.6 -0.8 -2.2 456.2 1.6 4.3
8 412.0 -0.7 -1.9 407.6 1.4 3.7
9 380.2 -0.9 -5.6 375.8 1.6 10.4
10 465.9 -0.7 -2.2 461.5 1.4 4.3
11 359.8 -0.5 1.8 355.4 1.2 -3.1
12 378.8 2.3 -1.6 375.0 -1.4 3.3
13 382.2 -3.6 -2.1 378.4 4.0 3.8
14 380.4 -0.5 1.4 376.6 1.1 0.4
15 380.6 -0.9 -5.0 376.8 1.5 6.7
Critical Combination:5 - ((G+Q)P22 *F)
Min Design
N (kN) 380.2 - 380.2
M1 (kN.m) 1.6 3.8 0.0 200
M2 (kN.m) 10.4 3.8 12.5
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.380 Le1/b1 = 10.3 < 15.0 200
Beta = 0.55 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.5 / 0.3 kN As (Required): %0.83 333.71 mm2 4Y12
vc'(1/2)= 1.09 / 0.91 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.02 / 0.01 N/mm2
Links = Y8-125

1C40 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 772.8 -0.1 -0.1 768.3 0.1 0.1
2 726.1 0.2 -0.2 721.7 -0.2 0.2
3 620.4 0.1 6.0 616.0 -0.1 -11.4
4 734.6 -0.4 -0.1 730.2 0.5 0.1
5 620.6 -0.4 -6.3 616.1 0.4 11.6
6 772.7 -0.1 -0.2 768.3 0.2 0.2
7 772.8 -0.1 -0.1 768.3 0.1 0.1
8 734.7 -0.3 -0.1 730.3 0.4 0.1
9 620.6 -0.3 -6.3 616.1 0.3 11.6
10 726.1 0.1 -0.1 721.7 -0.1 0.1
11 620.4 0.1 6.0 616.0 -0.1 -11.3
12 636.9 3.1 0.2 633.1 -3.0 -0.2
13 636.5 -3.2 -0.5 632.7 3.2 0.5
14 636.7 0.1 3.2 632.9 -0.1 -3.2
15 636.7 -0.3 -3.5 632.9 0.3 3.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 772.8 - 772.8
M1 (kN.m) 0.1 7.7 0.0 200
M2 (kN.m) -0.1 -7.7 -10.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.773 Le1/b1 = 10.2 < 15.0 200
Beta = 0.30 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.1 / 5.5 kN As (Required): %3.53 1411.60 mm2 4Y25
vc'(1/2)= 1.87 / 1.85 N/mm2 As (Provided): %4.91 1963.50 mm2
v (1/2)= 0.00 / 0.18 N/mm2
Links = Y8-300

Project: Av_Offices_2
Project Job Ref.
Av Office
Section Sheet no./rev.
Column C40 Check (With 4Y20 ) 1
Calc. by Date Chk'd by Date App'd by Date
M.I 29/07/2021

RC COLUMN DESIGN (BS8110:PART1:1997)


TEDDS calculation version 2.0.01

Column definition
Column depth (larger column dim); h = 300 mm
Nominal cover to all reinforcement (longer dim); c h = 35 mm
Depth to tension steel; h' = h - c h – L dia – D col/2 = 247 mm
Column width (smaller column dim); b = 200 mm
Nominal cover to all reinforcement (shorter dim); c b = 35 mm
Depth to tension steel; b' = b - c b - L dia – D col/2 = 147 mm
Characteristic strength of reinforcement; fy = 410 N/mm 2
Characteristic strength of concrete; fcu = 20 N/mm 2

Minor axis (y)

Links - 8 dia links in 1s @ 200 centres


35

Reinforcement (each face) -2No. 20 dia bar(s)

Characteristic concrete strength - 20.0 N/mm 2


247
300

Major axis (x)

35

200

Unbraced Column Design to cl 3.8.4


Check on overall column dimensions
Column OK - h < 4b
Unbraced column slenderness check
Unbraced column clear height; lo = 2700 mm
Slenderness limit; llimit = 60  b = 12000 mm
Slenderness limit; llimit1 = 100  b 2 / h = 13333 mm
Column slenderness limit OK
If column is unrestrained, slenderness limit OK
Short column check for unbraced columns
Column clear height; lo = 2700 mm
Effect height factor for unbraced columns - maj axis;  x = 1.20
BS8110:Table 3.20
Effective height (major axis); lex =  x  l o = 3.240 m
Slenderness check; lex /h = 10.80
The unbraced column is slender (major axis)
Effect height factor for unbraced columns - min axis;  y = 1.20
BS8110:Table 3.20
Effective height (minor axis); ley =  y  l o = 3.240 m
Slenderness check; ley/b = 16.20
Project Job Ref.
Av Office
Section Sheet no./rev.
Column C40 Check 2
Calc. by Date Chk'd by Date App'd by Date
M.I 29/07/2021

The unbraced column is slender (minor axis)


Column slender about minor axis - axial only - (notional minor axis bending)
Define column reinforcement
Main reinforcement in column
Assumed diameter of main reinforcement; D col = 20 mm
Assumed no. of bars in one face (assumed sym); L ncol = 2
Area of "tension" steel; A st = L ncol    D col2 / 4 = 628 mm 2
Area of compression steel; A sc = A st = 628 mm 2
Total area of steel; A scol = A st + A sc = 1256.6 mm 2
Percentage of steel; (A st + A sc) / (b  h) = 2.1 %

Design ultimate loading


Design ultimate axial load; N = 459 kN
Additional moment
 ay = l ey2 / (2000  b 2 ) = 0.13
Reduction factor to correct deflection for axial load
N uz = 0.45  fcu  h  b + 1/ ms  f y  A scol = 988.0 kN
N bal = 0.25  f cu  h  b' = 220.5 kN
K = min( (N uz - N)/(N uz - N bal), 1.0) = 0.69
a uy =  ay  K  b = 18.1 mm
Additional moment; M addy = N  a uy = 8.3 kNm

Minimum design moments


Min design moment; M ymin = min(0.05  b, 20 mm)  N = 4.6 kNm

Design moments
Design moment; M design = max ( M addy, M ymin ) = 8.3 kNm
Set up section dimensions for design:-
Section depth; D = b = 200 mm
Depth to "tension" steel; d = b' = 147 mm
Section width; B = h = 300 mm
Check of design forces - symmetrically reinforced section

NOTE
Note:- the section dimensions used in the following calculation are:-
Section width (parallel to axis of bending); B = 300 mm
Section depth perpendicular to axis of bending); D = 200 mm
Depth to "tension" steel (symmetrical); d = 147 mm
Compression steel yields (0.9x<D)
Determine correct moment of resistance
N R =ceiling(if(xcalc <D/0.9, N R1 , N R2 ),0.001kN) = 459.0 kN
M R = ceiling(if(xcalc <D/0.9, M R1 , M R2 ) ,0.001kNm) = 27.0 kNm
Applied axial load; N = 459.0 kN
Check for moment; M design = 8.3 kNm
Moment check satisfied
Project Job Ref.
Av Office
Section Sheet no./rev.
Column C40 Check 3
Calc. by Date Chk'd by Date App'd by Date
M.I 29/07/2021

Check min and max areas of steel


Total area of concrete; A conc = b  h = 60000 mm 2
Area of steel (symmetrical); A scol = 1257 mm 2
Minimum percentage of compression reinforcement; k c = 0.40 %
Minimum steel area; A sc_min = k c  A conc = 240 mm 2
Maximum steel area; A s_max = 6 %  A conc = 3600 mm 2
Area of compression steel provided OK
Define Containment Links Provided
Link spacing; s v = 200 mm; Link diameter; L dia = 8 mm; No of links in each group; L n = 1
Minimum Containment Steel (Cl 3.12.7)
Shear steel
Link spacing; s v = 200 mm
Link diameter; L dia = 8 mm
Column steel
Diameter; D col = 20 mm
Min diameter; L limit = max( (6 mm), D col/4) = 6.0 mm
Link diameter OK
Max spacing; s limit = 12  D col = 240.0 mm
Link spacing OK
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-21

1C41 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 408.6 0.7 -0.2 404.2 -1.5 0.1
2 375.2 0.7 -0.2 370.8 -1.4 0.2
3 322.9 0.9 3.8 318.5 -1.6 -6.8
4 411.9 0.5 -0.1 407.5 -1.3 0.1
5 322.4 0.4 -4.1 318.0 -1.2 7.1
6 408.5 0.7 -0.3 404.1 -1.5 0.2
7 408.6 0.7 -0.2 404.2 -1.5 0.2
8 412.0 0.6 -0.2 407.6 -1.4 0.2
9 322.4 0.4 -4.1 318.0 -1.2 7.1
10 375.1 0.6 -0.1 370.7 -1.3 0.1
11 322.9 0.9 3.8 318.5 -1.5 -6.7
12 338.6 3.5 0.3 334.8 -3.9 -0.3
13 335.5 -2.3 -0.6 331.7 1.4 0.6
14 337.2 0.8 3.4 333.4 -1.5 -3.3
15 337.0 0.4 -3.7 333.2 -1.1 3.6
Critical Combination:8 - ((G+Q)P41 *F)
Min Design
N (kN) 412.0 - 412.0
M1 (kN.m) -1.4 -4.1 0.0 200
M2 (kN.m) -0.2 -4.1 -6.2
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.412 Le1/b1 = 10.3 < 15.0 200
Beta = 0.52 Le2/b2 = 10.2 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.5 / 3.6 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 1.03 / 1.09 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.02 / 0.11 N/mm2
Links = Y8-125

1C42 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 144.0 -0.7 -5.0 139.6 1.3 10.0
2 147.0 -0.6 -5.0 142.6 1.2 10.0
3 152.7 -0.3 -5.5 148.3 1.0 11.7
4 126.8 -0.6 -5.1 122.4 1.0 10.1
5 82.5 -1.0 -1.8 78.1 1.5 2.8
6 144.1 -0.8 -5.1 139.7 1.4 10.0
7 144.0 -0.7 -5.0 139.6 1.3 10.0
8 126.8 -0.5 -5.1 122.3 0.9 10.1
9 82.5 -1.0 -1.8 78.1 1.5 2.8
10 147.0 -0.7 -5.0 142.6 1.3 10.0
11 152.8 -0.3 -5.5 148.3 1.0 11.7
12 117.3 2.5 -3.9 113.5 -1.7 8.0
13 121.1 -3.7 -4.3 117.3 3.9 8.4
14 117.5 -0.2 -1.1 113.7 0.7 5.5
15 120.9 -1.0 -7.1 117.1 1.5 10.8
Critical Combination:15 - (G+Q-Ny)
Min Design
N (kN) 120.9 - 120.9
M1 (kN.m) 1.5 1.2 0.0 200
M2 (kN.m) 10.8 1.2 12.1
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.121 Le1/b1 = 10.3 < 15.0 200
Beta = 0.86 Le2/b2 = 10.4 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.8 / 5.7 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.81 / 0.85 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.03 / 0.18 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-22

1C43 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 325.0 -0.2 -10.9 320.6 0.3 21.8
2 295.9 0.1 -10.9 291.5 -0.2 21.8
3 338.6 0.3 -11.9 334.2 -0.2 24.6
4 300.9 -0.5 -10.8 296.5 0.7 21.7
5 207.7 -0.6 -4.0 203.2 0.7 7.1
6 325.1 -0.2 -10.9 320.7 0.3 21.8
7 325.0 -0.2 -10.9 320.6 0.3 21.8
8 301.0 -0.4 -10.9 296.5 0.6 21.8
9 207.6 -0.6 -4.0 203.2 0.7 7.1
10 295.9 0.0 -10.9 291.4 -0.1 21.8
11 338.6 0.3 -11.9 334.2 -0.2 24.6
12 268.7 3.1 -8.6 264.9 -3.0 17.5
13 268.5 -3.4 -9.2 264.7 3.4 18.1
14 267.1 0.3 -5.8 263.3 -0.2 15.0
15 270.1 -0.6 -12.0 266.3 0.6 20.6
Critical Combination:11 - ((G+Q)P52 *F)
Min Design
N (kN) 338.6 - 338.6
M1 (kN.m) 0.3 3.4 0.0 200
M2 (kN.m) 24.6 3.4 26.7
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.339 Le1/b1 = 10.2 < 15.0 200
Beta = 0.60 Le2/b2 = 10.4 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.0 / 10.4 kN As (Required): %2.63 1050.35 mm2 4Y20
vc'(1/2)= 1.28 / 1.32 N/mm2 As (Provided): %3.14 1256.64 mm2
v (1/2)= 0.00 / 0.33 N/mm2
Links = Y8-225

1C44 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 166.0 0.6 -6.2 161.6 -1.3 12.3
2 144.9 0.5 -6.2 140.4 -0.9 12.3
3 173.5 1.0 -6.2 169.1 -1.7 13.4
4 167.9 0.5 -6.2 163.5 -1.2 12.3
5 99.7 0.1 -2.9 95.3 -0.9 4.6
6 166.0 0.6 -6.3 161.6 -1.3 12.3
7 166.0 0.6 -6.2 161.5 -1.3 12.3
8 168.0 0.6 -6.2 163.6 -1.3 12.3
9 99.7 0.2 -2.9 95.3 -0.9 4.6
10 144.8 0.4 -6.1 140.4 -0.9 12.2
11 173.5 1.0 -6.2 169.1 -1.7 13.4
12 138.7 3.6 -4.6 134.9 -3.9 9.6
13 135.9 -2.5 -5.5 132.1 1.6 10.5
14 135.9 0.9 -1.8 132.1 -1.5 7.1
15 138.7 0.1 -8.3 134.9 -0.8 13.0
Critical Combination:15 - (G+Q-Ny)
Min Design
N (kN) 138.7 - 138.7
M1 (kN.m) -0.8 -1.4 0.0 200
M2 (kN.m) 13.0 1.4 14.2
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.139 Le1/b1 = 10.3 < 15.0 200
Beta = 0.84 Le2/b2 = 10.4 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.3 / 6.8 kN As (Required): %0.54 216.93 mm2 4Y12
vc'(1/2)= 0.79 / 0.88 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.01 / 0.21 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-23

2C44 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 24.0 -0.5 0.8 19.6 1.0 -1.1
2 21.0 -0.5 0.4 16.6 0.8 -0.6
3 24.7 -0.7 0.5 20.3 1.2 -0.9
4 13.4 -0.4 0.6 8.9 0.8 -0.7
5 17.8 -0.1 0.6 13.4 0.6 -0.8
6 18.1 -0.3 0.6 13.7 0.9 -0.7
7 18.0 -0.5 0.4 13.6 1.0 -0.6
8 13.8 -0.4 0.6 9.4 0.7 -0.7
9 23.5 0.1 1.0 19.1 0.4 -1.4
10 21.0 -0.6 0.4 16.6 1.0 -0.6
11 25.0 -0.9 0.5 20.6 1.4 -0.9
12 19.3 1.0 0.6 15.5 -0.6 -0.8
13 21.0 -1.7 0.7 17.2 2.2 -1.0
14 20.8 -0.5 1.7 17.0 0.9 -2.1
15 19.5 -0.3 -0.4 15.7 0.6 0.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 24.0 - 24.0
M1 (kN.m) 1.0 0.2 0.0 200
M2 (kN.m) -1.1 -0.2 -2.0
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.024 Le1/b1 = 9.6 < 15.0 200
Beta = 0.97 Le2/b2 = 9.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.3 / 1.2 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.73 / 0.73 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.04 / 0.04 N/mm2
Links = Y8-125

2C45 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 69.5 -3.1 1.6 65.1 2.7 -2.4
2 53.4 -0.8 1.8 49.0 0.6 -2.5
3 59.5 -3.5 0.9 55.1 3.1 -1.3
4 64.4 -3.7 1.5 60.0 3.4 -2.2
5 70.7 -2.7 1.7 66.3 2.3 -2.6
6 70.9 -3.3 1.7 66.5 2.9 -2.5
7 70.5 -3.1 1.7 66.1 2.8 -2.5
8 62.6 -3.3 1.5 58.2 3.0 -2.3
9 60.1 -2.6 1.1 55.7 2.2 -1.5
10 53.4 -0.9 1.7 48.9 0.8 -2.5
11 69.2 -3.5 1.5 64.7 3.1 -2.3
12 58.4 -1.0 1.2 54.7 0.6 -1.9
13 57.5 -4.1 1.5 53.7 3.9 -2.1
14 58.5 -2.7 2.4 54.7 2.4 -3.2
15 57.4 -2.4 0.2 53.7 2.1 -0.8
Critical Combination:13 - (G+Q-Nx)
Min Design
N (kN) 57.5 - 57.5
M1 (kN.m) -4.1 -0.6 -6.1 200
M2 (kN.m) -2.1 -0.6 0.0
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.058 Le1/b1 = 9.5 < 15.0 200
Beta = 0.93 Le2/b2 = 9.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.5 / 1.8 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.79 / 0.78 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.08 / 0.06 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-24

2C46 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 78.9 0.0 0.2 74.5 0.0 -1.2
2 53.5 -1.8 -0.6 49.1 1.6 0.1
3 68.4 -0.5 -0.4 64.0 0.5 -0.2
4 60.8 2.0 0.4 56.4 -1.7 -0.9
5 81.0 0.5 0.1 76.6 -0.4 -1.3
6 60.9 2.2 0.8 56.5 -2.0 -1.3
7 79.1 0.0 0.2 74.6 0.0 -1.2
8 68.5 0.0 -0.7 64.1 0.0 0.1
9 80.4 0.4 0.1 76.0 -0.4 -1.3
10 53.7 -2.0 -0.7 49.3 1.7 0.1
11 68.8 -0.4 -0.4 64.4 0.4 -0.2
12 65.7 1.5 0.1 61.9 -1.5 -0.9
13 65.8 -1.5 0.2 62.0 1.6 -1.0
14 66.4 -0.2 1.3 62.6 0.2 -2.2
15 65.0 0.1 -1.0 61.3 -0.1 0.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 78.9 - 78.9
M1 (kN.m) 0.0 0.8 0.0 200
M2 (kN.m) -1.2 -0.8 -1.9
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.079 Le1/b1 = 9.6 < 15.0 200
Beta = 0.91 Le2/b2 = 9.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.2 / 0.0 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.78 / 0.73 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.04 / 0.00 N/mm2
Links = Y8-125

2C47 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 65.9 2.4 2.6 61.5 -2.1 -3.0
2 61.2 3.1 1.5 56.7 -2.9 -2.1
3 55.9 2.0 2.6 51.5 -1.6 -2.4
4 51.2 0.4 2.3 46.8 -0.3 -3.0
5 66.8 2.9 1.5 62.3 -2.6 -2.3
6 51.1 0.7 2.2 46.7 -0.6 -2.9
7 67.1 2.4 2.6 62.7 -2.1 -3.1
8 60.1 2.5 1.9 55.7 -2.3 -2.6
9 55.9 2.9 1.9 51.4 -2.6 -1.7
10 66.6 2.8 1.6 62.2 -2.5 -2.3
11 65.5 1.9 2.1 61.1 -1.6 -2.9
12 54.4 3.5 2.1 50.6 -3.3 -2.5
13 55.6 0.4 2.2 51.8 -0.1 -2.5
14 55.7 1.8 3.4 51.9 -1.6 -3.8
15 54.3 2.1 0.9 50.5 -1.9 -1.2
Critical Combination:12 - (G+Q+Nx)
Min Design
N (kN) 54.4 - 54.4
M1 (kN.m) 3.5 0.5 5.9 200
M2 (kN.m) -2.5 -0.5 0.0
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.054 Le1/b1 = 9.5 < 15.0 200
Beta = 0.93 Le2/b2 = 9.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.2 / 2.3 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.79 / 0.78 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.07 / 0.07 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-25

2C48 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 31.8 0.1 3.6 27.4 -0.4 -5.5
2 19.7 0.1 2.6 15.3 -0.5 -3.2
3 31.5 -0.3 2.8 27.1 0.0 -5.3
4 32.4 0.1 3.7 28.0 -0.3 -5.8
5 24.4 0.5 2.9 20.0 -0.8 -4.0
6 34.5 0.3 3.7 30.1 -0.5 -5.8
7 31.8 0.1 3.5 27.4 -0.5 -5.4
8 17.9 -0.1 2.4 13.4 -0.2 -3.0
9 22.1 0.5 2.8 17.7 -0.8 -3.7
10 31.6 0.1 3.8 27.2 -0.5 -5.7
11 31.7 -0.3 3.0 27.3 0.0 -5.5
12 27.6 1.4 2.9 23.8 -1.8 -4.5
13 25.7 -1.3 3.0 22.0 1.1 -4.6
14 27.0 -0.1 4.2 23.2 -0.2 -5.9
15 26.3 0.2 1.7 22.6 -0.5 -3.3
Critical Combination:12 - (G+Q+Nx)
Min Design
N (kN) 27.6 - 27.6
M1 (kN.m) -1.8 -0.3 0.0 200
M2 (kN.m) -4.5 -0.3 -6.3
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.028 Le1/b1 = 9.6 < 15.0 200
Beta = 0.97 Le2/b2 = 9.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.0 / 3.2 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.74 / 0.74 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.03 / 0.10 N/mm2
Links = Y8-125

2C49 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 51.8 -7.4 3.3 47.4 7.3 -3.7
2 51.6 -7.1 3.2 47.2 7.0 -3.5
3 45.1 -7.9 2.6 40.7 7.8 -3.1
4 36.7 -4.1 2.9 32.3 4.1 -3.2
5 52.2 -7.0 2.9 47.8 6.8 -3.1
6 52.0 -7.3 3.5 47.6 7.1 -3.8
7 52.8 -7.4 3.5 48.4 7.3 -3.8
8 37.3 -4.0 3.2 32.9 4.0 -3.5
9 42.6 -7.1 1.5 38.2 7.0 -1.8
10 50.8 -7.2 2.9 46.4 7.1 -3.1
11 52.0 -7.8 3.8 47.6 7.7 -4.2
12 42.7 -4.9 2.8 38.9 4.7 -3.1
13 43.8 -7.5 2.7 40.0 7.5 -3.0
14 44.0 -6.3 4.1 40.2 6.2 -4.5
15 42.5 -6.0 1.4 38.7 5.9 -1.6
Critical Combination:11 - ((G+Q)P52 *F)
Min Design
N (kN) 52.0 - 52.0
M1 (kN.m) -7.8 -0.5 -11.7 200
M2 (kN.m) -4.2 -0.5 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.052 Le1/b1 = 9.7 < 15.0 200
Beta = 0.94 Le2/b2 = 9.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 5.0 / 2.7 kN As (Required): %0.79 315.24 mm2 4Y12
vc'(1/2)= 0.77 / 0.76 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.15 / 0.08 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-26

2C50 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 42.6 7.2 0.9 38.2 -7.1 -1.0
2 37.7 7.6 0.4 33.3 -7.5 -0.5
3 43.7 6.8 1.1 39.3 -6.7 -1.6
4 25.4 3.7 0.3 21.0 -3.7 -0.4
5 36.4 7.7 0.0 32.0 -7.6 0.2
6 37.8 7.4 0.3 33.4 -7.3 -0.4
7 42.3 7.3 0.4 37.9 -7.2 -0.8
8 25.0 3.8 0.5 20.6 -3.8 -0.6
9 43.3 7.5 0.1 38.9 -7.4 -0.3
10 37.8 7.5 0.1 33.4 -7.4 -0.2
11 37.2 6.9 1.4 32.8 -6.8 -1.3
12 36.2 7.3 0.7 32.4 -7.3 -0.9
13 35.0 4.7 0.7 31.3 -4.5 -0.8
14 36.4 5.9 2.1 32.6 -5.8 -2.4
15 34.9 6.1 -0.7 31.1 -6.1 0.7
Critical Combination:11 - ((G+Q)P52 *F)
Min Design
N (kN) 37.2 - 37.2
M1 (kN.m) 6.9 0.4 8.2 200
M2 (kN.m) 1.4 0.4 0.0
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.037 Le1/b1 = 9.7 < 15.0 200
Beta = 0.96 Le2/b2 = 9.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.8 / 1.4 kN As (Required): %0.50 198.06 mm2 4Y12
vc'(1/2)= 0.75 / 0.75 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.15 / 0.04 N/mm2
Links = Y8-125

2C51 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 40.5 -0.2 -1.0 36.1 1.1 1.0
2 33.9 -0.2 -0.5 29.5 1.3 0.5
3 32.1 -0.2 -1.5 27.7 1.2 1.6
4 19.3 -0.1 -0.4 14.9 0.6 0.4
5 33.0 -0.2 -0.2 28.6 0.8 0.1
6 27.6 -0.2 -0.4 23.2 1.1 0.4
7 31.9 -0.2 -0.7 27.4 1.0 0.5
8 20.2 -0.1 -0.4 15.8 0.6 0.4
9 41.2 -0.1 -0.5 36.8 0.8 0.5
10 33.7 -0.2 -0.6 29.3 1.3 0.6
11 32.5 -0.2 -1.6 28.1 1.3 1.7
12 33.1 -0.6 -1.0 29.4 0.1 0.9
13 34.5 0.2 -0.7 30.7 1.6 0.7
14 33.8 -0.1 0.5 30.1 0.9 -0.6
15 33.8 -0.2 -2.2 30.0 0.8 2.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 40.5 - 40.5
M1 (kN.m) 1.1 0.4 2.0 200
M2 (kN.m) -1.0 -0.4 0.0
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.040 Le1/b1 = 9.7 < 15.0 200
Beta = 0.95 Le2/b2 = 9.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.2 / 1.4 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.72 / 0.75 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.01 / 0.04 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-27

2C52 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 131.0 -9.7 -0.9 126.6 7.0 0.9
2 100.5 -9.6 -0.8 96.1 5.3 0.8
3 117.5 -9.9 -0.5 113.1 7.2 0.3
4 127.2 -4.5 -0.5 122.8 5.0 0.5
5 118.4 -9.4 -1.1 114.0 6.6 1.4
6 134.8 -9.4 -0.6 130.4 7.0 0.6
7 118.8 -9.7 -1.2 114.4 7.0 1.5
8 122.0 -4.6 -0.7 117.6 4.8 0.7
9 117.1 -9.4 -0.3 112.7 6.6 0.1
10 101.6 -9.7 -0.8 97.2 5.5 0.8
11 130.9 -9.9 -0.9 126.5 7.2 1.0
12 109.3 -6.7 -0.8 105.5 4.3 0.9
13 108.4 -9.2 -0.6 104.7 7.2 0.6
14 108.7 -8.0 0.6 104.9 5.8 -0.6
15 109.1 -7.9 -2.1 105.3 5.7 2.1
Critical Combination:10 - ((G+Q)P51 *F)
Min Design
N (kN) 101.6 - 101.6
M1 (kN.m) -9.7 -1.0 -10.5 200
M2 (kN.m) 0.8 1.0 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.102 Le1/b1 = 9.7 < 15.0 200
Beta = 0.88 Le2/b2 = 9.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.8 / 0.1 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.83 / 0.82 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.15 / 0.00 N/mm2
Links = Y8-125

2C53 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 178.0 1.0 5.9 173.6 -0.9 -5.5
2 145.6 3.3 6.6 141.2 -0.4 -6.7
3 163.7 0.8 6.4 159.3 -0.6 -6.3
4 116.7 -1.6 2.7 112.3 -1.2 -2.5
5 162.6 1.3 5.1 158.2 -1.1 -4.4
6 114.9 2.2 2.7 110.5 -3.0 -2.6
7 177.5 1.0 5.9 173.1 -0.9 -5.5
8 171.8 -2.6 6.5 167.4 1.1 -6.6
9 162.7 1.3 5.1 158.3 -1.0 -4.4
10 139.7 3.3 6.4 135.3 -0.7 -6.3
11 164.3 0.8 6.4 159.9 -0.7 -6.3
12 147.8 2.4 4.8 144.1 -2.3 -4.5
13 147.9 -0.7 4.9 144.1 0.9 -4.6
14 147.4 0.7 6.2 143.7 -0.6 -6.0
15 148.3 0.9 3.5 144.5 -0.8 -3.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 178.0 - 178.0
M1 (kN.m) 1.0 1.8 0.0 200
M2 (kN.m) 5.9 1.8 7.3
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.178 Le1/b1 = 9.6 < 15.0 200
Beta = 0.79 Le2/b2 = 9.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.1 / 4.1 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.73 / 0.91 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.00 / 0.13 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-28

2C54 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 158.0 3.2 0.3 153.6 -1.1 -0.3
2 139.0 2.2 0.4 134.6 -2.6 -0.4
3 146.4 3.0 0.4 142.0 -0.8 -1.1
4 131.8 2.3 0.1 127.4 1.4 -0.1
5 140.0 3.8 0.2 135.6 -1.9 0.4
6 130.9 2.1 0.1 126.4 1.0 -0.1
7 145.1 3.2 0.0 140.7 -1.2 0.2
8 129.3 4.6 0.3 124.9 -3.3 -0.3
9 137.3 3.8 -0.2 132.9 -2.0 -0.3
10 169.4 1.0 0.5 165.0 -0.1 -0.5
11 160.8 3.0 1.1 156.4 -0.8 -1.0
12 131.3 4.2 0.2 127.6 -2.5 -0.2
13 131.4 1.1 0.2 127.6 0.7 -0.3
14 130.9 2.6 1.7 127.1 -0.8 -1.8
15 131.8 2.7 -1.3 128.0 -1.0 1.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 158.0 - 158.0
M1 (kN.m) 3.2 1.6 4.5 200
M2 (kN.m) -0.3 -1.6 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.158 Le1/b1 = 9.6 < 15.0 200
Beta = 0.82 Le2/b2 = 9.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.3 / 0.0 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.74 / 0.73 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.01 / 0.00 N/mm2
Links = Y8-125

2C55 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 164.2 -5.4 0.3 159.8 3.1 -0.2
2 137.6 -6.1 0.1 133.2 5.1 0.1
3 156.7 -5.6 1.8 152.2 3.4 -1.6
4 137.0 -1.8 0.5 132.5 -0.7 -0.5
5 147.5 -5.3 -1.4 143.1 3.3 1.4
6 166.7 -5.0 0.2 162.3 2.5 -0.1
7 151.7 -5.3 -0.7 147.3 3.1 0.8
8 136.0 -6.4 0.5 131.6 5.4 -0.4
9 146.5 -5.4 0.6 142.1 3.4 -0.5
10 135.6 -1.8 0.2 131.2 -0.5 -0.1
11 166.2 -5.7 0.9 161.8 3.4 -0.8
12 136.6 -3.0 0.3 132.8 1.0 -0.2
13 136.4 -5.9 0.2 132.7 4.1 -0.1
14 136.1 -4.5 1.9 132.3 2.7 -1.8
15 137.0 -4.3 -1.4 133.2 2.5 1.5
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 164.2 - 164.2
M1 (kN.m) -5.4 -1.6 -6.7 200
M2 (kN.m) 0.3 1.6 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.164 Le1/b1 = 9.6 < 15.0 200
Beta = 0.81 Le2/b2 = 9.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.4 / 0.0 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.77 / 0.75 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.01 / 0.00 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-29

2C56 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 70.6 0.4 1.0 66.2 -0.5 -0.7
2 58.9 0.5 0.9 54.5 -0.6 -0.7
3 62.4 0.4 1.9 58.0 -0.5 -1.3
4 38.0 0.2 0.5 33.6 -0.2 -0.3
5 64.7 0.4 -0.1 60.3 -0.5 -0.1
6 55.0 0.4 0.7 50.6 -0.5 -0.5
7 72.3 0.4 1.3 67.9 -0.5 -1.0
8 58.8 0.4 1.0 54.4 -0.5 -0.9
9 63.5 0.4 0.0 59.1 -0.5 0.5
10 39.4 0.3 0.4 35.0 -0.2 -0.2
11 61.7 0.4 1.5 57.2 -0.5 -1.6
12 59.1 -0.3 0.9 55.3 -0.4 -0.7
13 58.6 1.0 0.7 54.8 -0.3 -0.5
14 58.5 0.4 2.5 54.8 -0.4 -2.3
15 59.1 0.3 -0.9 55.3 -0.4 1.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 70.6 - 70.6
M1 (kN.m) -0.5 -0.7 0.0 200
M2 (kN.m) 1.0 0.7 1.6
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.071 Le1/b1 = 11.4 < 15.0 200
Beta = 0.92 Le2/b2 = 9.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.0 / 0.0 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.72 / 0.72 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.00 / 0.00 N/mm2
Links = Y8-125

2C57 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 65.2 -1.2 4.2 60.8 1.4 -3.8
2 47.4 -1.2 2.1 42.9 1.5 -2.1
3 58.6 -1.1 4.3 54.2 1.3 -4.1
4 39.0 -1.3 2.3 34.6 1.5 -2.2
5 59.0 -1.2 2.8 54.6 1.4 -2.8
6 46.2 -1.4 2.3 41.8 1.9 -2.2
7 65.5 -1.0 4.2 61.1 1.2 -3.8
8 39.2 -1.2 2.3 34.8 1.3 -2.2
9 58.8 -1.3 2.9 54.4 1.6 -2.9
10 47.3 -1.3 2.1 42.8 1.6 -2.0
11 58.6 -1.0 4.2 54.2 1.3 -4.1
12 53.7 0.4 3.3 49.9 -0.3 -3.0
13 55.3 -2.4 3.6 51.5 2.7 -3.3
14 54.0 -1.0 4.5 50.2 1.3 -4.3
15 55.1 -0.9 2.4 51.3 1.1 -2.0
Critical Combination:13 - (G+Q-Nx)
Min Design
N (kN) 55.3 - 55.3
M1 (kN.m) 2.7 0.6 0.0 200
M2 (kN.m) 3.6 0.6 6.1
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.055 Le1/b1 = 9.6 < 15.0 200
Beta = 0.93 Le2/b2 = 9.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.9 / 2.8 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.75 / 0.78 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.03 / 0.09 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-30

2C58 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 75.1 0.9 0.5 70.6 -0.8 0.2
2 60.0 1.7 0.6 55.6 -1.6 0.0
3 66.7 0.8 -0.9 62.3 -0.7 1.3
4 71.1 -0.5 0.7 66.7 0.6 0.0
5 66.7 0.9 1.2 62.3 -0.7 -0.8
6 81.0 0.0 0.5 76.5 -0.1 0.2
7 63.3 0.9 0.9 58.9 -0.8 -0.5
8 59.1 0.4 0.7 54.7 -0.2 0.0
9 79.9 0.9 0.8 75.5 -0.7 -0.1
10 61.8 1.6 0.6 57.4 -1.5 0.1
11 65.2 0.8 -0.9 60.8 -0.7 1.3
12 62.6 2.4 0.3 58.8 -2.3 0.2
13 62.4 -0.9 0.5 58.6 1.1 0.0
14 62.5 0.7 1.7 58.7 -0.6 -1.2
15 62.5 0.8 -0.9 58.7 -0.7 1.5
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 75.1 - 75.1
M1 (kN.m) 0.9 0.8 1.6 200
M2 (kN.m) 0.5 0.8 0.0
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.075 Le1/b1 = 9.5 < 15.0 200
Beta = 0.91 Le2/b2 = 9.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.5 / 0.0 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.80 / 0.71 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.05 / 0.00 N/mm2
Links = Y8-125

2C59 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 152.7 -12.2 2.5 148.3 11.3 -2.6
2 143.4 -12.6 1.0 139.0 11.9 -1.2
3 140.6 -12.5 2.2 136.2 11.6 -1.2
4 106.0 -5.2 2.7 101.6 4.8 -3.3
5 147.2 -11.6 1.5 142.8 10.5 -2.6
6 105.1 -5.0 2.7 100.7 4.6 -3.2
7 152.1 -12.2 1.4 147.7 11.4 -2.1
8 159.2 -12.5 1.8 154.8 11.8 -2.3
9 147.9 -11.5 2.7 143.5 10.4 -3.1
10 139.3 -12.5 0.9 134.9 11.6 -1.2
11 140.5 -12.5 2.2 136.1 11.7 -1.2
12 127.3 -8.5 2.0 123.5 7.7 -2.0
13 126.5 -11.6 2.1 122.7 11.0 -2.2
14 127.2 -10.0 3.2 123.4 9.4 -3.3
15 126.5 -10.0 1.0 122.8 9.3 -0.9
Critical Combination:11 - ((G+Q)P52 *F)
Min Design
N (kN) 140.5 - 140.5
M1 (kN.m) -12.5 -1.4 -14.3 200
M2 (kN.m) 2.2 1.4 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.141 Le1/b1 = 9.6 < 15.0 200
Beta = 0.84 Le2/b2 = 9.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 7.2 / 1.9 kN As (Required): %0.55 221.14 mm2 4Y12
vc'(1/2)= 0.89 / 0.85 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.22 / 0.06 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-31

2C60 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 189.8 11.5 0.0 185.4 -9.5 -0.1
2 160.0 13.5 0.3 155.5 -12.6 -0.3
3 175.5 11.4 0.4 171.1 -9.4 0.1
4 157.1 3.6 0.1 152.7 -1.5 -0.3
5 179.4 11.4 -0.2 175.0 -9.1 -0.6
6 150.5 4.2 0.1 146.1 -2.4 -0.2
7 177.1 11.5 0.1 172.7 -9.5 -0.7
8 167.2 12.9 0.6 162.8 -12.1 -0.7
9 194.6 11.4 0.2 190.2 -9.0 -0.4
10 189.4 11.4 0.1 185.0 -9.2 -0.1
11 173.0 11.4 -0.2 168.6 -9.4 0.3
12 157.5 11.0 -0.1 153.8 -9.4 -0.1
13 157.7 8.0 0.0 153.9 -6.2 -0.2
14 157.5 9.4 1.4 153.7 -7.8 -1.6
15 157.7 9.5 -1.5 153.9 -7.9 1.4
Critical Combination:2 - ((G+Q)P11 *F)
Min Design
N (kN) 160.0 - 160.0
M1 (kN.m) 13.5 1.6 14.8 200
M2 (kN.m) -0.3 -1.6 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.160 Le1/b1 = 9.6 < 15.0 200
Beta = 0.81 Le2/b2 = 9.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 8.3 / 0.0 kN As (Required): %0.52 208.45 mm2 4Y12
vc'(1/2)= 0.94 / 0.73 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.26 / 0.00 N/mm2
Links = Y8-125

2C61 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 160.6 -5.4 -1.7 156.2 3.8 0.9
2 134.4 -3.6 -1.6 130.0 4.7 0.9
3 144.4 -5.5 -1.7 140.0 3.9 1.2
4 137.6 -4.4 -1.7 133.2 0.9 0.9
5 152.3 -5.2 -0.8 147.9 3.5 0.2
6 167.8 -2.5 -2.0 163.4 1.7 1.3
7 148.2 -5.3 -0.6 143.8 3.8 -0.1
8 132.0 -6.5 -1.7 127.6 6.2 1.0
9 165.4 -5.3 -1.9 161.0 3.6 1.2
10 132.3 -4.3 -1.2 127.9 1.3 0.4
11 144.1 -5.5 -1.7 139.7 3.9 1.3
12 133.2 -2.8 -1.4 129.5 1.5 0.8
13 133.5 -6.1 -1.4 129.7 4.8 0.8
14 133.3 -4.5 0.2 129.5 3.2 -0.8
15 133.4 -4.4 -3.0 129.7 3.1 2.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 160.6 - 160.6
M1 (kN.m) -5.4 -1.6 -6.8 200
M2 (kN.m) -1.7 -1.6 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.161 Le1/b1 = 9.6 < 15.0 200
Beta = 0.81 Le2/b2 = 9.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.0 / 0.2 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.90 / 0.81 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.13 / 0.01 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-32

2C62 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 87.2 11.5 -1.8 82.8 -10.2 0.9
2 71.8 7.7 -1.3 67.4 -9.5 0.8
3 82.0 11.3 -0.7 77.5 -10.1 -0.6
4 47.6 9.9 -1.1 43.1 -6.5 0.4
5 74.9 11.6 -2.5 70.5 -10.3 2.2
6 69.3 7.2 -1.3 64.8 -8.2 0.7
7 76.5 11.3 -2.0 72.1 -10.1 1.3
8 71.4 11.8 -1.5 67.0 -11.1 1.0
9 78.7 11.7 -2.4 74.3 -10.5 1.3
10 48.2 10.3 -1.0 43.8 -7.1 0.4
11 91.6 11.3 -0.5 87.2 -10.0 -0.3
12 72.8 10.7 -1.5 69.0 -9.8 0.7
13 72.5 8.2 -1.5 68.7 -7.1 0.7
14 72.5 9.4 0.2 68.8 -8.4 -1.0
15 72.8 9.5 -3.2 69.0 -8.5 2.4
Critical Combination:5 - ((G+Q)P22 *F)
Min Design
N (kN) 74.9 - 74.9
M1 (kN.m) 11.6 0.7 13.9 200
M2 (kN.m) -2.5 -0.7 0.0
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.075 Le1/b1 = 9.7 < 15.0 200
Beta = 0.91 Le2/b2 = 9.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 7.3 / 0.0 kN As (Required): %0.89 355.80 mm2 4Y12
vc'(1/2)= 0.81 / 0.72 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.23 / 0.00 N/mm2
Links = Y8-125

2C63 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 54.5 1.4 0.2 50.1 0.3 -0.2
2 61.3 0.2 0.6 56.9 0.7 -0.7
3 44.7 1.6 1.2 40.3 0.1 -1.1
4 43.8 2.2 0.4 39.4 -0.6 -0.5
5 42.6 1.5 -1.3 38.2 0.2 1.2
6 51.3 1.9 0.4 46.9 -0.2 -0.5
7 55.6 1.6 0.2 51.2 0.1 -0.2
8 44.0 2.0 0.5 39.6 -0.5 -0.6
9 41.4 1.4 -1.3 37.0 0.3 1.1
10 61.2 0.2 0.5 56.8 0.8 -0.6
11 44.9 1.6 1.2 40.5 0.1 -1.0
12 44.7 2.6 0.0 40.9 -1.3 0.0
13 46.4 -0.3 0.3 42.6 1.8 -0.3
14 45.6 1.2 1.5 41.9 0.2 -1.5
15 45.5 1.1 -1.2 41.7 0.3 1.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 54.5 - 54.5
M1 (kN.m) 1.4 0.5 1.9 200
M2 (kN.m) -0.2 -0.5 0.0
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.055 Le1/b1 = 9.6 < 15.0 200
Beta = 0.93 Le2/b2 = 9.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.2 / 0.0 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.76 / 0.73 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.04 / 0.00 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-33

2C64 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 212.7 -15.2 1.1 208.3 13.1 -1.8
2 169.1 -5.8 0.6 164.7 5.1 -1.5
3 196.8 -15.1 0.3 192.3 13.0 -2.2
4 196.2 -16.2 0.9 191.8 14.1 -1.4
5 184.6 -15.2 1.0 180.2 13.0 -0.3
6 215.4 -15.8 1.3 211.0 13.5 -2.3
7 213.2 -15.1 1.9 208.8 13.0 -2.2
8 194.4 -15.3 0.4 189.9 13.4 -0.9
9 184.0 -15.3 0.2 179.6 13.1 0.1
10 169.5 -6.0 0.5 165.1 5.3 -1.5
11 196.8 -15.1 0.3 192.3 13.0 -2.2
12 177.5 -10.8 0.8 173.7 9.1 -1.4
13 176.0 -14.1 1.0 172.2 12.5 -1.6
14 176.7 -12.4 2.3 172.9 10.8 -3.0
15 176.8 -12.5 -0.5 173.0 10.8 -0.1
Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 196.2 - 196.2
M1 (kN.m) -16.2 -2.0 -17.8 200
M2 (kN.m) -1.4 -2.0 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.196 Le1/b1 = 9.6 < 15.0 200
Beta = 0.77 Le2/b2 = 9.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 9.6 / 0.0 kN As (Required): %0.79 314.78 mm2 4Y12
vc'(1/2)= 0.99 / 0.76 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.30 / 0.00 N/mm2
Links = Y8-125

2C65 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 239.3 9.3 1.0 234.9 -8.0 -2.2
2 203.9 -1.5 0.8 199.5 0.9 -2.1
3 224.0 9.2 1.5 219.6 -8.0 -3.3
4 200.7 14.8 0.9 196.3 -12.6 -1.8
5 208.9 9.3 -0.1 204.4 -8.0 0.2
6 210.9 15.0 1.3 206.5 -12.8 -2.7
7 240.6 9.2 1.2 236.2 -7.9 -2.3
8 230.9 8.4 0.8 226.5 -7.2 -1.6
9 207.0 9.3 -0.4 202.6 -8.1 0.2
10 202.3 -1.0 0.5 197.9 0.5 -1.8
11 224.6 9.2 1.5 220.2 -8.0 -3.3
12 198.5 9.1 0.8 194.7 -8.2 -1.8
13 198.9 6.1 0.9 195.1 -5.0 -1.9
14 198.8 7.6 2.4 195.0 -6.6 -3.4
15 198.6 7.6 -0.7 194.8 -6.6 -0.3
Critical Combination:6 - ((G+Q)P31 *F)
Min Design
N (kN) 210.9 - 210.9
M1 (kN.m) 15.0 2.1 17.1 200
M2 (kN.m) -2.7 -2.1 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.211 Le1/b1 = 9.6 < 15.0 200
Beta = 0.76 Le2/b2 = 9.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 8.7 / 0.1 kN As (Required): %0.69 277.47 mm2 4Y12
vc'(1/2)= 0.99 / 0.79 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.27 / 0.00 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-34

2C66 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 189.5 0.5 3.8 185.1 0.3 -3.0
2 169.0 6.1 4.1 164.6 -4.9 -3.4
3 173.5 0.7 5.0 169.0 0.0 -4.5
4 160.0 -5.0 3.7 155.6 4.9 -2.9
5 165.6 0.4 0.3 161.2 0.4 0.3
6 159.7 -4.7 3.8 155.3 4.5 -3.0
7 190.1 0.6 3.7 185.7 0.2 -3.0
8 163.1 3.6 3.8 158.7 -2.9 -3.1
9 165.1 0.4 0.5 160.7 0.5 0.2
10 194.1 3.0 4.0 189.7 -1.7 -3.3
11 173.3 0.8 4.9 168.9 0.0 -4.5
12 157.4 2.1 3.1 153.6 -1.4 -2.5
13 157.3 -1.2 3.1 153.5 1.9 -2.5
14 157.5 0.5 4.7 153.7 0.2 -4.1
15 157.2 0.4 1.5 153.4 0.3 -0.9
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 189.5 - 189.5
M1 (kN.m) 0.5 1.9 0.0 200
M2 (kN.m) 3.8 1.9 5.3
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.189 Le1/b1 = 9.6 < 15.0 200
Beta = 0.78 Le2/b2 = 9.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.0 / 0.0 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.71 / 0.71 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.00 / 0.00 N/mm2
Links = Y8-125

2C67 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 149.3 5.5 3.9 144.9 -4.8 -2.8
2 88.4 1.4 1.7 84.0 -1.5 -1.2
3 129.6 5.5 2.2 125.2 -4.7 -1.1
4 114.1 7.0 2.0 109.6 -5.8 -1.4
5 133.6 5.3 3.4 129.2 -4.8 -2.8
6 121.2 7.1 1.9 116.8 -5.7 -1.4
7 139.2 5.5 4.1 134.8 -4.8 -3.4
8 90.6 1.6 1.7 86.2 -1.4 -1.1
9 147.2 5.3 3.1 142.8 -4.8 -2.0
10 108.4 5.4 1.9 104.0 -4.9 -1.3
11 128.4 5.5 2.2 124.0 -4.7 -1.2
12 123.3 5.8 3.2 119.6 -5.5 -2.4
13 124.9 3.2 3.1 121.1 -2.4 -2.3
14 124.2 4.5 4.9 120.4 -4.0 -4.0
15 124.1 4.5 1.5 120.3 -4.0 -0.6
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 149.3 - 149.3
M1 (kN.m) 5.5 1.5 8.7 200
M2 (kN.m) 3.9 1.5 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.149 Le1/b1 = 9.7 < 15.0 200
Beta = 0.83 Le2/b2 = 9.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.1 / 2.8 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.86 / 0.88 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.13 / 0.09 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-35

2C68 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 37.4 1.0 -4.3 33.0 1.2 4.1
2 36.7 0.2 -4.4 32.3 0.9 4.3
3 37.9 1.4 -4.7 33.5 0.8 4.4
4 32.3 1.4 -4.1 27.9 0.8 3.9
5 28.0 0.8 -1.7 23.6 1.5 1.8
6 37.4 1.2 -4.1 33.0 1.1 3.9
7 37.3 1.0 -4.3 32.9 1.2 4.0
8 32.4 1.3 -4.1 28.0 0.8 3.9
9 28.1 0.8 -1.7 23.7 1.4 1.8
10 36.8 0.1 -4.5 32.4 1.0 4.3
11 37.9 1.4 -4.7 33.5 0.8 4.4
12 30.1 2.3 -3.6 26.3 -0.5 3.5
13 32.5 -0.7 -3.5 28.7 2.6 3.3
14 30.8 0.9 -2.5 27.0 0.9 2.3
15 31.8 0.7 -4.6 28.0 1.1 4.5
Critical Combination:12 - (G+Q+Nx)
Min Design
N (kN) 30.1 - 30.1
M1 (kN.m) 2.3 0.3 0.0 200
M2 (kN.m) -3.6 -0.3 -5.8
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.030 Le1/b1 = 9.6 < 15.0 200
Beta = 0.96 Le2/b2 = 9.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.0 / 2.9 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.73 / 0.75 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.03 / 0.09 N/mm2
Links = Y8-125

2C69 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 58.2 -9.2 -7.0 53.8 4.5 9.2
2 58.2 -3.3 -4.9 53.8 1.3 7.7
3 59.5 -8.8 -5.2 55.1 4.2 8.6
4 43.1 -9.9 -4.8 38.7 5.1 6.9
5 37.5 -9.4 -5.9 33.1 4.8 6.1
6 58.4 -9.5 -5.5 54.0 4.6 8.5
7 58.0 -9.2 -7.2 53.6 4.5 9.2
8 42.6 -9.4 -4.6 38.2 4.8 6.6
9 37.6 -9.4 -5.6 33.2 4.8 6.0
10 58.2 -3.4 -5.0 53.8 1.3 7.8
11 59.6 -8.8 -5.3 55.1 4.2 8.6
12 49.8 -5.9 -5.9 46.0 2.1 7.7
13 47.3 -9.2 -5.7 43.6 5.3 7.5
14 48.2 -7.4 -4.7 44.4 3.6 6.4
15 48.9 -7.6 -6.9 45.1 3.8 8.8
Critical Combination:7 - ((G+Q)P32 *F)
Min Design
N (kN) 58.0 - 58.0
M1 (kN.m) -9.2 -0.6 -17.7 200
M2 (kN.m) 9.2 0.6 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.058 Le1/b1 = 9.6 < 15.0 200
Beta = 0.93 Le2/b2 = 9.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.8 / 5.0 kN As (Required): %1.49 596.07 mm2 4Y16
vc'(1/2)= 0.91 / 0.92 N/mm2 As (Provided): %2.01 804.25 mm2
v (1/2)= 0.15 / 0.16 N/mm2
Links = Y8-175

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-36

2C70 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 75.6 4.4 -5.3 71.2 1.5 8.9
2 77.4 -1.9 -4.6 73.0 4.7 8.2
3 76.8 4.6 -4.7 72.4 1.3 8.7
4 52.4 7.9 -4.1 48.0 -1.9 7.0
5 54.1 4.2 -4.2 49.7 1.6 5.8
6 75.4 6.9 -4.8 71.0 0.4 8.5
7 75.5 4.4 -5.3 71.1 1.5 8.9
8 53.0 5.3 -4.4 48.6 -0.8 7.4
9 54.3 4.2 -4.1 49.9 1.7 5.8
10 77.1 -2.0 -4.5 72.7 4.8 8.1
11 76.7 4.6 -4.7 72.3 1.3 8.7
12 62.6 5.0 -4.4 58.8 -0.2 7.4
13 63.5 2.1 -4.4 59.7 2.8 7.4
14 62.5 3.6 -3.2 58.7 1.2 6.1
15 63.6 3.5 -5.6 59.8 1.4 8.7
Critical Combination:4 - ((G+Q)P21 *F)
Min Design
N (kN) 52.4 - 52.4
M1 (kN.m) 7.9 0.5 14.4 200
M2 (kN.m) 7.0 0.5 0.0
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.052 Le1/b1 = 9.7 < 15.0 200
Beta = 0.94 Le2/b2 = 9.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.1 / 4.5 kN As (Required): %1.10 439.97 mm2 4Y12
vc'(1/2)= 0.76 / 0.78 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.10 / 0.14 N/mm2
Links = Y8-125

2C71 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 122.0 1.4 -8.9 117.6 -1.1 8.7
2 103.7 4.1 -8.8 99.3 -3.6 8.6
3 122.6 1.8 -8.5 118.1 -1.5 8.4
4 102.1 -2.0 -8.6 97.7 1.9 8.4
5 104.4 1.1 -5.1 100.0 -0.8 5.2
6 121.5 -1.0 -8.5 117.1 0.0 8.2
7 122.0 1.4 -8.9 117.6 -1.1 8.7
8 102.0 0.9 -8.6 97.5 0.5 8.5
9 104.4 1.1 -5.2 100.0 -0.8 5.2
10 104.0 3.7 -9.1 99.6 -3.4 9.0
11 122.6 1.8 -8.5 118.2 -1.5 8.4
12 101.4 2.8 -7.3 97.7 -2.6 7.2
13 101.5 -0.5 -7.3 97.7 0.9 7.2
14 100.9 1.2 -6.1 97.1 -1.0 5.8
15 102.0 1.0 -8.6 98.2 -0.8 8.6
Critical Combination:2 - ((G+Q)P11 *F)
Min Design
N (kN) 103.7 - 103.7
M1 (kN.m) 4.1 1.0 0.0 200
M2 (kN.m) -8.8 -1.0 -12.3
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.104 Le1/b1 = 9.6 < 15.0 200
Beta = 0.88 Le2/b2 = 9.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.1 / 5.7 kN As (Required): %0.52 208.46 mm2 4Y12
vc'(1/2)= 0.74 / 0.86 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.00 / 0.18 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-37

2C72 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 103.5 1.5 -5.3 99.1 -3.0 4.9
2 74.6 0.2 -1.2 70.2 -1.1 1.2
3 81.8 2.0 -0.3 77.4 -3.5 0.0
4 71.6 2.6 -2.8 67.2 -4.0 2.7
5 101.8 1.1 -6.2 97.4 -2.5 5.9
6 87.0 2.5 -1.7 82.6 -3.4 1.7
7 104.3 1.5 -5.3 99.9 -3.0 5.0
8 71.1 1.5 -2.4 66.7 -3.6 2.3
9 100.7 1.1 -6.2 96.2 -2.5 5.7
10 75.1 0.6 -1.5 70.7 -1.3 1.6
11 82.0 2.0 -0.3 77.6 -3.5 0.1
12 86.3 2.6 -4.2 82.5 -3.9 3.9
13 86.3 0.0 -4.5 82.5 -1.0 4.1
14 85.7 1.4 -3.0 81.9 -2.6 2.5
15 86.9 1.2 -5.7 83.1 -2.4 5.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 103.5 - 103.5
M1 (kN.m) -3.0 -1.0 0.0 200
M2 (kN.m) -5.3 -1.0 -7.9
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.104 Le1/b1 = 9.7 < 15.0 200
Beta = 0.88 Le2/b2 = 9.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.1 / 3.5 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.79 / 0.84 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.07 / 0.11 N/mm2
Links = Y8-125

2C73 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 14.4 -1.1 -0.5 10.0 2.1 0.7
2 9.5 -0.9 -0.6 5.1 1.5 0.8
3 12.5 -1.1 -1.2 8.1 2.3 1.4
4 9.1 -0.6 -0.4 4.7 1.2 0.6
5 12.7 -0.6 0.5 8.3 1.3 -0.4
6 9.0 -0.8 -0.4 4.6 1.5 0.6
7 14.2 -0.9 -0.5 9.8 1.8 0.7
8 10.0 -0.6 -0.6 5.6 1.2 0.8
9 17.7 -1.0 0.6 13.2 2.1 -0.4
10 8.8 -0.9 -0.5 4.4 1.6 0.6
11 12.4 -1.1 -1.2 8.0 2.2 1.3
12 12.6 -2.3 -0.4 8.8 3.3 0.6
13 11.8 0.5 -0.4 8.0 0.3 0.6
14 13.4 -0.8 -1.9 9.6 1.7 2.1
15 11.0 -0.9 1.1 7.2 1.8 -1.0
Critical Combination:12 - (G+Q+Nx)
Min Design
N (kN) 12.6 - 12.6
M1 (kN.m) 3.3 0.1 3.8 200
M2 (kN.m) 0.6 0.1 0.0
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.013 Le1/b1 = 9.6 < 15.0 200
Beta = 0.98 Le2/b2 = 9.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.8 / 1.3 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.72 / 0.72 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.05 / 0.04 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-38

2C74 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 70.0 -1.0 1.9 65.6 0.5 -2.2
2 65.3 -0.8 2.0 60.9 0.2 -2.4
3 60.5 -0.5 2.8 56.1 0.1 -3.2
4 61.6 -1.2 1.9 57.2 1.2 -2.2
5 53.5 -1.3 -0.1 49.1 0.7 -0.1
6 61.5 -1.1 1.9 57.1 0.7 -2.2
7 69.1 -1.0 1.9 64.7 0.5 -2.2
8 75.5 -0.9 1.9 71.1 0.7 -2.3
9 54.8 -1.2 -0.1 50.4 0.7 -0.1
10 55.6 -1.2 2.0 51.2 0.9 -2.3
11 60.4 -0.5 2.8 56.0 0.1 -3.1
12 58.6 0.7 1.6 54.9 -1.2 -1.9
13 57.9 -2.3 1.5 54.1 2.0 -1.8
14 58.0 -0.8 3.4 54.2 0.4 -3.6
15 58.5 -0.8 -0.2 54.7 0.4 -0.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 70.0 - 70.0
M1 (kN.m) -1.0 -0.7 0.0 200
M2 (kN.m) -2.2 -0.7 -3.1
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.070 Le1/b1 = 9.6 < 15.0 200
Beta = 0.92 Le2/b2 = 9.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.4 / 0.0 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.79 / 0.71 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.04 / 0.00 N/mm2
Links = Y8-125

2C75 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 57.4 3.2 -3.9 53.0 -3.4 4.4
2 57.0 2.2 -3.8 52.6 -2.5 4.3
3 47.3 1.6 -3.0 42.9 -1.8 3.6
4 47.5 1.3 -3.9 43.0 -1.5 4.4
5 43.1 3.1 -3.1 38.7 -3.4 3.4
6 56.9 2.2 -3.8 52.4 -2.5 4.4
7 57.4 3.2 -3.9 52.9 -3.4 4.4
8 47.9 1.2 -4.0 43.4 -1.4 4.6
9 43.0 3.1 -3.1 38.6 -3.4 3.4
10 56.7 2.2 -3.7 52.3 -2.5 4.2
11 47.3 1.6 -3.1 42.9 -1.8 3.6
12 48.2 3.9 -3.1 44.4 -4.3 3.6
13 47.3 1.3 -3.3 43.5 -1.4 3.8
14 47.1 2.7 -1.8 43.3 -3.0 2.1
15 48.4 2.5 -4.6 44.7 -2.7 5.2
Critical Combination:15 - (G+Q-Ny)
Min Design
N (kN) 48.4 - 48.4
M1 (kN.m) -2.7 -0.5 0.0 200
M2 (kN.m) 5.2 0.5 7.8
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.048 Le1/b1 = 9.6 < 15.0 200
Beta = 0.94 Le2/b2 = 9.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.6 / 3.1 kN As (Required): %0.40 (min) 160.00 mm2 4Y12
vc'(1/2)= 0.77 / 0.77 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.08 / 0.10 N/mm2
Links = Y8-125

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-39

2C76 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 98.2 -1.8 22.3 93.8 2.5 -20.4
2 101.6 -1.4 22.4 97.2 2.5 -20.6
3 74.6 -1.2 10.1 70.2 1.8 -10.0
4 78.3 -1.6 21.7 73.9 1.6 -19.8
5 98.1 -2.1 23.6 93.7 2.9 -21.3
6 95.8 -1.9 22.3 91.4 2.6 -20.4
7 98.5 -1.8 22.3 94.1 2.5 -20.4
8 77.4 -1.4 21.7 73.0 1.4 -19.8
9 97.7 -2.1 23.6 93.3 2.9 -21.3
10 106.5 -1.5 22.4 102.1 2.5 -20.5
11 74.6 -1.2 10.0 70.2 1.8 -10.0
12 82.0 0.1 18.4 78.2 0.4 -16.9
13 81.4 -3.2 18.3 77.6 3.8 -16.8
14 81.9 -1.5 19.6 78.1 2.1 -18.3
15 81.5 -1.5 17.2 77.7 2.1 -15.5
Critical Combination:9 - ((G+Q)P42 *F)
Min Design
N (kN) 97.7 - 97.7
M1 (kN.m) 2.9 1.0 0.0 200
M2 (kN.m) 23.6 1.0 26.2
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.098 Le1/b1 = 9.5 < 15.0 200
Beta = 0.88 Le2/b2 = 9.8 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.1 / 14.3 kN As (Required): %2.35 938.16 mm2 4Y20
vc'(1/2)= 1.05 / 1.15 N/mm2 As (Provided): %3.14 1256.64 mm2
v (1/2)= 0.00 / 0.45 N/mm2
Links = Y8-225

2C77 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 155.2 -1.3 28.5 150.8 2.0 -24.8
2 130.7 -0.2 28.5 126.3 -0.5 -24.7
3 120.7 -1.3 10.2 116.3 2.1 -10.1
4 138.9 -1.7 28.4 134.5 3.6 -24.6
5 159.9 -1.3 31.7 155.5 2.0 -26.9
6 155.4 -0.7 28.4 151.0 1.8 -24.7
7 155.2 -1.3 28.5 150.8 2.0 -24.8
8 138.7 -2.1 28.3 134.3 3.7 -24.6
9 159.9 -1.3 31.7 155.5 2.0 -26.9
10 130.6 -0.2 28.5 126.2 -0.4 -24.8
11 120.7 -1.3 10.2 116.3 2.1 -10.1
12 128.9 0.6 23.5 125.1 0.0 -20.5
13 129.0 -2.7 23.3 125.2 3.4 -20.3
14 129.3 -1.0 24.7 125.6 1.7 -21.9
15 128.5 -1.1 22.1 124.7 1.7 -18.9
Critical Combination:9 - ((G+Q)P42 *F)
Min Design
N (kN) 159.9 - 159.9
M1 (kN.m) 2.0 1.6 0.0 200
M2 (kN.m) 31.7 1.6 33.3
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.160 Le1/b1 = 9.6 < 15.0 200
Beta = 0.81 Le2/b2 = 9.8 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.1 / 18.6 kN As (Required): %2.88 1152.88 mm2 4Y20
vc'(1/2)= 1.05 / 1.23 N/mm2 As (Provided): %3.14 1256.64 mm2
v (1/2)= 0.00 / 0.59 N/mm2
Links = Y8-225

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-40

2C78 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 73.4 4.8 15.8 69.0 -7.7 -13.8
2 57.4 3.5 15.9 53.0 -4.3 -13.8
3 54.0 4.6 6.4 49.6 -7.5 -6.4
4 74.7 4.1 15.8 70.3 -7.7 -13.7
5 75.6 4.7 16.9 71.2 -7.7 -14.3
6 73.3 4.1 15.7 68.9 -7.4 -13.7
7 73.4 4.8 15.8 69.0 -7.7 -13.8
8 74.8 4.8 15.8 70.4 -8.1 -13.7
9 75.6 4.7 16.9 71.2 -7.7 -14.3
10 57.4 3.4 15.9 52.9 -4.3 -13.8
11 54.0 4.6 6.4 49.6 -7.5 -6.4
12 61.6 5.2 13.1 57.8 -7.8 -11.5
13 60.7 2.7 12.9 56.9 -5.0 -11.2
14 61.5 4.0 14.4 57.8 -6.4 -12.9
15 60.7 3.9 11.7 56.9 -6.4 -9.8
Critical Combination:9 - ((G+Q)P42 *F)
Min Design
N (kN) 75.6 - 75.6
M1 (kN.m) -7.7 -0.8 0.0 200
M2 (kN.m) 16.9 0.8 23.9
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.076 Le1/b1 = 9.8 < 15.0 200
Beta = 0.91 Le2/b2 = 9.8 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.9 / 9.4 kN As (Required): %2.19 876.43 mm2 4Y20
vc'(1/2)= 1.07 / 1.09 N/mm2 As (Provided): %3.14 1256.64 mm2
v (1/2)= 0.12 / 0.30 N/mm2
Links = Y8-225

2C79 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 195.5 -5.6 -6.4 191.1 8.7 6.2
2 200.6 -5.9 -6.3 196.2 10.0 6.1
3 160.8 -5.0 3.6 156.4 8.1 -2.6
4 162.5 -3.2 -5.6 158.1 4.0 5.4
5 169.7 -5.5 -14.4 165.3 8.6 13.1
6 195.5 -5.6 -6.5 191.1 8.7 6.3
7 195.5 -5.6 -6.4 191.1 8.7 6.2
8 162.5 -3.1 -5.6 158.1 3.9 5.4
9 169.7 -5.5 -14.4 165.3 8.6 13.1
10 200.6 -6.0 -6.3 196.2 10.0 6.1
11 160.8 -5.0 3.6 156.4 8.1 -2.5
12 162.1 -3.4 -5.3 158.3 5.8 5.1
13 163.0 -5.9 -5.4 159.2 8.6 5.3
14 162.5 -4.5 -3.6 158.7 7.1 3.4
15 162.5 -4.7 -7.1 158.8 7.3 7.0
Critical Combination:5 - ((G+Q)P22 *F)
Min Design
N (kN) 169.7 - 169.7
M1 (kN.m) 8.6 1.7 0.0 200
M2 (kN.m) -14.4 -1.7 -21.4
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.170 Le1/b1 = 9.7 < 15.0 200
Beta = 0.80 Le2/b2 = 9.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.6 / 8.7 kN As (Required): %1.30 520.41 mm2 4Y16
vc'(1/2)= 1.06 / 1.11 N/mm2 As (Provided): %2.01 804.25 mm2
v (1/2)= 0.14 / 0.28 N/mm2
Links = Y8-175

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-41

2C80 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 355.0 -1.5 -0.4 350.6 2.6 0.4
2 313.4 1.4 -0.3 309.0 -2.5 0.3
3 309.4 -1.1 14.4 304.9 2.2 -11.9
4 321.6 -3.7 -0.4 317.2 6.4 0.4
5 309.5 -1.8 -15.2 305.1 2.9 12.7
6 355.0 -1.5 -0.5 350.5 2.6 0.5
7 355.0 -1.5 -0.4 350.6 2.6 0.4
8 321.6 -3.6 -0.5 317.2 6.4 0.5
9 309.5 -1.8 -15.2 305.1 2.9 12.7
10 313.4 1.3 -0.3 309.0 -2.4 0.3
11 309.4 -1.1 14.4 304.9 2.2 -11.9
12 294.4 0.5 -0.2 290.6 0.4 0.2
13 294.3 -2.9 -0.5 290.6 3.9 0.5
14 294.4 -1.1 1.5 290.6 2.0 -1.6
15 294.4 -1.3 -2.2 290.6 2.3 2.2
Critical Combination:5 - ((G+Q)P22 *F)
Min Design
N (kN) 309.5 - 309.5
M1 (kN.m) 2.9 3.1 0.0 200
M2 (kN.m) -15.2 -3.1 -17.2
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.309 Le1/b1 = 9.6 < 15.0 200
Beta = 0.64 Le2/b2 = 9.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.1 / 8.9 kN As (Required): %1.07 429.06 mm2 4Y12
vc'(1/2)= 0.78 / 1.14 N/mm2 As (Provided): %1.13 452.39 mm2
v (1/2)= 0.00 / 0.28 N/mm2
Links = Y8-125

2C81 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 171.8 7.7 -0.4 167.4 -13.5 0.4
2 143.3 4.3 -0.3 138.9 -6.7 0.3
3 145.7 7.8 8.7 141.3 -13.4 -7.3
4 175.0 8.1 -0.5 170.6 -14.4 0.5
5 145.5 7.2 -9.5 141.1 -12.8 8.1
6 171.8 7.7 -0.5 167.4 -13.4 0.5
7 171.8 7.7 -0.4 167.4 -13.4 0.4
8 175.0 8.1 -0.5 170.6 -14.5 0.5
9 145.5 7.2 -9.5 141.1 -12.8 8.1
10 143.3 4.3 -0.3 138.9 -6.6 0.3
11 145.7 7.8 8.7 141.3 -13.4 -7.3
12 143.2 7.6 -0.2 139.4 -12.5 0.2
13 142.4 5.2 -0.5 138.6 -9.7 0.5
14 142.8 6.5 1.6 139.0 -11.2 -1.7
15 142.8 6.3 -2.3 139.0 -11.0 2.4
Critical Combination:5 - ((G+Q)P22 *F)
Min Design
N (kN) 145.5 - 145.5
M1 (kN.m) -12.8 -1.5 -20.7 200
M2 (kN.m) -9.5 -1.5 0.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.145 Le1/b1 = 9.8 < 15.0 200
Beta = 0.83 Le2/b2 = 9.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 6.7 / 5.6 kN As (Required): %1.33 530.00 mm2 4Y16
vc'(1/2)= 1.03 / 1.07 N/mm2 As (Provided): %2.01 804.25 mm2
v (1/2)= 0.21 / 0.18 N/mm2
Links = Y8-175

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-42

2C82 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 62.3 -3.7 -13.6 57.9 5.3 12.0
2 65.0 -3.8 -13.5 60.6 5.9 11.9
3 65.5 -3.2 -15.5 61.1 4.8 13.5
4 49.0 -2.2 -13.8 44.5 2.6 12.2
5 43.2 -4.0 -4.5 38.8 5.6 4.6
6 62.4 -3.8 -13.6 57.9 5.4 12.0
7 62.3 -3.7 -13.6 57.9 5.3 12.0
8 48.9 -2.1 -13.8 44.5 2.6 12.2
9 43.2 -4.0 -4.5 38.8 5.6 4.6
10 65.0 -3.9 -13.5 60.6 5.9 11.9
11 65.5 -3.2 -15.5 61.1 4.8 13.5
12 51.4 -1.8 -11.1 47.6 2.9 9.8
13 52.4 -4.4 -11.2 48.6 5.9 10.0
14 51.5 -2.9 -9.9 47.7 4.2 8.5
15 52.4 -3.3 -12.4 48.6 4.6 11.3
Critical Combination:11 - ((G+Q)P52 *F)
Min Design
N (kN) 65.5 - 65.5
M1 (kN.m) 4.8 0.7 0.0 200
M2 (kN.m) -15.5 -0.7 -19.9
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.066 Le1/b1 = 9.7 < 15.0 200
Beta = 0.92 Le2/b2 = 9.8 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.0 / 9.2 kN As (Required): %1.70 681.25 mm2 4Y16
vc'(1/2)= 0.91 / 0.95 N/mm2 As (Provided): %2.01 804.25 mm2
v (1/2)= 0.10 / 0.29 N/mm2
Links = Y8-175

2C83 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 158.7 -1.1 -29.1 154.3 1.7 25.4
2 135.2 0.8 -28.9 130.8 -1.3 25.2
3 163.1 -0.4 -32.3 158.7 1.0 27.6
4 139.7 -2.7 -29.1 135.3 4.1 25.3
5 124.8 -1.7 -10.8 120.4 2.3 10.7
6 158.7 -1.2 -29.2 154.3 1.8 25.5
7 158.7 -1.1 -29.1 154.3 1.7 25.4
8 139.7 -2.6 -29.1 135.3 4.0 25.4
9 124.8 -1.7 -10.8 120.4 2.3 10.7
10 135.2 0.8 -28.9 130.8 -1.3 25.2
11 163.1 -0.4 -32.3 158.7 1.0 27.6
12 131.8 0.9 -23.8 128.1 -0.4 20.8
13 131.8 -2.7 -24.0 128.0 3.2 21.0
14 131.4 -0.7 -22.6 127.6 1.2 19.4
15 132.2 -1.2 -25.2 128.4 1.7 22.4
Critical Combination:11 - ((G+Q)P52 *F)
Min Design
N (kN) 163.1 - 163.1
M1 (kN.m) 1.0 1.6 0.0 200
M2 (kN.m) -32.3 -1.6 -33.6
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.163 Le1/b1 = 9.6 < 15.0 200
Beta = 0.81 Le2/b2 = 9.8 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.2 / 19.0 kN As (Required): %2.90 1160.13 mm2 4Y20
vc'(1/2)= 1.17 / 1.23 N/mm2 As (Provided): %3.14 1256.64 mm2
v (1/2)= 0.07 / 0.61 N/mm2
Links = Y8-225

Project: Av_Offices_2
Mulondo Ivan (*1EE-3A9R-E633-KZMP)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-43

2C84 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 73.2 4.7 -16.5 68.8 -7.5 14.5
2 56.9 2.6 -16.4 52.5 -3.8 14.3
3 75.7 5.2 -17.6 71.2 -8.1 14.9
4 75.0 4.7 -16.6 70.5 -7.9 14.6
5 53.6 3.9 -7.1 49.2 -6.7 7.1
6 73.2 4.6 -16.6 68.8 -7.5 14.6
7 73.2 4.7 -16.5 68.8 -7.5 14.5
8 75.0 4.8 -16.6 70.6 -8.0 14.6
9 53.6 3.9 -7.1 49.2 -6.7 7.0
10 56.9 2.6 -16.3 52.5 -3.7 14.3
11 75.7 5.2 -17.6 71.3 -8.1 14.9
12 61.3 5.1 -13.5 57.5 -7.7 11.8
13 60.6 2.6 -13.7 56.8 -4.8 12.1
14 60.6 4.1 -12.2 56.8 -6.5 10.4
15 61.3 3.7 -14.9 57.5 -6.1 13.5
Critical Combination:11 - ((G+Q)P52 *F)
Min Design
N (kN) 75.7 - 75.7
M1 (kN.m) -8.1 -0.8 0.0 200
M2 (kN.m) -17.6 -0.8 -25.0
N-max (kN) 0.0
Concrete Cover = 25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.076 Le1/b1 = 9.8 < 15.0 200
Beta = 0.91 Le2/b2 = 9.8 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.1 / 9.7 kN As (Required): %2.33 930.37 mm2 4Y20
vc'(1/2)= 1.08 / 1.09 N/mm2 As (Provided): %3.14 1256.64 mm2
v (1/2)= 0.13 / 0.31 N/mm2
Links = Y8-225

Project: Av_Offices_2
Project: PROPOSED OFFICE BUILDING AT BWEYA, BUSILO COUNTY, WAKISO DISTRICT, PLOT 676, 400, 590, 1257 1339,
BLOCK 396 WAKISO DISTRICT
Section: HOLLOW BLOCK SLAB
Sheet: 1

REFERENCE
CALCULATION OUTPUT
BS 8110: Part 1: 1997
>>>>> Span of slab, L (m) = 4.3
>>>>> Depth of Slab, h (mm) = 250
>>>>> Width of Rib, r (mm) = 150
3.17 >>>>> Topping Thickness, t (mm) = 100
>>>>> Width of Flange, b (m) = 300
>>>>> Position of Rib termination from center of support, a (m) = 0.4
>>>>> Design Concrete Compression Strength, Fcu (N/mm²) = 25
>>>>> Design Steel Tensile Strength, Fy (N/mm²) = 410
>>>>> Concrete Cover to bottom Reinforcement, c (mm) = 25
>>>>> Design UNFACTORED DEAD load, gk (kN/m2) = 4.42
>>>>> Design UNFACTORED IMPOSED load, qk (kN/m2) = 2.5
Ultimate FACTORED load on flange, per m, w (kN/m) = 3.0564
3.6.3 Design Moment at Midspan, M (kNm) = 28.26
3.6.4 Design Shear Force, V (kN) = 5.35
d (mm) = h-cover-[1/2 x bar dia] = 217
d' (mm) = h-d = 33

3.6.3 / 3.4.4 BENDING REINFORCEMENT


3.4.4.4 k= 0.080
Check k: is k <= 0.156?
use k = 0.080

lever arm, z = 195.598


Maximum value of z, 0.95d = 206.150
use z = 195.598

Compression Reinforcement Required, As' (mm²) = 0


Tension Reinforcement Required, As (mm²) = 185

As' min needed (0.2% of bh) = 75


As min needed (0.13% of bh) = 48.75
As max needed = As' max needed (4% of bh) = 1500

>>>>> Provide For Compression PER RIB, As' (mm²) = 0T12 0


>>>>> Provide For Tension PER RIB, As (mm²) = 2T12 226
Project: PROPOSED OFFICE BUILDING AT BWEYA, BUSILO COUNTY, WAKISO DISTRICT, PLOT 676, 400, 590, 1257 1339,
BLOCK 396 WAKISO DISTRICT
Section: HOLLOW BLOCK SLAB
Sheet: 2
3.6.4 SHEAR REINFORCEMENT
3.6.4.2 Shear Stress at any given point, v (N/mm²) = 0.164
Lesser of 0.8√Fcu or 5N/mm² = 4.0
Check: v < 0.8√Fcu or 5N/mm² -----> OK

Table 3.8 Design Concrete Shear Stress, vc


100As/bd = 0.694
400/d = 1.843
Fcu/25 = 1.000
Partial Safety Factor, Ȣm = 1.25
vc (N/mm²) = 0.652
0.5vc = 0.326
vc + 0.4 = 1.052

Table 3.7 is v <=0.5vc ---> As/Sv = Nominal Links


is 0.5vc < v < vc + 0.4 ---> As/Sv = N/A
is v > vc + 0.4 ---> As/Sv = FALSE

3.4.5.5 Max'm Link Spacing, Sv (mm) = 162.75

>>>>> Provide Links: R8@200c/c, ---> As/Sv = 0.503

3.6.5 DEFLECTION
Longest Span, L (m) = 4.3
Table 3.9 >>>>> Basic Span/Eff depth Ratio = 26
Service Stress, fs (N/mm²) = 210.266
Table 3.10 >>>>> Modification Factor, MF = 1.004
Limiting Span/Eff depth Ratio = 26.093
Actual Span/Eff depth Ratio = 19.816

Check Deflection: Limiting Vs Actual -----> SLAB OK


Project: Av_Offices_2 - Mulondo Ivan (*1EE-3A9R-E633-KZMP)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-1

SLAB ANALYSIS AND DESIGN REPORT

NOTATION:
d/h = Effective/Total Depth of Slab (d=h-conc.cover)
g/q = Dead/Live Load (not factored)
L1 = Width of the Slab Along the Strip Direction
L2 = Width of the Slab Perpendicular to the Strip Direction
C = Moment Coefficient M=C p / L^2
M-spn = Ultimate Design Span Moment
M-sup = Ultimate Design Support Moment
Mc = Balanced Support Moment
As = Steel Area (Required/Supplied)

Material: C20/25 / Grade 410 (Type 2)

Slab Strip: X2 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.6Support As = 254.40/452.39 Top:Y12-250(T1)

1S1 1 5.400 3212.50 0.0519 0.0389 254.4/452.39


119/150 2.000 4700.00 5.8 4.3 Bottom: Y12-250(B1)
Deflection Check: L/d = 27.0 < 52.0 *** Sufficient ***

Support Mc = 5.8Support As = 254.40/452.39 Top:Y12-250(T1)

1S2 1 5.400 3212.50 0.0519 0.0389 254.4/452.39


119/150 2.000 4700.00 5.8 4.3 Bottom: Y12-250(B1)
Deflection Check: L/d = 27.0 < 52.0 *** Sufficient ***

Support Mc = 5.8Support As = 254.40/452.39 Top:Y12-250(T1)

Slab Strip: X3 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 3.6Support As = 254.40/452.39 Top:Y12-250(T1)

1S2 1 5.400 4700.00 0.0000 0.0240 254.4/452.39


107/150 2.000 3212.50 0.4 2.7 Bottom: Y12-250(B2)

Support Mc = 0.4Support As = 254.40/452.39 Top:Y12-250(T1)

Slab Strip: X4 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 3.6Support As = 254.40/452.39 Top:Y12-250(T1)

1S1 1 5.400 4700.00 0.0000 0.0240 254.4/452.39


107/150 2.000 3212.50 0.4 2.7 Bottom: Y12-250(B2)

Support Mc = 0.4Support As = 254.40/452.39 Top:Y12-250(T1)

Slab Strip: X5 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 1.0Support As = 254.40/452.39 Top:Y12-250(T1)

1S3 1 5.400 2200.00 0.0400 0.1250 254.4/452.39

Project: Av_Offices_2
Project: Av_Offices_2 - Mulondo Ivan (*1EE-3A9R-E633-KZMP)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-2

119/150 2.000 5200.00 2.1 6.5 Bottom: Y12-250(B1)


Deflection Check: L/d = 18.49 < 40.0 *** Sufficient ***

Support Mc = 2.1Support As = 254.40/452.39 Top:Y12-250(T1)

Slab Strip: X6 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.0Support As = 254.40/452.39 Top:Y12-250(T1)

1S3 1 5.400 5200.00 0.0000 0.0000 254.4/452.39


107/150 2.000 2200.00 0.0 0.0 Bottom: Y12-250(B2)

Support Mc = 0.0Support As = 254.40/452.39 Top:Y12-250(T1)

Slab Strip: X7 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.5Support As = 254.40/452.39 Top:Y12-250(T1)

1S3 1 5.400 1505.01 0.0000 0.1250 254.4/452.39


119/150 2.000 4900.00 0.5 3.0 Bottom: Y12-250(B1)
Deflection Check: L/d = 12.65 < 40.0 *** Sufficient ***

Support Mc = 0.5Support As = 254.40/452.39 Top:Y12-250(T1)

Slab Strip: X8 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.0Support As = 254.40/452.39 Top:Y12-250(T1)

1S3 1 5.400 4900.00 0.0000 0.0000 254.4/452.39


107/150 2.000 1505.01 0.0 0.0 Bottom: Y12-250(B2)

Support Mc = 0.0Support As = 254.40/452.39 Top:Y12-250(T1)