You are on page 1of 5

A DCE EC FAZ 24-Aug-2018 ISSUE FOR REVIEW

REV BY CHK'D APPR. DATE DESCRIPTION

CUSTOMER: PROJECT:
Shell Upstream Americas Shell Upstream CPF IBE

PLANT: SHELL DIN Nº:


SB / CDL / CASO, Neuquén SOV-1008-MS-2105-0003

TITLE: HYTECH Doc. Nº: REVISION

CPF-V-1265/75 - FG Scrubbers N/A


Data Sheet SCALE:

N/A
A
THIS MATERIAL IS CONFIDENTIAL FOR USE ONLY BY PERSONNEL WITHIN YOUR ORGANIZATION REQUIRING THE INFORMATION. IT SHALL NOT BE REPRODUCED IN ANY MANNER OR
DISTRIBUTED OUTSIDE YOUR ORGANIZATION FOR ANY PURPOSE WHAT SO EVER EXCEPT BY WRITTEN PERMISSION OF HYTECH INGENIERIA S.A.
DATE: 24-Aug-2018 Nº REV.
SHEET: 2 of 5
DATASHEET SOV-1008-MS-2105-0003 A
PLANT:
SB / CDL / CASO, Neuquén
PROJECT:
Shell Upstream CPF IBE
DOCUMENT:
CPF-V-1265/75 - FG Scrubbers Data Sheet
1 GENERAL
2 Plant/Process Unit SBCDL / CASO CPF Location Neuquen
3 Service CPF-V-1265/75 - FG scrubbers Quantity 2
4 Applicable to l Proposal  Purchase  As Built
5 Client/Agent Shell Upstream Manufacturer/Vendor -
6 Model and/or Type Vertical Vessel
7 Information to be completed by  Client n Vendor r Client/Vendor as applicable
8 GENERAL
9 Head Type: Semielliptical 2:1 Volume: (HOLD 1) m3
10 Sandblast/Internal Painting: Yes (Note 8) Empty Weight: (HOLD 1) kg
11 Sandblast/Painting/Ext. Coating: No (Note 8) Hydrostatic Test Weight: (HOLD 1) kg
12 Insulation: No Operating Weight: (HOLD 1) kg
13 Tracing: No Shipping Weight:
depe (HOLD 1) kg
14 Fireproofing: No
15 Client Specification: (Note 10)
16 Other Specifications: (Note 7)
17 OPERATING CONDITIONS
18 Operating Pressure: 5.0 barg Heavy Liquid Design Case: Raw Gas
19 Operating Temperature: 35.0 ºC Flow Rate (Design): 0.004 Sm3/h
20 Gas Design Case: SUMMER Mass Flow Rate: 4 kg/h
21 Flow Rate (Design): 3,668 Sm3/d Density: 1,026 kg/m3
22 Mass Flow: 150 kg/h Viscosity: 1.750 cP
23 Molecular Weight: 23.2 Surface Tension: 76.4 Dyn/cm
24 Density: 5.6 kg/m3 Foams: No
25 Viscosity: 0.011 cP Solids: Yes
26 Light Liquid Design Case: Raw Gas CO2/H2S content 0.0 / 0.0 %mole
27 Flow Rate (Design): 0.008 Sm3/h Operative Range: - %
28 Mass Flow: 6 kg/h Corrosive Agents: -
29 Density: 654 kg/m3 Residence Time: - min
30 Viscosity: 0.3 cP
31 Surface Tension: 22.4 Dyn/cm
32 DESIGN CONDITIONS
33 Design Pressure: 12.0 barg @ 65 °C Post Weld Heat Treatment req'd: Acc. to Code
34 Min. Design Temperature: -20 °C @ 12.0 barg Radiography req'd: RT-1
35 Corrosion Allowance: 1.6 mm NACE MR-01-75 req'd: No
36 Design Code: ASME VIII Div 1 Special Requirements: No
37 Stamp: NO Basic Design Loads: (NOTES 2, 3, 4)
38 "National Board" Registration: NO
39

40 INTERNALS
41 Demister: Coalescer: Type: -
42 Type: - Shape: - Size: -
43 Size: - Thickness: - mm
44 Thickness: - mm Material: -
45 Material: - Coil: Design Pressure: - barg @ - °C
46 Flow Distribution: - Diam. - mm Turns Qty. -
47 Flow Direction: - Corrosion Allowance: - mm
48 - Others: -
49

50 VESSEL DIMENSIONS OTHER REQUIREMENTS


51 Shell (ID x Lss): 203 x 1900 mm x mm Instrument Clips: Yes (Note 1)
52 Shell/Head Thk. 8.179 Stairs/Platform Clips: No
53 Boot (ID x Hts): - mm x mm Insulation/Fireproofing Clips: No
54 Boot/Head Thk. - Earthing: Yes
55 Dome (ID x Hts): - mm Cathodic Protection: No
56 Dome/Head Thk. - Others: No
57

58
59

60
DATE: 24-Aug-2018 Nº REV.
SHEET: 3 of 5
DATASHEET SOV-1008-MS-2105-0003 A
PLANT:
SB / CDL / CASO, Neuquén
PROJECT:
Shell Upstream CPF IBE
DOCUMENT:
CPF-V-1265/75 - FG Scrubbers Data Sheet
1 CONSTRUCTIVE MATERIALS
2 Shell: SA-106 B Internals:
3 Body Flanges: - Wave Breaker: -
4 Body Gaskets: - Inlet Deflecting Plate: -
5 Heads SA-234 WPB Vortex Breaker: -
6 Nozzle Necks: SA-106 B Weir Plate: -
7 Nozzle Flanges: SA-105 Demister: -
8 Nozzle Reinforcement: SA-516 70 Coalescer: -
9 Nozzle Gaskets: Spiral Wound AISI 316 Graphite Supports: -
10 Fittings: SA-234 WPB Bolts / Nuts: -
11 Bolts / Studs: SA 193 B7 Coil: -
12 Nuts: SA 194 2H Distributor: -
13 Saddles-Skirt / Reinf.: SA-516 70 / SA-36 Perforated Plate: -
14 Insulation Rings / Clips: - Outlet Deflecting Plate: -
15 Lifting Lugs / Reinf.: SA-516 70 / SA-36 (Note 1) Sand Washing system: -
16 Earthing / Reinf.: AISI 304 Other: -
17 Davit: -
18 NamePlate / Support: AISI 304
19

20 NOZZLES
21 Tag Qty. NPS Type Rating Sch. Service Notes
22 A 1 2" WNRF 150# (HOLD 1) FEED INLET
23 B 1 2" WNRF 150# (HOLD 1) GAS OUTLET
24 C 1 2" WNRF 150# (HOLD 1) CONDENSATE OUTLET
25 D 1 2" WNRF 150# (HOLD 1) DRAIN
26 F 1 2" WNRF 150# (HOLD 1) VENT
27 G1/2 2 2" WNRF 150# (HOLD 1) GLASS LEVEL INDICATOR
28 L1 1 3" WNRF 150# (HOLD 1) LEVEL TRANSMITTER (SAFETY)
29 L2 1 4" WNRF 150# (HOLD 1) LEVEL TRANSMITTER
30 P 1 2" WNRF 150# (HOLD 1) PRESSURE INDICATOR
31 S 1 2" WNRF 150# (HOLD 1) PSV
32 T 1 1½" WNRF 150# (HOLD 1) TEMPERATURE INDICATOR
33

34
35

36
37

38
39

40
41

42
43

44
45

46
47

48
49

50
51

52
53

54
55

56
57

58
59

60
DATE: 24-Aug-2018 Nº REV.
SHEET: 4 of 5
DATASHEET SOV-1008-MS-2105-0003 A
PLANT:
SB / CDL / CASO, Neuquén
PROJECT:
Shell Upstream CPF IBE
DOCUMENT:
CPF-V-1265/75 - FG Scrubbers Data Sheet
1 REFERENCE DOCUMENTS
2 1. Basis of Design - SOV-1008-AA-7704-0006
3 2. Heat And Material Balance - SOV-1008-PX-1216-0003
4 3. P&IDs - SOV-1008-PX-2365-0057/0058
5 4. Mechanical Requirements for Packaged Equipment - SOV-1008-MX-7770-0001
6 5. CPF-V-1265/75 - FG scrubbers - Detail GA Drawings - SOV-1008-MS-4018-0011
7 6. Painting Specification SOV-1008-RA-7754-0001
8 7. General Mechanical Vessels Technical Specification SOV-1008-MS-7771-0001
9

10
11 APPLICABLE CODES, STANDARDS AND SPECIFICATIONS
12 ASME BPVC - Last Edition
13 Welding Research Council bulletin 107 (WRC-107)
14 CIRSOC 102 - 2005
15 CIRSOC 103 - 1991
16 CIRSOC 104 - 2005
17

18
19

20
21 OTHER SPECIFICATIONS
22 PRS Specification for surface facilities for North American Onshore Unconventionals - PRS 39.01.40.10-Gen
23

24
25

26
27

28 HOLDS
29 1. To be defined in next revision, according to Mechanical Design.
30
31

32
33

34
35

36 NOTES
37 (1) If required, pads shall be SA-516 70 with a thickness not greater than shell thickness.
38 (2) Wind Loads According to CIRSOC 102 (2005):
39 - Zone: Neuquén
40 - β = 48 m/s
41 - Category 3
42 - Exposure Category C
43 (3) Earthquake Design according to CIRSOC 103 (1991/2005):
44 - Zone: Añelo
45 - Seismic zone: Zone 1
46 - Group A0
47 - Risk Factor: γd = 1.4
48 - Soil Classification: Type II
49 (4) Environmental effects according to CIRSOC 104 (2005):
50 - External load: Snow - 90kg/m2
51 - Category 3
52 (5) See connections orientation in CPF-V-1265/75 - FG scrubbers - Detail GA Drawings - SOV-1008-MS-4018-0011
53 (6) Latest editions of applicable international codes and standards shall be applied.
54 (7) See General Mechanical Vessels Technical Specification, & Mechanical Requirements for Packaged Equipment
55 SOV-1008-MX-7770-0001.
56 (8) According to Painting Specification SOV-1008-RA-7754-0001.
57 (9) All dimensions are in millimeters. Elevations are referred to internal vessel bottom tangent line (BTL).
58 (10) See PRS Specification for surface facilities for North American Onshore Unconventionals - PRS 39.01.40.10-Gen
59

60
61
DATE: 24-Aug-2018 Nº REV.
SHEET: 5 of 5
DATASHEET SOV-1008-MS-2105-0003 A
PLANT:
SB / CDL / CASO, Neuquén
PROJECT:
Shell Upstream CPF IBE
DOCUMENT:
CPF-V-1265/75 - FG Scrubbers Data Sheet
1 SKETCH (Notes 5 & 9)
2
3

4
5

6
7

8
9

10
11

12
13

14
15

16
17

18
19

20
21

22
23

24
25

26
27

28
29

30
31

32
33

34
35

36
37

38
39

40
41

42
43

44
45

46
47

48
49

50
51

52
53

54
55

56
57

58

59

60

You might also like