INDIAN RAILWAYS
SCHEDULE OF TECHNICAL REQUIREMENT FOR
REHABILITATION OF BOXN WAGONS
FOR
BROAD GAUGE-1676 mm
ISSUED BY
June,2016 Price:
NO. WD-12-BOXN (Rehab.)-2006(Rev-1)
The following amendment is issued with the approval of the competent authority:
x-x-x
NO. WD-12-BOXN (Rehab.)-2006(Rev-1)
CONTENTS
1. Scope 3
2. Work Details 4
3. Under frame repair 4
4. Wagon Body 5
5. Air Brake 6
6. Other Technical Requirements 6
7. Painting and Marking 7
8. Testing 7
9 Inspection 7
10 Annexure-I 9
11 Annexure-II 10
12 Annexure-III 11
Page 2 of 11
NO. WD-12-BOXN (Rehab.)-2006(Rev-1)
INDIAN RAILWAYS
PARTICULAR SPECIFICATION
FOR
SCHEDULE OF TECHNICAL REQUIREMENT FOR
REHABILITATION OF BOXN WAGON
(FITTED WITH AIR BRAKE SYSTEM)
1.0 SCOPE
1.1 This specification covers the technical requirements for the
rehabilitation of BOXN wagons. The work involves fabrication of
new side walls, end walls (condition basis), replacement of floor
plate, doors, damaged under frame members and fitment of feed
pipe (to convert the wagon from single pipe to twin pipe). To
ensure good quality of welding, it is essential to install the wagon
on manipulator for undertaking this work so that horizontal down
hand welding can be performed to the maximum extent. The top
and bottom centre pivots will also require replacement and fixing
with Lock bolts. The bogie, air brake equipment and pipes,
draft gear and couplers including uncoupling gear and
brake gear of the existing wagons will be retained. In case
any of these components are missing or damaged, they will
have to be replaced.
Preferably BOXN Wagons in age group of 18-22 years should be
taken up for this rehabilitation unless condition of a particular
wagon so dictates and the BOXN wagons in age group 12-18
years should be taken up for upgraded rehabilitation using RDSO
Specification WD-16-BOXNR-2010 (Rev-1).
Page 3 of 11
NO. WD-12-BOXN (Rehab.)-2006(Rev-1)
2.2 Wagons provided with single pipe shall be converted into Twin pipe
Air brake system to RDSO drawing no-WD-80007-S-12 (Sheet 1of
2) & WD-80007-S-12 (Sheet 2 of 2)
2.3 Strip off side walls, end walls (if found damaged/repaired) and floor
plate completely by cutting carefully from under frame and carry
out measurement of camber.
3.1 The wagon taken up for rehabilitation will have to be checked for
camber before rehabilitation. The camber of the wagon under frame
should not be sagging. Before repairing of the under frame of the
wagon it will be shot blasted or mechanically cleaned so that all
scales, rusts etc. is removed. On the basis of physical condition of
the members these will be replaced with new one as per Design
Drg. No. WD-80007-S-04.The repair work of under frame/welding
shall be carried out with the help of manipulator to ensure down
hand welding.
Generally sole bar over the doorways are found corroded. As such
a protection plate of size 3.15x295x1384 mm and material to
IS:1079 Gr `O` with Cu shall be welded on the sole bar over the
door way portion on all the wagons as shown in RDSO Drg.
No.WD-80007-S-14. When the thickness of the web of the sole bar
is reduced by more than 2 mm but less than 5 mm, then a 5 mm
thick protection plate of size 240 x 1454 mm to IS:2062 E 250
shall be welded. Before application of protection plate, sole bar
outer surface shall be thoroughly scrapped and cleaned of rust,
scale or dirt and properly dressed. On provision of protection plate,
the existing 5 mm thick door hinge packing (item-16 of Drg. No.
WD-90007-S-1) shall be replaced by a packing of suitable
Page 4 of 11
NO. WD-12-BOXN (Rehab.)-2006(Rev-1)
3.2 When sole bar web thickness is found to be less than 4 mm, it
shall be replaced by a new one to Drg . No. WD-80007-S-14.
4.0 Wagon Body
4.1 Body side wall
4.2 Body end wall: Examine the End Wall as per parameters
mentioned at Annexure- III , If the End wall qualifies on the
parameters than the same shall be retain otherwise the complete
body end arrangement shall be replaced with new one as per
RDSO Drg.No.WD-80007-S-06.Material specifications of different
items are given in the drawing. The body end complete shall be
manufactured on a suitable welding fixture to ensure down hand
welding and then assembled with the under frame. However, for
assembly of corner stanchion with body side Para 4.5 will be
followed.
4.3 Flap doors: The middle doors of side walls to be closed. On each
side wall end flap doors (2 Nos.) complete shall be replaced by a
new flap doors as shown in RDSO Drg. No.WD-90007-S-1. The
material specifications of different items are shown in the drawing.
Page 5 of 11
NO. WD-12-BOXN (Rehab.)-2006(Rev-1)
The assembly of body side/body end with the under frame shall be
with riveted/Lock bolted joint as shown in RDSO Drg. WD-80007-
S-05 and WD-80007-S-06. The assembly of body side with corner
stanchion and side wall top coping with end top coping shall be
with welded joint and welding shall be carried out on manipulator
to ensure down hand welding.
4.6 The design of top and bottom centre pivot shall be as per
drawing No. WD-85079-S-2, Item-2 & 1 respectively.
5.0 AIR BRAKE
8.0 TESTING
The pattern wagon shall be tested as detailed in Clause 12 of
General Standard Specification No. G-72 (Latest Revision).
Clearance found between various members of under frame
and bogie shall be measured under tare, fully loaded,
overloaded and unloaded condition and submitted to the
Engineers through the Inspecting Officer.
9.0 INSPECTION
9.1 The entire rehabilitated wagon will be inspected and replacements
made their in along with measurements recorded in separate
measurement book. The inspection of the wagon with all its
fittings shall be done by NTXR as per extant procedure.
Page 7 of 11
NO. WD-12-BOXN (Rehab.)-2006(Rev-1)
9.4 Rehab wagon needs to give trouble free residual service, over
their stipulated codal life. Any major repairs/ NPOH marking, in
rehab wagons, needs, be reported to the shop which had
undertaken the rehab and these repairs also reporting CRIS to
include this in FMM and WISE. Till such time FMM is fully
functional, these repairs reports send to rebuilding Workshop and
RDSO.
*****
Page 8 of 11
NO. WD-12-BOXN (Rehab.)-2006(Rev-1)
Annexure-I
Page 9 of 11
NO. WD-12-BOXN (Rehab.)-2006(Rev-1)
Annexure-II
Page 10 of 11
NO. WD-12-BOXN (Rehab.)-2006(Rev-1)
Annexure-III
Page 11 of 11