Professional Documents
Culture Documents
d) When was EIA first started in India and for what type of
projects ?
f) When was original EIAnotification superseded and why ? 8. a) Explain ‘biomagnification’ using D.D.T. as the polluting
agent. Also give some examples of better alternative for
g) What is the composition of EAC or SEAC ?
pest control. 7
h) What must be added with draft EIA report to prepare the
final report ? b) Explain the term ‘bilgeochemical cycles’ and compare the
two basic groups of these cycles.
i) What is an EMP ?
Also discuss with a neatly labelled sketch the functioning
j) What may be the main hindrance in achieving the goal of
of a ‘sulfur’ cycle. 9
sustainable development through an EIA study ?
2510=20
2. a) Mention threshold values for ‘mining of minerals’ and
‘coal-fired thermal power plants’.
Answer any three questions. iv) A 1.0 million to/annum production capacity cement
Two marks for neatness. plant. 4+3+2+2+4=15
5. a) Describe the scope and objectives of ecological study. 3. a) Draw a flow chart showing EC procedure for an industrial
8 activity.
b) Describe with a sketch the importance of estuarine b) Why is ‘screening’ so named and how is it done ?
environment. Explain why it is more productive than the
adjacent ecosystems. 8 c) What is ‘scoping’ ? How may it save time and money of
an EIA study ?
6. a) Explain why unsubsidised solar powered ecosystems are
highly valued from human interest standpoint. 7 d) Write a brief note on ‘base line standard’. 5+3+4+3=15
b) Explain in detail the flow of energy in an ecosystem with a 4. a) What may be the role of ‘public consultation’ in a
typically Labelled energy flow diagram showing tropic successful in EIA study ?
levels in a linear food chain. 9 b) Describe the ‘appraisal’ step of EIA including the time
7. a) Explain the term food chain with the two types and available for it.
compare them. Describe a grazing food chain with a c) What do you know about the ‘validity’ of EC ? Is it
labelled compartment model for a typical firm pond transferable ?
managed for sport fishing. 9
d) What are the two types of monitoring to be done for EIA
b) Compare naturally subsidised and fuel subsidised solar and what are the basic differences between them ?
powered ecosystem. 7 4+4+3+4=15
[ Turn over