Ex/CE/T/416(e)/12/2014

BACHELOR OF ENGINEERING IN CIVIL ENGINEERING


EXAMINATION, 2014
( 4th Year, 1st Semester )
ECOLOGY AND ENVIRONMENTAL MANAGEMENT
Time : Three hours Full Marks : 100
( 50 marks for each Part )
Use a separate Answer-Script for each Part
PART - I
Attempt question no. 1 and any two from the rest.
Answers should be brief.

1. a) Mention the type of minimisation achieved through EIA,


with reasons.

b) Why is mathematical modeling essential for performing


EIA ?

c) Mention the basic differences between Environmental


Audit and EIA (be very brief).

d) When was EIA first started in India and for what type of
projects ?

e) When was EIA first legally implemented in India and


under which law ?
[ Turn over
[2] [5]

f) When was original EIAnotification superseded and why ? 8. a) Explain ‘biomagnification’ using D.D.T. as the polluting
agent. Also give some examples of better alternative for
g) What is the composition of EAC or SEAC ?
pest control. 7
h) What must be added with draft EIA report to prepare the
final report ? b) Explain the term ‘bilgeochemical cycles’ and compare the
two basic groups of these cycles.
i) What is an EMP ?
Also discuss with a neatly labelled sketch the functioning
j) What may be the main hindrance in achieving the goal of
of a ‘sulfur’ cycle. 9
sustainable development through an EIA study ?
2510=20
2. a) Mention threshold values for ‘mining of minerals’ and
‘coal-fired thermal power plants’.

b) Name three projects or activities for which all projects


belong to ‘A’ Category project.

c) Write about the application procedure for EC of the


construction projects.

d) What are the basis of categorization of projects into ‘A’


and ‘B’ categories ?

e) Say the category of following projects :

i) A 30 MW hydroelectric power projects.

ii) A 350 TPD chlor-alkali industry located inside a


notified area.
[4] [3]

PART - II iii) A 30 KLD molasses based distillery.

Answer any three questions. iv) A 1.0 million to/annum production capacity cement
Two marks for neatness. plant. 4+3+2+2+4=15

5. a) Describe the scope and objectives of ecological study. 3. a) Draw a flow chart showing EC procedure for an industrial
8 activity.
b) Describe with a sketch the importance of estuarine b) Why is ‘screening’ so named and how is it done ?
environment. Explain why it is more productive than the
adjacent ecosystems. 8 c) What is ‘scoping’ ? How may it save time and money of
an EIA study ?
6. a) Explain why unsubsidised solar powered ecosystems are
highly valued from human interest standpoint. 7 d) Write a brief note on ‘base line standard’. 5+3+4+3=15

b) Explain in detail the flow of energy in an ecosystem with a 4. a) What may be the role of ‘public consultation’ in a

typically Labelled energy flow diagram showing tropic successful in EIA study ?

levels in a linear food chain. 9 b) Describe the ‘appraisal’ step of EIA including the time

7. a) Explain the term food chain with the two types and available for it.

compare them. Describe a grazing food chain with a c) What do you know about the ‘validity’ of EC ? Is it
labelled compartment model for a typical firm pond transferable ?
managed for sport fishing. 9
d) What are the two types of monitoring to be done for EIA
b) Compare naturally subsidised and fuel subsidised solar and what are the basic differences between them ?
powered ecosystem. 7 4+4+3+4=15