SURFACE PREPARATION & PAINT

INSPECTION REPORT
(QC-V-PAİNT)

Project : Port Fertilizer, Phosphoric Acid Project And Auxiliary


Unit : Client:
Buildings

Report No: Date: Test Package :

Form No: Sub.System No: Line No. :

Inspection Plan : Procedure :


DFT Standard Reference : 12944-7 DFTAcceptance Criteria :
APPLICATION METHOD TESTEX
Blasting Standard ISO 8503-1-2-5 Acc ¨ Rej ¨ N/A ¨
Blasting Air Cleanliness Test ASTM D 4285 Acc ¨ Rej¨ N/A ¨
Mechanical Cleaning SSPC SP-1-2-3 Yes ¨ No ¨
Paint Application Airles Yes ¨ No ¨ Brush/Roller Yes ¨ No ¨

SURFACE INTERMEDIATE INTERMEDIATE


PRIMER COAT TOP COAT
PREPARATION COAT 1 COAT 2
APPLICATION DATE /TIME
AMBIENT TEMPERATURE (°C) °C
RELATIVE HUMUDITY (% RH) %RH
SURFACE TEMP / DEW POINT (°C) °C °C
PAINT ID/BATCH NO.
Comp A
Comp B
PAINT MANUFACTURE E. DATE
THINNER BRAND NAME
THINNER BATCH NO
THINNER MANUFACTURE E.DATE
WET FILM THICKNESS

Paint Surface Avrg. Thk. Avrg. Thk. Avrg. Thk. Avrg. Thk.
No Item No. / İso No. Weld No Visual Visual Visual Visual Visual
Sys. Profile (Micron) (Micron) (Micron) (Micron)
1 µm µm µm

2 µm µm µm

3 µm µm µm

4 µm µm µm

5 µm µm µm

6 µm µm µm

7 µm µm µm

8 µm µm µm

9 µm µm µm

INSPECTION NOTIFICATION REFERANCE


S/H/F RFI NO:
ACC: Accepted, REJ : To be repaired.
COMPANY Sub-cont. QC Contractor Client REMARKS OF
THE COMPANY
NAME INSPECTOR :
DATE

Page 1
SURFACE PREPARATION & PAINT
INSPECTION REPORT
(QC-V-PAİNT)

Project : Port Fertilizer, Phosphoric Acid Project And Auxiliary


Unit : Client:
Buildings

Report No: Date: Test Package :

Form No: Sub.System No: Line No. :

SIGNATURE
CERT NO

Ref. ITP No:

Page 2