Pay Item No. Item Description Unit 30mtr Quantity Rate (Rs.) Amount (Rs.)
107a Structural excavation in common material. C.M - 0.00 360.92 0
107d Granular backfill C.M 434.98 457.00 1,506.40 688,425
Cast-in-place concrete piles dia as per drawings (excluding
reinforcement).
a Test piles dia as per drawings (excluding reinforcement)
407d3 Cast in Place concrete piles upto 1.1-1.5 M dia in Normal Soil (Boring only) M 11.00 12.00 12,163.40 145,961
406i Neoprene Bearing Strip thickness s per drawings & specification S.M 7.26 8.00 1,962.36 15,699
407m Pile Load Test upto 900 TON Each 1.00 1.00 1,350,000.00 1,350,000
407n Pile Load Test upto 1200 TON Each 0.00 1,800,000.00 0
407p Pile Integrity test (sonic integrity) on all working piles Each 8.00 8.00 3,000.00 24,000
407qi Cross Hole Sonic Logging Test including G.I.pipes and grouting complete in Each 1.00 1.00 143,000.00 143,000
all respect as per drawings and specification (on test piles only)
406cv Expansion joint Monobolic type 65mm Movement (USA/EU Make) M 25.54 27.00 53,623.93 1,447,846
509c Rip Rap Class C C.M - 0.00 2,014.39 0
509e Grouted Rip Rap Class B C.M 256.80 270.00 4,730.47 1,277,227
509h Filter Layer of Granular Material C.M 102.72 108.00 1,668.47 180,195
SP-614a G.I. drain pipes (100mm diameter ) as per drawings M 0.00 1,948.44 0
SP-614b G.I. drain pipes (75mm diameter ) as per drawings M 4.80 5.00 1,500.00 7,500
Flood Protection Wall
401f Lean concrete C.M 17.05 18.00 5,906.03 106,309
507a Steel Wire Mesh For Gabion Kg 3,262.81 3,426.00 165.47 566,900
507b Rock Fill in Gabion C.M 701.68 737.00 1,144.36 843,393
TOTAL BILL NO. 4D: STRUCTURES (BRIDGES) (RS) 28,685,994
CONSULTANCY SERVICES FOR FEASIBILITY STUDY AND DETAILED DESIGN FOR METALLED ROAD FROM MOTORWAY INTERCHANGE KATHA LILLA UPTO MIANWALI VIA NALI, KUND, JABBI, WARCHA,
GOLEWALI, CHIDDRU, MUSAKHEL AND MIANWALI 0+000 KM - 40+000 KM (40 KM)
Pay Item No. Item Description Unit 20 mtr Quantity Rate (Rs.) Amount (Rs.)
107a Structural excavation in common material. C.M 181.50 191.00 360.92 68,936
107d Granular backfill C.M 434.98 457.00 1,506.40 688,425
Cast-in-place concrete piles dia as per drawings (excluding
reinforcement).
a Test piles dia as per drawings (excluding reinforcement)
407d3 Cast in Place concrete piles upto 1.1-1.5 M dia in Normal Soil (Boring only) M 7.20 8.00 12,163.40 97,307
406i Neoprene Bearing Strip thickness s per drawings & specification S.M 7.26 8.00 1,962.36 15,699
407m Pile Load Test upto 900 TON Each 1.00 1.00 1,350,000.00 1,350,000
407n Pile Load Test upto 1200 TON Each 0.00 1,800,000.00 0
407p Pile Integrity test (sonic integrity) on all working piles Each 12.00 12.00 3,000.00 36,000
407qi Cross Hole Sonic Logging Test including G.I.pipes and grouting complete in Each 1.00 1.00 143,000.00 143,000
all respect as per drawings and specification (on test piles only)
406cv Expansion joint Monobolic type 65mm Movement (USA/EU Make) M 25.54 27.00 53,623.93 1,447,846
509c Rip Rap Class C C.M - 0.00 2,014.39 0
509e Grouted Rip Rap Class B C.M - 0.00 4,730.47 0
509h Filter Layer of Granular Material C.M - 0.00 1,668.47 0
SP-614a G.I. drain pipes (100mm diameter ) as per drawings M 0.00 1,948.44 0
SP-614b G.I. drain pipes (75mm diameter ) as per drawings M 3.20 3.00 1,500.00 4,500
Flood Protection Wall
401f Lean concrete C.M 5,906.03 6,201.00 5,906.03 36,623,292
507a Steel Wire Mesh For Gabion Kg 165.47 174.00 165.47 28,792
507b Rock Fill in Gabion C.M 1,144.36 1,202.00 1,144.36 1,375,521
TOTAL BILL NO. 4D: STRUCTURES (BRIDGES) (RS) 76,599,455
BRIDGE NO
MEASUREMENT SHEET
BILL NO.4
Steel
Sr. No. Pay Item No. Item Description Unit NOS L B H/D QTY
Concrete Kg/cum Ton
107a Structural Excavation in Common Material. CM
Retaining wall footing 4 4 3.9 0.8
2 12.1 5 1.5 181.5
181.50
TOTAL
434.98
8.14
97.63
42.93
8.17
Back wall
CM 2 13.800 0.40 3.800 41.95 45.68 150.00 6.85
Backwall tappered
CM 2 13.800 0.30 0.450 3.73 0.00
Side wall/curtain wall/Champher abutment transom
CM 4 1.750 0.20 0.30 0.42 0.42 150.00 0.06
Side wall/curtain wall/Champher pier transom
CM 0 1.700 0.20 0.30 0.00 0.00 150.00 0.00
Small shear keys Abutment
CM 8 1.750 0.30 0.60 2.52 2.52 150.00 0.38
Large shera keys abutment
CM 0.00 0.00 150.00 0.00
Small shear keys piers
CM 0 1.750 0.30 0.60 0.00 0.00 150.00 0.00
Large shear keys piers
CM 0.00 0.00 150.00 0.00
Concrete pads
CM 10 0.650 0.55 0.06 0.22 0.22 150.00 0.03
Wing walls
CM 4 2 0.500 3.80 15.20 26.40 150.00 3.96
Piers Columns/shafts
CM 12.00 2.00 A 1.13 27.12 27.12 180.00 4.88
Retaining wall
CM 2.00 12.10 0.85 8.50 174.85 175.39 200.00 35.08
TOTAL 418.60
Retaining wall footing CM 2 12.10 5.50 1.50 199.65 199.65 200.00 39.93
78.21
MEASUREMENT SHEET
BILL NO.4
Steel
Sr. No. Pay Item No. Item Description Unit NOS L B H/D QTY
Concrete Kg/cum Ton
26.61
MEASUREMENT SHEET
BILL NO.4
Steel
Sr. No. Pay Item No. Item Description Unit NOS L B H/D QTY
Concrete Kg/cum Ton
404b Reinforcement in including Piles as per AASHTO
M31.
4,150.13 4.15
406i Neoprene Bearing Strip 10mm thick as per drawing SM 2 12.10 0.30 7.26 7.26
407qi Cross Hole Sonic Logging Test (on test piles only)
NO 1 1.00
0.00
0.00
0.00
MEASUREMENT SHEET
BILL NO.4
Steel
Sr. No. Pay Item No. Item Description Unit NOS L B H/D QTY
Concrete Kg/cum Ton
107a Structural Excavation in Common Material. CM
Retaining wall footing 4 4 3.9 0.8
0 13.8 2.3 1.8 0
-
TOTAL
434.98
12.43
99.44
47.89
8.17
Back wall
CM 2 13.800 0.40 3.800 41.95 45.68 150.00 6.85
Backwall tappered
CM 2 13.800 0.30 0.450 3.73 0.00
Side wall/curtain wall/Champher abutment transom
CM 4 1.750 0.20 0.30 0.42 0.42 150.00 0.06
Side wall/curtain wall/Champher pier transom
CM 0 1.700 0.20 0.30 0.00 0.00 150.00 0.00
Small shear keys Abutment
CM 8 1.750 0.30 0.60 2.52 2.52 150.00 0.38
Large shera keys abutment
CM 0.00 0.00 150.00 0.00
Small shear keys piers
CM 0 1.750 0.30 0.60 0.00 0.00 150.00 0.00
Large shear keys piers
CM 0.00 0.00 150.00 0.00
Concrete pads
CM 10 0.650 0.55 0.06 0.22 0.22 150.00 0.03
Wing walls
CM 4 2 0.500 3.80 15.20 26.40 150.00 3.96
Piers Columns/shafts
CM 8.00 2.00 A 1.13 18.08 18.08 180.00 3.25
Retaining wall
CM 4.00 4.00 0.50 5.00 0.00 200.00 0.00
TOTAL 261.40
126.65
MEASUREMENT SHEET
BILL NO.4
Steel
Sr. No. Pay Item No. Item Description Unit NOS L B H/D QTY
Concrete Kg/cum Ton
15.61
MEASUREMENT SHEET
BILL NO.4
Steel
Sr. No. Pay Item No. Item Description Unit NOS L B H/D QTY
Concrete Kg/cum Ton
404b Reinforcement in including Piles as per AASHTO
M31.
6,126.38 6.13
406i Neoprene Bearing Strip 10mm thick as per drawing SM 2 12.10 0.30 7.26 7.26
407qi Cross Hole Sonic Logging Test (on test piles only)
NO 1 1.00
256.80
0.00
102.72