PROJECT

PT. SIIX EMS INDONESIA EXPANSION FACTORY

LOCATION

JL. MALIGI VIII LOT S-4, KAWASAN INDUSTRI KIIC


WEST JAVA - INDONESIA
1. PROJECT OUTLINE
PROJECT INFORMATION
Project Name PT. SIIX EMS INDONESIA - EXPANSION FACTORY
Location JL. MALIGI VIII LOT S-4, Kawasan Industri KIIC Karawang 41361, WEST JAVA-INDONESIA
Client PT. SIIX EMS INDONESIA
Industrial Area KIIC INDUSTRIAL ESTATE KARAWANG
Use EMS FACTORY
Designed by PT. HAZAMA ANDO MURINDA
Commencement : 2020/8/10
Construction Period
Completion : 2021/9/9
BUILDING INFORMATION
Building Stories Office and Factory 2 Floor

Building Height 12m


Total Area of Site 25,719 m2
1 Building Area 8,643 m2
2 Total Floor Area 17,076 m2

Pile Square Pile 25x25 cm


Foundation Type Depend footing and continuous footing with pile
Structure 2FL-RC Structure+ Steel Structure ,Roof frame steel structure
Roof Metal Sheet Roofing
ALC Block with Plaster and skimcoat finishing wall painting
Exterior

(1st Floor)
Floor : Conductive PVC Tile, Epoxy Paint, Floor Hardener
Wall : LGS gypsum board and ALC Wall
Ceiling : Gyptile with T-Bar System, GRC Board, Expose Ceiling
Interior
(2nd Floor)
Floor : No Finishing
Wall : ALC Wall with Plaster

ROAD: Heavy duty concrete road t:200mm & Heavy duty asphalt Pavement
External Work
DRAINAGE: Open Concrete Ditch & Concrete Pipe
Building Works
External Works
Mechanical Works
Electrical Works

Major Scope of Work


PT. SIIX EMS INDONESIA
Project Organization Chart EXPANSION FACTORY PROJECT

Construction Manager PT. SIIX EMS INDONESIA
Masanobu ITOGAWA (OWNER)
0811 868 444

Drafter
Ghofur
0813 8081 9965

Project Site
Project Manager
Masaki ONO
0811 1988 691

Site Engineer
Parlin
0812 8100 2125

Safety and 
Drafter Site Engineer
Mat. Control
Kuswanto Sodilin
Denny
0852 8239 1810 0815 9360 366
0813 4367 3284

Site Engineer Safety Officer
M. Arif Yoyok
0819 0721 0022 0821 3916 5529

SUBCONTRACTOR

PT. Hazama Ando Murinda – 12.08.2020 
CONSTRUCTION MASTER SCHEDULE HAZAMA ANDO CORPORATION
ID Task Name 期間 開始日 終了日
2021年
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M
1 PT. SIIX EMS INDONESIA FACTORY 395 days 金)20/08/07 ( 木)21/09/09 ( PT. SIIX EMS INDONESIA FACTORY EXPANSION PROJECT
EXPANSION PROJECT 08/07 09/09
2 QUATION AND CONTRACT 1 day 金)20/08/07 ( 金)20/08/07 ( QUATION AND CONTRACT
08/07 08/07
3 CONTRACT 1 day 金)20/08/07 ( 金)20/08/07 ( CONTRACT
08/07 08/07
4 DESIGN AND APPLICATION 111 days 金)20/08/07 ( 水)20/11/25 ( DESIGN AND APPLICATION
08/07 11/25
5 COSTRUCTION PERMIT APPLICATION 19 days 金)20/08/07 ( 火)20/08/25 (STRUCTION PERMIT APPLICATION DRAWING AND DOCUMENT
DRAWING AND DOCUMENT 08/07 08/25
6 SUBMIT APPLICATION (IBM) 2 days 水)20/08/26 ( 木)20/08/27 ( SUBMIT APPLICATION (IBM)
08/26 08/27
7 APPROVAL 90 days 金)20/08/28 ( 水)20/11/25 ( APPROVAL
08/28 11/25
8 COSTRUCTION WORK 382 days 木)20/08/20 ( 木)21/09/09 ( COSTRUCTION WORK
08/20 09/09
9 PREPARATION 40 days 木)20/08/20 ( 月)20/09/28 ( PREPARATION
08/20 09/28
10 SITE GRABBING AND SURVEY WORK 40 days 木)20/08/20 ( 月)20/09/28 ( SITE GRABBING AND SURVEY WORK
08/20 09/28
11 TEMPORARY FACILITY WORK 40 days 木)20/08/20 ( 月)20/09/28 ( TEMPORARY FACILITY WORK
08/20 09/28
12 TEMPORARY WORK 156 days 土)20/09/26 ( 日)21/02/28 ( TEMPORARY WORK
09/26 02/28
13 TOWER CRANE 156 days 土)20/09/26 ( 日)21/02/28 ( TOWER CRANE
09/26 02/28
14 PILLING WORK(523p) 40 days 火)20/09/01 ( 土)20/10/10 ( PILLING WORK(523p)
09/01 10/10
15 STRUCTURE WORK 186 days 土)20/09/26 ( 火)21/03/30 ( STRUCTURE WORK
09/26 03/30
16 FOUNDATION WORK 60 days 土)20/09/26 ( 火)20/11/24 ( FOUNDATION WORK
09/26 11/24
17 AREA 1 Grid 9 to 13 123 days 金)20/10/16 ( 月)21/02/15 ( AREA 1 Grid 9 to 13
10/16 02/15
18 1ST FLOOR GRABBING AND LEAN 10 days 金)20/10/16 ( 日)20/10/25 ( 1ST FLOOR GRABBING AND LEAN CONCREAT
CONCREAT 10/16 10/25
19 1F RC COLUMN WORK (36p) 15 days 月)20/10/26 ( 月)20/11/09 ( 1F RC COLUMN WORK (36p)
10/26 11/09
20 2F SLAB WORK 40 days 火)20/11/10 ( 土)20/12/19 ( 2F SLAB WORK
11/10 12/19
21 2F RC COLUMN WORK 15 days 日)20/12/20 ( 日)21/01/03 ( 2F RC COLUMN WORK
12/20 01/03
22 RF BEAM 14 days 月)21/01/04 ( 日)21/01/17 ( RF BEAM
01/04 01/17
23 DISMANTLE SUPPORT FOR FORM 14 days 火)21/01/19 ( 月)21/02/01 ( DISMANTLE SUPPORT FOR FORM WORK
WORK 01/19 02/01
24 1F SLAB WORK 14 days 火)21/02/02 ( 月)21/02/15 ( 1F SLAB WORK
02/02 02/15
25 AREA2 Grid 13 to 17 146 days 木)20/11/05 ( 火)21/03/30 ( AREA2 Grid 13 to 17
11/05 03/30
26 1ST FLOOR GRABBING AND LEAN 10 days 木)20/11/05 ( 土)20/11/14 ( 1ST FLOOR GRABBING AND LEAN CONCREAT
CONCREAT 11/05 11/14
27 1F RC COLUMN WORK 15 days 日)20/11/15 ( 日)20/11/29 ( 1F RC COLUMN WORK
11/15 11/29
28 2F SLAB WORK 40 days 月)20/11/30 ( 金)21/01/08 ( 2F SLAB WORK
11/30 01/08
29 2F RC COLUMN WORK 15 days 土)21/01/09 ( 土)21/01/23 ( 2F RC COLUMN WORK
01/09 01/23
30 RF BEAM 14 days 日)21/01/24 ( 土)21/02/06 ( RF BEAM
01/24 02/06
31 DISMANTLE SUPPORT FOR FORM 14 days 月)21/02/08 ( 日)21/02/21 ( DISMANTLE SUPPORT FOR FORM WORK
WORK 02/08 02/21
32 1F SLAB WORK 14 days 月)21/02/22 ( 日)21/03/07 ( 1F SLAB WORK
02/22 03/07
33 STRUCTURE WORK OF AFTER TAKE OFF 30 days 月)21/03/01 ( 火)21/03/30 ( STRUCTURE WORK OF AFTER TAKE OFF TOWER CRANE
TOWER CRANE 03/01 03/30
34 AREA3 Grid 17 to 21(736m3) 123 days 水)20/11/25 ( 土)21/03/27 ( AREA3 Grid 17 to 21(736m3)
11/25 03/27
35 1ST FLOOR GRABBING AND LEAN 10 days 水)20/11/25 ( 金)20/12/04 ( 1ST FLOOR GRABBING AND LEAN CONCREAT
CONCREAT 11/25 12/04
36 1F RC COLUMN WORK 15 days 土)20/12/05 ( 土)20/12/19 ( 1F RC COLUMN WORK
12/05 12/19
37 2F SLAB WORK 40 days 日)20/12/20 ( 木)21/01/28 ( 2F SLAB WORK
12/20 01/28
38 2F RC COLUMN WORK 15 days 金)21/01/29 ( 金)21/02/12 ( 2F RC COLUMN WORK
01/29 02/12
39 RF BEAM 14 days 土)21/02/13 ( 金)21/02/26 ( RF BEAM
02/13 02/26
40 DISMANTLE SUPPORT FOR FORM 14 days 日)21/02/28 ( 土)21/03/13 ( DISMANTLE SUPPORT FOR FORM WORK
WORK 02/28 03/13
41 1F SLAB WORK 14 days 日)21/03/14 ( 土)21/03/27 ( 1F SLAB WORK
03/14 03/27
42 RF STEEL STRUCTURE TRUSS 60 days 月)21/01/18 ( 木)21/03/18 ( RF STEEL STRUCTURE TRUSS WORK
WORK 01/18 03/18
43 INTERIOR WORK 179 days 火)21/02/02 ( 火)21/08/03 ( INTERIOR WORK
02/02 08/03
44 1F INTERIOR WORK 130 days 火)21/03/16 ( 火)21/07/27 ( 1F INTERIOR WORK
03/16 07/27
45 INTERIOR WORKS(CEILING, WALL, 130 days 火)21/03/16 ( 火)21/07/27 ( INTERIOR WORKS(CEILING, WALL, JOINERY, FLOOR)
JOINERY, FLOOR) 03/16 07/27
46 2F INTERIOR WORK 107 days 木)21/04/08 ( 火)21/07/27 ( 2F INTERIOR WORK
04/08 07/27
47 INTERIOR WORKS(Modify Structure) 107 days 木)21/04/08 ( 火)21/07/27 ( INTERIOR WORKS(Modify Structure)
04/08 07/27
48 HAND OVER CLEANING 7 days 水)21/07/28 ( 火)21/08/03 ( HAND OVER CLEANING
07/28 08/03
49 EXTERIOR FINISHING WORK 131 days 火)21/02/02 ( 水)21/06/16 ( EXTERIOR FINISHING WORK
02/02 06/16
50 ROOF METAL SHEET WORK 50 days 火)21/03/09 ( 火)21/04/27 ( ROOF METAL SHEET WORK
03/09 04/27
51 EXTERIOR WALL FINISHING WORK 120 days 火)21/02/02 ( 土)21/06/05 ( EXTERIOR WALL FINISHING WORK
02/02 06/05
52 JOINERY WORK 50 days 火)21/04/13 ( 土)21/06/05 ( JOINERY WORK
04/13 06/05
53 DOWN SPOUT WORK 30 days 月)21/05/03 ( 土)21/06/05 ( DOWN SPOUT WORK
05/03 06/05
54 TAKE OFF SCAFFOLDING WORK 25 days 日)21/05/23 ( 水)21/06/16 ( TAKE OFF SCAFFOLDING WORK
05/23 06/16
55 EXTERNAL WORK 75 days 火)21/05/18 ( 土)21/07/31 ( EXTERNAL WORK
05/18 07/31
56 RAIN WATER DRAINAGE WORK 45 days 火)21/05/18 ( 木)21/07/01 ( RAIN WATER DRAINAGE WORK
05/18 07/01
57 ROAD WORK 50 days 土)21/06/12 ( 土)21/07/31 ( ROAD WORK
06/12 07/31
58 CAR PARK WORK 50 days 土)21/06/12 ( 土)21/07/31 ( CAR PARK WORK
06/12 07/31
59 ELECTRICAL WORK 265 木)20/11/05 ( 土)21/07/31 ( ELECTRICAL WORK
days 11/05 07/31
60 POWER ON 1 day 火)21/06/01 ( 火)21/06/01 ( POWER ON
06/01 06/01
61 PLUMBING WORK 265 days 木)20/11/05 ( 土)21/07/31 ( PLUMBING WORK
11/05 07/31
62 AIR AND VENTILATION WORK 134 days 火)21/03/16 ( 土)21/07/31 ( AIR AND VENTILATION WORK
03/16 07/31
63 INTERNAL INSPECTION / DEFECT 14 days 水)21/08/04 ( 火)21/08/17 ( INTERNAL INSPECTION / DEFECT REPAIR
REPAIR 08/04 08/17
64 CLIENT INSPECTION 3 days 月)21/08/23 ( 水)21/08/25 ( CLIENT INSPECTION
08/23 08/25
65 DEFECT REPAIR 14 days 木)21/08/26 ( 水)21/09/08 ( DEFECT REPAIR
08/26 09/08
66 HANDOVER BUILDING 1 day 木)21/09/09 ( 木)21/09/09 (

Project: 東プレ概略工程表(21-10)1月末 Task Milestone Project Summary External Milestone Inactive Milestone Manual Task Manual Summary Rollup Start-only Progress
Date: 20/08/28 (金) Split Summary External Tasks Inactive Task Inactive Summary Duration-only Manual Summary Finish-only Deadline

Page 1
100

100%
97.8

90%
89.6

80%
78.8

70%
67.1

60%
57.4

50%
47.6

40%
38.3
schedule 31.7%
30%
actul 31.7%
25.9

20.6
20%

14.7
10%
7.9%

2.3% 0%
REVISION
NO. DESCRIPTION SIGN DATE

0 1ST ISSUED 11AUG20


EXPANSION FACTORY EXISTING FACTORY 1 REVISED 21AUG20
2 REVISED 27AUG20
9'
3 REVISED 14SEP20
21 20 19 18 17 16 15 14 13 12 11 10 9 1 4 REVISED 19SEP20
5 REVISED 07OKT20
31684 120000 99500
6684 12000 13000 30000 90000 8x10000 = 80000 19500
CIVIL FABRICATION
10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 7500
WORKER TOILET APAR APAR 2500 TEMPORARY FENCE REVISED 4 :
NEW BRC FENCE NEW BRC FENCE MOVE TOWER CRANE POSITION
10034 4800
NEW BRC FENCE ±45° SLOPE SOIL EXISTING BRC FENCE
14834
20834

FABRICATION
OUTSIDE SCAFFOLDING

CIVIL
K
6000

FL.+0.300 FL.+0.300 FL.+0.300

M&E FOUNDATION
FL.+0.200
M&E FOUNDATION M&E FOUNDATION
FL.+0.200 FL.+0.200

STOCK AREA
M&E FOUNDATION
FL.+0.200

MATERIAL
APAR
8000 8000 8000 8000 8000 8000 8000 8000

APAR
I
00
24000

700
EXISTING SOIL DRAINAGE

H 2000 APAR m
NEW BRC FENCE

E R70 PILE MACHINE


G CR AN

EXISTING BRC FENCE


ER
T OW
64000
106867

F
STEEL MATERIAL

& REMOVE

4000
STOCK AREA
24000

20
19
18
17
16
15
14

E
13
12
11

PILE MACHINE
10
09
08
07
06
05
04

R19349
03
02
01

D
OUTSIDE
16000

C SCAFFOLDING
8 40
R9
B
6000

M&E FOUNDATION M&E FOUNDATION


FL.+0.200 FL.+0.200

M&E FOUNDATION
FL.+0.200

FL.+0.300 FL.+0.300 FL.+0.300

A SCAFFOLDING APAR
22033

TEMPORARY ROAD APAR 90 PERSON @1m APAR


TOWER BIKE PARKING
16033

CAR PARKING
M&E SAFETY MORNING AREA SITE OFFICE AREA
WASHING

FABRICATION HAZAMA & SUBCON


BAY

125 PERSON @1m


EW
VI

(NO HELMET ZONE) (NO HELMET ZONE)

-
BANNER FENCE PUBLIC ROAD
PT. HAZAMA ANDO MURINDA
12070 3850 WORKER BANNER FENCE MIDPLAZA 1 BUILDING 16th FLOOR
TRAINING SUBCON IN EXISTING BRC FENCE TEMPORARY FENCE Jl. Jendral Sudirman Kav. 10-11 Jakarta 10220, INDONESIA
Tel :(021) 5735 774 (Hunting) Fax :(021) 5735 737
OFFICE
PROJECT
20000 17500 5500 9000 25050 3000 10500 2500 26000 11550 PHASE-1 = 80000 19500
3000 PT. SIIX EMS INDONESIA
58104 10000 90600 EXISTING SUB STATION
1 EXPANSION FACTORY PROJECT
3 EXISTING SECURITY POS TEMPORARY GATE ACCESS
SAFETY CONE 19 9
DRAWING TITLE

GENERAL PLAN GATE OF ANOTHER FACTORY


- GENERAL PLAN
SCALE 1 : 1000 -

SCALE 1:1000
LEGEND :
SIGNATORIES
TAMPORARY BANNER FENCE WORKER TOILET OUT SIDE SCAFFOLDING TEMPORARY DRAINAGE
RAINY SEASON DESCRIPTION SIGNATURE DATE
TAMPORARY METAL FENCE
HANDRAIL TEMPORARY ROAD FABRICATION AREA WATER SUPPLY POINT APPROVED BY Mr. Itogawa
500MM THK. LIME STONE
STEEL PLATE BRIDGE CHECKED BY Mr. Ono
TEMPORARY PARKING TEMPORARY LIGHTING
100MM THK. BASE COURSE MATERIAL STOCK
CHECKED BY Parlin
SITE OFFICE TEMPORARY WALK WAY TEMPORARY ELECTRICAL LINE
NEW WORKER TRAINING & LOAD PANEL CAD BY Kuswanto 07 OKT 20
WIDTH 1m
NO HELMET WALK WAY HANDWASHING
5 APAR LOCATION
PROJECT CODE DRAWING NO. SHT. NO.

SIIX-2020 T-01 -

D:\00. PT. HAZAMA ANDO MURINDA\29. PT. SIIX EMS INDONESIA\PT. SIIX INDONESIA\TEMPORARY WORK\T-01 - TEMPORARY OFFICE - R6 - 07-10-2020.dwg
REVISION
NO. DESCRIPTION SIGN DATE

0 1ST ISSUED 10OKT20

0m
20600

20.6 m
TOWER CRANE

22 m

25 m
27 m

30 m
32 m

35 m

40 m
42 m

45 m
47 m

50 m
52 m

55 m
57 m

60 m
62 m

65 m
67 m

70 m
DISTANCE LOAD
70000 RADIUS

9.53 t
8.67 t

6.24 t

5.64 t

4.93 t

4.58 t
4.37 t

4.07 t
3.89 t

3.65 t

3.17 t
11.1 t
6000

7.6 t

5.2 t

3.3 t
3.5 t
12 t
STANDARD LOAD

6 t

3 t
7 t
2400

9.6 t
8.9 t

7.6 t
6.9 t

6.1 t
5.6 t

5t

4.8 t
4.5 t

4.2 t
3.9 t

3.7 t
3.5 t

3.3 t
3.1 t

2.92 t
2.8 t

2.64 t
2.54 t

2.4 t
HAZAMA LOAD

3350

8800
FL.+11.665

CLEAR H=23000
FL.+10.705
FL.+10.065
C1

11655
INSIDE FACTORY FL.+5.000
10470

FENCE
FENCE PUBLIC
FENCE INSIDE FACTORY ROAD
FL.±0.000

BOUNDARY LINE
FL.-0.350
BOUNDARY LINE

6000 8000 8000 8000 8000 8000 8000 8000 8000 6000
5359 9475 76000 16834
-
107668
PT. HAZAMA ANDO MURINDA
MIDPLAZA 1 BUILDING 16th FLOOR
J J I H G F E D C B A Jl. Jendral Sudirman Kav. 10-11 Jakarta 10220, INDONESIA
Tel :(021) 5735 774 (Hunting) Fax :(021) 5735 737

PROJECT
TOWER CRANE LOAD DIAGRAM -
SCALE 1 : 425 - PT. SIIX EMS INDONESIA
EXPANSION FACTORY PROJECT
DRAWING TITLE

TOWER CRANE DETAIL

SCALE 1:100 & 500

SIGNATORIES
DESCRIPTION SIGNATURE DATE

APPROVED BY Mr. Itogawa

CHECKED BY Mr. Ono

CHECKED BY Parlin

CAD BY Kuswanto 10 OKT 20

PROJECT CODE DRAWING NO. SHT. NO.

SIIX-2020 T-16 -

D:\00. PT. HAZAMA ANDO MURINDA\29. PT. SIIX EMS INDONESIA\PT. SIIX INDONESIA\TEMPORARY WORK\T-13 - TEMPORARY TOWER CRANE FOUNDATION.dwg
REVISION

EXPANSION FACTORY EXISTING FACTORY NO.


0
DESCRIPTION
1ST ISSUED
SIGN DATE
07AUG20
1 REVISION - 1 12SEP20
2 REVISION - 2 19SEP20
9' 3 REVISION - 3 03OCT20
21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 4 REVISION - 4 14NOV20
5 REVISION - 5 16NOV20
120000 20000
30000 90000

10000 10000 10000 10000 9257 10743 10000 10000 10000 10000 10000 7500 2500 10000 10000

4000 16000 10000 10000 9670 2830 7500 24000 2700 13300
INSIDE STAIR-6
II III B TO 2ND FLOOR
EMERGENCY STAIR-2 (STEEL STAIR)
COOLING
K TOWER FL.+0.300 FL.+0.300 FL.+0.300

AHU-5 CHILLER-2 AHU-4


M&E FOUNDATION
FL.+0.200
6000

6000
M&E FOUNDATION M&E FOUNDATION

I
FL.+0.200 FL.+0.200

2.0 ton/m2 2.0 ton/m2


M&E FOUNDATION
FL.+0.200

M F 2.0 ton/m2

3250 3250 2500


UP UP
J
8000

STORAGE-1 FL±0,00
10000 FLOOR FINISH: CONDUCTIVE PVC TILE
I 1500 NO CEILING
CARGO LIFT (FUTURE) 2750 LOAD: 1.0 ton/m2
24000

PIT & COVER ONLY


8000

140

4085 PASS PASS PASS


BOX-1 BOX-2 BOX-3
H
w.5000xh.3500

ANTE 4000
SS-1
20000

RM
8000

G FUTURE RM
HSS-1 FL±0,00

EXISTING WALL TO BE DEMOLISH


8000

C w.5000xh.3500 NO FLOOR FINISH PHASE-1


NO CEILING PHASE-2
64000

LOAD: 1.0 ton/m2


F
EMERGENCY SUB ASSEMBLY LINE
STAIR-1 STORAGE-2 FL±0,00
24000

SUB ASSEMBLY LINE


8000

FL±0,00
20
19

FLOOR FINISH:
18

FL±0.000
17
16

FLOOR FINISH:
15
14

13
12
11

CONDUCTIVE EPOXY PAINT CONDUCTIVE PVC TILE


E CH=+3,000
10
09
08

NO CEILING SHOP DRAWING


07
06
05
04

(GYPTILE 600x600 T-BAR SYSTEM)


03
02

LOAD: 1.0 ton/m2


01

FLOOR LOAD: 1.0 ton/m2


8000

UP PT. HAZAMA ANDO MURINDA


MIDPLAZA 1 BUILDING 16th FLOOR

D Jl. Jendral Sudirman Kav. 10-11 Jakarta 10220, INDONESIA


Tel :(021) 5735 774 (Hunting) Fax :(021) 5735 737

PROJECT
8000

PT. SIIX EMS INDONESIA


EXPANSION FACTORY PROJECT
16000

C
5 DRAWING TITLE
8000

SS-2 SS-2 EXPANSION FACTORY PLAN


w.5000xh.3000 w.5000xh.3000 (1st FLOOR PLAN)
B UP M&E FOUNDATION
FL.+0.200
UP M&E FOUNDATION
FL.+0.200

CHILLER-1 AHU-2 AHU-3


M&E FOUNDATION

ELECTRICAL RM-1
FL.+0.200
6000

6000
AHU-1 M F
7000

I 2.0 ton/m2 SCALE : 1:500


2.0 ton/m2 FL.+0.300 FL.+0.300 FL.+0.300
2.0 ton/m2 2.0 ton/m2 2.0 ton/m2
COOLING UP SIGNATORIES
A TOWER
DESCRIPTION SIGNATURE DATE

FUTURE WALL 8000 4000 8000 12500 10000 7500 8000 15500 4000 10000 FUTURE WALL APPROVED BY Mr. Ono
INSIDE STEEL STAIR-4
INSIDE STEEL STAIR-3 II STAIR-1 A TO 2ND FLOOR III STAIR-2 CHECKED BY Parlin
TO 2ND FLOOR FLOOR FINISHING:
INSIDE STAIR-5 CHECKED BY
120000 FLOOR HARDENER
TO 2ND FLOOR
PHASE-2 CAD BY Kuswanto 16-NOV-20
CONDUCTIVE PVC TILE
EXPANSION FACTORY PLAN (1st FLOOR PLAN) - CONDUCTIVE EPOXY PAINT
PROJECT CODE DRAWING NO. SHT. NO.
SCALE 1 : 500 -
NO FLOOR FINISH
SIIX EMS-2020 A-GA-02 -
D:\00. PT. HAZAMA ANDO MURINDA\29. PT. SIIX EMS INDONESIA\PT. SIIX INDONESIA\SHOP DRAWING\00. GA\A-GA-00 - ARCHITECTURE\A-GA-01~03 PLAN.dwg
REVISION
EXPANSION FACTORY EXISTING FACTORY NO. DESCRIPTION SIGN DATE

9' 0 1ST ISSUED 07AUG20


1 REVISION - 1 12SEP20
21 20 19 18 17 16 15 14 13 12 11 10 9 8 7
2 REVISION - 2 19SEP20
120000

10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 7500 2500 10000 10000

20970 1530 7500 24000 13500


INSIDE STAIR
2 TO 1ST FLOOR EMERGENCY STAIR-2 (STEEL STAIR)
4000 1 1
1
K TOILET ROOF
1st FLOOR
AHU CHILLER AHU
6000

6000
I II III 1.0 ton/m2 1.0 ton/m2 M F 1.0 ton/m2

2500
J C4

3625 3675
DOWN TO 1F UP TO ROOF DOWN TO 1F
8000

CANOPY ROOF
10000
I 1
C4

CARGO LIFT (FUTURE) 3400


24000

OPENING & COVER ONLY


8000

H C4
20000
8000

G C4
C4

EXISTING WALL TO BE DEMOLISH


8000

3 PHASE-1
PHASE-2
64000

F HEAD ASSEMBLY LINE


C4

FL.+5.000
26 DN
25
24
24000

23
22
8000

21

NO FINISHING FLOOR
20

EMERGENCY
19
18
17
16
15

STAIR-1 NO CEILING
14

13

FLOOR LOAD: 0.75 ton/m2


12

E C4
8000

D C4

SHOP DRAWING
8000

PT. HAZAMA ANDO MURINDA


16000

MIDPLAZA 1 BUILDING 16th FLOOR


C C4
Jl. Jendral Sudirman Kav. 10-11 Jakarta 10220, INDONESIA

V V CANTILEVER Tel :(021) 5735 774 (Hunting) Fax :(021) 5735 737
8000

SLAB PROJECT
INSIDE STAIR INSIDE STAIR
TO 1ST FLOOR SS-2 TO 1ST FLOOR 1 SS-2 PT. SIIX EMS INDONESIA
w.5000xh.3000 w.5000xh.3000
B DN
C4
EXPANSION FACTORY PROJECT
DN
CHILLER M F ELECTRICAL RM AHU
6000

6000

6000
I AHU AHU 1.0 ton/m2 1.0 ton/m2
1.0 ton/m2 1.0 ton/m2 DRAWING TITLE
1.0 ton/m2
A DN EXPANSION FACTORY PLAN
(2nd FLOOR PLAN)
II III
CANTILEVER 1 INSIDE STAIR
STAIR-2
STAIR-1 SLAB TO 1ST FLOOR SCALE : 1:500
180
30000 8000 4000 8000 12500 10000 7500 8000 15500 4000 10000 2500 SIGNATORIES
120000
OUT SIDE IN SIDE DESCRIPTION SIGNATURE DATE
PHASE-2
LINTLE COLUMN SHUTTER DOOR APPROVED BY Mr. Ono
FLOOR FINISHING: 200 STEEL ANGLE
EXPANSION FACTORY PLAN (2nd FLOOR PLAN) - FL.+5.000 CHECKED BY Parlin
SCALE 1 : 500 - SLOPE
NO FINISHING CHECKED BY

10
CAD BY Kuswanto 19-SEP-20
2 CONCRETE BEAM
SECTION-V - 265 135 PROJECT CODE DRAWING NO. SHT. NO.
SCALE 1 : 20 -
A SIIX EMS-2020 A-GA-03 -
Z:\KIIC AREA\PT. SIIX INDONESIA\SHOP DRAWING\00. GA\A-GA-00 - ARCHITECTURE\200919\A-GA-01~03 PLAN.dwg
REVISION
NO. DESCRIPTION SIGN DATE
0 1ST ISSUED 07AUG20
1 REVISION - 1 12SEP20

EXPANSION FACTORY EXISTING FACTORY

I II III B

9'
21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
200000
120000
30000 90000 80000
10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 7500 10000 10000 10000 10000 10000 10000 10000 10000
ROOF: CORRUGATED METAL SHEET
w/ GLASS WOOL INSULATION 2500
SLOPE 1/25 (4%)
20000 4000 16000
K 1 1
6000

CT
2500

J DN
8000

CANOPY
I
24000
8000

1
H
20000
8000

C
G
8000
64000

F 10000
24000
8000

PHASE-2 PHASE-1
E
EMERGENCY
8000

STAIR-1
D SHOP DRAWING
PT. HAZAMA ANDO MURINDA
8000
16000

C
MIDPLAZA 1 BUILDING 16th FLOOR
Jl. Jendral Sudirman Kav. 10-11 Jakarta 10220, INDONESIA
Tel :(021) 5735 774 (Hunting) Fax :(021) 5735 737
8000

PROJECT
B PT. SIIX EMS INDONESIA
6000

CT EXPANSION FACTORY PROJECT


A
30000 12000 8000 30000 8000 29500 2500
DRAWING TITLE

A III ROOF PLAN


I II
120000 80000 SCALE : 1:750
PHASE-2 PHASE-1
SIGNATORIES
ROOF: CORRUGATED METAL SHEET
w/ GLASS WOOL INSULATION DESCRIPTION SIGNATURE DATE
SLOPE 1/25 (4%)
APPROVED BY Mr. Ono

EXPANSION FACTORY PLAN (ROOF PLAN) CHECKED BY Parlin


SCALE 1 : 750 CHECKED BY

CAD BY GHOFUR 12SEP20

PROJECT CODE DRAWING NO. SHT. NO.

SIIX EMS-2020 A-GA-04 -


Z:\KIIC AREA\PT. SIIX INDONESIA\SHOP DRAWING\00. GA\A-GA-00 - ARCHITECTURE\200924\A-GA-04 ROOF PLAN.dwg
REVISION
FL.+11.665 ROOF: CORRUGATED SLOPE
4% 4%
NO. DESCRIPTION SIGN DATE
SLOPE 1 METAL SHEET 1
0 1ST ISSUED 07AUG20
FL.+10.065 25 25 FL.+10.705

960
FL.+9.825 1 REVISION - 1 12SEP20

2160
C1

1200
C1
960

TOC.+9.505 FL.+9.505
TOC.+8.865 TOC.+8.865 TOC.+9.065 DOWN

4505

4505
3865

PIPE

11665
FL.+5.000 FL.+5.000 FL.+5.000

CH.+3.000
PARTITION
1
5000

5000
PARTITION PARTITION PARTITION PARTITION PARTITION WALL
WALL WALL WALL WALL WALL
FL.±0.000 FL.±0.000 FL.±0.000

5000 3000
DRAINAGE 6000 8000 8000 8000 8000 8000 8000 8000 8000
70000 8000

DRAINAGE
A B C D E F G H I J
SECTION III - III -
SCALE 1 : 300 - FL.+11.665 ROOF: CORRUGATED SLOPE
4% 4%
- SLOPE 1 METAL SHEET 1
FL.+10.065 25 25 FL.+10.705

960
FL.+9.825

2160

1200
960

TOC.+9.505 FL.+9.505
TOC.+8.865 TOC.+8.865 TOC.+9.065

4505

4505
3865

CONC. PARTITION
STAIR

11665
FL.+5.000 FL.+5.000 WALL FL.+5.000
28

1200
25
21 CH.+3.000
FL.+5.000 17
5000

14 PARTITION PARTITION PARTITION PARTITION PARTITION PARTITION PARTITION

3800
11
WALL WALL WALL WALL WALL WALL WALL

3000
7
FL.±0.000 3 FL.±0.000 FL.±0.000

6000 8000 8000 8000 8000 8000 8000 8000 8000 DRAINAGE
DRAINAGE
70000 8000
TOILET WALL SHOP DRAWING
A B C D E F G H I J
PT. HAZAMA ANDO MURINDA
SECTION II - II - 4% FL.+11.665 ROOF: CORRUGATED SLOPE MIDPLAZA 1 BUILDING 16th FLOOR

SCALE 1 : 300 - SLOPE 1 METAL SHEET 1 4% Jl. Jendral Sudirman Kav. 10-11 Jakarta 10220, INDONESIA
Tel :(021) 5735 774 (Hunting) Fax :(021) 5735 737
25 25 FL.+10.705

960
1013
PROJECT
FL.+10.065

1000
PT. SIIX EMS INDONESIA
1000
1000

C4
FL.+9.705 EXPANSION FACTORY PROJECT
FL.+9.065

4705
4065

DRAWING TITLE
10652
9705

11665
FL.+5.000 FL.+5.000 FL.+5.000 SECTION I, II, & III
10065

9705
9065

1 CH.+4.000 SCALE : 1:300


5000

5000
3500
STORAGE-2 SIGNATORIES
FL.±0.000 FL.±0.000 FL.±0.000 DESCRIPTION SIGNATURE DATE

5000 APPROVED BY Mr. Ono

DRAINAGE DRAINAGE CHECKED BY Parlin


8000 8000 8000 8000 8000 8000 8000 8000
CHECKED BY
7000 64000 8000
CAD BY GHOFUR 12SEP20

B C D E F G H I J
PROJECT CODE DRAWING NO. SHT. NO.
SECTION I - I -
SCALE 1 : 300 SIIX EMS-2020 A-GA-05 -
Z:\KIIC AREA\PT. SIIX INDONESIA\SHOP DRAWING\00. GA\A-GA-00 - ARCHITECTURE\200919\A-GA-05 SECTION.dwg
REVISION
ROOF: CORRUGATED METAL SHEET
SLOPE 4% 1 1 SLOPE 4% ALC WALL NO. DESCRIPTION SIGN DATE
T.O.C 25 25 T.O.C 0 1st ISSUED 07AUG20
FL+10,705 FL+10,065

1000
1 REVISED-1 12SEP20

1000
2nd FL 2 2nd FL

5000 4705

5000 4065
FL+5,000 FL+5,000

10705

10065
1st FL 1st FL

6000
ROAD ROAD
FL±0,00 FL-0.300 2 FL-0.300 FL±0,00

13000 EMERGENCY STAIR-1 13000


8000 6000 8000 8000 8000 8000 8000 8000 8000 8000 6000
24000 24000 16000 7000 8000
24000 40000
64000
ELEVATION - C
SCALE 1 : 750
K J I H G F E D C B A

EXISTING FACTORY EXPANSION FACTORY


ROOF: CORRUGATED METAL SHEET
ALC WALL
EMERGENCY STAIR-2 10000 T.O.C
FL+10,065

1000
2nd FL

5000 4065
2 2 2 2 2 FL+5,000

1200 10065
6000
ROAD 1st FL
2 2 2 2 2 FL-0.300 FL±0,00

15500 12000
2500 4000
27500
10000 10000 10000 10000 10000 10000 10000 10000 7500 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000
80000 90000 30000
200000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

ELEVATION - B 9'
SCALE 1 : 750
EXPANSION FACTORY EXISTING FACTORY SHOP DRAWING
ROOF: CORRUGATED METAL SHEET
ALC WALL PT. HAZAMA ANDO MURINDA
T.O.C 10000 MidPlaza 1 Building 16th Floor,
FL+10,065 Jl. Jendral Sudirman Kav.10-11 Jakarta 10220, INDONESIA
760

Tel :(021) 573 5774 (Hunting) Fax :(021) 573 5737


2nd FL PROJECT
5000 4065

FL+5,000 2 2 2 2 2
9825

PT. SIIX EMS INDONESIA


6000

1st FL ROAD
FL±0,00 FL-0.300 2 2 2 1 2 2 EXPANSION FACTORY PROJECT
CANTILEVER SLAB CANTILEVER SLAB
12000 15500 DRAWING TITLE
2500
27500 ELEVATION - A, B & C
10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 7500 10000 10000 10000 10000 10000 10000 10000 10000
30000 90000 80000 SCALE 1 : 750
200000
SIGNATORIES
DESCRIPTION SIGNATURE DATE
21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 APPROVED BY Mr. Itogawa .

CHECKED BY Mr. Suyitno


ELEVATION - A 9'
CHECKED BY Mr. Faisal
SCALE 1 : 750
CAD BY: Kuswanto

PROJECT CODE DRAWING NO. SHT. NO.

SIIX-2020 A-GA-06 06
FEB2020

c:/PROJECT/ Gen Plan


REVISION
21 20 19 18 17 16 15 14 13 12 11 10 9' 9
NO. DESCRIPTION SIGN DATE
32704 120000
0 1st ISSUED 16SEP20
7704 12000 13000 30000 90000
1 REVISED - 1 01OCT20
10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 7500 2500

136250 9150
6834

BOD D-1
FL-1.308 400 DESIGN W=600

300
BOD 0,3% P-1 P-1 P-1 P-1

PVC PIPE
0.3% 0,3% 0,3% 0,3% NO CONNECT
6000
20834

BOD BOD

∅250
FL-1.233 EX. W=300

PVC PIPE
FL-1.053 FL-0.900
FL-0.730

∅250
2000

PVC PIPE

PVC PIPE
16000

K BOM (MH-2) BOD : BOTTOM OF DRAINAGE

∅250

∅250
FL-0.750
0.2%

BOM (MH-1) BOM (MH-1) BOM (MH-1) BOM : BOTTOM OF MANHOLE


6000

BOD 2900 FL-0.750 FL-0.750 FL-0.750


FL-1.337
J 4000 400
BOM (MH-1) BOM (MH-1) BOM (MH-1) 1850
FL-0.750
8000

R500 FL-0.750 FL-0.750


0 EX. CONC. PIPE∅150
8142

R50
00 PVC PIPE P-1 BOM (MH-2) FL-0.700
I ∅250 FL-0.750
FL-0.700
1 1
0.2%
8000

'A'
16000 13000
H
8000

BOD
FL-1.388
G
8000

0.2%

PHASE-2
42716
64000

F D-2 SUB ASSEMBLY LINE


FL±0,00
8000

20

STORAGE
19
18
17
16
15
14

13
FL±0,00
12
11
10
09

E
08
07
06
05
04
03
02
01
8000

BOD
FL-1.436
D
0.2%

'B'
SHOP DRAWING
8000

PT. HAZAMA ANDO MURINDA


MIDPLAZA 1 BUILDING 16th FLOOR
C Jl. Jendral Sudirman Kav. 10-11 Jakarta 10220, INDONESIA
8142

Tel :(021) 5735 774 (Hunting) Fax :(021) 5735 737


00 EX. CONC. PIPE∅150
R50 PROJECT
8000

0 FL-0.700
BOD R500 BOM (MH-1) BOM (MH-1) BOM (MH-1) BOD
FL-1.470 FL-0.750 FL-0.750 FL-0.750 PT. SIIX EMS INDONESIA
FL-0.600
B EXPANSION FACTORY PROJECT
BOM (MH-2) P-1 BOM (MH-2) BOM (MH-2)
6000 1000 6000

PVC PIPE

P-1 BOM (MH-2) DRAWING TITLE


FL-0.750
∅250

FL-0.750 FL-0.750
16000

FL-0.750
0,2%

P-1 P-1 DRAINAGE PLAN


A
P-1
123100

PVC PIPE
BOD BOD

∅250
BOD
22000

'C' FL-0.900 13000 110100


FL-1.270
FL-1.496 'D' SCALE : 1:500

300
BOD
2934

FL-1.502
3799 3424 SIGNATORIES
BOD
BOD 0,3% 0,3% 0,3% FL-1.119 0,3% 0,3% DESCRIPTION SIGNATURE DATE
D-1
9000

BOD 1

9073
FL-1.512 1
D-1
6552

FL-1.283

12618
BOD APPROVED BY Mr. Ono
FL-1.733 Parlin
CHECKED BY
BOD BOD BOD
3424

3537
1 FL-1.830 FL-2.148 1 CHECKED BY Ghofur
45°

FL-2.038
CAD BY Syamsul 16SEP20

BOD BOD
FL-2.330 DRAINAGE PLAN FL-2.648 PROJECT CODE DRAWING NO. SHT. NO.
SCALE 1:500
SIIX EMS-2020 SD-EX-DR-01 -
PT. HAZAMA ANDO MURINDA
PT. SIIX EMS INDONESIA - EXPANSION FACTORY PROJECT
Overall Site Progress Photo
for Augustus 2020
PT. HAZAMA ANDO MURINDA
PT. SIIX EMS INDONESIA - EXPANSION FACTORY PROJECT
Overall Site Progress Photo
for September 2020
PT. HAZAMA ANDO MURINDA
PT. SIIX EMS INDONESIA - EXPANSION FACTORY PROJECT
Overall Site Progress Photo
for October 2020
PT. HAZAMA ANDO MURINDA
PT. SIIX EMS INDONESIA - EXPANSION FACTORY PROJECT
Overall Site Progress Photo
for November 2020
PT. HAZAMA ANDO MURINDA
PT. SIIX EMS INDONESIA - EXPANSION FACTORY PROJECT
Overall Site Progress Photo
for December 2020
PT. HAZAMA ANDO MURINDA
PT. SIIX EMS INDONESIA - EXPANSION FACTORY PROJECT
Overall Site Progress Photo
for January 2021