Dear Sir
We are pleased to submit our quotation for supply materials,remove & install of the items listed below :
Unit Price
NO DESCRIPTION QTY TOTAL
IDR
1 To Supply materials and repaint of the existing main office
external wall 598 m2
a) To hack the cracks line and fill back with cement
b) To wash dirty surface of the wall
c) To apply 1 layer of paint sealer
d) To paint using top coat(Nippon paint weather bond)
2 to 3 layer
Location : Main office
Lump Sum : Rp 55.000.000
2 To Supply materials ,remove & Install
a) To remove and repaint doors 19 UNITS
b) To supply doors lock 19 UNIT
c) To supply door closer 19 UNIT
d) To supply wooden door 2 UNITS
e) To supply wooden door frame 1 UNIT
Location : Main office fwd and aft 12 units,
prayer room 1 unit,female toilet 1 unit(beside HR),
main office 1st floor 2 units,car park toilet 1 unit,
container 40 feet 2 units.
Lump Sum : Rp 20.380.000
Authorised Signature
Erwin Alfonsius W