Professional Documents
Culture Documents
Suyat Masonry
and Carpentry Works)
To MG S Construction Inc., Main Office
2F Starmall Annex, Alabang-Zapote Road, Corner
Doña Manuela Avenue, Pamplona III, Las Pinas, 1740
Metro Manila
QOUTATION BREAKDOWN
Lump Sum
Categories (PHP)
Direct Cost
Material Cost (MC) 4,759,645.80
Flat Latex Paint by Boysen/Davies
Semi-Gloss Latex Paint by Boysen/Davies
Top Coat Latex Paint by Boysen/Davies
Gasa Tape by Boysen/Davies
Skim Coat
Penetrating Sealer
Sand Paper #100
Sand Paper #120
Paint Brush (Assorted #1,2,3,4)
Roller #4 with Pan
Roller #7 with Pan 6,425,521.83
Roller #9 with Pan
Boral Joint Compound
SCOPE OF WORKS:
Walls
1. Preparation of Surfaces
a. Cleaning of Surfaces
b. Filling-in gaps
c. Sanding
2. Application of Penetrating Sealer to Walls
3. Application of Flat Latex Paint
4. Application of Skim Coat
5. Sanding
6. Top Coating (2x)
Ceiling
1. Installation of Boral Gypsum Board
2. Preparation of Ceiling Surfaces
a. Cleaning of Surfaces
b. Filling-in gaps
c. Sanding
3. Application of Flat Latex Paint
4. Application of Skim Coat
5. Sanding
6. Top Coating (2x)
Prepared by: