You are on page 1of 2

(Formerly R.D.

Suyat Masonry
and Carpentry Works)
Project Name : Vista Brent Hill (Painting Works)
Address : Yangco Rd, Upper General Luna, Baguio City
General Scope of Works : Interior Painting Works (21,500sqm)

METHOD STATEMENT FOR PAINTING WORKS


1. OBJECTIVE
1.1.Is to define the procedural requirements for supply and application of
paints for the buildings.

2. SCOPE
2.1.Application of paint to 21, 500 sqm worth of interior wall and ceiling
surfaces to Condominium Units at Vista Brent Hill, Yangco Road, Upper
General Luna, Baguio City under MGS Construction, Inc.

3. PORCEDURE
3.1.PAINT MATERIALS
3.1.1. All the paint materials shall be of MGS Construction approved brand
and make prior approval for the type of finish. Material and shade shall
be taken from Boysen Color Swatches. Samples of each type of finish,
clearly mentioning the location of application/building, number of
coats et. may be prepared and approved by MGS.

3.2.SURFACE PREPARATION
3.2.1. Paint shall be applied to properly prepared, clean, sound and dry
surfaces. No paint shall be applied to the surface structurally or
superficially damp and all surfaces must be ascertained to be free from
condensation, efflorescence, etc. before application of each coat. The
surface shall first be scrapped to remove mortar splashes. The surface
shall then be rubbed down with fine sand paper to remove loose
particles and to smooth irregularities.

3.3.APPLICATION
3.3.1. Priming coats shall be applied by roller/brush to give a coat of
adequate thickness with no misses and to satisfy the porosity of the
surface. The priming shall be well worked into the surface, joints,
angles and other places where moisture is likely to collect.
3.3.2. On approval from MGS, the filler coat shall be spread evenly with a
scraper on overall surfaces and allowed to dry. This has to be sanded
down and dusted off. by emery paper to obtain a very smooth surface
finish.
3.3.3. Undercoats shall be applied evenly over the whole surface to give a
solid film; Care shall be taken to avoid uneven thickness of paint at
edges and angles
3.3.4. Each coat of paint shall be thoroughly dried before the next coat is
applied and the surface of primers and under coats shall be lightly
rubbed down. Further coats shall be applied at proper intervals to
secure maximum adhesion.
3.3.5. All paint shall be roller/brush applied unless otherwise approved or
specified. Paint shall be applied so that the finished surface is free from
brush marks.
3.3.6. Finishing coats shall be applied evenly over the whole surface to give
a solid film free from brush marks, sags, runs orange peeling and other
defects.
3.3.7. After completion of finishing coat, approval shall be taken Any snag
items / punch list shall be attended immediately and clearance shall be
taken from MGS.

Prepared by:

Owner: Richard D. Suyat


R.D. Suyat Construction

You might also like