Project: Environmental Impact Assessment
Study of Proposed Industrial Area
Development (Baggad Industrial
Area) at Village-Baggad, Tehsil-
Bhim, District-Rajsamand
(Rajasthan)
Table of Contents
1 Introduction .................................................................................................................... 1
1.1 Prelude .................................................................................................................. 1
1.2 Project & Project Proponent................................................................................... 2
1.3 Mineral Production in District Rajsamand. ............................................................. 2
1.4 Objective of the Study............................................................................................ 3
1.5 Purpose of Study ................................................................................................... 4
1.6 Scope of Study ...................................................................................................... 4
1.7 Project Location ..................................................................................................... 4
1.8 Site Selection Criteria ............................................................................................ 5
1.9 Benefits from the Project ....................................................................................... 6
1.10 Regulatory Framework .......................................................................................... 7
1.11 ToR Compliance Matrix ......................................................................................... 8
1.12 Structure of the Report ........................................................................................ 14
2 Project Description....................................................................................................... 16
2.1 Type of the Project .............................................................................................. 16
2.2 Need of the Project .............................................................................................. 16
2.3 Project Location ................................................................................................... 18
2.4 Connectivity of the Project Site ............................................................................ 18
2.5 Topography of the Project Site ............................................................................ 18
2.6 Existing Land Use Pattern of the Project Site ...................................................... 19
2.7 Project Planning and Area Statement .................................................................. 20
2.8 Zoning & Type of industry .................................................................................... 23
2.9 Infrastructure Development.................................................................................. 23
2.9.1 Site Preparation ............................................................................................... 23
2.9.2 Road Development .......................................................................................... 23
2.10 Drainage System Development ........................................................................... 29
2.11 Type of Industries ................................................................................................ 30
2.12 Project Requirements .......................................................................................... 31
2.13 Construction Material Sourcing ............................................................................ 31
2.14 Water Requirement ............................................................................................. 31
2.15 Power Requirement ............................................................................................. 32
2.16 Environmental Consideration ............................................................................... 32
2.17 Public Hearing ..................................................................................................... 38
3 Description of the Environment .................................................................................... 39
3.1 Prelude ................................................................................................................ 39
3.2 Site Description and its Environs ......................................................................... 39
3.3 Physical Environment .......................................................................................... 42
3.1.1 Topography ..................................................................................................... 42
3.1.2 Geology of the Study Area ............................................................................... 45
3.1.3 Groundwater Resources .................................................................................. 45
3.1.3.1 Hydrogeology .................................................................................................. 45
3.1.3.2 Depth to Water Level ....................................................................................... 46
3.4 Micro-Meteorology ............................................................................................... 50
3.5 Baseline Environmental Quality ........................................................................... 51
3.1.6 Air Environment ............................................................................................... 52
3.1.7 Noise Environment .......................................................................................... 55
3.1.8 Water Environment .......................................................................................... 56
3.1.9 Soil Environment.............................................................................................. 57
3.6 Traffic Survey ...................................................................................................... 61
3.7 Biological Environment ........................................................................................ 62
3.7.1 Forest and Forest Types .................................................................................. 62
3.7.2 Core Area (Proposed Industrial Area) .............................................................. 62
3.7.3 Aquatic Ecology ............................................................................................... 70
Page | i
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page ii
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
List of Tables
Table 1.1: RIICO - At a Glance ............................................................................................. 1
Table 1.2: Brief Summary of Net Profit of RIICO Since 2002................................................. 2
Table 1.3: Mineral production in Udaipur District ................................................................... 3
Table 1.4: Regulations Applicable to the Proposed Project ................................................... 7
Table 1.5 Compliance of TOR Points – 18th June 2015 ......................................................... 8
Table 2.1: Connectivity of Proposed Project Site................................................................ 18
Table 2.2: Khasra-wise Land Use of the Project Site........................................................... 19
Table 2.3: Area Statement .................................................................................................. 20
Table 2.4 Detail of Industrial Plots ....................................................................................... 21
Table 2.5: Details of Road Development ............................................................................. 23
Table 2.6: Requirement of Construction Material ................................................................ 31
Table 2.7: Proposed Species to be planted ......................................................................... 34
Table 2.8: Cost of Project .................................................................................................... 38
Table 2.9: Implementation Schedule ................................................................................... 38
Table 2.10: Summary of Public Hearing .............................................................................. 38
Table 3.1: Salient Environmental Features around Proposed Plant Site ............................. 39
Table 3.2: Groundwater resources in Blocks and Rajsamand district .................................. 45
Table 3.3: Seasonal Water Level Fluctuation (Pre &Post-monsoon, 2006) ......................... 46
Table 3.4: Land Use Category in the Study Area ................................................................ 48
Table 3.5: Meteorological Data of Chittorgarh (Period 1961-1990) ...................................... 50
Table 3.6: Summary of Micrometeorological Data ............................................................... 50
Table 3.7: Environmental Monitoring Locations ................................................................... 52
Table 3.8: Ambient Air Quality Status (Winter Season) ....................................................... 54
Table 3.9: Ambient Noise Monitoring Locations .................................................................. 55
Table 3.10: Ambient Noise Quality Results, dB (A) ............................................................. 55
Table 3.11: Water Sampling Locations ................................................................................ 56
Table 3.12: Groundwater Quality in the Study Area ............................................................ 56
Table 3.13: Groundwater Quality in the Study Area (Contd.) ............................................... 57
Table 3.14: Soil Sampling Locations ................................................................................... 58
Table 3.15: Physiochemical Characteristics of Soil ............................................................. 58
Table 3.14 a: List of Tree Flora Recorded in the Study Area during primary study .............. 63
Table 3.14 b: List of Shrub Flora Recorded in the Study Area during primary study ............ 64
Table 3.14c: List of Herb/Grass Flora Recorded in the Study Area during primary study .... 65
Table 3.15 a. List of Mammalian Fauna Recorded/reported during primary study ............... 68
Table 3.15 b. List of Avi- Fauna Recorded in the study area during primary survey ............ 68
Table 3.16. List of Herpetofauna Recorded in the study area .............................................. 69
Table 3.17: Village-wise Population Distribution of Study Area ........................................... 70
Table 3.18: Infrastructure Facilities in the Villages of Study Area ........................................ 75
Table 4.1: Predicted Impacts on Existing Ecology during Construction Phase .................... 87
Table 4.2: Predicted Impacts on Ecology during Operation Phase ...................................... 94
Page iii
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Table 4.3:Pre mitigation Matrix for Various Project Activities and Associated Potential
Environmental Impacts on Various Environmental Attributes ....................................... 95
Table 8.1: Environmental Monitoring during Constructional Phase.................................... 106
Table 8.2 Environmental Monitoring during Operational Phase ......................................... 108
Table 8.3: Environmental Monitoring Cost......................................................................... 110
Table 9.1 Air Pollution Control Measures .......................................................................... 114
Table 5.1: List of Plant Species with Higher Sound Absorption Co-efficient ...................... 118
Table 5.2: List of Plant Species Suitable for Noise and Dust Attenuation .......................... 118
Table 5.3: List of Plant Species Suitable for Dust and Air Pollution Abatement ................. 118
List of Figures
Figure 1.1: Location of the Project Area ................................................................................ 5
Figure 2.1: Location Map of the Proposed Baggad Industrial Area within 10 km ................. 17
Figure 2.2: Slop of the Project Site Area ............................................................................. 19
Figure 2.3: Current View of Proposed Site .......................................................................... 20
Figure 2.4: Plot Plan of Baggad Industrial Area ................................................................... 22
Figure 2.5: Cross Section of a Typical Road ....................................................................... 24
Figure 2.6: Cross Section of 45-m ROW with 1.5-m wide central Verge .............................. 25
Figure 2.7: Cross Section of 30-m ROW ............................................................................. 26
Figure 2.8: Cross Section of 24-m ROW ............................................................................. 27
Figure 2.10: Drainage Plan ................................................................................................. 30
Figure 2.11 Landscape Plan ............................................................................................... 36
Figure 2.12: RWH Pit Design .............................................................................................. 37
Figure 3.6: Land Use Pattern of the Study Area .................................................................. 48
Figure 3.7: Land use Map of the Study Area ....................................................................... 49
Figure 3.8(a): Wind Rose Diagram (Post-monsoon Season) ............................................... 51
Figure 3.8(b): Wind Frequency Distribution Graph (Post - Monsoon Season) ..................... 51
Figure 3.9: Monitoring Locations within 10 km study area .................................................. 53
Figure 3.12: Tehsil wise population of the Study Area ......................................................... 71
Figure 3.13:Tehsil-wise SC/ST Population in Study Area .................................................... 72
Figure 3.14: Gender-wise Distribution of Literacy in Study Area .......................................... 72
Figure 3.15 :Workers Scenario of Study Area ..................................................................... 72
Figure 3.16 :Genderwise Distribution of Workers ................................................................ 73
Figure 3.17: Types of Main Workers in Study Area ............................................................. 73
Figure 3.18:Types of Marginal Workers in Study Area ........................................................ 74
List of Annexures
Page iv
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Abbreviation
AM Ante-Meridian
AP Air Pollution
AQ Air Quality
ASL Above Sea Level
BHC Benzene Hexa-Chloride
C.I. Cast Iron
CGWA Central Ground Water Authority
CHWTSDF Common Hazardous Waste Treatment, Storage & Disposal Facility
CPCB Central Pollution Control Board
CTO Consent to Operate
Cum Cubic meter
dB(A) Audible Decibel
dB(C) Continuous Decibel
DG Diesel Generator
E East
EB Ecology and Biodiversity
EC EIA Co-coordinator
EIA Environmental Impact Assessment
EMP Environmental Management Plan
ETP Effluent Treatment Plant
FAE Functional Area Expert
GIS Geographical Information System
gm/cc gram per cubic centimeter
GSS Grid Sub-Station
GSS Geology and Soil
ha Hectare
HG Hydrogeology
HP Hand Pump
IRC Indian Road Congress
IS India Standard
IUCN International Union for Conservation of Nature and Natural Resources
JVVNL Jaipur Vidyut Vitaran Nigam Limited
kg Kilogram
KLD Kilo Liter per Day
km Kilometer
kmph Kilometer per Hour
LAI Leaf Area Index
LC Least Concern
LU Land Use
m meter
m/s meter / second
m/yr meter / year
max. Maximum
mg/kg microgram per kilogram
mg/l microgram per liter
min. Minimum
mm Millimeter
MoEF&CC Ministry of Environment and Forest and Climate Change
msa Million Standard Axles
MSW Municipal Solid Waste
MT Metric Ton
MVA Million Volt Ampere
N North
Page | v
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page vi
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
1 INTRODUCTION
This Chapter provides background information of the project proponent, Need for the EIA
study as per prevailing legislation, Location and brief description of the project,
methodology adopted for EIA study and structure of the report.
1.1 Prelude
Rajasthan State Industrial Development and Investment Corporation, popularly known as
RIICO, is a premier agency of Government of Rajasthan that has played a catalytic role
in the industrial development of Rajasthan. The corporation was incorporated on 28th
March, 1969 as Rajasthan State Industrial & Mineral Development Corporation Limited
(RIMDC) and got its present name (RIICO) on 1st January, 1980.
RIICO-The Rajasthan State Industrial Development & Investment Corporation Ltd. since
its inception in 1969 has emerged as a multi-faceted and dynamic institution .It has kept
pace with the industrialisation process in providing complete and innovative means of
financial and investment support services.
RIICO is also the sole government agency in the State involved in development of land
for industrial enterprises. Large, medium and small scale projects get an easy access to
a ready to use base with supportive infrastructure facilities in the industrial areas,
developed and managed by RIICO. The financial and vital infrastructural facilities
provided by RIICO have contributed to promoting accelerated growth of industrial sector
in the State.
RIICO has 27 offices in Rajasthan and one in Delhi and has staff strength of 1,000. As
on June 30, 2015, RIICO has total authorized capital of Rs. 2,350-million and paid-up
capital of Rs. 2,102-million. A brief summary of RIICO is presented in 0.
Table 1.1: RIICO - At a Glance
S. No. Particular Details
(Cumulative since inception Up to May, 2015)
1. Investment Catalyzed (Rs. in Millions) 83784.0
2. Employment Generated (Nos.) 107870
3. Land Acquired (Acres) 78123.81
4. Land Developed (Acres) 43972.56
5. Industrial Areas (Nos.) 328
6. Growth Centers (Nos.) 8
7. Mini Growth Centers (Nos.) 13
8. Plots Allotted (Nos.) 53943
9. Industries in Production in Industrial Areas (Nos.) 35277
(Source: Official Website of RIICO-http://riico.co.in/glance.htm)
Site selection and acquisition of land, Financial assistance to small medium and large
scale projects, Equity participation in large projects on merit, Technical consultancy for
project identification and technical tie-ups, Escort services, facilitation of government
Page 1
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
clearances, Merchant banking and financial tie-ups, and extending incentives and
concessions as per the policy of the State Government. A brief summary of Net Profit of
RIICO Since 2002 to 30th November 2013 is presented in Table 1.2 as follows;
Page 2
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
It can be inferred from the table above that there is an increased production of minor
minerals, like Limestone, Marble masonry stone etc., and also some major minerals, like
Rock-phosphates, Pyrophillite, Lead Zinc (ROM) etc. Based on the information provided
in the Table above, RIICO has taken the opportunity of fulfilling this increased demand of
a Mineral Processing Unit/Organized Industrial Area near the quarry for these minerals in
the District.
Page 3
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
To control the adverse impacts, sound and safe environmental management plan has to
be implemented by the proponent, which makes environmental protection as essential
requirement along with profits due to the production
Page 4
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page 5
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Baggad Industrial Area. Scattered vegetations were observed. At the north-eastern side
of the project site a hillock is present. No habitation is observed within the project site.
NH-8 abuts by the project site on the eastern side. A natural storm water drain is present
at the northern side of the proposed project site. A village road is there at the southern
side and the western side of the site is flanked by hillocks, agricultural land, Open
scrubland etc In view of Land utilization, RIICO has selected the site, which is otherwise
not being utilized viably as compared to its size.
Land Utilization: As per the revenue records, a major chunk of the land of the proposed
project site is uncultivable fallow govt. land, Hillocks, open scrubland etc., which are of
no use otherwise except a little portion for grazing. The top soil is covered with hard
rocks on which no other vegetation exists except some herbs and shrubs. Agriculture is
also not possible in the proposed project site. This type of barren and uncultivable land is
being used for development of industrial area, which is certainly a positive initiative in
view of land utilization.
Connectivity of the Project Site: The proposed project site is situated about 56-km
away from the City of Rajsamand and 25-km away from Bhim. NH-8 abuts by the project
site. Nearest Railway Station is Kamali Ghat which is 8 km away from the project site
and Nearest Airport is Dabok Airport which is 135-km away.Thus, it may be said that the
site has the optimum connectivity for development of industrial area. NH-8 which
connects some big cities including Delhi, Jaipur, Ajmer, Udaipur, Ahmedabad, Vadodara,
Mumbai etc. abuts by the project site and offer the necessary connectivity for Raw
material supply, product export etc.
Page 6
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page 7
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Reason of
S. Coordinating Key Applicability or
Legislation Applicability
No. Agency Requirement Non-
applicability
Provide for
collection,
Municipal Solid Solid waste will
segregation,
Wastes be generated
storage,
7 (Management RSPCB Applicable both from the
treatment and
and Handling) proposed
disposal of
Rules, 2000 project.
municipal solid
wastes
Protection of
wildlife (wild
There are no
Wildlife animals,
national parks
(Protection) Act, defined plants Not
8 MoEFCC or sanctuaries
1972 and rules and birds) in Applicable
located near the
there under either National
proposed site.
Parks or
sanctuaries
Other Relevant Legal Framework
To control
Other than the
vehicular air
regular traffic
and noise
within the
Ministry of pollution. To
proposed
Road regulate
Central Motor project, there
Transport and development of
9 Vehicles Act, Applicable will be transport
Highways the transport
1988 of materials in
/Department of sector, check
and out of the
Police and control
project of the
vehicular air
proposed
and noise
project.
pollution
Provides for the
preservation of
The Ancient ancient and
No places of
Monuments and historical
Archaeological archaeological
Archaeological monuments and Not
10 Survey of India importance are
Sites and archaeological Applicable
(ASI) located near the
Remains Act, sites and
proposed site.
1958 remains of
national
importance
Page 8
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page 9
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page 10
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page 11
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page 12
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page 13
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page 14
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Chapter 1: Introduction
Chapter 2: Project Description
Chapter 3: Description of the Environment
Chapter 4: Anticipated Environmental Impacts and Mitigation Measures
Chapter 5: Environmental Management Plan
Chapter 6: Project Benefits
Chapter 7: Additional Studies
Chapter 8: Environmental Monitoring program
Chapter 9: Summary and Conclusions
Chapter 10: Disclosure of Consultants
Page 15
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
2 PROJECT DESCRIPTION
This Chapter deals with the details of the proposed Industrial Area such as location,
connectivity, size and magnitude of the operation, project requirements, Infrastructure
development, environmental consideration, project cost, implementation schedule,
resettlement and rehabilitation plan etc.
Page | 16
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Figure 2.1: Location Map of the Proposed Baggad Industrial Area within 10 km
Page | 17
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page | 18
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Source: Riico
Page | 19
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
North South
East West
Figure 2.3: Current View of Proposed Site
Page | 20
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page | 21
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Source: RIICO
Page | 22
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page | 23
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Unbound Granular bases which comprise conventional Water Bound Macadum (WBM),
Wet Mix Macadum (WMM) etc. conforming the IRC specification, will be used. Paver
Finishers will be used for laying this layer. Dense Bituminous macudum will be used for
the surfacing. The materials will be transported from outside workshop of the contract
awardee. No mixing plant or hot mix plant will be installed within the Project Site.
The Bituminous Macadum will be laid manually and will be compacted with the Help of a
Road Roller. It is estimated that for Road construction of the proposed project 1 Paver
finisher and 2 Road Roller will be required. Road cross-sections of 45, 30, 24 and 18-m
roads have been presented in Figure 2.5, 2.6, 2.7 and 2.8, respectively.
Page | 24
EIA of Proposed Industrial Area Development (Baggad Industrial Area - Extension) by
Rajasthan Industrial Development & Investment Corporation Limited
Figure 2.6: Cross Section of 45-m ROW with 1.5-m wide central Verge
Page | 25
EIA of Proposed Industrial Area Development (Baggad Industrial Area - Extension) by
Rajasthan Industrial Development & Investment Corporation Limited
Page | 26
EIA of Proposed Industrial Area Development (Baggad Industrial Area - Extension) by
Rajasthan Industrial Development & Investment Corporation Limited
Page | 27
EIA of Proposed Industrial Area Development (Baggad Industrial Area - Extension) by
Rajasthan Industrial Development & Investment Corporation Limited
Page | 28
EIA of Proposed Industrial Area Development (Baggad Industrial Area - Extension) by
Rajasthan Industrial Development & Investment Corporation Limited
All industrial units would be allotted plots with a condition of “zero” discharge. Therefore,
all industrial waste water generated at respective industrial level will be treated by them
and either recycled or used for green area development within their allotted area or within
green belt developed by RIICO.
It is planned to construct total 17 km open storm water drains along roads in both sides.
These drains will be linked to rain water harvesting structures to be built up within project
site. Drainage plan for the proposed Industrial area is provided at Figure 2.10.Design
basis for the storm water drainage system has been presented in Box No. 2.
Box No. - 2
Design Basis of Storm Water Drains
Storm Water Run-off: The calculation of storm water runoff would be made as per the
guidelines given in IRC SP-13.
Q 0.028 x P x A x IC
Where,
A = Area of catchments
IC = Critical Intensity of rainfall in cm/hr
P = Percentage coefficient of run-off for the catchments characteristics.
Page | 29
EIA of Proposed Industrial Area Development (Baggad Industrial Area - Extension) by
Rajasthan Industrial Development & Investment Corporation Limited
Source: RIICO
Page | 30
EIA of Proposed Industrial Area Development (Baggad Industrial Area - Extension) by
Rajasthan Industrial Development & Investment Corporation Limited
Category A or Category B type of industries as per EIA Notification, 14th September, 2006
as amended on 1st December, 2009 is anticipated.
Description Requirement
Soil 30000-Cum
Stone 10000-Cum
Aggregates 15000-Cum
Bitumen 250-MT
There will be water requirement of approximately 15-KLD including 5-KLD domestic water
requirements for workers (45-lpcd for 75-workers) during the construction phase based on
construction activity requirement. The water requirement during this phase will be met
from the existing ground water sources outside the proposed industrial area. Drinking
water at construction sites will be provided by RIICO.
Operation phase:
Based on the data collected from RIICO of its operational industrial areas, the water
requirement in the proposed project during operation phase will be about 1203-KL/day
(water requirement per acres =1000-gallons/day).Water requirement calculation for
Industrial zone is presented in Annexure V.
The water requirement during operation phase will be met by RIICO through ground water
and for the same application is attached as Annexure IV. Any extra requirement of water
other than the quantity stated above will be arranged by the industries themselves.
Expected industries to be proposed at project area viz. (Marble, granite, minerals, &
engineering) which are of zero discharge, so CETP will not be proposed at site.
Page | 31
EIA of Proposed Industrial Area Development (Baggad Industrial Area - Extension) by
Rajasthan Industrial Development & Investment Corporation Limited
To avoid any kind of water pollution during construction phase, it is proposed to provide
temporary sanitation facilities at construction site/ camp such as septic tank followed by
soak pit or mobile toilets.
During the operation phase of the project, water pollution will be in the form of industrial
effluent as well as domestic effluent from industrial units in the industrial area. Mitigation of
water pollution will be the responsibility of each individual industrial unit. Polluting industrial
units will have to install Effluent Treatment Plant (ETP) and/or Sewage Treatment Plant
(STP) as per their requirement in compliance with the RSPCB norms. Treated water from
ETP and/or STP shall be utilized by the industrial units within their premises for reuse in
process/ gardening/ non-potable usage. Any excess quantity of treated water can be sent
to green areas of RIICO after taking permission from RIICO. All the units will opt for "Zero
Discharge System".
2.16.3 Air Pollution Control
During the construction phase of the project, air pollution will be mainly from site
preparation, transportation of construction material, operation of construction machinery at
site, loading and unloading of construction material etc. RIICO will take adequate
measures to control the air pollution during the construction phase, which has been
discussed in details in Environmental Management Plan.
During operation phase of the project, air pollution will be mainly from operation of
industrial units and movement of vehicles for transportation of raw materials and final
products. All the industrial units will take "Consent to Operate" under Air Act from RSPCB
Page | 32
EIA of Proposed Industrial Area Development (Baggad Industrial Area - Extension) by
Rajasthan Industrial Development & Investment Corporation Limited
prior to start of the production and shall provide adequate air pollution control equipments
as applicable to adhere the conditions stipulated in the CTO.
2.16.4 Waste Management
Waste during construction activity relates to excess cement mix or concrete left after work
is over, rejection caused due to change in design or wrong workmanship etc. These are
normally re-used as filling at the same site after completion of excavation work. Demolition
and/or construction waste will be utilized in road construction wherever possible.
Excavated earth during the civil works including road construction, fencing, drainage, site
levelling etc., shall be utilized within the project site. Topsoil shall be conserved and will be
utilized in the areas earmarked for greenbelt development.
Municipal Solid Waste Management
Approximately 10 to 15-kg of municipal solid waste will be generated from the construction
camp and construction site. This will be collected and disposed off in a fenced pit dugout
at the site and covered properly after completion of construction activity.Waste
management would be the responsibility of individual industries. Individual industry will
provide system for municipal solid waste collection, storage and disposal.
Each industry shall have to comply with the Municipal Solid Waste Management Rules,
2000 and amendments therefore. Approximately 2000 persons will be involved during the
operation phase of the project. Taking into consideration approximately 0.15-
kg/person/day of municipal solid waste generation, the total municipal waste generation in
the proposed industrial area will be about 300-kg/day.
Hazardous Waste Management
3.672-ha of total area within the project site will be developed as Greenbelt area by RIICO
only. Besides, individual industries will also provide greenbelt area in their own plot as per
RSPCB Consent Condition. RIICO in consultation with Forest department will undertake
afforestation in nearby eco-sensitive Todgarh Raoli wildlife sanctuary. Landscape plan for
the proposed project is attached as Figure 2.11.
Green belt will be developed keeping in consideration the climatic conditions of the area,
quality of soil & water, type of industries & pollution to be generated. Nature of species
proposed to be planted should be as per CPCB norms:
Perennial, evergreen & fast growing trees
Round, thick & spreading canopy.
Page | 33
EIA of Proposed Industrial Area Development (Baggad Industrial Area - Extension) by
Rajasthan Industrial Development & Investment Corporation Limited
Tolerant to climatic conditions of the area and with less water requirement & after
care will preferable be planted.
Plantation of Indigenous species
Plantation trees with ornamental foliage & shrubs with fragrant flowers will enhance
scenic beauty of the area.
Plantation of trees resistant to air pollutants
Plantation should be such that it maintains ecological & hydrological balance of the
region.
Trees Planted along periphery of project site should alternate with shrubs & herbs
so as to form a continuous green barrier.
Green Belt development Plan: Healthy and established sapling having 1m height
shall be selected for planting in greenbelt to avoid mortality. Pit measurements of
0.6 m x 0.6 m x 0.6 m are proposed to be dug up at desired point in triangular
pattern
The tall shrubs and dwarf trees with 3 m spacing between plants and rows is
sufficient while medium and tall trees in middle and rear rows are to be planted at a
distance of 6-7m and 8-10m apart respectively depending upon the space
available.
The pit should be filled with mixture of cow dung manure and soil in ratio of 1: 4.10
gm suitable soil conditioner should be properly mixed with the soil and manure to
kill the termites and insect.
Close plantation with three tiers system keeping dwarf trees with round canopy
exposed to the source of emission followed by medium and tall trees with
cylindrical canopy is ideal design for the polluted area, because all plants are
exposed to the pollutants. Thick plantation shall be done along the periphery and
along the proposed road.
Close plantation also result in tall trees with deeper roots and ultimately yield more
bio-mass per unit area and more efficient absorption of pollutants. Plantation of
trees in staging arrangement in multiple rows across the direction of the wind is
recommended for better trapping and absorption of the pollutants.
• Avenue plantation: Road of ROW 45 m, 30 m, 24 m & 18 m is planned within
project site. Along road of 45 m, 6 rows of trees will be provided, 2 rows in centre
verge (5 m), 2 rows (2 m) each on either side of road. Along road of 30 m
plantation will be carried out on both sides of road in double rows, along 24 m road
on both sides of road in double row& along 18 m on one side of road in a single
row.
Plant species with pollution abatement capacity will be planted. The list of the
same is given in Error! Reference source not found.7 as follows;
Page | 34
EIA of Proposed Industrial Area Development (Baggad Industrial Area - Extension) by
Rajasthan Industrial Development & Investment Corporation Limited
Page | 35
EIA of Proposed Industrial Area Development (Baggad Industrial Area - Extension) by
Rajasthan Industrial Development & Investment Corporation Limited
Source: RIICO
Page | 36
EIA of Proposed Industrial Area Development (Baggad Industrial Area - Extension) by
Rajasthan Industrial Development & Investment Corporation Limited
As per the prevailing rules of allotment of RIICO, all the proposed industries will required
to construct water harvesting structure, which should be almost 60-70% of total land area.
For the remaining area (common services), the storm water drains will be constructed in
such a manner to harvest the rainwater in existing pits, small ponds of this area as well as
nearby area. Hence, proper rain water harvesting will be taken care of by digging pits in
open areas.
Source: RIICO
The project is in its planning Stage. The total approximate cost of the project is estimated
to be Rs.3937-Lakhs. Tentative break-up of the cost is given in following Table 2.8.
Page | 37
EIA of Proposed Industrial Area Development (Baggad Industrial Area - Extension) by
Rajasthan Industrial Development & Investment Corporation Limited
Description Cost
Land Cost Rs. 237-Lakhs
Infrastructure Development Cost Rs. 3500-Lakhs
Cost for Environmental Management Rs. 200-Lakhs
Total Rs.3937-Lakhs
2.16.8 Implementation Schedule
Description Timeline
Road Work 2017-2018
Power Line 2018-2019
Water Supply 2018-2019
Drainage work 2018-2019
Page | 38
EIA of Proposed Industrial Area Development (Baggad Industrial Area - Extension) by
Rajasthan Industrial Development & Investment Corporation Limited
This chapter describes the Baseline environmental conditions in and around the proposed
project site for various environmental attributes, viz., Physical, Biological and Socio-economic
features, within the 10-km radial study zone, which is termed as the study area. Topography,
Meteorology, Ambient air, Water, Land/Soil, and Noise environment constitute the physical
environment, whereas flora & fauna constitute the Biological environment. Demographic
features and Occupational pattern in the study area constitute Socio-economic environment.
Baseline environmental conditions are based on the field studies carried out during the period
of October, 2015 to December, 2015 as winter season
3.1 Prelude
It is necessary for the Environmental Impact Assessment (EIA) studies to establish
baseline status for valued environmental components, which are likely to be affected
because of the developmental activities/ modernization or expansion. Hence, it is
imperative to study the existing environmental conditions not only to establish the pre-
project physical, biological, and socio-economic conditions, but also to predict
environmental impacts caused by the construction and operation phases of the project.
The environmental status around the proposed project site is determined by studying in
detail the major environmental attributes viz., Air, Water Land/Soil, Noise, Biological and
Socio-economic in a 10-km radial zone. For collecting the baseline information, primary
data were generated as per TOR prescribed by EAC MoEF & CC. Secondary data from
literature search were also obtained from various Government and non-government
sources such as Meteorological Departments, CPCB publications, and other agencies.
The primary data generation was carried out during October to December 2015. M/s
Kamal Enviro & Food Lab Pvt. Ltd., Gurgaon-Haryana with EQMS Team, carried out
sampling and testing. The study area within a 10 km radius around the proposed plant site
has been considered as impact zone for EIA study. Primary and secondary data has been
collected for 10 Km radius of the project site.
Page | 39
EIA of Proposed Industrial Area Development (Baggad Industrial Area - Extension) by
Rajasthan Industrial Development & Investment Corporation Limited
3. Social Environment
T Physical Setting Rural Urban / Rural Settings
U Physical Sensitive None Yes (Temples, Schools, College,
Receptors Hospital)
V Archaeological None None
Monuments
Page | 40
EIA of Proposed Industrial Area Development (Baggad Industrial Area - Extension) by
Rajasthan Industrial Development & Investment Corporation Limited
Page | 41
EIA of Proposed Industrial Area Development (Baggad Industrial Area - Extension) by
Rajasthan Industrial Development & Investment Corporation Limited
Page | 42
EIA of Proposed Industrial Area Development (Baggad Industrial Area - Extension) by
Rajasthan Industrial Development & Investment Corporation Limited
Page | 43
EIA of Proposed Industrial Area Development (Baggad Industrial Area - Extension) by
Rajasthan Industrial Development & Investment Corporation Limited
Page | 44
EIA of Proposed Industrial Area Development (Baggad Industrial Area - Extension) by
Rajasthan Industrial Development & Investment Corporation Limited
water development
Net annual ground
Stage of ground
irrigation (MCM)
resource (MCM)
Annual ground
Annual ground
water draft for
industrial use
replenishable
Block/District
Gross annual
ground water
domestic &
Annually
(MCM)
(MCM)
(MCM)
(%)
Bhim 12.1457 10.9311 13.9956 1.0862 15.0818 137.97
Deogarh 12.3505 11.1154 11.7042 0.6986 12.4028 111.58
Rajsamand District 10.1094 9.0985 11.6868 2.8017 14.4885 159.24
3.1.3.1 Hydrogeology
The occurrence of ground water in the study area is mainly controlled by the topographic
and structural features present in the geological formations. The principal source of ground
water is precipitation. Out of the total rainfall received, a major part of it is lost as run-off
and by evapo-transpiration through soil and vegetation. Only a small part of rainfall
infiltrates down to reach ground water body. Groundwater occurs mainly under water table
conditions in all formations. The important water bearing formation in study area is
alluvium.
Alluvial deposits of recent origin occur in narrow discontinuous bands along the channels
of Khari in the form of valley fills. They are composed of stream laid sand and gravel and
occasionally silt, clay and kankar. Besides these, blown sand occurs in localized patches.
Thickness of alluvium has been found to vary from thin veneer near outcrops to 19m in the
south of Bamania Kalan. The bed rock is overlain by a boulder gravel bed varying in
Page | 45
EIA of Proposed Industrial Area Development (Baggad Industrial Area - Extension) by
Rajasthan Industrial Development & Investment Corporation Limited
thickness from 2 to 6 m. Ground water in boulder and gravel beds occurs under confined
conditions. Saturated thickness of alluvium has been found to vary between 3 and 12 m.
Study Area
(Source-http://cgwb.gov.in/District_Profile/Rajasthan/Rajsamand.pdf)
Figure 3.4: Hydro-geological Map of Rajsamand District
3.1.3.2 Depth to Water Level
As per CGWB report (2006) the ground water level during pre monsoon season in study
area ranges from 3.16 to 20.99-m below ground level (mbgl) and in post monsoon season
ranges between 0.30 to 13.31-m. Seasonal water level fluctuation in different blocks of
Rajsamand district is given below:
Page | 46
EIA of Proposed Industrial Area Development (Baggad Industrial Area - Extension) by
Rajasthan Industrial Development & Investment Corporation Limited
(Source-http://images.indiatvnews.com/buzzlife/2015/1430124406earthquake-zone-india-full-map.jpg)
Figure 3.5: Seismic Zonation and Intensity Map of India
Page | 47
EIA of Proposed Industrial Area Development (Baggad Industrial Area - Extension) by
Rajasthan Industrial Development & Investment Corporation Limited
3.1.5 Land-Use
Land use analysis was carried out using remote Sensing Data. Interpretation approach
based on systematic digital imaging was used for delineating the land use classes. The
demarcation of boundaries falling under different land use/land cover units is done using
different colours assigned to different land use/land cover units of a satellite imagery1.
Most of the land within the 10 km area of the proposed site is under open scrub land. As
per the land use based on satellite image, about 51.67% of the land is under open scrub
land. 23% of the land is under agriculture, about 15.31% land is under dense forest, 4.72%
land is under open jungle and rest of the land is under other uses (Refer Figure 3.7 and
Table 3.4).
1 The satellite Imagery of Indian Remote Sensing Satellite (IRS- ID, sensor P6, LISS III) of 24 m resolution was
used. The Swath of the imagery is 141 Km x 141 Km. Band used are 4, 3, 2 and 5. LANDSAT imagery of 30 meter
resolution and 185 x 185 km swath is also used for the comparative and overall analysis of the area. LISS III
imagery and LANDSAT 4-5 TM imagery were used for the complete coverage of the study area
Page | 48
EIA of Proposed Industrial Area Development (Baggad Industrial Area - Extension) by
Rajasthan Industrial Development & Investment Corporation Limited
Page | 49
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
3.4 Micro-Meteorology
The meteorological parameters play a vital role in transport and dispersion of
pollutants in the atmosphere. Historical meteorological data were obtained from
climatological tables pertaining to Chittorgarh (nearest representative IMD station) for
the period 1961-1990 and is summarised in Table 3.5.
Page | 50
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page | 51
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
availability of reliable power supply etc. These were examined while finalizing the
monitoring locations.
3.1.6 Air Environment
Ambient air quality monitoring was carried out between October to December 2015
with the frequency of twice a week of 24 hr sampling. All the ambient air analysis with
respect to each parameter was analyzed as per CPCB guidelines. The AAQ
monitoring locations are provided in Table 3.7. Map showing environment
monitoring location is given in Figure 3.9. Ambient Air Quality test results are
presented in Table 3.7 & 3.8.
Page | 52
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page | 53
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page | 54
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
The CO and HC were not detected at any locations and found below 0.1 mg/m 3 which is well
within the NAAQS Standard. Overall the ambient air quality of the study area were found well
within the NAAQS.
3.1.7 Noise Environment
Noise after a certain level can have a very disturbing effect on the people and animals
exposed to it. Hence, it is important to assess the present noise quality of the area in order to
predict the potential impact of future noise levels due to the proposed project.
The Noise Monitoring locations are shown in Table 3.7.Noise measurements were done using
Cygnet Sound Level Meter Model 2031A. Ambient noise monitoring was carried out at 8
locations within the study area. Monitoring was carried out both in the day and night time and
accordingly Leq day and night were derived from the monitored data. Noise monitoring results
are given in Table 3.9 & 3.10. Monitored levels were compared against Ambient Noise
Standards, The Noise Pollution (Regulation and Control) Rules, 2000 prescribed by CPCB.
Page | 55
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Code Location Dist & Dir wrt to project site Source Coordinates
GW1 Baggad 00 Hand pump 25°35'57.38"N, 73°54'5.33"E
GW2 Pipali Nagar 1.22 West Hand pump 25°35'22.77"N 73°52'24.28"E
GW3 Jhootara 0.66 NE Hand pump 25°35'35.69"N 73°54'34.57"E
GW4 Kamala 1.94 West Hand pump 25°34'26.82"N 73°52'9.22"E
GW5 Kundeli 2.89 E Hand pump 25°34'11.43"N 73°55'16.28"E
GW6 Phukiythar 1.72 S Hand pump 25°33'11.28"N 73°53'30.91"E
GW7 Thoriya 1.64 NW Hand pump 25°36'12.56"N 73°52'29.39"E
GW8 Kamlighat 2.93 SW Hand pump 25°33'12.41"N 73°52'3.14"E
Desirable Permissible
S.No Parameters Limit IS: Limit IS: GW-1 GW-2 GW-3 GW-4
10500 10500
1. pH 6.5-8.5 No relaxation 7.1 7.0 7.2 6.9
2. Conductivity, mhos/cm - - 670 870 815 464
3. Turbidity,NTU 5 10 0.2 0.3 0.3 0.5
4. TDS, mg/l 500 2000 426 578 544 308
5. T Hardness as CaCO3, mg/l 300 600 277 312 302 178
6. Chloride asCl, mg/l 250 1000 52 72 64 38
7. Alkalinity, mg/l 200 600 64 112 122 54
8. Sulphates as, SO4, mg/l 200 400 24 34 29 16
9. Nitrates as NO3, mg/l 45 100 11 22 18 12
10. Fluoride as F, mg/l 1 1.5 0.28 0.36 0.28 0.36
11. Iron as Fe, mg/l 0.3 1 0.18 0.46 0.33 0.25
12. Zinc as Zn, mg/l 5 15 0.70 0.78 0.65 0.60
13. Calcium as Ca, mg/l 75 200 66 80 74 48
14. Magnesium as Mg 30 100 27 27 28.3 14
Page | 56
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
15. Cadmium as Cd, mg/l 0.01 No relaxation <0.01 <0.01 <0.01 <0.01
16. Copper as Cu, mg/l 0.05 1.5 <0.01 <0.01 <0.01 <0.01
17. Nickel as Ni, mg/l - - <0.01 <0.01 <0.01 <0.01
18. Lead as Pb, mg/l 0.05 No relaxation <0.01 <0.01 <0.01 <0.01
19. Mercury as Hg, mg/l 0.001 No relaxation <0.001 <0.001 <0.001 <0.001
20. Chromium (Total as Cr, mg/l 0.05 No relaxation <0.05 <0.05 <0.05 <0.05
21. Arsenic as As, mg/l 0.05 No relaxation <0.025 <0.025 <0.025 <0.025
22. Phenolic compound 0.001 0.002 <0.001 <0.001 <0.001 <0.001
Desirable Permissible
S.N
Parameters Limit IS: Limit IS: GW-5 GW-6 GW-7 GW-8
o
10500 10500
1 pH 6.5-8.5 No relaxation 7.3 7.1 7.0 7.1
2 Conductivity, mhos/cm - - 741 818 506 780
3 Turbidity,NTU 5 10 0.3 0.2 0.3 0.5
4 TDS, mg/l 500 2000 478 532 328 510
T Hardness as CaCO3,
5 300 600 292 284 214 304
mg/l
6 Chloride asCl, mg/l 250 1000 60 72 48 64
7 Alkalinity, mg/l 200 600 72 112 68 102
Sulphates as, SO4,
8 200 400 26 28 14 21
mg/l
9 Nitrates as NO3, mg/l 45 100 12 16 11.3 14.5
10 Fluoride as F, mg/l 1 1.5 0.30 0.65 0.44 0.52
11 Iron as Fe, mg/l 0.3 1 0.39 0.45 0.22 0.15
12 Zinc as Zn, mg/l 5 15 0.88 0.96 0.56 0.48
13 Calcium as Ca, mg/l 75 200 70 58 44 74
14 Magnesium as Mg 30 100 29 34 25 29
15 Cadmium as Cd, mg/l 0.01 No relaxation <0.01 <0.01 <0.01 <0.01
16 Copper as Cu, mg/l 0.05 1.5 <0.01 <0.01 <0.01 <0.01
17 Nickel as Ni, mg/l - - <0.01 <0.01 <0.01 <0.01
18 Lead as Pb, mg/l 0.05 No relaxation <0.01 <0.01 <0.01 <0.01
19 Mercury as Hg, mg/l 0.001 No relaxation <0.001 <0.001 <0.001 <0.001
Chromium (Total as Cr,
20 0.05 No relaxation <0.05 <0.05 <0.05 <0.05
mg/l
21 Arsenic as As, mg/l 0.05 No relaxation <0.025 <0.025 <0.025 <0.025
22 Phenolic compound 0.001 0.002 <0.001 <0.001 <0.001 <0.001
Source: Lab Result
Observation on Ground Water Quality: The pH value of water samples at all locations
varies from 6.9 – 7.3 and are within permissible limit. The conductivity values were found to be
in the range of 464 – 870 μmhos/cm. The chloride level was found to vary from 38 – 72 mg/l
within permissible limit. The total hardness values were found to vary from 178 – 312 mg/l;
within permissible limit. Calcium and Magnesium values were within the permissible limit.
Fluoride levels found within the permissible limit. Zinc and Fe levels were found to be within
the permissible limit. No metallic contamination has been found in the ground water samples.
All the others parameters in ground water sample are within the permissible limit of Indian
Standard IS: 10500-2012.
3.1.9 Soil Environment
Page | 57
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
The soil samples were examined for various physicochemical parameters, to determine the
existing soil characteristics of the study area. Soil samples were collected from the vicinity of
proposed project site. Physicochemical characteristics of soil are presented in Table: 3.141 as
follows,
Page | 58
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page | 59
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Soil pH is an important soil property, which affects the availability of several plant nutrients. It
is a measure of acidity and alkalinity and reflects the status of base saturation. The soil pH
ranges from 7.28 to 7.82, thereby indicating the soils are neutral to slightly alkaline.
Organic Carbon
The effect of soil organic matter on soil properties is well recognized. Soil organic matter plays
a vital role in supplying plant nutrients, cation exchange capacity, improving soil aggregation
and hence water retention and soil biological activity. The Organic Carbon content of soil
varied from 0.38 to 0.48 %( 0.66 to 0.83% as Organic Matter) thereby implying that soils are
low in organic content.
Macronutrients
Nutrients like nitrogen (N), phosphorus (P) and potassium (K) are considered as primary
nutrients and sulphur (S) as secondary nutrient. These nutrients help in proper growth,
development and yield differentiation of plants and are generally required by plants in large
quantity.
Available Nitrogen
Nitrogen is an integral component of many compounds including chlorophyll and enzyme
essential for plant growth. It is an essential constituent for amino acids which is building blocks
for plant tissue, cell nuclei and protoplasm. It encourages aboveground vegetative growth and
deep green color to leaves. Deficiency of nitrogen decreases rate and extent of protein
synthesis and results into stunted growth and develop chlorosis. Available nitrogen content in
the surface soils ranges between 265.6& 278.9-kg/ha, thereby indicating that soils are low in
available nitrogen content.
Available Phosphorus
Phosphorus is an important component of adenosine di-phosphate (ADP) and adenosine tri-
phosphate (ATP), which involves in energy transformation in plant. It is essential component
of deoxyribonucleic acid (DNA), the seat of genetic inheritance in plant and animal.
Phosphorous take part in important functions like photosynthesis, nitrogen fixation, crop
maturation, root development, strengthening straw in cereal crops etc. The availability of
phosphorous is restricted under acidic and alkaline soil reaction mainly due to P-fixation. In
acidic condition it gets fixed with aluminum and iron and in alkaline condition with calcium.
Available phosphorus content ranges between 22.5 & 41.3-kg/ha, thereby indicating that soils
are having medium to high available phosphorus.
Available Potassium
Potassium is an activator of various enzymes responsible for plant processes like energy
metabolism, starch synthesis, nitrate reduction and sugar degradation. It is extremely mobile
in plant and help to regulate opening and closing of stomata in the leaves and uptake of water
by root cells. It is important in grain formation and tuber development and encourages crop
resistance for certain fungal and bacterial diseases. Available potassium content in these soils
ranges between 322.4 & 341.5-kg/ha, thereby is indicating that the soils are high in potassium
content.
Micronutrients
Proper understanding of micronutrients availability in soils and extent of their deficiencies is
the pre-requisite for efficient management of micronutrient fertilizer to sustain crop
Page | 60
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page | 61
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
The 10 km area within the proposed site is considered as buffer zone. The vegetation within
the 10 km area of the proposed site is comprises of following three major types of vegetation:
Page | 62
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Forest area
Non-forested area (Plantation and natural vegetation along roadside and along
agriculture fields and along residential areas)
vegetation in Tadgarh Rauli Wildlife Sanctuary.
Vegetation in Forest area: Forest vegetation of buffer zone is mostly comprised of scattered
growth of tree flora and scrub land dominated with xerophytic vegetation. Various species of
Acacia are leading species in such kind of notified forest areas. Somewhere these areas were
found densely dominated with various shrub species like Lantana camara, Adhatoda vasica,
Calotropis procera and Martynia annua. The list of trees, shrubs, herbs, climbers and grasses
found in the buffer zone area listed in Table 3.14a, 3.14b, 3.14c respectively Photographs of
buffer zone viewing ecological habitat is shown in Figure 3.10 b. Photographs of flora and
fauna species found in buffer zone is shown in Figure 3.11 a and 3.11 b respectively.
Todgarh Sanctuary: Tadgarh Rauli Wildlife Sanctuary is the another important biotic feature
present in the buffer zone of the project which is located about 3.37km, towards west and
north-west of proposed project site. The Sanctuary lies in the Arawali hill range which one of
the oldest formations in the world which spreads over an area of 495.27 Km2. Small area of
Todgarh sanctuary falls within the 10 km area of the project site.
Tadgarh Rauli Wildlife Sanctuary is quite rich in terms of biodiversity and the flora reported
from the Sanctuary is comprised of Dhaak, Kankeda, Jhinja, Ronjh, Bargad, Peepal, Gular,
Ber,Babool , Khair, Dhawda, Mahuwa, Hingot, Goyakhair, Kumtha, Khirni, Aanwala, Salar
,Karaya ,Gurjan , Kair, Kanther, Gangeran, Kalisyali, Googal, Chanbor, Aanwal, Adusa,
Jalijamni, Ratti, Doodhi, Shatawar, Khaatalimbu, Kikoda, Salarbel, Amarbel, Punwad,
Andhiveda, Chirchita and Van Tulsi. Majority of these species have xerophytic
adaptation.These forest provide habitat for primary consumer (herbivorous) like Nilgai,
Sambar, Common Langur, etc. which support omnivorous and carnivorous like Jungle cat,
Leopard , Porcupine, Sloth Bear, Jackal, Indian Wild Boar, Common Palm Civet and Sloth
Bear.
Avifauna reported in this sanctuary are black shouldered kite, Shikra, White-backed Vulture,
Spotted Owlet ,Yellow-footed Green Pigeon, Grey, Partridge,Grey, Jungle Fowl, Spotted
Dove, Koel, Rose-ringed Parakeet, Common Myna, Eurasian Collared Dove, Black Drongo,
Black-rumped Flameback, Chestnut-shouldered Petronia, Jungle Babbler, Red-vented Bulbul,
Indian Robin, Purple Sunbird ,Oriental White-eye,Baya Weaver, White-browed Fantail, Little
Grebe, Little Egret, Little Cormorant etc. Common garden lizard, Common skink, Common
Indian Monitor, Common tree snake, Spectacled cobra, Saw scaled Viper.
Vegetation in Non Forest area: the non forest area includes the vegetation along agriculture
fields, near settlement, along road side and other open areas. The tree species reported in
these area are comprises of Mangifera indica, Dalbergia sissoo, Mahua (Madhucaa indica),
Neem (Azadirachta indica), Bakain (Melia azaderach), Imli (Tamarindus indica), Ficus
Bengalensis, Eucalyptus (Eucalyptus sp), Siris (Albizzia lebback), Babul (Acacia catechu),
Chilbil (Holoptelea integrifolia) etc. Tall Bamboo (Dendrocalamus strictus) is also noticed.
Table 3.14 a: List of Tree Flora Recorded in the Study Area during primary study
Sl. Core
No. Scientific Name Name Family Area Buffer Area
Tree S1 S2 S3 S4
Page | 63
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Table 3.14 b: List of Shrub Flora Recorded in the Study Area during primary study
Sl. Core
No. Scientific Name Name Family Area Buffer Area TWLS
Shrub S1 S2 S3 S4
1 Adhatodavasica Ardusa Acanthaceae * * * *
Page | 64
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Table 3.14c: List of Herb/Grass Flora Recorded in the Study Area during primary study
Sl. Core
No. Scientific Name Name Family Area Buffer Area TWLS
Herb/Grasses S1 S2 S3 S4
1 Abrusprecatorius Ratti Fabaceae * * *
2 Achyranthesaspera Ultakanta Amaranthaceae * *
3 Amaranthusspinosus Amaranthaceae * *
4 Ampelocissuslatifolia Khatalimbu Vitaceae * * *
5 Asparagus racemosus Satavari Liliaceae * *
6 Cardiospermumhalicacabum Kak-mardica Sapindaceae * *
7 Cascutareflxa Amarvel Convolvulaceae *
8 Dioscoreabulbifera VarahiKand Dioscoreaceae *
9 Ipomoea nil Kaladana Convolvulaceae *
10 Ipomoea sp Convolvulaceae *
11 Abelmoschusmanihot JangliBhindi Malvaceae * *
12 Abutilon indicum Malvaceae * * *
13 Acalyphaciliata Euphorbiaceae *
14 Alysicarpuslongifolius Fabaceae *
15 Amaranthusgracilis Amaranthaceae *
Page | 65
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
16 Argemonemexicana Papaveraceae * *
17 Bidensbiternata Asteraceae *
18 Cannabis sativa Bhang Cannabaceae * *
19 Cassia absus Chimod Fabaceae *
20 Cleome viscosa Cleomaceae * *
21 Commelinabenghalensis Commelinaceae * * * *
22 Commelinasp Commelinaceae * * * *
23 Corchorussp Malvaceae *
24 Crotalaria juncea Saniya Fabaceae * *
25 Cyperuscompressus Cyperaceae * *
26 Argyreia nervosa Convolvulaceae * *
27 Barleriacristata Acanthaceae * * *
28 Desmodiumdichotomum Paplionaceae *
29 Dipteracanthussp Acanthaceae *
30 Leucasaspera Kubi Lamiaceae * * *
31 Indigoferatinctoria Fabaceae * * * *
32 OcimumCanum Lamiaceae *
33 Cynodondactylon Poaceae * * *
34 Dichanthiumannulatum Poaceae * * *
35 Echinopsechinatus Asteraceae * *
36 Euphorbia chamaesyce Euphorbiaceae * * *
37 Euphorbia granulata Euphorbiaceae * * * *
38 Euphorbia hirta Euphorbiaceae * * *
39 Heteropogoncontortus Poaceae * * * *
40 Imperatacylindrica Poaceae * * *
41 Partheniumhysterophorus Asteraceae * * * *
42 Sidaacuta Malvaceae * *
43 Solanumnigrum Solanaceae * *
44 Tephrosiapurpurea Fabaceae * * *
45 Tridaxprocumbens Kalimendhi Asteraceae * * *
46 Typhasp Typhaceae * *
*observed during site visit other reported from the study area.
Page | 66
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
In order to study the wild mammals, avifauna, herpetofauna of the project area, a normal
systematic transect sampling was done in different strata. Under this sampling, a 2-3 km long
transect walks were carried out in the different locations. In addition to the field sampling
Page | 67
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
secondary data and information was also collected through indirect evidences such as calls,
signs and trophies of mammals, interviews of local villagers for the presence of various animal
species and the Forest Working Plan of the Forest Division. NBWL Clearance enclosed as an
Annexure XV.
Forest Working Plan of Udaipur (North) Forest Division reported a various Mammalian species
in the forest division territory but a total of 16 mammalian species were reported in the study
area in present primary survey which are listed in Table 3.15 a.
Sl.
No. Name Scientific Name Order Family CS Schedule
1 Langur* Semnopithecus entellus Primates Cercopithecidae LC II
2 Muntjak Muntiacusmuntjak Artiodactyla Cervidae LC III
3 Sambar Rusa unicolor Artiodactyla Cervidae VU III
4 Spotted Deer Axis axis Artiodactyla Cervidae LC III
Boselaphus
5 Blue Bull* tragocamelus Artiodactyla Bovidae LC IV
6 Wild Pig Sus scrofa Artiodactyla Suidae LC III
7 Jungle Cat* Felis chaus Carnivora Felidae LC III
8 Indian Civet Viverricula indica Carnivora Viverridae LC II
9 Golden Jackal Canis aureus Carnivora Canidae LC II
10 Indian Fox* Vulpes bengalensis Carnivora Canidae LC II
11 Rabbit* Lepus nigricollis Lagomorpha Leporidae LC IV
12 House Srew* Suncus murinus Soricomorpha Soricidae LC Unlisted
14 Porcupine* Hystrix indica Rodentia Hystricidae LC IV
Indian Palm
15 Squirrel* Funambulus pennantii Rodentia Sciuridae LC IV
16 House Rat* Ratus ratus Rodentia Muridae LC V
17 Leopard Panthera pardus Carnivora Felidae NT I
CS- Conservation Status, LC- Least Concern, NT Near Threatened (* recorded during feild study)
Most of the birds encountered in present study are residential. During the study, a total of 30
bird species has been recorded/sighted from the study area. The common birds recordedfrom
the study area were: Common Pigeon, Black Drongo, Indian Courser, Indian Pond Heron,
Indian Roller, Little ringed ploverand Common Myna along with the seasonal visitor Black-
winged Stilt. The list of avifauna and birds recorded in the study area is listed in Table 3.15 b.
Table 3.15 b. List of Avi- Fauna Recorded in the study area during primary survey
Sl.
No. Name Scientific Name Order Habit CS WLS
1 Black Drongo Dicrurusmacrocercus Passeriformes R LC IV
2 Black-winged Stilt Himantopushimantopus Charadriiformes V LC IV
3 Common Myna Acridotherestristis Passeriformes R LC IV
4 Common Moorhen Gallinulachloropus Gruiformes R LC IV
5 Common Pigeon Columba livia Columbiformes R LC IV
Page | 68
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Three species of lizards, one species of skink along with common rat snake were sighted
during the primary survey. (Table 3.16)
Page | 69
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page | 70
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
14000
12000
10000
8000
6000
4000
2000
0
Bhim Deogarh
3.8.1.3 SC / ST Population
16% of the population in the study area is constituted by SC/ST, out of which SC population
constitutes 13% and rest 3% is constituted by ST Populations. A comparative graph of tehsil
wise SC/ST population in study area is given in Figure 3.13 as follows;
6000
5000
4000
3000
2000
1000
0
Male Female Male Female
Bhim Deogarh
General SC ST
Page | 71
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
5000
4000
3000
2000
1000
0
Male Female Male Female
Bhim Deogarh
Literates Illiterates
Non-
Marginal Workers
Workers 56%
20% Main
Workers
24%
Page | 72
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
12000
10000
8000
6000
4000
2000
0
Main Workers Marginal Workers Non Workers
Page | 73
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page | 74
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Higher Credit
Primary Middle Secondary Colleg Hospit Dispens Post Telephone Source of
Tehsil Village Secondary PHC PHSC Bank Societ
School School School e al ary Office Connection Water
School y
Baggar 3 1 0 0 0 0 0 0 1 1 5 0 0 HP,W
Lakha Gurha 1 1 0 0 0 0 0 0 1 1 1 0 1 HP,W,TW
Theekarwas
1 1 0 0 0 0 0 0 0 0 0 0 0 HP,W,TW
Khurd
Theekarwas
Bhim 1 1 1 0 0 0 0 0 1 1 23 0 0 HP,W,TW
Kalan
Kachhbali 2 1 0 0 0 0 0 0 1 1 1 0 0 HP,W
Peepali 10 2 1 0 0 0 0 0 1 1 40 0 0 HP,W
Hamela Ki Ber 5 1 0 0 0 0 0 0 0 1 0 0 0 HP,W,TW
Total 23 8 2 0 0 0 0 0 5 6 70 0 1 HP,W
Rashmi 1 0 0 0 0 0 0 0 0 0 0 0 0 HP,W
Kundeli 1 1 0 0 0 0 0 0 0 0 1 0 0 HP,W
Ghati 1 0 0 0 0 0 0 0 0 0 0 0 0 HP,W
Deogarh
0 1 0 0 0 0 0 0 0 0 0 0 0 HP,W,TW
(Rural)
Deogarh Anjna 2 1 0 0 0 0 0 0 0 0 0 0 0 HP,W
Madariya 1 1 1 0 0 0 0 0 1 1 1 0 0 HP,W,TW
Swadari(A) 1 1 0 0 0 0 0 0 1 1 1 0 0 HP,W
Bilakhi 1 0 0 0 0 0 0 0 0 0 0 0 0 HP,W
Hira Khera 1 0 0 0 0 0 0 0 0 0 0 0 0 HP,W,TW
Total 9 5 1 0 0 0 0 0 2 2 3 0 0
Grand Total 32 13 3 0 0 0 0 0 7 8 73 0 1
Page | 75
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
This chapter details the inferences drawn from the EIA study of the proposed project. It
describes the overall impacts of the project activities and underscores the areas of
concern, which need mitigation measures.
4.1 Introduction
In this chapter the environmental impacts associated with the proposed development of
Baggad Industrial Area are identified, characterized, and evaluated systematically. The
extent of impact on air, water, soil, flora and fauna will be evaluated in relation to the
environmental pollution. The impacts will be distinctly direct and indirect, positive and
negative, reversible and irreversible. The prediction of impacts on various environmental
parameters during pre-operational, operational and post-operational activities assists in
effective identification of mitigation measures to minimize the adverse impacts on
environmental quality. The prediction of impacts on different sectors has been studied
using scientific tools and the results are anticipated. Such predictions are superimposed
over the baseline (pre-project) status of environmental quality to develop the ultimate (post-
project) scenario of the environmental conditions. The successful environmental impact
assessment process requires proper identification, prediction, assessment, and also
communication of the significant environmental impacts to the public. The details on impact
of the project activity on each of the disciplines mentioned above are discussed below. The
environmental impacts associated due to the proposed Industrial Area are classified into
two phases and the possible impacts are assessed.
Impacts during constructional phase
Impacts during operational phase
76 | P a g e
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Land Environment
Biological Environment
Socio-economic Environment
The impacts can be further categorized as positive impacts and negative impacts
depending upon their nature, potential and magnitude.
4.2.1 Topography
As per the topographic survey of the proposed project site, level difference is about 22-m.
To develop the site as a state-of-the-art industrial area and to ensure uniformity in the
topographic condition of the site, site preparation activities like cut and fill operations will be
performed. This operation will be done by J.C.B Dumpers, Mechanical Hammers and
Tractors. Due care will be taken to maintain the natural slope of the project site so that the
developmental activity will not alter the natural drainage system to a considerable degree.
At the proposed site, trees are scanty and the vegetation is scattered. Thus, extensive
clearance of vegetation is not required. The proposed project site witnesses growth of
bushes and grasses in scattered fashion. Bushes like Lantana camara, Calotropis procera
Ziziphus nummularia, Acacia jacquemontii, are naturally growing species. All these species
are well adapted to xerophytic condition. Grasses are noticed in patches in scattered
fashion, where soil is fertile, and contains moisture. Tree species like Azadirachta indica,
Acacia nilotica, has been observed. The trees in present in the project site will be
conserved as much as possible. Reforestation as green buffer has been envisaged in plan.
Care will be taken to reduce the impact on biological diversity of the project site due to the
proposed project.
4.2.2 Air Environment
The potential sources of air emission during construction phase will include site clearing,
vehicle movement, material storage and handling and operation of construction
equipments. Emissions from them are expected to result in temporary degradation of air
quality, primarily in the work environment affecting construction employees. However,
Particulate Matters rise in ambient air will be coarse and will settle within a short distance
close to the construction site. Hence, dust and other emissions are unlikely to spread
sufficiently to affect the surroundings of construction site.
4.2.2.1 Emission due to Site Preparation Activities
Cutting and filling method will be adopted for site preparation. Tractor, J.C.B. Dumper and
mechanical hammer will be used for this purpose. The major chunk of the land being
Rocky, coarse particulate emission is expected from site preparation activities. However,
the coarse particles will not travel a long distance and expected to settle within the project
site as manual operation with mechanical hammer is envisaged instead of blasting
operation. Prepared site will be well compacted to restrain the further emissions.
Emission due to Construction Equipments
The only construction equipments which will be used on-site are Paver finishers and Road
Rollers. Besides, J.C.B. Dumpers and tractors will also be used. Hot Mix Plant, concrete
77 | P a g e
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
mixing plant will not be used on site. The material will be prepared in some off-site
workshop of Contract awardee and will be transported to the site. Thus, the emission due
to the construction equipments will only include particulate emission and not gaseous
emission (except from vehicles). Combustion of hydrocarbon from preparation of
bituminous macadum is not expected, as the same will not be done on-site.
Fugitive Emissions
The source of fugitive emissions due to the proposed project will be loading and unloading
of materials, de-dusting, handling of materials, cement and earth mixing etc. However,
these impacts will be local to their source and will not affect the project site and its
surrounding as a whole. Following measures will be taken to control the fugitive emissions:
Following measures will be taken to control the fugitive emissions:
All dust producing construction materials would be transported to site with proper
cover as tarpaulins.
Water will be sprayed in the cement and earth mixing sites as well as after
compaction.
Dust suppression foam may also be used to minimize use of water.
In high dust areas, workers will be provided and encouraged to use nose masks.
Vehicular Emissions
Vehicular emission will be a concern during the construction phase of the proposed
project as there will be continuous movement of vehicle during the construction
phase. Following measures will be taken to control the vehicular emissions.
Regular maintenance, servicing of the vehicles and periodic emission check for
equipment and machinery would be carried out in conformity with the Central Motor
Vehicles Rules, 1989.
Water will be sprayed on the haul road.
Materials will be transported in covered conditions.
All the vehicles entering the project site will be checked for Pollution-Under-Control
Certificates.
Mitigation Measures
The impact of the above mentioned activities would be temporary and will be restricted to the
constructional phase. However, the impact is generally confined to the Industrial Area and is
expected to be negligible outside the boundary. Nevertheless, the following mitigation measures
will be adopted to limit the environmental impact during constructional phase.
Regular water sprinkling will be done to avoid the dust materials entering into the
atmosphere. Furthermore, during windy days, the frequency of the water sprinkling will
be increased.
The vehicular movement will be minimized, with a planned scheduling, to reduce the
emission of pollutants.
78 | P a g e
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Temporary thin sheets of sufficient height (3m) will be erected around the proposed site
as a barrier for dust control.
The excavated material shall be reused within the boundary and the movement of cut
and fill material will be limited.
Plantation of trees around the boundary and it will be initiated at the early stages by
plantation of 2 to 3 years old saplings using drip irrigation so that the area will be moist
for most part of the day.
All the vehicles carrying raw materials will be covered with tarpaulin/plastic sheet;
unloading and loading activity will be stopped during windy period.
4.2.3 Water Environment
The proposed project involves various construction activities and the impact on water
quality associated with each of these construction activities are described below:
Site formation
The preparation of land required for the subsequent development activities generates a
significant amount of construction waste. The site formation may produce large quantities
of run-off with high suspended solids in the absence of appropriate mitigation measures.
This potential problem will be intensified during rainy season.
Construction of buildings
During rainy season, due to the construction of various civil structures, the site runoff
results in significant pollution in the receiving water bodies and washing of various
construction equipments will also result in water pollution.
Site workshop
The storage of used engine oil and lubricants as waste materials has a potential to create
impacts if spillage occurs. Waste oil may infiltrate into the surface soil layers or in the form
of runoff into local watercourses which increases the hydrocarbon levels.
Presence of workers
Wastewater will be generated from eating areas and the sewage will be generated from
temporary sanitary facilities. Significant impact on water quality is envisaged if the sewage
is discharged directly into the receiving waters without any prior treatment.
Water supply will be sourced through tanker provided by RIICO during construction phase
and no significant impact is anticipated on ground water resources. No impact is anticipated
on surface water resources as due to non-perennial nature of existing small pond in the
project area.
Mitigation Measures:
• Natural slope will be maintained during the site preparation to avoid any effect on the
natural drainage pattern of the site.
• During the construction phase, the storm-water may be contaminated with particulate
matter and the turbidity of the same may increase. Temporary gully network will be
79 | P a g e
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
80 | P a g e
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
• The timing for construction activities shall be regulated, such that all noise generating
construction activities in odd hours say after school hours.
• The provision of temporary noise barrier (barricading) shall be made near identified
sensitive locations or near the noise source during construction.
• Plantation along the boundary wall shall be made at start of construction itself.
• Protection devices (earplugs or earmuffs) shall be provided to the workers operating
near high noise generating machines and their shifts shall be rotated.
• Noise measurements should be carried out to ensure the effectiveness of mitigation
measures and develop a mechanism to record and respond to complaints on noise.
Data shall be reviewed and analyzed by the project manager for adherence to any
strict measure.
• Smooth flow of traffic should be ensured on the internal road to avoid idling and
honking of vehicles.
81 | P a g e
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
82 | P a g e
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Rubble/ brick bats can be used for building activity, such as leveling, under coat
of lanes where the traffic does not constitute heavy moving loads.
Larger unusable pieces can be sent for filing up low laying areas.
Fine material such as sand, dust, etc can be used as cover material
The unearthed soil can be used for leveling as well as for lawn development
The broken pieces of the flooring material can be used for leveling in the
building or can be disposed off
The unused or remaining paints/varnishes/wood can either be reused or can be
disposed off
4.2.6 Demography and Socio-economics
All the activities to be carried out during the construction phase will require skilled,
semi-skilled and unskilled labours, which will create employment opportunity for the
local people during this phase, which will spread for about 3 years.
It is expected that, during construction phase the requirement of labour will be 75
persons per day. Local labours will be employed from the surrounding villages. A
temporary labour camp also may be provided as per the situation. However, the
responsibility of constructing a labour camp, if the need be will lie with the civil contract
awardee.
Most of the unskilled and semi-skilled labour will be by and large available from the
nearby villages. Thus impact on the physical and aesthetic resources will be minimal.
Further, local skilled, semi-skilled and unskilled labours will get direct and indirect
employment during the construction phase. This might result in a steep rise in
agricultural wages in the surrounding villages. Hence, the short term positive impacts
on socio-economic conditions of the area are anticipated during the construction phase.
The impact due to the proposed Industrial Area on demography and socio economic
conditions of the study area would be as follows.
Increase of floating population
Additional strain on civic amenities like road, transport, communication, drinking
water, sanitation, and other facilities to meet the work force requirement
Increase in demand for services like hotels, lodges, public transport, etc
Employment opportunities for construction laborers, skilled and unskilled workers,
etc Economic up liftment of the area
Raising of home rents and land prices and increase in labour rates
Rapid growth of service sector will result in increase of incomes in the area
More work to civil construction and transportation companies
Expanding of services like retail shops, banks, automobile workshop, schools,
hospitals, etc
Increase in literacy rates
4.2.7 Soil Environment
Impacts
83 | P a g e
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Soil around construction site, haulage road, and workshop areas, will get compacted
due to transportation of man, machine and materials. Soil may also get contaminated
around construction site, machine maintenance area, fuelling station, and internal road
construction material storage & preparation site and haulage road.
During construction, soil becomes unconsolidated due to removal of stabilizing material,
such as vegetation and disturbance of stabilized existing grade resulting in loss of top
soil and also deposition in undesirable places.
Mitigation Measures:
Fuel and lubricants shall be stored at the predefined storage location. The storage area
shall be paved with gentle slope to a corner and connected with a chamber to collect
any spills of the oils.
Fuel and lubricants shall be stored at the predefined storage location.
The storage area shall be paved with gentle slope to a corner and connected with
a chamber to collect any spills of the oils.
Construction vehicles and equipment shall be maintained and refuelled in such a
fashion that oil/diesel spillage does not contaminate the soil.
All efforts shall be made to minimise the waste generation. Unavoidable waste
shall be stored at the designated place prior to disposal.
To avoid soil contamination at the wash-down and re-fuelling areas, “oil
interceptors” shall be provided. Oil and grease spill and oil soaked materials are to
be collected and stored in labelled containers (Labelled: WASTE OIL; and
hazardous sign be displayed) and sold off to SPCB/ MoEFCC authorized Waste
Oil Recycler.
To prevent soil compaction in the adjoining productive lands beyond the ROW, the
movement of construction vehicles, machinery and equipment shall be restricted to
the designated haulage route.
Septic tank or mobile toilets fitted with anaerobic treatment facility shall be
provided at construction camp.
Domestic solid waste at construction camp shall be segregated into biodegradable
and non-biodegradable waste. The non-biodegradable and recyclable waste shall
be sold off. Efforts shall be made that biodegradable waste shall be composted in
the mechanized and movable composter by the contractor. Non bio-degradable
and non-saleable waste shall be disposed off to authorized land fill site.
Non-bituminous wastes should be dumped in borrow pits with the concurrence of
landowner and covered with a layer of topsoil conserved from opening the pit.
Bituminous wastes will be disposed of in an identified dumping site approved by
the SPCB.
When opening the site, care shall be taken to keep vegetation clearing at a
minimum.
To avoid soil compaction along the transportation routes, only identified haulage
roads would be used for transportation.
84 | P a g e
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
All constructional wastes would be collected and stored at designated places and
would be used in constructional activities and landscaping to the extent possible.
To minimize disruption of soil and for conservation of top soil, the contractor shall
keep the top soil cover separately and stockpile it.
After the construction activity is over, top soil will be utilized for landscaping
activity.
Maximize use of organic fertilizer for landscaping and green belt development.
Removal of plantation as little as possible during the land development and re-
plantation of bare areas after the project developed.
To avoid the soil contamination at the wash down areas, oil interceptors shall be
provided.
4.2.8 Biological Environment
Negligible impacts on the flora and fauna like removal of shrubs etc. are anticipated in
the core zone i.e. project site. In buffer zone, Todgarh Raoli Wildlife sanctuary is
located 3.37 km (W) from proposed project site. Habitat of the sanctuary is already
been discussed in chapter 3. There will be significant impact on the ecology of the
buffer zone i.e. the study area due to this upcoming industrial estate. A brief detail of
the impact is discussed in following sub-sections and impacts during the construction
phase on core zone (project site) and buffer zone (from project boundary to 10 km
radial zone) have been summarized in Table 4.1.
Impact on Terrestrial Flora
Efforts will be maximizing to incorporate existing trees in the greenbelt
development plan wherever possible. Removal of herbs and shrubs are inevitable.
But development of temporary peripheral greenbelt along the boundary will
simultaneously reduce the effect of pollution. Local species will be selected during
the development of greenbelt to maintain the ecological balance of the Area.
The flora species present at Todgarh Raoli wildlife sanctuary (buffer zone) may get
affected due to presence of industrial estate activities during construction and
operation phase if not mitigated properly. During construction phase temporary
barriers i.e plantation along the boundary, shed barrier, etc will be maintained at
site. Construction machinery and equipment will run such that generating noise
and emission in standard limits. Also, the dominant wind direction around the
project site is from NW-W towards SE-E and the wildlife is at west which results in
low emissions at wildlife sanctuary. RIICO in consultation with Forest Department
will undertake afforestation in eco-sensitive zone lying around the project site.
Impact on Terrestrial Fauna
No niches or habitats mammalian species has been observed in the project site.
Grazing activity is observed at the project site. Thus, there will be a permanent loss
of these grazing lands. However, the project activity will have significant impact on
terrestrial fauna outside the project premises i.e at Todgarh Raoli wildlife
sanctuary.
Impact on Aquatic Ecosystem
No Aquatic Ecosystem is observed within the study Area.
85 | P a g e
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
86 | P a g e
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
87 | P a g e
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
88 | P a g e
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
As discussed in Chapter 2, the proposed water requirement for the proposed Industrial
Area will be met through groundwater extraction. RIICO will obtain prior permission from
Central Groundwater Authority (CGWA) for abstraction of groundwater.
The waste water generation from proposed industry is minimal. Sewage is likely to be
generated from these plants as the prime liquid effluent. Engineering industry is likely to
generate water soluble or metal finishing effluent. Uncontrolled discharge of these can
however cause land pollution.
Mitigation
Industrial Wastewater: Based on the data collected from RIICO of its operational industrial
areas, the water requirement in the proposed project during operation phase will be about
1203-KL/day. Expected industries proposed at this are will follow zero discharge scheme,
so there will be no need for CETP.
Management of industrial wastewater will be the responsibility of individual industries.
Individual industries will install the effluent treatment plant (ETP) and sewage treatment
plant (STP) as per their process and utilities requirement. All the units will adopt the zero
discharge philosophy as per the conditions in land allotment letter issued by RIICO to the
individual industries. No treated water outside the plot premises will be allowed. It will be
mandatory for all the industries to obtain Consent to Establish and Consent to Operate prior
to operation of the industry from RSPCB under Section 25/26 of Water (Prevention and
Control of Pollution) Act, 1974. Strict compliance with the standards and condition of
RSPCB and CPCB will be mandated, wherever applicable and necessary.
Stormwater Management: Storm water drainage system of 17 km length will be constructed
for proper channelization of stormwater during the operation phase. This will recharge the
groundwater table. As per the prevailing rules of allotment of RIICO, all the proposed
industries will required to construct water harvesting structure, which should be almost 60-
70% of total land area. For the remaining area (common services), the storm water drains
will be constructed in such a manner to harvest the rainwater in existing pits, small ponds of
this area as well as nearby area. Each pit will be attached to a bar screen chamber to
arrest the unwanted dust particles. Stormwater discharge point will be marked on site plan
of every plot during the allotment to individual industries. Stormwater discharge will not be
allowed by RIICO except from the marked location.
4.3.3 Noise Environment
Impacts
The proposed unit are unlikely to generate significant noise except due to engineering
operations, DG set operations and vehicular movement. Since most of these activities
except vehicular movement will be in closed areas and will comply with the corresponding
noise regulation and ambient noise level criteria, impact on noise environment is expected
to be insignificant. Vehicular speed will be regulated and will have intermittent noise also
which will also not cause any significant increase in ambient noise level.
It is expected that all the industrial units shall comply with the Noise Pollution (Regulation
and Control) Rules, 2000 and provide adequate noise control measures in the plant
89 | P a g e
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
machineries and DG sets, if used for power backup. Apart from that each individual
industrial unit shall provide adequate greenbelt as per the stipulated consent conditions by
RSPCB within their plant premises.
Mitigation
All the industrial units shall comply with the Noise Pollution (Regulation and Control) Rules,
2000 and provide adequate noise control measures in the plant machineries and DG sets,
if used for power backup.
Apart from that each individual industrial unit shall provide adequate greenbelt as per the
stipulated consent conditions by RSPCB within their plant premises. Apart from that, RIICO
is going to provide green areas and road side plantation to attenuate the noise levels, these
will act as noise barriers. The impact of noise generated from the various industrial units on
their employees will be envisaged to be maintained within the prescribed statutory norms.
4.3.4 Land Environment
The main impact on land environment is the generation of waste and its management.
Municipal solid waste and hazardous wastes depending on the activity of the individual
industries will be generated from the proposed industrial area.
Municipal Solid Waste Management
Waste management would be the responsibility of individual industries. Individual industry
will provide system for municipal solid waste collection, storage and disposal. Each industry
shall have to comply with the Municipal Solid Waste Management Rules, 2000 and
amendments therefore.
Approximately 2000 persons will be involved during the operation phase of the project.
Taking into consideration approximately 0.15 kg/person/day of municipal solid waste
generation, the total municipal waste generation in the proposed industrial area will be
about 300 kg/day.
Hazardous Waste Management
During operation, phase hazardous waste management would be the responsibility of
individual industries. Prior to the commencement of production, each unit shall take
authorization for storage, handling and transport of hazardous waste, as per the Hazardous
Waste (Management, Handling and Trans-boundary Movement) Rules, 2008 and
amendments thereof, from RSPCB. The industrial units will ensure that recyclable wastes,
such as waste oil, used oil etc. will be provided to oil recyclers authorized by RSPCB,
incinerable waste (calorific value more than 2500-kcal/kg) will be given to common
incineration facilities approved by RSPCB and all other hazardous waste shall be sent to
common hazardous waste land fill site approved by RSPCB.
4.3.5 Biological Environment
Impact on terrestrial flora is negligible in core zone as the industries likely to come in the
proposed industrial area are not air pollution intensive. But, due to presence of wildlife
sanctuary 3.37 km from the project site, significant impacts are anticipated. According to
MoEF&CC guidelines for Cat 7(c) projects, 15 m wide greenbelt buffer will be developed by
90 | P a g e
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
RIICOto develop aesthetic environment as well as to provide air and noise pollution barriers
along the periphery of the project site and also 33% green area of the plot area will be
developed by individual industrial units. Apart from that there would not be any impact on
aquatic flora and fauna due to its distance from the project site. Predicted impacts during
the operation phase of the project have been presented in Table 4.2.
4.3.6 Traffic Survey
Impact
No significant impact will be observed. According to traffic survey study, it was found that
the existing road width of NH 8, is sufficient to cater traffic load.
Mitigation Measures
No traffic congestion will be there; as well planned network of internal roads is envisaged in
plan.
For smooth flow of traffic inside the industrial area, roads with 45 m, 30 m, 24 m and18 m
ROW has been proposed. The main roads with 45 m ROW will be having 4-lanes with
median.
91 | P a g e
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
92 | P a g e
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
employment generation will be of the order of approximately 10,000. This will open up a
huge job opportunity to the people of the surrounding villages and towns.
Infrastructure Development
The proposed project along with industrial development will also facilitate the development
of infrastructure of the surroundings. Grid Sub Station for Power supply will be developed.
Well planned storm water drainage system will be developed. These will indirectly induce
the infrastructure development of the surroundings.
Development of Industrial Profile of the Area
The proposed project will catalyze the industrial development of the area by attracting a
considerable percentage of Capital of the state. The industrial development in this area will
work as a catalyst for overall development of the area and nearby villages, due to inflow of
people.
93 | P a g e
EIA of Proposed Industrial Area Development (Baggad Industrial Area - Extension) by
Rajasthan Industrial Development & Investment Corporation Limited
Aquatic Flora and Nil Nil No aquatic habitat in core and inner Absent Nil
Fauna buffer zone
94 | P a g e
EIA of Proposed Industrial Area Development (Baggad Industrial Area - Extension) by
Rajasthan Industrial Development & Investment Corporation Limited
Table 4.3:Pre mitigation Matrix for Various Project Activities and Associated Potential Environmental Impacts on Various
Environmental Attributes
Socio-
Ambient Water Solid
Air Land Flora Fauna economic
Noise Quality Waste
Environment
Construction Phase
Earthwork and Excavation ST- LT- ST-
Disposal of Excavated Earth ST- ST- ST- ST-
Disposal of Construction Waste ST- ST- ST- ST-
Operation of Construction Machinery ST- ST-
Transportation of Construction Material ST- ST-
Material Handling ST- ST- ST-
O & M of Construction Machinery LT- ST-
Disposal of Domestic Waste & Effluents LT- ST- ST-
No Greenbelt Development LT- LT- LT- LT- LT- LT-
Influx of Workers LT- LT- LT- ST-
Sewage Discharge ST- ST- ST-
Income Generation ST+
Employment Generation ST+
Operation Phase
Operation of Industry LT- LT- LT- LT- LT- LT- ST+
Effluent Generation & Discharge ST- LT- LT- LT- LT-
Solid Waste Generation & Disposal ST- LT- LT- LT- LT-
Hazardous Waste Generation & Disposal LT- LT- LT- LT- LT-
Increase in Vehicular Movement LT- LT- LT-
Transportation of Raw Material and Final LT- LT- LT-
Products
Storage of Hazardous Chemicals LT- LT- LT- LT-
No Greenbelt Development LT- LT- LT- LT- LT- LT- LT-
Influx of Workers LT- ST- LT- LT-
Employment Generation LT- LT- LT- LT+
Notations:
ST+ : Short Term Positive
ST- : Short Term Negative
LT+ : Long Term Positive
LT- : Long Term Negative
95 | P a g e
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
5 PROJECT BENEFITS
This chapter details the associated project benefits due to the proposed project with
respect to the improvements in the physical and social infrastructure, employment
potential for skilled, semi-skilled and unskilled people and other tangible benefits linked
with the project.
5.1 Prelude
The proposed project of proposed industrial estate will cause various short/ long term and
primary/ secondary impacts on the Study Area. These are externalities of the proposed
project investments on the proposed project in the study area. There is however mitigation
measures and EMP proposed, non-conformance to which will lead to much higher costs in
terms of social and environmental concerns than the cost of the proposed mitigation
measures. In addition to that, overall infrastructure development due to this project and the
facilities which will come up after commissioning of the project will substantially support the
development of the whole area. The project benefits due to the proposed project are
described in the following sections:
Page 96
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
6 ADDITIONAL STUDIES
This chapter provides mitigation and control measures to attenuate or eliminate
environmental impacts, which are likely to be caused by the proposed project. An
Environmental Management Plant (EMP) has been developed to mitigate the potential
adverse impacts and to strengthen the beneficial environmental impacts during the
construction and operation phases. The institutional capacity of Baggad Industrial area
reporting requirement to fully implement the mitigation measures have also been
described in this chapter.
6.1 Introduction
It is imperative to conduct risk analysis for all the projects where hazardous materials,
either as raw material or the product are handled. The risk assessment is carried out here
as a few hazardous materials will be handled in the RIICO Area.
The following have been addressed as part of the risk analysis.
Introduction
Hazard Identification and Risk Analysis
Risk Reducing Measures
Hazard Identification and Risk Analysis discusses about the various types of hazards
associated with the operation of the Plant due to process, storage & handling, human
errors, electric failures and natural calamities. It also presents the calculated frequencies of
occurrence of different accident scenarios for the identified potential hazard occurrence in
the industrial area and the details of consequence modeling/analysis for the identified
potential accidents/disaster scenarios. Risk Reducing Measures are based on the
calculated frequencies and consequences.
6.2 Objective
The principal objective of the study is to identify the potential hazards from the proposed
facility and estimate the effects of the hazards on people and property within the vicinity of
the proposed industrial area premises.
The consequences resulting due to accidental release of toxic & flammable gases and
leakage of fuels, will provide data for developing strategies to prevent accidents right from
design to operational phase. This will also generate information for formulating a
meaningful Disaster Management Plan (DMP).
A risk analysis is defined as an assessment of the likelihood of a release of HAZMAT
(hazardous materials) and the consequences that may result, based on information
gathered during the hazard identification and vulnerability analyses. Risk analysis requires
evaluation of existing base and local community plans, response capabilities, and previous
incidents.
In order to determine the risk factor at each facility as the base, the following information
was evaluated:
Page 97
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
6.3 Methodology
The Risk Analysis Study was carried out under the following task heads:
6.3.1 System Study
The system description covers the plant description, storage & handling of fuels / chemicals,
etc.
6.3.2 Hazard Identification
The hazards associated with the proposed industrial area have been discussed in terms of
material & process hazards.
6.3.3 Frequency of Hazard Occurrence
Based on the available international statistics and in-house risk database, the frequencies of
occurrence for the different accident scenarios were determined. The frequencies were derived
from the historical databasethat has been checked with the possible hazard scenario identified
during hazard identification.
6.3.4 Consequence Analysis
Based on the identified hazards, accident scenarios and the frequency of occurrence,
consequence modelling was carried out for calculating the spreading distances (zone of
influence) or risk distance for Pool fires and Explosions etc.
6.3.5 Risk Reducing Measures
Necessary risk reducing measures have been suggested based on the consequence scenarios.
The main hazard potentials in the proposed industrial area are categorized as below:
Material hazards; High Speed Diesel (HSD), Light Diesel Oil (LDO), as an auxiliary
fuel for start-up and flame stabilization, and coal as raw materials used in the
proposed Cement Plant .
Process hazards due to loss of containment during handling of hazardous materials or
processes resulting in fire, explosion, bursting of cyclones due to high pressure in the
pre-heater circuit, etc
Mechanical hazards due to "mechanical" operations such as welding, maintenance,
falling objects etc. - basically those NOT connected to hazardous materials.
Electrical hazards: electrocution, high voltage levels, short circuit, etc.
Out of these, the material and process hazards are the one with a much wider damage potential
as compared to the mechanical and electrical hazards, which are by and large limited to very
small local pockets.
Page 98
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page 99
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Storage tanks should be above ground and surrounded with dikes capable of holding
entire contents.
Limit quantity of material in storage. Restrict access to storage area.
Post warning signs when appropriate. Keep storage area separate from populated
work areas. Inspect periodically for deficiencies such as damage or leaks.
Have appropriate fire extinguishers available in and near the storage area.
The following measures are suggested for reducing the risk involved in pipeline systems.
Preventive Maintenance:
Routine inspection of equipment/facilities at the unit.
Instruments: All the instruments like pressure, temperature transmitters/gauges and alarms
switches and safety interlocks should be tested for their intended application as per the
preventive maintenance schedule. Similarly, the emergency shutdown system should be tested
as per the preventive maintenance schedule.
Page 100
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page 101
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page 102
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
To consult between themselves on matters related to more than one services and to
decide on the action to be taken.
6.6.5.4 Casualty Services
The commanding officer of casualty services will be medical officer.
6.6.5.5 Functions:
Provide the first services of first-aid to the parties on the spot.
Ambulance services for transport of casualties from the spot to the township hospital
and from township hospital to outside, if required.
6.6.5.6 Procedure for Treatment
On getting a signal from the Disaster Control Desk or information on telephone or hearing
siren, the sub- commanding officer of the casualty services will report to the clinic and doctors
on call duty and first aid personnel will report to disaster control room. The Ambulance with
driver will report to the Disaster Control Room. First aid parties will render first aid to casualties
at the place of occurrence and those requiring further treatment would be transported to the
nearest hospital by ambulance.
In case of extra help from outside or within Company medical officer would contact
Co-coordinator (Planning) for help in areas such as:
Extra medical helps from neighboring hospital or main hospital.
Evacuating the casualties.
Essential assistance in first aid.
6.6.5.7 First Aid
It is necessary to give first aid to the persons injured in the disaster. There are two first aid posts
to meet the workload, one post is near the Disaster Control Room and the other post is in the
township hospital. At each post, first-aid parties shall be kept in rotating shifts of 8 hours.
6.6.5.8 Rescue Services
The responsibility of effective working Rescue and Repair services are with Co- ordinator
(Services) and Sub-emergency controlling officer.
6.6.5.9 Repair Services
To take up quick repairs of the damaged machinery
To take up repair of damaged building roads and culverts.
To maintain essential public utility services viz. water, electricity and sewages
system.
6.6.5.10 Fire Fighting Services
Fire officer will be the commanding officer of the fire fighting services. Additional strength for
fire fighting which is beyond the control of the station will come from security and maintenance
personnel and if required from outside fire stations.
6.6.5.11 Functions
Page 103
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page 104
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Assists local police in patrolling in township and work out adequate arrangement for
protection of property.
One jeep and motorcycle are always kept as reserve to cope up with emergency
demand and for any further aggravate disaster.
6.6.5.19 Functions
To shut down the unit (s) affected and which may cause further disaster.
6.6.5.20 Public Relation Services
The officer–in–charge of public relation services looks after this job.
Function
To consult Emergency controller before communication, if required with outside
agencies.
PRO acts as the official spokesman for the plant with outside agencies.
PRO arranges for photography and filming of the whole disaster as photographer and
filming of such incident are of immense value for the purpose of investigation, training
and education.
6.6.5.21 Contingency Plans
The following plan shall is recommended:
Fire and Explosion
Plant fire fighting is activated
Disaster Controller along with Commanding Officer takes overall charges of the
situation
Emergency controller assesses the situation for possible after effect of the fire in the
plant and the surrounding areas likely to get affected
Emergency controller Informs local authority to send fire tenders if required
Emergency controller Informs the people of likely affected area through
communication system to leave the area and move to other area earmarked, if
necessary
Controls the traffic and law and order
Arranges medical aid and for the affected people
Emergency controller arranges inspection of affected area to get the first hand
knowledge of damages occurred.
Page 105
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
7.1 Prelude
The main objective of environmental monitoring program is to check the efficacy of the EMP
(Environmental Management Plan) and implementation and take corrective action needed. A
well defined environmental monitoring program would be followed for the proposed
development of Baggad Industrial Area. It would be ensured that trained and qualified staff
supervisors, the monitoring and sampling of ambient air, DG set & Boiler stack gases, common
sewage and trade/Industrial effluents, noise etc. to see that prescribed standards laid down /
obtained. The monitoring program will be done in two phases
Constructional phase
Operational phase
Page 106
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page 107
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page 108
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page 109
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page 110
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
8.1 Introduction
The proposed development of Baggad Industrial Area needs to be intertwined with utilization
of natural resources within the limits of permissible assimilative capacity. The Environmental
Management Plan (EMP) is required to ensure sustainable development in the proposed
Industrial Area. Hence, it needs proper Environmental Management Plan (EMP) to meet
these objectives. The Environmental Management Plan is an action plan aiming to control
pollution at the source level to the possible extent with the available and affordable
technology followed by treatment measures before they are discharged. It encompasses the
mitigation measures that are proposed in order to synchronize the economic development of
the study area with the environmental protection of the region.
Page 111
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Tree plantations around the boundary will be initiated at the early stages by
plantation of 2 to 3 years old samplings using drip irrigation so that the area will be
moist for most part of the day.
All the vehicles carrying raw materials will be covered with tarpaulin / plastic sheet,
unloading and loading activity will be stopped during windy period.
To reduce the dust movement from civil construction site to the neighbourhood the
external part of the building will be covered by plastic sheets
Given the implementation of proper control measures for dust suppression, no adverse
impacts are expected and compliance with the Ambient Air Quality is achieved at ASR’s (Air
pollution Sensitive Receivers) at all time.
Page 112
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
the solid waste material will be used for filing/ levelling of low-lying areas. All attempts will be
made to stick to the following measures.
All construction waste shall be stored within the proposed site itself. A proper screen
will be provided so that the waste does not get scattered.
Attempts will be made to keep the waste segregated into different heaps as far as
possible so that their further gradation and reuse is facilitated.
Materials, which can be reused for purpose of construction, levelling, making roads/
pavement will also be kept in separate heaps from those which are to be sold or land
filled.
The local body or a private company may be arranged to provide appropriate number
of skip containers/ trolleys on hire.
The use of the construction material basically depends on their separation and conditions of
the separated material. A majority of these materials are durable and therefore, have a high
potential for reuse. It would, however, be desirable to have quality standards for the recycled
materials. Construction waste can be used in the following manner.
Reuse of bricks, tiles, stone slabs, timber, piping railings etc to the extent possible
and depending upon their conditions.
Sale/ auction of materials which cannot be used at the proposed site due to design
constraint.
Plastics, broken glass, scrap metal, used cement bags, etc can be sold out to the
authorised agencies.
Rubble/ brick bats can be used for building activity, such as levelling, under coat of
lanes where the traffic does not constitute heavy moving loads.
Larger unusable pieces can be sent for filing up low lying areas.
Fine material such as sand, dust, etc can be used as cover material
The unearthed soil can be used for levelling as well as for lawn development
The broken pieces of the flooring material can be used for levelling in the building or
can be disposed off
The unused or remaining paints/varnishes/wood can either be reused or can be
disposed off to the authorised agencies.
Page 113
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page 114
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page 115
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Under CSR activity to improve the recharging capacity of the aquifer, greenbelt
development and construction of check dams along the natural drain will be taken up.
Page 116
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Apart from the bulk plantation in vacant areas, roadside avenue plantations, parks will also
be taken up. The placement of the plants would be designed as follows:
Trees growing up to 10m or more in height with thick canopy cover and perennial
foliage would be planted around the proposed Industrial Area.
Planting of trees would be done in rows with minimum three rows encircling
perimeter of the installation. While planting the trees care would be taken that the
installation structure would be difficult to see through foliage when seen from a point
outside the green envelope. For preventing the horizontal dispersion of pollutants, if
any, the trees planted in alternate rows would fall in straight line.
Trees would be planted on roadside for containment of vehicular traffic emissions
and fugitive emissions due to the movement of vehicles.
Tree trunk being free foliage up to a height of 2 to 3m, it is proposed to grow shrubs
in front of trees so as to give coverage to the open portion.
Local Species would be planted in patches along the entire green belt to work as
an indicator of pollution potential.
Page 117
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Table 5.1: List of Plant Species with Higher Sound Absorption Co-efficient
S.No Scientific Name Common Name Type
1 Ficus benjamina Weeping fig Shrub, Tree
2 Howea forsteriana Thatch palm Shrub
3 Dracaena fragrans Corn plant Shrubs
4 Dracaena marginata Madagascar dragon tree Shrubs, tree
5 Schefflera arboricola Dwarf umbrella tree Shrub
The list of species recommended for noise and dust pollution attenuation purpose is given in
Table 5.2.
Table 5.2: List of Plant Species Suitable for Noise and Dust Attenuation
S. Scientific Name Common Name Type
No.
1 Alostonia scholaris Indian Devil tree Tree
2 Butea monosperma Dhak Tree
3 Erythrina variegata Indian coral tree Tree
5 Pterospermum aceriolium karnikara tree Tree
6 Tamarindus indica Tamarind Tree
7 Terminalia arjuna Arjun Tree
8 Junipeus chinensis Chinese juniher Tree
9 Populus ferolinensis Populus Tree
10 Syringe vulgarus Common liliac shrub
11 Viburnum lantana Wayfaring Tree Shrub
In addition to the above selected species, some other plants will also be considered for
pollution abatement, which is listed in Error! Reference source not found..
Table 5.3: List of Plant Species Suitable for Dust and Air Pollution Abatement
S. Scientific Name Height Duct collection Air Pollution
No. Index tolerant
1 Albizia lebbeck Tall Moderate High
2 Azadirachta indica Tall Fair Medium
3 Pithecolobium dulce Tall Moderate High
4 Ficus glomerata Tall Moderate High
5 Ficus infectoria Tall Moderate High
6 Polyalthia longifolia Tall Moderate Medium
7 Tectona grandis Tall Moderate Medium
8 Terminalia arjuna Tall Moderate Medium
9 Bauhinalia purpurea Medium Good Low
10 Cassia fistula Medium Fair High
Page 118
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page 119
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
gauge the efficiency of the mitigating measures, monitoring shall be undertaken both during
the construction and operation period of the project. The Environmental Budget for the
proposed project is provided in Table 5.5
Page 120
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
This chapter concludes the findings that emerged from the environmental assessment
study and summarizes the key points to be addressed to ensure the environmental
sustainability of the project during the construction and operation phases.
9.1 Prelude
The present study was aimed at identifying the potential environmental impacts due to the
various project activities, assessment of the impact with and without mitigation measures,
and at developing environmental management and monitoring plans for proper mitigation of
any adverse environmental impact. In this study, the various activities likely to take place
during the construction and operation phases of the project were analyzed in relation to the
baseline condition of the different environmental components. The mitigation measures
proposed for the contractors and the project proponent have also been reviewed and the
potential residual impacts discussed. The key points considered in this study are described
in the following sections:
9.2 Regulatory Compliance
The project is yet at its technical investigation stage. Prior to its implementation, it will be
necessary to acquire all the necessary clearance from the Government of India, as per the
applicable national regulations. Key clearances include obtaining the No Objection
Certificate from the RSPCB under The Water (Prevention and Control of Pollution) Act,
1974 and Rules, 1975; The Air (Prevention and Control of Pollution) Act, 1981 and Rules,
1982; and Environmental Clearance from the State Level Environmental Impact
Assessment Authority (SEIAA) - Rajasthan, under the EIA Notification, 2006, The
Environment (Protection) Act, 1986 and Rules, 1986. In addition to that, all the industries,
which will come up in the proposed Industrial Area need to take NOC from RSPCB in the
form of Consent to Establish & Consent to Operate. Authorization for Hazardous Waste
Management will also be required under the Hazardous Waste (Management, Handling
and Transboundary Movement) Rules, 2008 from RSPCB by individual industrial units, if
applicable.
9.3 Baseline Conditions
The monitoring of the existing environmental conditions of the proposed project site and its
close vicinity has been established with respect to physical, biological and human
environment. The air quality of the area meets the prescribed NAAQS applicable for the
industrial, residential and rural Areas. The background noise levels were also found within
the standards as most of the Study Area is not developed at present.
The water quality also meets all standards for use in domestic and industrial applications.
The geology of the project area is of varied nature; however it is not prone to floods. In
addition to that, there is no sensitive ecosystem in the vicinity. No rehabilitation and
resettlement issue is emerging with the selected project site.
9.4 Environmental Impacts and Mitigation Measures
Page 121
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
The project entails various impacts on the study area, some negative and some positive.
The impacts will be caused by the construction activities and other industrial activities
during the construction and operation phases, respectively. Various impacts identified
during the study have been provided mitigation measures for better environmental
management conditions. In addition to that, the developers have also been given duties
and responsibilities in the EMP to monitor the proper implementation and to ensure the
mitigations of any adverse impacts.
9.5 Recommendations
Based on the EIA conducted, the following recommendations are made:
System of periodic auditing and reporting shall be adopted during the construction
period to ensure that the contractors adhere to the EMP.
The project proponent and its team of consultants and contractors are urged to
develop a strategy for effective communication with local people.
The construction team/ developer should effectively follow the suggestions made in
the EMP and/ or any other environmental measures so as not to damage the
environment of the project area.
Occupants of the Industrial Area shall have to adhere to the conditions stipulated in the
environmental clearance as well as in consent/ authorization from RSPCB.
Since regulations are fast changing in India, the project proponent should keep
themselves updated with respect to applicable laws and take appropriate actions in
case the provisions in some regulations undergo change.
Page 122
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
EIA Coordinator:
Name: S.K. Jain
Signature & Date:
Page 123
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Page 124
EIA of Proposed Industrial Area Development (Baggad Industrial Area) by
Rajasthan Industrial Development & Investment Corporation Limited
Team Members:
AP: Om Prakash, EB: Dr.Alok Singh, HG: Nisha Rani, NV: Shweta Gupta, SC: Dr.Alok Singh,
WP: Om Prakash, SE: Anil Kumar, AQ: Hitendra Kela
I, S.K.Jain, hereby confirm that the above-mentioned experts the EIA/EMP REPORT for for
Proposed Industrial Area Development (Baggad Industrial Area) by Rajasthan Industrial
Development & Investment Corporation Limited. I also confirm that the consultant organization
shall be fully accountable for any mis-leading information mentioned in this statement.
Signature:
Name: S.K.Jain
Designation: Director, Technical
Name of the EIA Consultant organization EQMS India Pvt. Ltd.