SCHEDULE OF BUILDING MATERIALS FOR PROPOSED DOUBLE CLASSROOM BLOCK
FOR M'GWERAMBAVI PRIMARY SCHOOL(OKONDWA PEOPLE)
1 FOUNDATION
- -
Item EXTERNAL AND INTERNAL WALLS UNIT QTY RATE TOTAL TOTAL
- -
4 WALLS - -
- -
4.1 Brick Wall - -
- -
4.1.1 BRICKS - -
Common bricks No 4,767 - -
- -
4.1.2 CEMENT - -
50Kg Bags 6 - -
- -
4.1.3 SAND - -
Building sand M3 2.1 - -
Building sand - - - -
- -
- -
- - -
- -
- -
-
- -
- -
- -
Item SUMMARY UNIT QTY RATE TOTAL TOTAL
SUBSTRUCTURE - -
RING BEAM - -
ROOF - -
TOTAL COST MK - -
NB: BRICKS AND SAND WILL BE PROVIDED BY THE COMMUNITY AS SUCH WE DID NOT PUT IN THE PRICE
SCHEDULE OF BUILDING MATERIALS FOR PROPOSED DOUBLE CLASSROOM BLOCK
FOR M'GWERAMBAVI PRIMARY SCHOOL(OKONDWA PEOPLE)
1 FOUNDATION
- -
Item EXTERNAL AND INTERNAL WALLS UNIT QTY RATE TOTAL TOTAL
- -
4 WALLS - -
- -
4.1 Brick Wall - -
- -
4.1.1 BRICKS - -
Common bricks No 4,767 - -
- -
4.1.2 CEMENT - -
50Kg Bags 6 - -
- -
4.1.3 SAND - -
Building sand M3 2.1 - -
Building sand - - - -
- -
- -
- - -
- -
- -
-
- -
- -
- -
Item SUMMARY UNIT QTY RATE TOTAL TOTAL
SUBSTRUCTURE - -
RING BEAM - -
ROOF - -
TOTAL COST MK - -
NB: BRICKS AND SAND WILL BE PROVIDED BY THE COMMUNITY AS SUCH WE DID NOT PUT IN THE PRICE
LABOUR FOR CONSTRUCTION OF A DOUBLE CLASSROOM BLOCK