Professional Documents
Culture Documents
DESIGN DRAWING
NAMA KEGIATAN
Galian
Jalan Raya Galian PEMBANGUNAN INFRASTRUKTUR
STA 0+100 STA 0+125 Jalan Raya
1.10
DESA POTENSIAL POTO TANO
1.10
1.00
NAMA PEKERJAAN
1.12
Pas.batu existing
Pas.batu existing
Uditch 80/90/120
0.94 Pasir Urug Uditch 80/90/120
0.94 Pasir Urug DED PENATAAN DRAINASE
Pas.batu existing
Pas.batu existing PERMUKIMAN POTO TANO
LOKASI PEKERJAAN
KEC. POTO TANO
PENGESAHAN
DIAJUKAN OLEH
KONSULTAN PERENCANA
9.110
9.110
9.110
9.110
8.815
8.815
8.815
8.815
8.815
Elevasi Rencana ( m ) Elevasi Rencana ( m )
9.110
9.110
9.110
9.110
8.680
8.930
8.930
8.930
8.930
8.500
Elevasi Tanah Asli ( m ) Elevasi Tanah Asli ( m )
8.103
8.103
7.808
7.808
Elevasi Dasar Saluran ( m ) Elevasi Dasar Saluran ( m )
Jarak (m) 2.89 2.00 3.00 3.00 2.00 2.07 Jarak (m) 2.89 2.00 3.00 3.00 2.00 2.07
WAHIDIN, ST
DIREKTUR
MENGETAHUI / MENYETUJUI
PEJABAT PEMBUAT KOMITMEN
1.10
1.10
ISMU RAHMAN, ST
1.00
0.89
Pas.batu existing
Pas.batu existing NIP. 19790121 201001 1 015
Uditch 80/90/120 Uditch 80/90/120
0.94 0.94
Pasir Urug Pasir Urug
8.520
8.520
8.520
8.520
8.478
8.478
8.478
8.478
8.478
Elevasi Rencana ( m ) Elevasi Rencana ( m )
8.520
8.520
8.520
8.520
8.090
8.370
8.370
8.370
8.370
7.940
Elevasi Tanah Asli ( m ) Elevasi Tanah Asli ( m )
JUDUL GAMBAR SKALA
7.519
7.519
7.478
7.478