SEPTIC VAULT VOLUME COMPUTATION 0.

05
0.05
0.80 SQ.
0.60 SQ.
0.05
0.05

8'' PVC
BOTHWAYS DRAIN PIPE

Assumptions : Number of occupants 1B


Number of occupants............................ 10 persons
Quantity of Sewage Flow, QT = 10 x 50
= 500 gallons per day (ave.)
HOLES, 38mm
DESIGN FORMULAS: WIDE X 100mm
LONG
PLAN - 1
1. V = Q = Qpeak 1.5 x Qaverage For flows up to 1500 Gal/Day 0.80 SQ.
2. V = 1,125 + 0.75 Q total For flows greater than 1500 gals. 0.05
0.05
0.60 SQ. 0.05
0.05
LIFT BAR
500 < 1500 Therefore use 1st Formula HOLES, 38mm WIDE
TOP OF PAVEMENT X 100mm LONG

0.031
OR FIN YARD LINE

0.10
V=Q = Q peak 1.5 x Qaverage 100mm THK CHB REIN-
= 1.5 x 500 FORCED W/ 3-U BAR

(0.35 MIN.)
VARIABLE
= 750 gallons = 2838.75 lit. = 2.84 cu. m.
6' OR 8' PVC SD
COMPUTATION:
DETERMINE SEPTIC TANK SIZE:
6' OR 8' PVC SD
Using Two - Tank System

0.10
CEMENT MORTAR
CONC. DRAIN
Assume the first tank (1st Digestive Chamber ) capacity is SECTION - 1
PIPE
equivalent to 70 percent of the total tank capacity.
V = 0.70 (3)
design = 2.10 cu.m CATCH BASIN DETAIL
V = L x W x d (liquid depth)

L =1.5 W
let d = 1.20 m
design
V =1.5 W x W x 1.20
2.10 = 1.8 W x W
0.45 SQ. CONC. COLLAR
W = 1.08 m say 1.10 m
COUNTER SUNK PLUG

L1 = 1.5 W
First Tank : = 1.5 x 1.10
FINISHED GRADE
= 1.6 m.
Therefore, adopt 1.65 x 1.10 (water depth) 1st digestive chamber First
inside tank dimention. PVC PIPE
1/8 CISP BEND

FL OM G
O
FR LD

W
B
Assumption:
Assume Second Tank capacity is equivalent 30 percent of the total tank capacity PVC WYE 100mm x
100mm x 100mm
(WHERE OCCURS)
ADAPTER
V2 = 30 % (3)
= .90 cu.m.
V = L x W x d (liquid depth)
FLOW
Let d = 1.20 m
W = 1.10 m
1/8 PVC BEND
.90 + 1.10 x L2 x 1.20 ( water depth) SEWER LINE
L2 = 0.75 m

Therefore, adoptTank
Second : x 1.10 x 1.20 (water depth) 2nd Digestive Chaber inside tank dimention.
0.75m
GROUND CLEANOUT DETAIL
Using 4" thk CHB reinforced w/ 10mm dia. vert. RSB @ 0.40 on bothways.Slab 10mm dia RSB @ 0.20 on BW.

OFF
TEST

TEST AN DRAIN
PUSH

DRAIN

OUT

P L A N
CATCH BASIN DETAIL -BESIDE WALL

FLOOR, WALL & BASE CLEANOUT


GATE VALVE DETAIL

ALLIED PROFESSION OWNER:


PROJECT TITLE: R.A. 9266 REVISIONS: SHEET NUMBER
AR.RYAN CLEYFORD LLAGAS THE DRAWINGS & SPECIFICATIONS DULY SIGNED

ROCKWELL LUCENA ARCHITECT AR. ARIES TAN


PROPOSED 2-STOREY
OR SEALED AS AN INSTRUMENT OF SERVICE ARE
THE INTELLECTUAL PROPERTY AND DOCUMENTS OF
T HE AR CH IT E CT S, WE A TH ER T H E OB J EC T FO R W HI CH
MASTER PLUMBER MR. CESAR S. ORTIZ, JR. THEY ARE MADE IS EXECUTED OR NOT. IT SHALL
P-3
DEVELOPMENT CORPORATION VALIDITY : 07/01/22
BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR
MAKE COPIES OF SAID DOCUMENTS FOR USE IN
PRC REG. No.: 0038992
VALIDITY :
RESIDENTIAL THE REPETITION OF WHETHER EXECUTED PARTLY
OR IN WHOLE,WITHOUT THE WRITTEN CONSENT OF
IAPOA No.: 35251 OR No. : 35251 178389 102716 PRC REG. No.: ARCHITECT OR AUTHOR OF SAID DOCUMENTS.

#1 ROSEMARIE COMPOUND, BRGY 8, LUCENA CITY


PTR No.: 1056350 DATE : 01/08/20 PTR No.: DATE :
LOCATION: 177 JADE EXECUTIVE VILLAGE, LUCENA CITY
RES CERT. No.: DATE :
SHEET CONTENTS: AS SHOWN
CAD / CAM BY: CLEY 15 15
DATE /ISSUED AT : LUCENA CITY ISSUED AT : ISSUED AT :