Circuit :220kV, Bay D-21 at SWHG to Bay D-02 at PVSW - Circuit 2
Cable Type — :220kV, 1C, 2000 Samm, CU, XLPE
Date 08 December, 2018.
Project Title _: Noor Abu Dhabi 1177MWp Solar PV Project at Sweihan, Abu Dhabi
Client TRANSCO
Consultant: Fitchner, EDF
Contractor: Sterling & Wilson
Subject _: Clarification for deviation of DC Conductor resistance results with respect
to the cable criteria
Dear Sir,
Further to the clarification required by the client on the topic of DC Conductor resistance
results for Circuit 2 red phase, please note that the deviation is because of multiple reasons
listed below:-
* The cable end to end length of Red, Yellow and Blue phase is not exactly equal as
there will always be some deviation in the cable length of respective phases.
‘+ The contact resistance value at the far end (ODSE End) where the looping cable is
connected will also come into consideration
‘+ Test Equipment accuracy.
Kindly note that the result is 9.03 m®/km whereas, the criteria as per the manufacturer is 9.0
mO/km which is not much deviation and is considerable.