You are on page 1of 1
CgSayLe Maricon speed ASS Sag TIN GY La Electromechanical Contracting L.L.C. (AVY N00 FP Ae aS (AV) 1) 20 PHF AE sgl Teme)| Tel: 41971 2) $5 333 84 Fax: +(971 2) 85 933 85 BAaGL day padhOLLe— palo gel VOT ose | 20.80%: 73235 -Abu Dnadi- UAE mafcont @emirates net ae ig 38 ays E-mail maricont@emirates.net.2e www mariconuae.com:533353\883% ner maanises Web: ww.mariconuae.com Circuit :220kV, Bay D-21 at SWHG to Bay D-02 at PVSW - Circuit 2 Cable Type — :220kV, 1C, 2000 Samm, CU, XLPE Date 08 December, 2018. Project Title _: Noor Abu Dhabi 1177MWp Solar PV Project at Sweihan, Abu Dhabi Client TRANSCO Consultant: Fitchner, EDF Contractor: Sterling & Wilson Subject _: Clarification for deviation of DC Conductor resistance results with respect to the cable criteria Dear Sir, Further to the clarification required by the client on the topic of DC Conductor resistance results for Circuit 2 red phase, please note that the deviation is because of multiple reasons listed below:- * The cable end to end length of Red, Yellow and Blue phase is not exactly equal as there will always be some deviation in the cable length of respective phases. ‘+ The contact resistance value at the far end (ODSE End) where the looping cable is connected will also come into consideration ‘+ Test Equipment accuracy. Kindly note that the result is 9.03 m®/km whereas, the criteria as per the manufacturer is 9.0 mO/km which is not much deviation and is considerable. ‘Thank you. Maricon Electromechanical Contracting LLC

You might also like