You are on page 1of 10

Service Training

MALAGA

320B/330B
Hydraulic Excavators

III. PILOT SYSTEM

The pilot system is very similar to the pilot system on the 300A with regard to
components and operation.

Francis
June 97
Page:

PILOT & LOGIC CONTROL SCHEMATIC


2

Pressure Switch
(Implement/ AEC)

Pressure Switch
Straight
(Travel / AEC)
Travel
Valve

Right Travel
Left Travel

Attachment

Boom 1
Stick 1

Bucket
Swing

CHAPTER : Pilot System

320B - 330B HYDRAULIC


EXCAVATORS
Pilot Control
Pilot Valve (Joystick)
Relief
Valve
Pilot
Pilot
Oil
Pump
Manifold
320B - 330B HYDRAULIC
EXCAVATORS
CHAPTER : Pilot System

PILOT LOGIC CIRCUIT

Rt
Trav Str Lft
Stk Bm Sw Stk Bm
Bkt Atch Trav Trav
2 1 1 2

Return Top Pump Parallel Nfc


Passage Inlet Passages
Nfc Return
Bottom Passage
Parallel Pump
Passages
Inlet

Page: 3
Page:

PILOT OIL MANIFOLD SCHEMATIC


4

To Logic
Return Circuit
Oil To Pump
Regulator

To
Swing
To Stick Brake
Control
Valve 2 PRESSURE
TRAVEL SPEED TRENCHING REDUCING
LEVEL FINISH SOLENOID VALVE
SOLENOID SOLENOID
From Stick
Pilot Control 121-1490 121-1491 121-1490 111-9916
Valve

CHAPTER : Pilot System


To Hydr.

320B - 330B HYDRAULIC


Actuation
Valve

EXCAVATORS
Pilot
Relieve
valve

From Main Control


Valve Group

Pilot Pump
320B - 330B HYDRAULIC
EXCAVATORS
CHAPTER : Pilot System

PILOT OIL MANIFOLD


(Partial)

To swing
brake

To Logic
Circuit

Hyd. Activ.
Control Valve Accumulator

Pilot
Relief
Valve

Check
Valve

Pilot
Pump

Page: 5
Page:

RIGHT TRAVEL CONTROL VALVE


6

Pressure swich
(Implement / AEC)
Orifice

Pressure switch

CHAPTER : Pilot System


(Travel / AEC)

320B - 330B HYDRAULIC


EXCAVATORS
Pilot line
320B - 330B HYDRAULIC
EXCAVATORS
CHAPTER : Pilot System

PROPORTIONAL REDUCING VALVE

SOLENOID

To Pump
SIGNAL CURRANT Suction
INCREASE Line

To Pump
Regulator a
(PS signal)

b
Pilot
Oil pump

To Pump
Suction
Line
To Pump
Regulator SIGNAL CURRANT
DECREASE
(PS signal)

Pilot
a. Return Passage
Oil pump
b. Inlet Passage

Page: 7
320B - 330B HYDRAULIC
EXCAVATORS
CHAPTER : Pilot System

PILOT CONTROL VALVE

300B
123-2147

From Main
Control Valve
1

3 2 c b

To Main
Control Valve

Pilot Pump

Pilot Pump

To Main
Control Valve

4000 kPa
Pilot Pressure

3000 kPa

800 kPa
300B
1. Rod
2. Spring
Lever Stroke 3. Spool
a. Line to control valve
b. Line from control valve
c. Return passage

Page: 8
320B - 330B HYDRAULIC
EXCAVATORS
CHAPTER : Pilot System

SHOCK REDUCING VALVE


(Check Valve Open)

Pilot
Control
Valve

Boom - 1

Shock
Reducing
Valve

Check
Valve
a Pump
a. Passage Assembly

Page: 9
320B - 330B HYDRAULIC
EXCAVATORS
CHAPTER : Pilot System

SHOCK REDUCING VALVE


(Check Valve Closed)

Pilot
Control
Valve

Boom - 1

c
Shock
Reducing
Valve

d
b Pump
Assembly

b. Outlet Port
c. Passage
d. Orifice

Page: 10

You might also like