Professional Documents
Culture Documents
D. Write the first four terms of the sequence, given the nth term formula
1. an = 2n + 3 answer: Solution:
an = 2n + 3
n=1
an = 2n + 3
a1 = 2(1) + 3
a1 = 2 + 3
a1 = 5
n=2
an = 2n + 3
a2 = 2(2) + 3
a2 = 4 + 3
a2 = 7
n=3
an = 2n + 3
a3 = 2(3) + 3
a3 = 6 + 3
a3 = 9
n=4
an = 2n + 3
a4 = 2(4) + 3
a4 = 8 + 3
a4 = 11
2. an = n2 – 1 answer: 0,3, 8, 15
G. An object falling from rest travels 16 feet during the 1st second, 48 feet
during the 2nd second, 80 feet during the 3rd second and so on. How far
Answer: d. 224ft
arithmetic sequence.
b. Common difference
c. Finite
d. Term
a. Infinite
c. 27
6. The missing term in the sequence 2, -2, ___, -2, 2 is
c. 2
7. The 6th term of the sequence defined by the general or nth term an = -2n + 3 is ____.
d. 9
8. The sequence 6, 10, 14, 18,... is defined by the general term ____
a. an = 4n + 2
9. A sequence in which a constant, is added to the previous term to get the next
c. Arithmetic
10. Determine the general term of the sequence {6, 12, 18, 24}
b. an = n+6
b. d
12. Give the next term in the sequence, 3, 7, 11, 15, 19, ...
b. 23
13. Find the next three terms of the sequence -4, -1, 2, 5, 8
a. 11, 14, 17
14. Determine the common difference of the arithmetic sequence 8, 5, 2, -1, -4
d. -5
33 d. 3, 5, 7, 9, 11
receives Php4,000 in January 2011. How much will be her salary 5 years later?
his birthday on the 25th of June. This goal made him decide to save
on a piggy bank as early as April 10. He put Php 1 on the first day,
Php 3 on the second day, Php 6 on the third day, Php 10 on the
a. 6th day? 20
b. 7th day? 28
c. 8th day? 39
d. 9th day? 47
e. 10th day? 57
3. How much will Arman save on the nth day? How will you
FRONLINERS
2. What is a PPE?
quipment worn to minimize exposure to a variety of hazards. Examples of PPE include such
items as gloves, foot and eye protection, protective hearing devices (earplugs, muffs) hard hats,
respirators and full body suits.
8. How will you give a hand for the heroes in the hot zone?
A temporary wall with doorway was installed to designate the “warm zone,” which was
designated with a yellow sign. This area was utilized to prepare for entry into the hot zone and
to store PPE supplies, trash and laundry receptacles for soiled PPE, a hard surface chair, if
needed for sitting during application of shoe covers, and a table to hold surface disinfectant spray
and hand sanitizer and for the exchange of supplies.