Professional Documents
Culture Documents
Table of Contents
1 Introduction .......................................................................................................... 3
1 Introduction
WARNING
The product must be installed and prepared by GE personnel or a
third party authorized by GE.
Feedback to GE
Make sure to read the entire Site Preparation Guide and complete the Site preparation
checklist in Chapter 3.
Return the completed Site preparation checklist to the GE service office in your region.
You will find E-mail address and fax numbers to the GE service office in your region under:
www.gelifesciences.com/contact .
If your region is not listed, select the nearest region.
Site preparation/ • Review the site preparation guide for safety information and system re-
installation quirements.
coordinator
• Choose the site.
• Coordinate the installation timing of the system with any domestic safety
procedures and testings.
• Order the required materials.
• Schedule the installation and inform the relevant personnel of the instal-
lation date.
Facilities personnel • Make sure that the installation requirements are met for:
- Environmental conditions
- Biosafety
- Electrical supply
Introduction
Before the product is delivered, you must prepare the site according to the instructions
in this chapter.
WARNING
Spread of biological agents. The operator must take all necessary
actions to avoid spreading hazardous biological agents. The facility
must comply with the national code of practice for biosafety.
Space requirements
Prepare a stable laboratory bench with a height of 1200 mm. The following space re-
quirements must be fulfilled at the location where the ÄKTApilot system will be installed:
Parameter Specification
The ÄKTApilot system can be installed on a mobile trolley. The dimensions for the Universal
Table trolley are:
• Width: 1200 mm
• Depth: 800 mm
• Height: 720-920 mm
Note: The computer and screen have their own specifications and requirements.
Make sure to follow these when connecting them.
WARNING
Access to power cord. Do not block access to the power cord. The
power cord must always be easy to disconnect.
900 mm
540 mm
750 mm
The weight of the ÄKTApilot system is 114 kg (monitor arm and computer not included).
The ÄKTApilot system is shipped in a wooden crate with the following dimensions:
• Width: 1200 mm
• Depth: 760 mm
• Height: 1350 mm
The system is delivered on a pallet that will add an extra weight of 20 kg.
Note: Since the ÄKTApilot system weighs 114 kg, four people are required to safely
lift the system out of the crate and onto either the workbench or a trolley.
Environmental requirements
The installation site must comply with the following specifications:
Parameter Specification
Electrical requirements
Parameter Specification
Frequency 50/60 Hz
WARNING
Protective ground. The product must always be connected to a
grounded power outlet.
Computer requirements
Note: The computer is either supplied as part of the system delivery or obtained lo-
cally. Install the client computer equipment according to the manufacturer's
instructions.
The ÄKTApilot system consists of a ÄKTApilot system separation unit, a connected
computer including a flat-screen monitor, and UNICORN control system. The following
table specifies the computer requirements.
Parameter Specification
Note: • The computer should be installed, placed and used according to the instruc-
tions and specifications provided by the manufacturer of the computer.
• A printer should be connected to the computer.
• The computer should not be connected to a network before the installation.
Equipment Specification
Equipment Specification
Item Specification
Ethanol 20%
Note: All solutions should be filtered and degassed, and all solutions should have
relevant certificates.
Parameter Specification
Introduction
Read the previous chapters in this Site Preparation Guide before completing the checklist.
Complete the checklist in this chapter to make sure that all necessary preparations have
been made for the installation of ÄKTApilot.
You must send the completed checklist to a GE office before GE service personnel can
install ÄKTApilot. See details in Chapter 1.
Checklist
General
Assigned personnel
• new user?
• intermediate user?
• advanced user?
Site selection
Space requirements
Environmental requirements
Ambient temperature
Relative humidity
Atmospheric pressure
Electrical requirements
Computer requirements
Access to photocopier
Acetone
pH solutions,
pH 4.00, 7.00 and 10.00
Conductivity solutions,
approximately 2, 12 and 110 mS/cm
Additional information
Company/Customer name
Company/Customer
representative
Name
Address
Email
Phone number