Transitional Housing Development Programme
Procurement Procurement Procurement of
of Consultants of Consultants Main Contractor
Notes:
4
Procurement of planning and related engineering consultants
Why Section 16 and STT application required for TH projects?
Planning Permission may be required for a Short Term Tenancy application is required for
proposed transitional housing although it is for use of vacant government land for community,
temporary use institutional or non-profit making purpose
5
Procurement of planning and related engineering consultants
Procurement Options
6
Procurement of planning and related engineering consultants
Procurement Process
2. Shortlist
1. Expression
approval of 4. Tender
of Interest 3. Tender 5. Tender 6. Tender
qualified Invitation and
issued to a list preparation Analysis Award
tenderers by Return
of tenderers
NGO
8
Procurement of planning and related engineering consultants
Tender Preparation - Tender Documents
Conditions
of Tender
Schedule Form of
Basic structure of of Fees Tender
tender documents
Tender
Documents
Project
Brief and Memorandum
Schedule of Agreement
of Services
Conditions
of
Engagement
9
Procurement of planning and related engineering consultants
Conditions of Tender
- Tender offer
Content of
Tender
- Tender validity
- Become a binding
contract once accepted Tender
validity
period
Contract
binding
General Conditions of
Special Conditions of
Engagement
Engagement
- Contract administration
Amendments to General
matters
Conditions of Engagement to
- Consultant’s responsibility
suit the project particulars and
- Employer’s responsibility
Employer’s need
- Variation / Change of design
- Payment Terms
- Copyright
- Professional Indemnity
- Termination
14
Procurement of planning and related engineering consultants
Conditions of Engagement
Project Brief
Schedule of Services
An introduction of the project containing
project background information, site Schedule of Services for each engineering
information and plans, development discipline
parameters, design requirements, critical
dates, notional design scheme (if any),
tentative programme, client’s
requirements to follow
16
Procurement of planning and related engineering consultants
Project brief and Schedule of Services
17
Procurement of planning and related engineering consultants
Project brief and Schedule of Services
Environmental Sewerage
To identify the potential Drainage
To identify existing sewerage
environmental issues resulted To identify existing drainage
provision within and surrounding
from TH development including provision within and surrounding
the site, estimate the additional
noise, water, waste, etc the site, estimate the additional
discharge of sewage to public
demand / discharge to public
sewerage system, recommend if
storm water drainage system
upgrading works required on
resulted from the development
existing public sewage system
18
Procurement of planning and related engineering consultants
Schedule of fee
- Fees (Lump sum or fee as a percentage
of construction works)
19
Procurement of statutory persons and related construction professionals
20
Procurement of statutory persons and related construction professionals
Registered Structural Engineer (RSE)
Authorized Person (AP)-Architect Registered Geotechnical Engineer (RGE)
-Acting as the AP for communication with Buildings -RSE/ RGE are responsible for geotechnical design, foundation
Department and superstructure design of a TH project
-handling statutory submissions and approval -handling structural-related statutory submissions and
approval
-preparing tender drawings and specification for
builder’s works -preparing tender drawings and specification for structural
works
-liaison with government departments
-liaison with government departments
-daily coordination among consultants and
contractors -daily coordination among consultants and contractors
-supervising clerk of works to check the quality of -supervising resident structural engineers to check the quality
builder’s works of structural works
-monitoring site progress -monitoring site progress in structural aspects and providing
adequate site supervision
21
Procurement of statutory persons and related construction professionals
-handling building services related statutory -To prepare various works contract documents and bills
submissions and approval of quantities of a TH project
-preparing tender drawings and specification for -To advise client on different tendering strategies
building services works
-To issue payment certificates to contractors in regular
-liaison with government departments and utility basis
companies regarding E&M issue
-To monitor payment status for all the works and to
-daily coordination among consultants and ensure the overall TH budget is under control
contractors
-To prepare and agree final account
-supervising building service inspector to check the
quality of E&M works
Procurement Options
23
Procurement of statutory persons and related construction professionals
Design and Build
(i) What is a Design and Build Contract?
The contractor is required to undertake the design and construction of the full package of
superstructure works, based on Employer’s requirements
Design and Build 3. Allow earlier involvement of contractor 3. The Contractor tends to provides minimum standard
24
Procurement of statutory persons and related construction professionals
Design and Build
• Information required for a proper Design and Build tender - A full set of
Employer’s requirement including building plans, MiC design, elevations,
design criteria, schedule of recommendation, pricing document
• MiC design may not be feasible for every TH project due to site constraints
25
Procurement of statutory persons and related construction professionals
Procurement Process
2. Shortlist
1. Expression
approval of 4. Tender
of Interest 3. Tender 5. Tender 6. Tender
qualified Invitation and
issued to a list preparation Analysis Award
tenderers by Return
of tenderers
NGO
The Tendering procedure and tender documentation preparation are more or less similar to those of the planning consultant with the following points
to note:-
28
Procurement of RGBC for construction works
Major works included in Main Contract Tender
Procurement Options
Contractor will be
responsible for
design, supply and
Design and Build construction of the
works in accordance
Traditional lump sum
with employer’s
Procurement requirement fixed price for Main
options for Contract and Design and
Main Contract Contractor will be Build for MiC
responsible for
Traditional construction of the
Approach works while the
design is provided by
consultants
- Design other than MiC should be provided by the consultant team to save time.
- Less design risk on the contractor as the consultants are responsible for the design except for the MiC part.
32
Procurement of RGBC for construction works
Procurement Process of Main Contract Tender
2. Shortlist
1. Expression
approval of 4. Tender
of Interest 3. Tender 5. Tender 6. Tender
qualified Invitation and
issued to a list preparation Analysis Award
tenderers by Return
of tenderers
NGO
Conditions
of Tender
Bills of
Basic structure of Quantities
main contract Form of
or
tender documents Tender
Schedule
of Rates
Tender
Documents
Drawings Articles of
and Agreement
Specifications
Conditions
of Contract
34
Procurement of RGBC for construction works
Conditions of Tender
For a simple contract - once six years have passed the right to sue in a
court of law is no longer possible
For a contract under seal - have right to sue in a court of law for
twelve years
Reference: Guidance on Execution of Public Works Contracts as Deed under DEVB(PS) 107/8 Sample page of Articles of Agreement
37
Procurement of RGBC for construction works
Conditions of Contract
A. General Conditions of Contract
• To define the terms under which the works to be carried out, the
relationship between the Employer and the Contractor, the
powers of the Architect and the terms of payment
38
Procurement of RGBC for construction works
Conditions of Contract
A. General Conditions of Contract
39
Procurement of RGBC for construction works
Conditions of Contract
B. Special Conditions of Contract
• To supplement the
amendments, additions,
deletions and amplifications Sample pages regarding the SCC of Design
to the general conditions of Responsibility for Contractor’s Design
40
Procurement of RGBC for construction works
Common standard forms of contract in use
41
Procurement of RGBC for construction works
Drawings
Enable tenderers to
understand the scope and
details of works so that price
submitted by the contractor
can be expected to be realistic
42
Procurement of RGBC for construction works
Drawings
43
Procurement of RGBC for construction works
Specification
44
Procurement of RGBC for construction works
Bills of Quantities
The purpose of the Bills of
Bills of Quantities
Quantities is: 1) Preambles
To describe the method of measurement used in preparing the bills of
-To set out the quantities quantities.
and descriptions of works to 2) Preliminaries
be executed for the To list out the site overheads requirements and contract conditions
tenderers to price (which do not form part of permanent works), such as description of
work, form of contract used, site supervision and site facilities
-To allow comparison of the 3) Measured work
tenders in the competitive Lump sum contract based on bills of quantities –
bidding process The quantities of work required for completion of the project will be
measured and stated in this section for pricing
4) Provisional sum and prime cost sum
-To provide a basis for
Provisional sum - lump sum items to cover some aspects of a project
valuing the completed work which cannot be measured in details at the time the tender
documents issued
Prime cost sum – a sum of money provided for work or services to be
executed by nominated subcontractor or nominated supplier
45
Procurement of RGBC for construction works
Bills of Quantities
Samples pages of
Bills of Quantities
46
Procurement of RGBC for construction works
Schedule of Rates
If the contract used is a lump
sum contract based on drawings
and specifications, no bills of
quantities will be prepared.
Instead, a schedule of rates with
approximate quantities will be
prepared for pricing purpose.
48
Procurement of RGBC for construction works
Employment of Project Manager for TH development
49
Reference Material
Material Link Source
Form of Tender for Capital https://www.devb.gov.hk/filemanager/en/content_188/form_of_ten Development Bureau
Works Contract der.doc
50