INTRODUCTION
RFPs have strict procurement rules for
content, timeline and vendor responses
and are used when the request has a
REQUEST FOR PROPOSAL
Issue of
01 Preparing a brief 02 RFQ
Preparation of brief Finding interested and
Description of project Qualified firms
REQUEST FOR PROPOSAL
Review
Detailed
03 RFQ 04 scope of work
Making a list of firms to Developing the scope of
be included in RFQ work and guidelines for RFP
Conducting
Selection
09 Interview 10 firms
Conducting the Finalizing the firm for
detailed interviews project
4
Negotiating Contract
11 Scope and fee 12 Execution
…BEFORE PREPARING RFP
6
Scope of work typically includes
Project type
New construction | Project size
renovation | addition Estimated square
footage of the
construction
SCOPE OF WORK
Program summery
Project budget
Type of fscility and program
Estimated budget for the specifications
project | construction cost | Project schedule
soft cost | total cost Targeted completion time
frames | proposed schedule
7
REQUEST FOR PROPOSAL
8
CONTENT OF
REQUEST FOR PROPOSAL
REQUEST FOR PROPOSAL
It tell the Deadline for the proposals, It includes all the information owner It includes any photograph or
address for proposal to send on,
proposal format, total no of proposals need to know about the firm and drawings available of the
requested how they would provide the services facility or the project proposed
10
Once completed, the RFQ should be distributed and
reviewed by the Selection Review Committee or the
appropriate people designated by owner
Once reviewed and approved the RFQ should be
made ready for publication.
REQUEST FOR QUALIFICATION
3. WRITING RFQ
Once the framework for FRP is developed, owner needs to ask questions important for the project. Owner
needs to understand not only the experience and capabilities of architectural firm, but what makes them
successful and what specific characteristics and practices have made them who they are today.
12
4. DEVELOPMENT OF RATING SYSTEM
Prior to publishing the RFP, it is important to determine how the responses will be rated. Owner should select the criteria and assign weights that are most appropriate for the
project.
An example of RFP evaluation sheet that could be used is as follows:
15
REQUEST FOR QUALIFICATION
7. RECEIVING PROPOSALS
The RFP should clearly state the date, location and
quantity of proposals to be submitted. The owner
should be prepared to receive proposals from
overnight mail carriers, standard mail, and walkins. The
16
owner should be prepared to provide receipt of
proposals to all walk-ins and time and date stamp all
received proposals. The owner should also be
prepared to handle phone calls and emergency
situations from proposers.
8. EVALUATING THE SUBMITTALS
REQUEST FOR PROPOSAL
17
9. DEVELOPING A SHORT LIST
After evaluating the responses submitted by
architectural firms, the Selection Committee will
typically find a small group of firms that they are
interested in. Once the short list of these firms is
developed a memorandum should be sent to the short-
RRQUEST FOR PROPOSAL
18
10. CHECKING CLIENT REFERENCES
REQUEST FOR PROPOSAL
It is a good idea to call and talk to the owners of the recent projects that the architects
have completed. This is usually the best way to get critical information about the
performance of the firm that would not be available anywhere else. A brief list of interview
questions should be prepared prior to the call. They should include questions about:
Stage 1
Invitation for presentation and
face to face meeting
REQUEST FOR PROPOSAL
Stage 2
Development of rating sheet
based on presentation
20 Stage 3
Final decision and selection of
the firm based on both the scores
12. SELECTING THE FIRM
21
RRQUEST FOR PROPOSAL
22
PROJECT DESCRIPTION
In ____, the voters of Some County approved the design and construction of a new Public Safety Centre. The centre
will house the following agencies: ______________________________. Significant time has elapsed since voters
approved the measure. This is in part, a result of the negotiations between the State of Any and the County on
funding for the _____________ and _______________ space. It is anticipated that by the end of April, a firm
project budget will be established. The County has hired ______________________ to serve as project manager
representing the County throughout the project. The following organizational chart is provided for clarification.
In ____, the County decided on the site for the proposed facility and to use a design/build delivery approach. The
architect who will be hired for this phase of work is anticipated to also assist in the development of the design/build
RFP and review submittals to that RFP. Further the firm that is hired for this phase of work will not be considered
for any part of the design/build phase
23
Since, time is of the essence; the following schedule has been established.
The selected firm must be able to demonstrate a willingness and ability to meet the July deadline. ______________ is
responsible for completing the space program and developing detailed room data sheets. The selected firm will
work closely with ______________ and key representatives of Some County. The selected firm must make
available to the County and the Design Build Team all documents created during the schematic design. The
selected firm should also be prepared to develop detailed cost estimates at agreed-to intervals during schematic
design.
PROPOSAL CONTENTS
The proposal should include a statement regarding the firm’s approach to public safety projects and detail not only the
firm’s experience, but should identify the proposed project staff and their experience on similar projects. Each
proposal must demonstrate how the firm will meet the deadlines established by the County. The proposal must
include a cost statement identifying hourly rates and expenses for work associated with the project. Proposed
24 costs will not be used in the interview selection process.
PROPOSAL FORMAT
The proposal should adhere to the following format in order to assist the County in evaluating each submittal. It is also
recommended that the proposal not exceed 15 pages in length, including references and staff information.
1. Title Page
2. Letter Of Introduction
3. Table Of Contents
4. Firm's Approach To Corrections Projects
5. Project Staff Assignment
RRQUEST FOR PROPOSAL
RESERVATIONS
The Commissioners and the evaluation team reserve the right to reject any and all proposals, and to waive informality,
technical defect, or clerical error in any proposal, as the interest of the County may require. They reserve the right
to select a group of firms for a future selection process or to move to any one or any other firms in their negotiation
process and perhaps return to one or several before the final determination is made. Further, the Board reserves
the right to contract for any future architectural services based on this selection process.
26
ADVERTISEMENT
________________ will send individual mailings to firms that have already expressed an interest in this project and
advertise in the following publications:
♦ Denver Post
♦ Rocky Mountain News
RRQUEST FOR PROPOSAL
EXAMPLE
http://www.mylibrary.us/wp-content/uploads/2018/09/ELE-2018.09.06-DesignBuild-RFP-rev1.pdf
27
28
SAMPLE OF RRQUEST FOR PROPOSAL
29
SAMPLE OF RRQUEST FOR PROPOSAL
THANK YOU