TAKE OFF SHEET

Project: Bole-Bulbula 40*60 Saving Houses Take off # 51


Block: F-3 Page # 1
Work Type:- BLOCK WORK
No size Qty Unit Location/Description No size Qty Unit Location/Description
B- Super Structure 1 1.25 dedaction W1'
2. BLOCK WORK 1.50
2.01 20cm thick class B external HCB
(13th floor wing-2 ) (1.88) m2
1 1.20 Axis A' b/n 5&5' 1 0.70 dedaction SD2
2.85 2.10
3.42 m2 (1.47) m2
1 0.70 dedaction SD2 1 0.70 Axis B b/n 7&8
2.10 2.50
(1.47) m2 1.75 m2
1 2.78 Axis A" b/n 4&4' 1 0.69 AxisB' b/n 6&6'
2.85 2.85
7.92 m2 1.97 m2
1 1.25 dedaction W1 1 2.50 Axis B' b/n 7&7'
1.50 2.85
(1.88) m2 7.13 m2
1 1.37 Axis A" b/n 4'&5 1 1.25 dedaction W1'
2.85 1.50
3.90 m2 (1.88) m2
1 2.51 AxisA"'b/n 4'&5" 1 1.55 Axis B' b/n 7'&8
0.60 2.85
1.51 m2 4.42 m2
1 2.05 Axis A"'b/n 5"&5' 1 1.86 Axis B' b/n 3&4
2.85 0.60
5.84 m2 1.12 m2
1 2.55 Axis B b/n 2'&3 1 0.65
2.50 2.85
6.38 m2 1.85 m2
1 1.25 dedaction W1' 1 1.99 Axis B' b/n 6&7
1.50 0.60
(1.88) m2 1.19 m2
1 5.55 Axis B b/n 3&4 1 0.65
2.50 2.85
13.88 m2 1.85 m2
1 1.25 dedaction W1 1 2.03 Axis B' b/n 7&8
1.50 0.60
(1.88) m2 1.22 m2
1 1.70 dedaction SD1 1 0.65
2.50 2.85
(4.25) m2 1.85 m2
1 0.80 dedaction TW1 1 5.50 Axis C b/n 3&4
0.90 2.72
(0.72) m2 14.96 m2
1 3.02 Axis B b/n 4&5 1 5.00 Axis C b/n 5&6
2.72 2.72
8.21 m2 13.60 m2
1 0.30 Axis B b/n 5'&6 1 1.20 dedaction D1
2.50 2.50
0.75 m2 (3.00) m2
1 2.61 Axis B b/n 6&6'
2.50
6.53 m2
_______________________ _______________________________ ______________________________
Prepared By: Checked By: Approved By:
TAKE OFF SHEET
Project: Bole-Bulbula 40*60 Saving Houses Take off # 51
Block: F-3 Page # 2
Work Type:- BLOCK WORK
No size Qty Unit Location/Description No size Qty Unit Location/Description
1 3.90 Axis C b/n 6&7 1 2.10 Axis D'' b/n 6&7
2.72 2.72
10.61 m2 5.71 m2
1 6.05 Axis C b/n 7&8 1 0.50 Axis 4 b/n A&A'
2.72 2.85
16.46 m2 1.43 m2
1 0.90 Axis C b/n 8&8' 1 1.00 Axis 5' b/n A&A'
2.85 2.85
2.57 m2 2.85 m2
1 0.80 dedaction TW1 1 4.90 Axis 4' b/n A' &B
0.90 2.72
(0.72) m2 13.33 m2
2 5.50 Axis D b/n 3&4,Axis D b/n 6&7 1 3.80 Axis 4 b/n A&B
2.50 2.50
27.50 m2 9.50 m2
2 1.25 dedaction W1' 1 2.00 dedaction SD3

1.50 2.50
(3.75) m2 (5.00) m2
2 2.00 dedaction SD3 1 3.80 Axis 5' b/n A&B
2.50 2.50
(10.00) m2 9.50 m2
1 6.05 Axis D b/n 7&8 1 1.25 dedaction W1

2.50 1.50
15.13 m2 (1.88) m2
1 1.25 dedaction W1' 3 3.60 Axis 3,5,6 b/n B&C
1.50 2.72
(1.88) m2 29.38 m2
1 0.90 Axis D b/n 8&8' 1 4.90 Axis 2 b/n C&D
2.85 2.50
2.57 m2 12.25 m2
1 5.85 Axis D' b/n 2&3 1 0.80 dedaction TW1

2.85 0.90
16.67 m2 (0.72) m2
1 1.25 dedaction W1' 1 1.40 Axis 4 b/n C&D
1.50 2.72
(1.88) m2 3.81 m2
1 0.80 dedaction TW1 1 1.45 Axis 5 b/n C&D
0.90 2.72
(0.72) m2 3.94 m2
1 2.09 Axis D' b/n 3&4 1 4.90 Axis 6 b/n C&D
0.60 2.72
1.25 m2 13.33 m2
1 1.86 Axis D' b/n 6&7 2 1.20 dedaction D1

0.60 2.50
1.12 m2 (6.00) m2
1 5.30 Axis D'' b/n 4&5 1 0.20
2.72 2.72
14.42 m2 (0.54) m2
_______________________ _______________________________ ______________________________

Prepared By: Checked By: Approved By:

TAKE OFF SHEET


Project: Bole-Bulbula 40*60 Saving Houses Take off # 51
Block: F-3 Page # 3
Work Type:- BLOCK WORK
No size Qty Unit Location/Description No size Qty Unit Location/Description
1 5.65 Axis 8' b/n C&D
2.85
16.10 m2
1 1.26 dedaction

2.25
(2.84) m2
2 0.22
2.85
(1.25) m2
1 1.65 Axis 6' b/n C&D
2.72
4.49 m2
1 2.53 Axis 4' b/n C&D
2.72
6.88 m2
3 0.79 Axis 3,6,8 b/n A&B
0.60
1.42 m2
1 1.00 Axis 3' b/n A&B
2.85
2.85 m2
2 0.31 Axis 6',7 b/n A&B
2.85
1.77 m2
3 0.59 Axis 3 ,6',7 b/n D&D'
0.60
1.06 m2
2 0.80 Axis 2,3 b/n D&D'
2.85
4.56 m2
1 1.20 Axis 2 b/n B&C
2.85
3.42 m2

309.64 TOTAL
_______________________ _______________________________ ______________________________
Prepared By: Checked By: Approved By:
TAKE OFF SHEET
Project: Bole-Bulbula 40*60 Saving Houses Take off # 51
Block: F-3 Page # 4
Work Type:- BLOCK WORK
No size Qty Unit Location/Description No size Qty Unit Location/Description
2.02 Ditto as item 2.01 but for 10cm
thick HCB internal wall (13th floor
wing-2) 1 2.60
1 1.85 Axis B b/n 5&5' 2.72
2.50 7.07 m2
4.63 m2 1 2.77 Axis D' b/n 6&7
1 1.68 Axis B' b/n 4&5 2.72
2.72 7.53 m2
4.57 m2 1 0.90 dedaction D2
1 1.75 Axis B' b/n 5&5' 2.50
2.72 (2.25) m2
4.76 m2 1 1.50 Axis D' b/n 7&8
1 2.60 Axis C b/n 2'&3 2.72
2.50 4.08 m2
6.50 m2 1 3.02
1 0.90 dedaction D2 2.72
2.50 8.21 m2
(2.25) m2 1 0.60
1 4.04 Axis C' b/n 3&4 2.85
2.72 1.71 m2
10.99 m2 1 0.50 Axis 4' b/n A&A'
1 0.90 dedaction D2 2.85
2.50 1.43 m2
(2.25) m2 1 1.00 Axis 5 b/n A&A'
1 0.70 dedaction D4 2.85
2.50 2.85 m2
(1.75) m2 1 1.95 Axis 5" b/n A&A'
1 0.20 2.72
2.72 5.30 m2
0.54 m2 1 0.70 dedaction D4
1 1.20 Axis C' b/n 6&7 2.50
2.72 (1.75) m2
3.26 m2 1 0.80 dedaction TW1
1 1.50 Axis C' b/n 7&8 0.90
2.72 (0.72) m2
4.08 m2 1 3.80 Axis 5 b/n A&B
1 0.65 2.72
2.72 10.34 m2
1.77 m2 1 0.90 dedaction D2
1 5.55 Axis D' b/n 2&3 0.22
2.72 (0.20) m2
15.10 m2 1 3.55 Axis 5" b/n A&B
2 0.70 dedaction D4 2.72
2.50 9.66 m2
(3.50) m2 1 0.90 dedaction D2
1 0.80 dedaction D3 0.22
2.50 (0.20) m2
(2.00) m2 2 2.65 Axis 3',3" b/n B&C
1 2.70 Axis D' b/n 4&5 2.72
2.72 14.42 m2
7.34 m2 1 0.80
1 0.90 dedaction D2 2.72
2.50 2.18 m2
(2.25) m2

_______________________ _______________________________ ______________________________


Prepared By: Checked By: Approved By:
TAKE OFF SHEET
Project: Bole-Bulbula 40*60 Saving Houses Take off # 51
Block: F-3 Page # 5
Work Type:- BLOCK WORK
No size Qty Unit Location/Description No size Qty Unit Location/Description
1 2.25 Axis 4' b/n B&C 1 0.60 Axis 7"' b/n B&B'
2.72 2.85
6.12 m2 1.71 m2
1 3.15 Axis 6' b/n B&C 1 0.60 dedaction TW1
2.72 0.90
8.57 m2 (0.54) m2
1 3.25 Axis 7' b/n B&C
2.72
8.84 m2
1 3.55 Axis 7" b/n B&C
2.72 231.87 TOTAL
9.66 m2
3 0.60 Axis 7,7' ,6' b/n A&B
2.85
5.13 m2
1 1.95 Axis 7 b/n B&C
2.72
5.30 m2
2 2.93 Axis 2',2" b/n C&D
2.72
15.94 m2
1 3.32 Axis 2"' b/n C&D
2.72
9.03 m2
1 0.90 dedaction D2
0.22
(0.20) m2
1 2.48 Axis 3 b/n C&D
2.72
6.75 m2
1 2.08 Axis 4 b/n C&D
2.72
5.66 m2
1 2.40 Axis 6' b/n C&D
2.72
6.53 m2
1 3.35 Axis 7' b/n C&D
2.72
9.11 m2
1 3.45 Axis 7" b/n C&D
2.72
9.38 m2
1 1.70 Axis 7"' b/n C&D
2.72
4.62 m2
1 0.70 dedaction D4
2.50
(1.75) m2
1 0.30 Axis 5"' b/n A&B
2.72
0.82 m2
1 0.30 Axis 2"' b/n D&D'
2.85
0.86 m2
1 0.40 Axis D' b/n 2"'&3
2.85

1.14 m2

_______________________ _______________________________ ______________________________


Prepared By: Checked By: Approved By:
TAKE OFF SHEET
Project: Bole-Bulbula 40*60 Saving Houses Take off # 51
Block: F-3 Page # 6
Work Type:- PLASTERING WORK
No size Qty Unit Location/Description No size Qty Unit Location/Description
d) To all lift shaft 13th floor wing-2) 1 1.85 Axis B b/n 5&5'
1 4.80 SW3 2.50
2.5 4.63 m2
12.00 m2 1 3.05 Axis B b/n 3&4
1 1.25 dedaction W1' 2.50
1.50 7.63 m2
(1.88) m2 1 1.25 dedaction W1
1 3.95 SW2 1.50
2.5 (1.88) m2
9.88 m2 1 0.80 dedaction TW1
1 3.60 SW2' 0.90
2.5 (0.72) m2
9.00 m2 1 2.65 Axis 3' b/n B&C

2.72
7.21 m2
2 2.65 Axis 3" b/n B&C
29.00 TOTAL 2.72
14.42 m2
d) To all internal wall to receive ceramic
wall tile (13th floor wing-2) 1 2.25 Axis 4' b/n B&C
1 1.75 Axis A"'b/n 5"&5' 2.72
2.85 6.12 m2
4.99 m2 1 3.85 Axis B' b/n 3&4
1 1.00 Axis 5' b/n A&A' 2.72
2.85 10.47 m2
2.85 m2 1 0.90 dedaction D2
1 1.95 Axis 5" b/n A&A' 2.50
2.72 (2.25) m2
5.30 m2 1 0.70 dedaction D4
1 0.70 dedaction D4 2.50
2.50 (1.75) m2
(1.75) m2 1 0.10
1 0.80 dedaction TW1 2.72
0.90 0.27 m2
(0.72) m2 1 1.45 Axis B b/n 6&6'
1 0.30 Axis 5"' b/n A&B 2.50
2.72 3.63 m2
0.82 m2 1 1.25 dedaction W1'
1 1.75 Axis B' b/n 5&5' 1.50
2.72 (1.88) m2
4.76 m2 1 2.55 Axis 6 b/n B&C
1 1.35 2.72
2.72 6.94 m2
3.67 m2 1 3.15 Axis 6' b/n B&C
1 3.35 Axis 5' b/n A&B 2.72
2.50 8.57 m2
8.38 m2 1 1.20 Axis B' b/n 6&7
1 1.25 dedaction W1' 2.72
1.50 3.26 m2
(1.88) m2 1 1.35 Axis B' b/n 7'&8
1 3.45 Axis 5" b/n A&B 2.85
2.72 3.85 m2
9.38 m2 1 2.65 Axis 7' b/n B&C
1 0.90 dedaction D2 2.72

2.50 7.21 m2
(2.25) m2

_______________________ _______________________________ ______________________________


Prepared By: Checked By: Approved By:
TAKE OFF SHEET
Project: Bole-Bulbula 40*60 Saving Houses Take off # 51
Block: F-3 Page # 7
Work Type:- PLASTERING WORK
No size Qty Unit Location/Description No size Qty Unit Location/Description
1 2.65 Axis 7" b/n B&C 1 1.80 Axis 6 b/n C&D
2.72 2.72
7.21 m2 4.90 m2
1 0.60 dedaction TW1' 1 2.27 Axis D b/n 6&6'
0.90 2.72
(0.54) m2 6.17 m2
1 0.65 Axis B' b/n 7&8 1 1.25 dedaction W1'
2.72 1.50
1.77 m2 (1.88) m2
1 1.20 Axis D' b/n 2&2' 1 2.40 Axis 6' b/n C&D
2.85 2.72
3.42 m2 6.53 m2
1 1.00 Axis 2 b/n D&D' 1 2.77 Axis D' b/n 6&7
2.85 2.72
2.85 m2 7.53 m2
2 2.93 Axis 2',2" b/n C&D 1 0.90 dedaction D2
2.72 2.50
15.94 m2 (2.25) m2
1 1.90 Axis D' b/n 2&2' 1 0.90 Axis C b/n 8&8'
2.72 2.85
5.17 m2 2.57 m2
1 1.39 Axis D' b/n 2'&3 1 0.80 dedaction TW1
2.72 0.90
3.78 m2 (0.72) m2
1 0.70 dedaction D4 1 1.70 Axis 8' b/n C&D
2.50 2.85
(1.75) m2 4.85 m2
1 1.19 Axis D' b/n 2'&3 1 1.05 Axis C b/n 7&8
2.72 2.50
3.24 m2 2.63 m2
1 0.80 dedaction TW1 1 2.45 Axis D' b/n 7&8'
0.90 2.72
(0.72) m2 6.66 m2
1 1.53 Axis 2 b/n C&D 1 1.70 Axis 7"' b/n C&D
2.50 2.72
3.83 m2 4.62 m2
1 0.30 Axis 2"' b/n D&D' 1 0.70 dedaction D4
2.85 2.50
0.86 m2 (1.75) m2
1 0.40 Axis D' b/n 2"'&3
2.85
1.14 m2
1 0.40 Axis 3 b/n D&D'
2.85 217.89 TOTAL
1.14 m2
1 1.43 Axis 3 b/n C&D
2.85
4.08 m2
1 2.08 Axis 4 b/n C&D
2.72
5.66 m2
1 2.43 Axis 4' b/n C&D
2.72
6.61 m2
1 2.70 Axis D' b/n 4&5
2.72
7.34 m2

1 0.90 dedaction D2
2.50
(2.25) m2
_______________________ _______________________________ ______________________________
Prepared By: Checked By: Approved By:
TAKE OFF SHEET
Project: Bole-Bulbula 40*60 Saving Houses Take off # 51
Block: F-3 Page # 8
Work Type:- PLASTERING WORK
No size Qty Unit Location/Description No size Qty Unit Location/Description
d) To all internal wall surfaces (13th
floor wing-2) 1 0.70 Axis B b/n 7&8
2 1.20 Axis A' b/n 5&5' 2.72
2.85 1.90 m2
6.84 m2 1 0.60
2 0.70 dedaction SD2 2.50
2.10 1.50 m2
(2.94) m2 1 0.59 Axis B' b/n 6&6'
1 1.95 Axis 5" b/n A&A' 2.85
2.72 1.68 m2
5.30 m2 1 1.80 Axis B' b/n 7&7'
1 0.70 dedaction D4 2.85
2.50 5.13 m2
(1.75) m2 1 1.25 dedaction W1'
1 0.80 dedaction TW1 1.50
0.90 (1.88) m2
(0.72) m2 1 3.02 Axis B' b/n 4&5
1 2.07 Axis A" b/n 4&4' 2.72
2.85 8.21 m2
5.90 m2 1 2.62
1 1.25 dedaction W1 2.72
1.50 7.13 m2
(1.88) m2 1 0.55 Axis B' b/n 3&4
1 1.17 Axis A" b/n 4'&5 2.85
2.85 1.57 m2
3.33 m2 1 2.09
1 2.51 Axis A"'b/n 4'&5" 0.60
0.60 1.25 m2
1.51 m2 1 1.99 Axis B' b/n 6&7
1 2.55 Axis B b/n 2'&3 0.60
2.50 1.19 m2
6.38 m2 1 0.55
1 1.25 dedaction W1' 2.85
1.50 1.57 m2
(1.88) m2 1 2.03 Axis B' b/n 7&8
1 2.15 Axis B b/n 3&4 0.60
2.50 1.22 m2
5.38 m2 1 0.55
1 1.70 dedaction SD1 2.85
2.50 1.57 m2
(4.25) m2 2 5.50 Axis C b/n 3&4
1 0.30 Axis B b/n5'&6 2.72
2.50 29.92 m2
0.75 m2 2 5.00 Axis C b/n 5&6
1 0.10 2.72
2.50 27.20 m2
0.25 m2 2 1.20 dedaction D1
1 1.36 Axis B b/n 6&6' 2.50
2.50 (6.00) m2
3.40 m2 1 3.90 Axis C b/n 6&7
1 1.11 2.72
2.50 10.61 m2
2.78 m2 1 3.70
2 0.70 dedaction SD2 2.72

2.10 10.06 m2
(2.94) m2

_______________________ _______________________________ ______________________________


Prepared By: Checked By: Approved By:
TAKE OFF SHEET
Project: Bole-Bulbula 40*60 Saving Houses Take off # 51
Block: F-3 Page # 9
Work Type:- PLASTERING WORK
No size Qty Unit Location/Description No size Qty Unit Location/Description
2 6.05 Axis C b/n 7&8 1 2.00 dedaction SD3
2.72 2.50
32.91 m2 (5.00) m2
1 5.50 Axis D b/n 3&4 4 3.60 Axis 3,5 b/n A&B
2.50 2.72
13.75 m2 39.17 m2
1 1.25 dedaction W1 1 3.60 Axis 6 b/n B&C
1.50 2.72
(1.88) m2 9.79 m2
1 2.00 dedaction SD3 1 0.80
2.50 2.72
(5.00) m2 2.18 m2
1 0.93 Axis D b/n 6&7 1 3.37 Axis 2 b/n C&D
2.50 2.50
2.33 m2 8.43 m2
1 6.05 Axis D b/n 7&8 1 1.40 Axis 4 b/n C&D
2.50 2.72
15.13 m2 3.81 m2
1 1.25 dedaction W1' 1 1.20
1.50 2.72
(1.88) m2 3.26 m2
1 0.90 Axis D b/n 8&8' 1 1.45 Axis 5 b/n C&D
2.85 2.72
2.57 m2 3.94 m2
1 2.16 Axis D' b/n 2&3 1 1.25
2.85 2.72
6.16 m2 3.40 m2
1 1.25 dedaction W1 1 4.90 Axis 6 b/n C&D
1.50 2.72
(1.88) m2 13.33 m2
1 2.09 Axis D' b/n 3&4 2 1.20 dedaction D1
0.60 2.50
1.25 m2 (6.00) m2
1 1.86 Axis D' b/n 6&7 1 1.65 Axis 8' b/n C&D
0.60 2.85
1.12 m2 4.70 m2
2 5.30 Axis D'' b/n 4&5 1 1.26
2.72 0.60
28.83 m2 0.76 m2
2 2.10 Axis D'' b/n 6&7 2 1.65 Axis 6' b/n C&D
2.72 2.72
11.42 m2 8.98 m2
1 0.50 Axis 4 b/n A&A' 1 2.43 Axis 4' b/n C&D
2.85 2.72
1.43 m2 6.61 m2
1 4.90 Axis 4' b/n A&A' 3 0.79 Axis 3,6,8 b/n A&B
2.72 0.60
13.33 m2 1.42 m2
1 4.70 1 1.00 Axis 3' b/n A&B
2.72 2.85
12.78 m2 2.85 m2
1 3.80 Axis 4 b/n A&B 1 1.11 Axis 6' b/n A&B
2.50 2.85

9.50 m2 3.16 m2

_______________________ _______________________________ ______________________________


Prepared By: Checked By: Approved By:
TAKE OFF SHEET
Project: Bole-Bulbula 40*60 Saving Houses Take off # 51
Block: F-3 Page # 10
Work Type:- PLASTERING WORK
No size Qty Unit Location/Description No size Qty Unit Location/Description
1 0.51 Axis 7' b/n A&B 1 0.90 dedaction D2
2.85 2.50
1.45 m2 (2.25) m2
1 1.20 Axis 2 b/n B&C 2 2.60
2.85 2.72
3.42 m2 14.14 m2
1 1.85 Axis B b/n 5&5' 1 2.77 Axis D' b/n 6&7
2.50 2.72
4.63 m2 7.53 m2
2 1.68 Axis B' b/n 4&5 1 0.90 dedaction D2
2.72 2.50
9.14 m2 (2.25) m2
2 2.55 Axis C b/n 2'&3 1 1.50 Axis D' b/n 7&7'
2.50 2.72
12.75 m2 4.08 m2
2 0.90 dedaction D2 1 1.40
2.50 2.72
(4.50) m2 3.81 m2
1 3.85 Axis C' b/n 3&4 1 3.02 Axis D' b/n 7'&8
2.72 2.72
10.47 m2 8.21 m2
1 0.90 dedaction D2 1 0.47
2.50 2.72
(2.25) m2 1.28 m2
1 0.70 dedaction D4 2 0.60 Axis D' b/n 7''&8
2.50 2.85
(1.75) m2 3.42 m2
1 0.10 2 1.00 Axis 5 b/n A&A'
2.72 2.85
0.27 m2 5.70 m2
1 1.20 Axis C' b/n 6&7 2 3.80 Axis 5 b/n A&B
2.72 2.72
3.26 m2 20.67 m2
1 1.60 Axis C' b/n 7&7' 2 0.90 dedaction D2
2.72 0.22
4.35 m2 (0.40) m2
1 1.50 1 3.55 Axis 5" b/n A&B
2.72 2.72
4.08 m2 9.66 m2
1 0.65 Axis C' b/n 7'&8 1 0.90 dedaction D2
2.72 0.22
1.77 m2 (0.20) m2
1 5.45 Axis D' b/n 2&3 1 2.65 Axis 3' b/n B&C
2.72 2.72
14.82 m2 7.21 m2
1 1.30 2 0.80
2.72 2.72
3.54 m2 4.35 m2
2 0.70 dedaction D4 1 2.35 Axis 4' b/n B&C
2.50 2.72
(3.50) m2 6.39 m2
1 0.80 dedaction D3 2 1.95 Axis 7 b/n B&C
2.50 2.72
(2.00) m2 10.61 m2
1 2.70 Axis D' b/n 4&5 1 3.15 Axis 6' b/n B&C
2.72 2.72
7.34 m2 8.57 m2

_______________________ _______________________________ ______________________________


Prepared By: Checked By: Approved By:

TAKE OFF SHEET


Project: Bole-Bulbula 40*60 Saving Houses Take off # 51
Block: F-3 Page # 11
Work Type:- PLASTERING WORK
No size Qty Unit Location/Description No size Qty Unit Location/Description
1 3.15 Axis 7' b/n B&C
2.72
8.57 m2
1 0.50
2.72
1.36 m2
1 3.55 Axis 7" b/n B&C
2.72
9.66 m2
1 1.60
2.72
4.35 m2
2 0.60 Axis 7,7' b/n A&B
2.85
3.42 m2
1 2.93 Axis 2' b/n C&D
2.72
7.97 m2
1 3.03
2.72
8.24 m2
1 3.42 Axis 2"' b/n C&D
2.72
9.30 m2
1 3.32
2.72
9.03 m2
2 0.90 dedaction D2
0.22
(0.40) m2
1 2.48 Axis 3 b/n C&D
2.72
6.75 m2
1 0.95
2.72
2.58
1 2.08 Axis 4 b/n C&D
2.72
5.66 m2
1 2.40 Axis 6' b/n C&D
2.72
6.53 m2
2 3.35 Axis 7' b/n C&D
2.72
18.22 m2
2 3.45 Axis 7" b/n C&D
2.72
18.77 m2
1 1.70 Axis 7"' b/n C&D
2.72
4.62 m2
1 0.70 dedaction D4
2.50
(1.75) m2

676.68 TOTAL

_______________________ _______________________________ ______________________________


Prepared By: Checked By: Approved By:
TAKE OFF SHEET
Project: Bole-Bulbula 40*60 Saving Houses Take off # 51
Block: F-3 Page # 12
Work Type:- PLASTERING WORK
No size Qty Unit Location/Description No size Qty Unit Location/Description
d) To columns(13th floor wing-2) 1 0.40 C-4 Axis C-8
1 0.60 C-1 Axis A-4 2.50
2.50 1.00 m2
1.50 m2 1 0.10
1 0.30 2.50
2.50 0.25 m2
0.75 m2 1 0.60
1 0.60 C-2 Axis A-5 2.50
2.50 1.50 m2
1.50 m2 3 0.40 C-4 axis D-8
1 0.30 2.50
2.50 3.00 m2
0.75 m2 1 0.60 C-5 Axis B-3
2 0.40 2.50
2.50 1.50 m2
2.00 m2 1 0.20
1 0.60 C-3 Axis A-5' 2.50
2.50 0.50 m2
1.50 m2 1 0.60 C-6 Axis B-4
1 0.20 2.50
2.50 1.50 m2
0.50 m2 2 0.50
1 0.60 C-3 Axis C-2 2.50
2.50 2.50 m2
1.50 m2 2 0.60 C-6 axis I-5
2 0.20 2.50
2.50 3.00 m2
1.00 m2 1 0.30
1 0.60 C-3 Axis D-2 2.50
2.50 0.75 m2
1.50 m2 1 0.40 C-6 axis B-6
2 0.20 2.50
2.50 1.00 m2
1.00 m2 1 0.60
1 0.10 C-4 axis B-2' 2.50
2.50 1.50 m2
0.25 m2 1 0.20 Dedaction W1
1 0.60 1.50
2.50 (0.30) m2
1.50 m2 1 0.60 C-6 axis B-7
1 0.20 Dedaction 2.50
1.50 1.50 m2
(0.30) m2 1 0.40
1 0.10 C-4 Axis B-8 2.50
2.50 1.00 m2
0.25 m2 3 0.60 C-7 Axis C-3,Axis C-4 ,axis C-5
1 0.20 2.50
2.50 4.50 m2
0.50 m2 3 0.50
1 0.60 2.50
2.50 3.75 m2
1.50 m2 3 0.40
2.50
3.00 m2
3 0.30
2.50
2.25 m2

_______________________ _______________________________ ______________________________


Prepared By: Checked By: Approved By:

TAKE OFF SHEET


Project: Bole-Bulbula 40*60 Saving Houses Take off # 51
Block: F-3 Page # 13
Work Type:- PLASTERING WORK
No size Qty Unit Location/Description No size Qty Unit Location/Description
2 0.40 C-7 Axis C-7 1 0.60 C-9 axis D-5
2.50 2.50
2.00 m2 1.50 m2
2 0.50 1 0.50
2.50 2.50
2.50 m2 1.25 m2
1 0.60 C-7 Axis (C-6) 1 0.30
2.50 2.50
1.50 m2 0.75 m2
1 0.50
2.50
1.25 m2
1 0.30
2.50 77.40 TOTAL
0.75 m2
2 0.60 C-8 axis D-3
B ) To exposed beams(13th floor
2.50 wing-2)
3.00 m2 1 5.05 Axis A b/n 4&5
1 0.40 0.35
2.50 1.77 m2 external side
1.00 m2 1 5.05
1 0.60 C-8 axis D-6 0.22
2.50 1.11 m2 internal side
1.50 m2 1 5.05
1 0.30 0.25
2.50 1.26 m2 bottom side
0.75 m2 1 3.00 Axis A b/n 5&5'
1 0.40 0.35
2.50 1.05 m2 external side
1.00 m2 1 3.00
1 0.60 C8' axis D-7 0.22
2.50 0.66 m2 internal side
1.50 m2 1 3.00
1 0.50 0.25
2.50 0.75 m2 bottom side
1.25 m2 1 0.50 dedaction
1 0.40 0.20
2.50 (0.10) m2
1.00 m2 1 6.05 AxiS B b/n (7&8)
1 0.30 0.22
2.50 1.33 m2 internal side
0.75 m2 1 6.05
1 0.40 C-9 axis D-4 0.25
2.50 1.51 m2 bottom side
1.00 m2 1 0.70 dedaction
2 0.60 0.20
2.50 (0.14) m2
3.00 m2
1 0.20 Dedaction
1.50
(0.30) m2
1 0.30 Dedaction
1.50
(0.45) m2

_______________________ _______________________________ ______________________________


Prepared By: Checked By: Approved By:
TAKE OFF SHEET
Project: Bole-Bulbula 40*60 Saving Houses Take off # 51
Block: F-3 Page # 14
Work Type:- PLASTERING WORK
No size Qty Unit Location/Description No size Qty Unit Location/Description
1 5.50 Axis B b/n (6&7) 2 5.50 Axis C b/n (6&7)
0.22 0.22
1.21 m2 internal side 2.42 m2 internal side
1 5.50 1 5.50
0.25 0.25
1.38 m2 bottom side 1.38 m2 bottom side
1 0.56 dedaction 1 3.90 dedaction
0.20 0.025
(0.11) m2 (0.10) m2
1 1.35 Axis B b/n (5'&6) 2 5.00 Axis C b/n (5&6)
0.22 0.22
0.30 m2 internal side form work 2.20 m2 internal side
1 1.35 1 5.00
0.25 0.25
0.34 m2 bottom form work 1.25 m2 bottom side
2 3.15 Axis B b/n (5&5') 1 3.80 dedaction
0.22 0.025
1.39 m2 internal side (0.10) m2
1 3.15 2 5.00 Axis C b/n (4&5)
0.25 0.22
0.79 m2 bottom side 2.20 m2 internal side
1 1.85 dedaction 1 5.00
0.10 0.25
(0.19) m2 1.25 m2 bottom side
2 5.00 AxiS B b/n (4&5) 2 5.40 Axis C b/n 3&4
0.22 0.22
2.20 m2 internal side 2.38 m2 internal side
1 5.00 1 5.40
0.25 0.225
1.25 m2 bottom side 1.22 m2 bottom side
1 2.62 dedaction 2 2.60 AxiS C b/n (2'&3)
0.20 0.22
(0.52) m2 1.14 m2 internal side
1 5.50 AxiS B b/n 3&4 1 2.60
0.22 0.15
1.21 m2 internal side 0.39 m2 bottom side
1 5.50 1 1.65 dedaction
0.25 0.10
1.38 m2 bottom side (0.17) m2
1 1.55 dedaction 2 2.05 AxiS C b/n (2&2')
0.20 0.22
(0.31) m2 0.90 m2 internal side
1 2.55 Axis B b/n (2'&3) 1 2.05
0.22 0.25
0.56 m2 internal side 0.51 m2 bottom side
1 2.55 1 6.05 AxiS D b/n (7&8)
0.25 0.22
0.64 m2 bottom side 1.33 m2 internal side
1 0.85 1 4.80
0.20 0.05
(0.17) m2 dedaction 0.24 m2 bottom side
2 6.05 AxiS C b/n (7&8) 1 1.25
0.22 0.25
2.66 m2 internal side 0.31 m2 bottom side
1 6.05
0.225

1.36 m2 bottom side

_______________________ _______________________________ ______________________________


Prepared By: Checked By: Approved By:
TAKE OFF SHEET
Project: Bole-Bulbula 40*60 Saving Houses Take off # 51
Block: F-3 Page # 15
Work Type:- PLASTERING WORK
No size Qty Unit Location/Description No size Qty Unit Location/Description
1 5.50 AxiS D b/n (6&7) 1 1.25
0.22 0.25
1.21 m2 internal side 0.31 m2 bottom side
1 5.50 1 3.78 AxiS 2' b/n BC
0.25 0.22
1.38 m2 bottom side 0.83 m2 internal side form work
1 2.05 dedaction 6 3.60 AxiS 3 ,5,6 b/n BC
0.20 0.22
(0.41) m2 4.75 m2 internal side form work
1 5.00 AxiS D b/n (5&6) 3 3.60
0.22 0.225
1.10 m2 internal side 2.43 m2 bottom side
1 5.00 4 3.60 AxiS 4,7 b/n BC
0.25 0.22
1.25 m2 bottom side 3.17 m2 internal side form work
1 5.00 AxiS D b/n (4&5) 2 3.60
0.22 0.25
1.10 m2 internal side 1.80 m2 bottom side
1 5.50 AxiS D b/n (3&4) 1 3.60 AxiS 8 b/n BC
0.22 0.22
1.21 m2 internal side 0.79 m2 internal side form work
1 5.50 1 4.90 AxiS 2 b/n CD
0.25 0.22
1.38 m2 bottom side 1.08 m2 internal side
1 2.05 dedaction 1 4.10
0.20 0.05
(0.41) m2 0.21 m2 bottom side
1 4.95 AxiS D b/n (2&3) 1 0.80
0.22 0.25
1.09 m2 internal side 0.20 m2 bottom side
1 4.95 10 4.90 AxiS 3 ,4,5,6,7 b/n CD
0.05 0.22
0.25 m2 bottom side 10.78 m2 internal side
1 3.80 AxiS 5' b/n AB 5 4.90
0.22 0.25
0.84 m2 internal side 6.13 m2 bottom side
1 2.55 1 4.90 AxiS 8 b/n CD
0.05 0.35
0.13 m2 bottom side 1.72 m2 External side
1 1.25 1 4.90
0.25 0.22
0.31 m2 bottom side 1.08 m2 internal side
2 3.80 AxiS 5 b/n AB 1 4.90
0.22 0.25
1.67 m2 internal side form work 1.23 m2 bottom side
1 3.80
0.15
0.57 m2 bottom side
1 3.80 AxiS 4 b/n AB 93.42 TOTAL
0.22
0.84 m2 internal side form work
1 2.55
0.05
0.13 m2 bottom side

_______________________ _______________________________ ______________________________


Prepared By: Checked By: Approved By:
TAKE OFF SHEET
Project: Bole-Bulbula 40*60 Saving Houses Take off # 51
Block: F-3 Page # 16
Work Type:- PLASTERING WORK
No size Qty Unit Location/Description No size Qty Unit Location/Description
f) To RC ceiling (13th floor wing-2) 1 2.25 axis C b/n (2&2')
B/n axis AB 1.20
1 5.375 on axis b/n 4&5 2.70 m2
4.20 1 2.73 axis B b/n (3&4)
22.58 m2 1.20
1 3.225 on axis b/n (25&5' ) 3.28 m2
4.20 1 2.80 axis D b/n (6'&7')
13.55 m2 1.00
B/n axis BC 2.80 m2
1 2.70 on axis b/n (2'&3) 1 6.60 axis B b/n (6&8)
4.125 0.60
11.14 m2 3.96 m2
2 5.75 on axis b/n (3&4), on axis b/n (6&7) 1 2.90
4.125 1.20
47.44 m2 3.48 m2
2 5.25 on axis b/n (4&5) ,on axis b/n (5&6) 1 2.83
4.125 1.20
43.31 m2 3.40 m2
1 6.425 on axis (b/n 7&8 )
4.125
26.50 m2
B/n axis CD
1 5.225 on axis b/n (2&3 )
5.425 393.98 TOTAL
28.35 m2
2 5.75 on axis b/n (3&4), on axis b/n (6&7)
5.425
62.39 m2
2 5.25 on axis b/n(4&5) ,on axis b/n (5&6)
5.425
56.96 m2
1 6.425 on axis b/n ( 7&8 )
5.425
34.86 m2
1 1.80 dedaction for SN&EL duct
0.50
(0.90) m2
Cantilever
1 5.38 Axis A b/n (4&5')
1.00
5.38 m2
1 3.97
0.30
1.19 m2
1 3.95 Axis 8 b/n (C&D)
0.9
3.56 m2
1 1.70
1.1
1.87 m2
1 5.90 Axis D b/n 5&6
1.50
8.85 m2
1 5.45 Axis D b/n (2&3')
0.80
4.36 m2
1 3.00
1.00
3.00 m2
_______________________ _______________________________ ______________________________
Prepared By: Checked By: Approved By:
TAKE OFF SHEET
Project: Bole-Bulbula 40*60 Saving Houses Take off # 51
Block: F-3 Page # 17
Work Type:- PLASTERING WORK
No size Qty Unit Location/Description No size Qty Unit Location/Description
d) To EDGE for columns(13th floor
wing-2 7 2.72 on axis BC b/n 3&4
1 2.50 C-1 Axis A-4 19.04 ML
2.50 ML 3 2.72 on axis BC b/n 4&5
3 2.50 C-2 Axis A-5 8.16 ML
7.50 ML 6 2.72 on axis BC b/n 6&7
1 2.50 C-3 Axis A-5' 16.32 ML
2.50 ML 7 2.72 on axis BC b/n 7&8
2 2.50 C-3 Axis C-2 19.04 ML
5.00 ML 2 2.50 Axis C b/n 2'&3
2 2.50 C-3 axis C-3 5.00 ML
5.00 ML 4 2.50 Axis C b/n 5&6
1 2.50 C-4 axis B-2' 10.00 ML
2.50 ML 1 2.50 Axis C b/n 6&7
1 2.50 C-4 Axis C-8 2.50 ML
2.50 ML 11 2.72 on axis CD b/n 2&3
2 2.50 C-4 axis D-8 29.92 ML
5.00 ML 10 2.72 on axis CD b/n 4&5
2 2.50 C-4 axis B-8 27.20 ML
5.00 ML 10 2.72 on axis CD b/n 6&7
2 2.50 C-5 Axis B-3 27.20 ML
5.00 ML 11 2.72 on axis CD b/n 7&8
3 2.50 C-6 Axis B-5,B-6&B-7 29.92 ML
d) To EDGE for Beam (13th floor
7.50 ML wing-2)
2 2.50 C-6 Axis B-4 2 5.05 AxiS A b/n (4&5)
5.00 ML 10.10 ML
10 2.50 C-7 Axis C-7,C-6,C-5,C-4,C-3 2 3.00 AxiS A b/n (5&5')
25.00 ML 6.00 ML
3 2.50 C8' axis D-7 1 0.50 Dedaction
7.50 ML (0.50) ML
3 2.50 C-8 Axis D-6&D-3 1 2.55 Axis B b/n (2'&3)
7.50 ML 2.55 ML
3 2.50 C-9 axis D-4&D-5 1 5.55 AxiS B b/n (3&4)
7.50 ML 5.55 ML
d) To EDGE for wall(13th floor wing-2) 2 5.00 AxiS B b/n (4&5)
2 2.50 Axis A b/n 5&5' 10.00 ML
5.00 ML 1 2.62 Dedaction
2 2.72 on axis AA'b/n 4&4' (2.62) ML
5.44 ML 2 3.15 Axis B b/n (5&5')
5 2.72 on axis AB b/n 4'&5' 6.30 ML
13.60 ML 1 1.85 Dedaction
2 2.50 Axis 5" b/n AB (1.85) ML
5.00 ML 1 1.65 Axis B b/n (5'&6)
2 2.50 Axis B b/n 3&4 1.65 ML
5.00 ML 1 5.50 Axis B b/n (6&7)
1 2.50 Axis B b/n 4&5 5.50 ML
2.50 ML 1 6.05 AxiS B b/n (7&8)
4 2.50 Axis B b/n 5&6 6.05 ML
10.00 ML 2 2.05 AxiS C b/n (2&2')
2 2.50 Axis B b/n 6&7 4.10 ML
5.00 ML
2 2.50 Axis B b/n 7&8
5.00 ML
2 2.85 Axis 6' b/n AB
5.70 ML

_______________________ _______________________________ ______________________________


Prepared By: Checked By: Approved By:
TAKE OFF SHEET
Project: Bole-Bulbula 40*60 Saving Houses Take off # 51
Block: F-3 Page # 18
Work Type:- PLASTERING WORK
No size Qty Unit Location/Description No size Qty Unit Location/Description
2 2.60 AxiS C b/n (2'&3)
5.20 ML
1 1.65 Dedaction
(1.65) ML
1 5.50 AxiS C b/n (3&4)
5.50 ML
2 5.00 AxiS C b/n (4&5)
10.00 ML
1 5.00 Axis C b/n (5&6)
5.00 ML
1 1.20
1.20 ML
1 5.50 Axis C b/n (6&7)
5.50 ML
1 1.50
1.50 ML
1 6.05 AxiS C b/n (7&8)
6.05 ML
2 4.95 AxiS D b/n (2&3)
9.90 ML
1 5.50 AxiS D b/n (3&4)
5.50 ML
1 5.00 AxiS D b/n (5&6)
5.00 ML
1 5.50 AxiS D b/n (6&7)
5.50 ML
1 6.05 AxiS D b/n (7&8)
6.05 ML
2 3.80 AxiS 4,5' b/n AB
7.60 ML
2 3.80 AxiS 5 b/n AB
7.60 ML
3 3.60 AxiS 3,5,6, b/n BC
10.80 ML
4 3.60 AxiS 4,7 b/n BC
14.40 ML
2 4.90 AxiS 8 b/n CD
9.80 ML
1 4.90 AxiS 2 b/n CD
4.90 ML
4 4.90 AxiS 3,7 b/n CD
19.60 ML
2 4.90 AxiS 4 b/n CD
9.80 ML
1 1.47 Dedaction
(1.47) ML
2 4.90 AxiS 5 b/n CD
9.80 ML
1 1.45 Dedaction
(1.45) ML
2 4.90 AxiS 6 b/n CD
9.80 ML
1 2.35 Dedaction
(2.35) ML

580.95 TOTAL

_______________________ _______________________________ ______________________________


Prepared By: Checked By: Approved By:
Bridge Construction Plc
Bill of Quantity
Project: Bolle bulbula Saving Houses .
Location :- Addis Ababa, Bolle
Contractor:- Bridge Construction Plc
Client:- Bolle bulbula Saving Houses Development Enterprise
Sub Contractor/SP:-Neamen alemayehu &friends Commencemet Date:-14/11/2016
Month:-November Block:- F1
Pay
Contract Contract Quantity Amount Remaining Remaining
Item Description Unit Unit Rate
No. Quantity Amount (ETB) Prev. This Month To date Prev. This Month To date Quantity Amount %age

2.05 M ild steel reinforcement according to structural


drawings.price includes cutting,bending,placing,in
position, tying wire and concrete spacers and chairs
SUB STRUCTURE
a) Dia 8mm deformed bar kg 5,552.13 1.10 6,107.34 4,276.98 4,276.98 4,704.67 - 4,704.67 1,275.15 1,402.67 22.97
b) Dia 10mm deformed bar kg 51,225.30 1.10 56,347.83 40,271.18 40,271.18 44,298.30 - 44,298.30 10,954.12 12,049.53 21.38
c) Dia 12mm deformed bar kg 51,316.45 1.10 56,448.10 35,908.70 35,908.70 39,499.57 - 39,499.57 15,407.75 16,948.53 30.02
d) Dia 14mm deformed bar kg 29,155.82 1.10 32,071.40 29,696.82 29,696.82 32,666.50 - 32,666.50 (541.00) (595.10) -1.86
e) Dia 16mm deformed bar kg 50,925.96 1.10 56,018.56 29,784.74 29,784.74 32,763.21 - 32,763.21 21,141.22 23,255.35 41.51
f) Dia 20mm deformed bar kg 103,977.58 1.10 114,375.34 40,350.86 40,350.86 44,385.95 - 44,385.95 63,626.72 69,989.39 61.19
g) Dia 24mm deformed bar kg 56,801.87 1.10 62,482.06 38,695.71 38,695.71 42,565.28 - 42,565.28 18,106.16 19,916.78 31.88
SUPER STRUCTURE
a) Dia 6 mm deformed bar kg 24,245.15 1.30 31,518.70 3563.23 3,563.23 4,632.20 - 4,632.20 11,021.12 10,638.79
a) Dia 8mm deformed bar kg 76,442.71 1.30 99,375.52 3377.65 3,377.65 4,390.94 - 4,390.94 60,744.89 73,771.50
b) Dia 10mm deformed bar kg 52,842.08 1.30 68,694.70 33501.60 33,501.60 43,552.08 - 43,552.08 (73,738.46) (132,314.19)
c) Dia 12mm deformed bar kg 40,469.58 1.30 52,610.45 12900.95 12,900.95 16,771.24 - 16,771.24 (13,360.72) (33,524.03)
d) Dia 14mm deformed bar kg 94,011.38 1.30 122,214.79 20348.88 20,348.88 26,453.54 - 26,453.54 10,034.90 (11,785.96)
e) Dia 16mm deformed bar kg 130,874.63 1.30 170,137.02 16440.85 16,440.85 21,373.10 - 21,373.10 41,788.47 10,009.26
f) Dia 20mm deformed bar kg 89,588.23 1.30 116,464.70 15990.68 15,990.68 20,787.89 - 20,787.89 34,015.76 30,650.03
g) Dia 24mm deformed bar kg 93.75 1.30 121.88 54652.15 54,652.15 71,047.80 - 71,047.80 (102,564.43) (149,403.84)
4th floor elevation Columns - 8th floor slab
a) Dia 6 mm deformed bar kg 1.50 3513.02 3,513.02 5,269.53 - 5,269.53
a) Dia 8mm deformed bar kg 1.50 3630.92 3,630.92 5,446.38 - 5,446.38
b) Dia 10mm deformed bar kg 1.50 32709.48 32,709.48 49,064.22 - 49,064.22
c) Dia 12mm deformed bar kg 1.50 14004.97 14,004.97 21,007.45 - 21,007.45
d) Dia 14mm deformed bar kg 1.50 22194.10 22,194.10 33,291.15 - 33,291.15
e) Dia 16mm deformed bar kg 1.50 20495.25 20,495.25 30,742.88 - 30,742.88
f) Dia 20mm deformed bar kg 1.50 19865.81 19,865.81 29,798.72 - 29,798.72
g) Dia 24mm deformed bar kg 1.50 24554.33 24,554.33 36,831.50 - 36,831.50
8th floor elevation Columns - 12th floor slab
a) Dia 6 mm deformed bar kg 1.70 3513.02 3,513.02 5,972.13 - 5,972.13
a) Dia 8mm deformed bar kg 1.70 3714.42 3,714.42 6,314.52 - 6,314.52
b) Dia 10mm deformed bar kg 1.70 31546.83 31,546.83 53,629.61 - 53,629.61
c) Dia 12mm deformed bar kg 1.70 14002.66 14,002.66 23,804.52 - 23,804.52
d) Dia 14mm deformed bar kg 1.70 22337.93 22,337.93 37,974.48 - 37,974.48
e) Dia 16mm deformed bar kg 1.70 30216.90 30,216.90 51,368.73 - 51,368.73
f) Dia 20mm deformed bar kg 1.70 11161.47 11,161.47 18,974.49 - 18,974.49
g) Dia 24mm deformed bar kg 1.70 14559.05 14,559.05 24,750.39 - 24,750.39
12th floor elevation Columns&above
a) Dia 6 mm deformed bar kg 1.90 2634.76 2,634.76 5,006.05 - 5,006.05
a) Dia 8mm deformed bar kg 1.90 4974.84 4,974.84 9,452.19 - 9,452.19
b) Dia 10mm deformed bar kg 1.90 28822.62 28,822.62 54,762.98 - 54,762.98
c) Dia 12mm deformed bar kg 1.90 12921.72 12,921.72 24,551.27 - 24,551.27
d) Dia 14mm deformed bar kg 1.90 19095.57 19,095.57 36,281.58 - 36,281.58
e) Dia 16mm deformed bar kg 1.90 29812.13 29,812.13 56,643.04 - 56,643.04
f) Dia 20mm deformed bar kg 1.90 8554.51 8,554.51 16,253.57 - 16,253.57
g) Dia 24mm deformed bar kg 1.90 8892.64 8,892.64 16,896.02 - 16,896.02

Total 1,044,988.38 767,489.94 - 767,489.94 1,103,979.70 - 1,103,979.70 97,911.65 (58,991.31)


__________________ ___________________ _____________________
Prepared By: Checked By: Approved By: Authorized by______________

Bridge Construction Plc


Bill of Quantity
Project: Bolle bulbula Saving Houses .
Location :- Addis Ababa, Bolle
Contractor:- Bridge Construction Plc
Client:- Bolle bulbula Saving Houses Development Enterprise
Sub Contractor/SP:-Neamen alemayehu &friends Commencemet Date:-14/11/2016
Month:-November Block:- F3
Pay Quantity Amount Remaining
Contract Contract Remaining
Item Description Unit Unit Rate
Quantity Amount (ETB) %age
No. Prev. This Month To date Prev. This Month To date Quantity Amount
Summary of BOQ
2. BLOCK WORK
20cm thick Class B external HCB wall which
can satisfy the designed strength , bedded in
2.01 14,041.16 20.00 280,823.20 339.71 339.71 6,794.19 - 6,794.19 6,777.04 86,747.93 30.89
cement mortar (1:3).Price shall include
mortar bedding. M2
2nd floor M2 21.00 163.08 163.08 3,424.68 - 3,424.68
3rd floor M2 22.00 600.53 600.53 13,211.59 - 13,211.59
4th floor M2 23.00 620.08 620.08 14,261.90 - 14,261.90
5th floor M2 24.00 619.51 619.51 14,868.30 - 14,868.30
6th floor M2 25.00 620.08 620.08 15,502.06 - 15,502.06
7th floor M2 26.00 600.53 600.53 15,613.70 - 15,613.70
8th floor M2 27.00 620.08 620.08 16,742.22 - 16,742.22
9th floor M2 28.00 619.51 619.51 17,346.35 - 17,346.35
10th floor M2 29.00 310.44 310.44 9,002.87 - 9,002.87
11th floor M2 30.00 600.53 600.53 18,015.81 - 18,015.81
12th floor M2 31.00 620.08 620.08 19,222.55 - 19,222.55
13th floor M2 32.00 309.87 309.64 619.51 9,915.96 9,908.43 19,824.40
14th floor M2 33.00 310.44 310.44 10,244.65 - 10,244.65
15th floor M2 34.00 - - - -

2.02 Ditto as Item 2.01 but for 100mm HCB 9516.82 20.00 190,336.40 494.61 494.61 9,892.23 - 9,892.23 3,671.42 36,536.26 19.20
internal wall wall M2
2nd floor M2 21.00 249.53 249.53 5,240.21 - 5,240.21
3rd floor M2 22.00 462.73 462.73 10,179.96 - 10,179.96
4th floor M2 23.00 464.09 464.09 10,674.10 - 10,674.10
5th floor M2 24.00 464.09 464.09 11,138.19 - 11,138.19
6th floor M2 25.00 464.09 464.09 11,602.28 - 11,602.28
7th floor M2 26.00 462.73 462.73 12,030.87 - 12,030.87
8th floor M2 27.00 464.09 464.09 12,530.46 - 12,530.46
9th floor M2 28.00 464.09 464.09 12,994.55 - 12,994.55
10th floor M2 29.00 232.22 232.22 6,734.44 - 6,734.44
11th floor M2 30.00 462.73 462.73 13,881.77 - 13,881.77
12th floor M2 31.00 464.09 464.09 14,386.83 - 14,386.83
13th floor M2 32.00 232.22 231.87 464.09 7,431.11 7,419.81 14,850.92
14th floor M2 33.00 232.22 232.22 7,663.33 - 7,663.33
15th floor M2 34.00 - - - -

Sub Total 471,159.60 12,568.02 541.51 13,109.53 330,547.17 17,328.24 347,875.41 10,448.45 123,284.19
__________________ ___________________ _____________________
Prepared By: Checked By: Approved By: Authorized by______________

Bridge Construction Plc


Bill of Quantity
Project: Bolle bulbula Saving Houses .
Location :- Addis Ababa, Bolle
Contractor:- Bridge Construction Plc
Client:- Bolle bulbula Saving Houses Development Enterprise
Sub Contractor/SP:-Neamen alemayehu &friends Commencemet Date:-14/11/2016
Month:-November Block:- F3
Pay Quantity Amount Remaining
Contract Contract Remaining
Item Description Unit Unit Rate
Quantity Amount (ETB) %age
No. Prev. This Month To date Prev. This Month To date Quantity Amount
Summary of BOQ
6.PLASTERING
6.01 Apply two coats of plastering in cement
mortar (1.3).
a) To external wall surfaces, M2 8312.55 - - - - - - 8,312.55 -
b) To exposed beams, M2 2837.25 25.00 70,931.25 2847.53 93.42 2,940.95 71,188.23 2,335.60 73,523.83
(3,159.33) (63,705.14) -89.81
To columns & To stair case M2 20.00 2978.23 77.40 3,055.63 59,564.56 1,548.00 61,112.56
c) To all internal wall to receive ceramic
85,660.58 5,344.02 102,522.73 4,357.77 106,880.49 (1,061.00) (21,219.92) -24.77
wall tile, M2 4283.03 20.00 5126.14 217.89
d) To all lift shaft shear wall to receive
20,596.50 1,306.75 25,555.00 580.00 26,135.00 (276.93) (5,538.50) -26.89
ceramic wall tile, M2 1029.83 20.00 1277.75 29.00
e) To all internal wall surfaces, M2 24407.60 20.00 488,152.00 15713.74 676.68 16,390.42 314,274.77 13,533.65 327,808.42 8,017.18 160,343.58 32.85
f) To RC ceiling M2 18436.64 25.00 460,915.94 11082.99 393.98 11,476.97 277,074.78 9,849.42 286,924.20 6,959.67 173,991.74 37.75
To edge work ML 10.00 15373.05 580.95 15,954.00 153,730.50 5,809.50 159,540.00

Sub Total 1,126,256.26 54,399.42 2,069.32 56,468.74 1,003,910.57 38,013.93 1,041,924.50 18,792.15 243,871.76
Total 1,597,415.86 66,967.45 2,610.83 69,578.27 1,334,457.74 55,342.17 1,389,799.91 29,240.60 367,155.95

__________________ ___________________ _____________________


Prepared By: Checked By: Approved By: Authorized by______________
Bridge Construction Plc
Summary Sheet
Project: Bolle bulbula Saving Houses
Location :- Addis Ababa, Bolle
Contractor:- Bridge Construction Plc
Client:- Bolle bulbula Saving Houses Development Enterprise
Sub Contractor/SP:-Neamen alemayehu &friends Commencemet Date:-14/11/2015
Month:-November Block:- F-1&F3

No. of Commulative Amount for Amount During This Months


Series Description Total upto date (ETB) Remaining Amount (ETB)
Labors Previous Months (ETB) (ETB)

Price Summary & Percentage Amount %age Amount %age Amount %age Amount %age
1.12
M ild steel reinforcement according to structural
drawings.price includes cutting,bending,placing,in 1,103,979.70 105.65 - - 1,103,979.70 105.65 (58,991.31) (5.65)
position, tying wire and concrete spacers and chairs

2.00 BLOCK WORK , PLASTERING & POINTING 1,334,457.74 83.54 55,342.17 3.46 1,389,799.91 87.00 367,155.95 22.98

Total 2,438,437.43 189.18 55,342.17 2,493,779.61 308,164.64

__________________ ___________________ _____________________


Prepared By: Checked By: Approved By: Authorized by______________
CERTIFICATE OF PAYMENT No. ( 51)
Project: Bolle bulbula Saving Houses
Location :- Addis Ababa, Bolle Contract Value Amount(birr)
Contractor:- Bridge Construction Plc Main Service Sum 2,556,743.67
Client:- Bolle bulbula Saving Houses Development Enterprise Supplementary Contract
Sub Contractor/SP:-Neamen alemayehu &friends Varation Order No.01
Month:November Varation Order No.02 -
Sub- Total
VAT (15%) 383,511.55
Grand Total 2,940,255.22

According to the measurements taken by supervisor(s) of the works Mr____________________________on


the measurement and value of the work and/or materials supplied up to date is:-
Advance Payment (if any __________________________________

Excuted Amount
Previous Payments ( Birr)
No. Date Service Sum VAT(15%) Service Sum (A) 2,493,779.61
Advance Deductions Amount ( Birr)

1st IPC-14th IPC 525,886.25 78,882.94 1. Prev.Payment (only Service Sum) 2,349,582.77
15th IPC 69,536.42 10,430.46 2. Retention 5%(A) 91,621.78
16th IPC(Retention) 12,120.52 1,818.08 3.Advance Re-Pay 20%of (A)
17th IPC-23th IPC 322,158.07 48,323.71 4.Penality -
24th IPC (Retention 10,595.66 1,589.35 B=Total Deduction 2,441,204.54

24th IPC-32th IPC 398,729.63 59,809.45 C=Net pay to the ContractorA-B 52,575.07
33th IPC(Retention) 10,351.03 1,552.65 D=VAT 15%(A) 374,066.94
34th IPC-47th IPC 791,518.98 118,727.85 E=Previous paid VAT 352,437.41
48th IPC 76,858.41 11,528.76 F=VAT from Retention 15% (2) 13,743.27
49th IPC 61,986.90 9,298.04 G=VAT from Adv.15% (3) -
50th IPC 69,840.90 10,476.13 H=Net VAT (D-E-F-G) 7,886.26
51th IPC - I= Net Pay to the Contractor (C+H) 60,461.33
52th IPC -
53th IPC -
54th IPC -

Total 2,349,582.77 352,437.41


Service Sum Vat Sum
Repaid Up to date
Advance
Remaining Advance Payment
Sum

We certify that the contractor is now entiteled to the sum of birr:-_______ 60,461.33
(Sixty Thousand Four Hundred Sixty One & 33/100 )

Prepared by______________ Checked by _________ Approved by______________ Authorized by______________


Reinforcement bar schedule
Project: 40/60 Saving Houses No.50
Block: F1 Page -1-
Structure: Top tile Beam & strap(wing-2)
Length of Total No. Length of bars
No. of
Location/Description Bar size shape bar No. of bar members of bars Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24
Beam on axis D - - - - -
Top bar - - - - - - - - -
1 16 9.295 3 1 3 - - - - - 27.89 - -
2 16 11.89 3 1 3 - - - - - 35.67 - -
3 16 6.39 3 1 3 - - - - - 19.17 - -
4 16 10.545 3 1 3 - - - - - 31.64 - -
Bottom bar - - - - - - - - -
1 14 6.300 3 1 3 - - - - 18.90 - - -
2 14 6.52 3 1 3 - - - - 19.56 - - -
3 14 6.06 6 1 6 - - - - 36.36 - - -
4 14 6.560 3 1 3 - - - - 19.68 - - -
5 14 7.350 3 1 3 - - - - 22.05 - - -
_Ve bar - - - - - - - - -
1 16 2.065 1 1 1 - - - - - 2.07 - -
2 16 3.00 1 1 1 - - - - - 3.00 - -
3 14 3.83 1 1 1 - - - - 3.83 - - -
strap - - - - - - - - -
Axis D b/n 2&3 8 1.20 26 1 26 - 31.20 - - - - - -
Axis D b/n 3&4 8 1.20 29 1 29 - 34.80 - - - - - -
Axis D b/n 4&5 8 1.20 26 1 26 - 31.20 - - - - - -
Axis D b/n 5&6 8 1.20 26 1 26 - 31.20 - - - - - -
Axis D b/n 6&7 8 1.20 29 1 29 - 34.80 - - - - - -
Axis D b/n 7&8 8 1.20 31 1 31 - 37.20 - - - - - -
Beam on axis C - - - - - - - - -
Top bar - - - - - - - - -
1 16 4.800 2 1 2 - - - - - 9.60 - -
14 4.80 2 1 2 - - - - 9.60 - - -
2 16 5.295 2 1 2- - - - - 10.59 - -
14 5.295 2 1 2- - - - 10.59 - - -
3 16 11.89 3 1 3- - - - - 35.67 - -
4 16 6.390 3 1 3- - - - - 19.17 - -
5 16 10.55 3 1 3- - - - - 31.64 - -
Bottom bar - - - - - - - - -
1 16 5.995 3 1 3- - - - - 17.99 - -
2 14 6.60 3 1 3- - - - 19.80 - - -
3 14 6.06 6 1 6- - - - 36.36 - - -
4 14 6.63 3 1 3- - - - 19.89 - - -
5 14 7.050 3 1 3- - - - 21.15 - - -
_Ve bar - - - - - - - - -
1 16 2.490 2 1 2 - - - - - 4.98 - -
- - - - - - - - -
Axis C b/n 2&2' 8 1.20 11 1 11 - 13.20 - - - - - -
Axis C b/n 2'&3 8 1.20 14 1 14 - 16.80 - - - - - -
Axis C b/n 3&4 8 1.20 29 1 29 - 34.80 - - - - - -
Axis C b/n 4&5 8 1.20 26 1 26 - 31.20 - - - - - -
Axis C b/n 5&6 8 1.20 26 1 26 - 31.20 - - - - - -
Axis C b/n 6&7 8 1.20 29 1 29 - 34.80 - - - - - -
Axis C b/n 7&8 8 1.20 31 1 31 - 37.20 - - - - - -
Beam on axis B - - - - - - - - -
Top bar - - - - - - - - -
1 16 6.795 3 1 3 - - - - - 20.39 - -
2 16 6.39 3 1 3 - - - - - 19.17 - -
3 16 6.23 3 1 3 - - - - - 18.69 - -
4 16 6.38 3 1 3 - - - - - 19.14 - -
5 16 10.625 3 1 3 - - - - - 31.88 - -
Bottom bar - - - - - - - - -
1 16 3.800 2 1 2 - - - - - 7.60 - -
14 3.800 2 1 2 - - - - 7.60 - - -
2 14 6.58 3 1 3 - - - - 19.74 - - -
3 14 11.56 3 1 3 - - - - 34.68 - - -
4 16 6.56 3 1 3 - - - - - 19.68 - -
5 14 7.475 3 1 3 - - - - 22.43 - - -
- - - - - - - - -
_Ve bar - - - - - - - - -
1 14 2.075 1 1 1 - - - - 2.08 - - -

- - - - - - - -
Total length (m) 0.00 399.60 0.00 0.00 324.29 385.60 0.00 0.00
Weight per meter (m) 0.222 0.395 0.617 0.888 1.21 1.58 2.47 3.55
Total weight (Kg) 0.00 157.842 0 0 392.3909 609.25 0 0.00
__________________ ___________________ _____________________
Prepared By: Checked By: Approved By:
Reinforcement bar schedule
Project: 40/60 Saving Houses No.50
Block: F1 Page -2-
Structure: Top tile Beam & strap(wing-2)
Length of No. of Total No. Length of bars
Location/Description Bar size shape bar No. of bar members of bars Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24
strap - - - - -
Axis B b/n 2'&3 8 1.20 14 1 14 - 16.80 - - - - - -
Axis B b/n 3&4 8 1.20 29 1 29 - 34.80 - - - - - -
Axis B b/n 4&5 8 1.20 26 1 26 - 31.20 - - - - - -
Axis B b/n 5&6 8 1.20 26 1 26 - 31.20 - - - - - -
Axis B b/n 6&7 8 1.20 29 1 29 - 34.80 - - - - - -
Axis B b/n 7&8 8 1.20 31 1 31 - 37.20 - - - - - -
- - - - - - - - -
Beam on axis A - - - - - - - - -
Top bar 14 10.05 3 1 3 - - - - 30.15 - - -
Bottom bar 16 10.05 3 1 3 - - - - - 30.15 - -
_Ve bar 14 2.40 2 1 2 - - - - 4.80 - - -
14 1.70 2 1 2 - - - - 3.40 - - -
strap - - - - - - - - -
Axis A b/n 4&5 8 1.20 26 1 26 - 31.20 - - - - - -
Axis B b/n 5&5' 8 1.20 16 1 16 - 19.20 - - - - - -
Beam on axis 4 &5 - - - - - - - - -
Top bar - - - - - - - - -
1 16 8.365 3 2 6 - - - - - 50.19 - -
2 16 7.425 3 2 6 - - - - - 44.55 - -
Bottom bar - - - - - - - - -
1 14 10.385 3 2
2 14 5.325 3 2 6 - - - - 31.95 - - -
_Ve bar - - - - - - - - -
1 20 1.864 2 2 4 - - - - - - 7.46 -
- - - - - - - - -
strap - - - - - - - - -
Axis 4 ,5 b/n D&C 8 1.20 26 2 52 - 62.40 - - - - - -
Axis 4,5 b/n C&B 8 1.20 19 2 38 - 45.60 - - - - - -
Axis 4 ,5 b/n A&B 8 1.20 20 2 40 - 48.00 - - - - - -
Beam on axis 3 - - - - - - - - -
Top bar 14 8.4 3 1 3 - - - - 25.20 - - -
14 2.900 3 1 3 - - - - 8.70 - - -
Bottom bar - - - - - - - - -
1 14 6.375 3 1 3 - - - - 19.13 - - -
2 14 5.08 3 1 3 - - - - 15.23 - - -
_Ve bar - - - - - - - - -
1 14 2.355 1 1 1 - - - - 2.36 - - -
2 14 3.23 1 1 1 - - - - 3.23 - - -
strap - - - - - - - - -
Axis 3 b/n D&C 8 1.20 26 1 26 - 31.20 - - - - - -
Axis 3 b/n C&B 8 1.20 19 1 19 - 22.80 - - - - - -
- - - - - - - - -
- - - - - - - - -
Beam on axis 2 - - - - - - - - -
Top bar 14 6.65 3 1 3 - - - - 19.95 - - -
Bottom bar - - - - - - - - -
1 14 6.65 3 1 3 - - - - 19.95 - - -
- - - - - - - - -
_Ve bar - - - - - - - - -
1 14 2.355 2 1 2 - - - - 4.71 - - -
- - - - - - - - -
strap - - - - - - - - -
Axis 2 b/n D&C 8 1.20 26 1 26 - 31.20 - - - - - -
Beam on axis 2' - - - - - - - - -
Top bar 14 5.35 3 1 3 - - - - 16.05 - - -
Bottom bar 14 5.35 3 1 3 - - - - 16.05 - - -
strap - - - - - - - - -
Axis 2' b/n C&B 8 1.20 19 1 19 - 22.80 - - - - - -
- - - - - - - - -
Beam on axis 5' - - - - - - - - -
Top bar 14 5.55 3 1 3 - - - - 16.65 - - -
Bottom bar 14 5.55 3 1 3 - - - - 16.65 - - -
_Ve bar 14 2 1 1 1 - - - - 2.00 - - -
Strap - - - - - - - - -
Axis 5' b/n A&B 8 1.20 20 1 20 - 24.00 - - - - - -
- - - -
Total length (m) 0.00 524.40 0.00 0.00 256.15 124.89 7.46 0.00
Weight per meter (m) 0.222 0.395 0.617 0.888 1.21 1.58 2.47 3.55
Total weight (Kg) 0 207.138 0 0 309.9391 197.33 18.41632 0.00
__________________ ___________________ _____________________
Prepared By: Checked By: Approved By:
Reinforcement bar schedule
Project: 40/60 Saving Houses No.50
Block: F1 Page -3-
Structure: Top tile Beam & strap(wing-2)
Length of No. of Total No. Length of bars
Location/Description Bar size shape bar No. of bar members of bars Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24
Beam on axis 7 - - - - - -
Top bar 14 11.15 3 1 3 - - - - 33.45 - - -
Bottom bar - - - - - - - - -
1 14 6.300 3 1 3 - - - - 18.90 - - -
2 14 5.000 3 1 3 - - - - 15.00 - - -
_Ve bar - - - - - - - - -
1 14 2.355 1 1 1 - - - - 2.36 - - -
2 14 1.50 1 1 1 - - - - 1.50 - - -
strap - - - - - - - - -
Axis 7 b/n D&C 8 1.20 26 1 26 - 31.20 - - - - - -
Axis 7 b/n C&B 8 1.20 19 1 19 - 22.80 - - - - - -
1 - - - - - - - - -
Beam on axis 6 - - - - - - - - -
Top bar - - - - - - - - -
1 14 10.9 3 1 3 - - - - 32.70 - - -
- - - - - - - - -
Bottom bar - - - - - - - - -
1 16 6.38 3 1 3 - - - - - 19.13 - -
2 14 5.05 3 1 3 - - - - 15.15 - - -
_Ve bar - - - - - - - - -
1 14 2.505 2 1 2 - - - - 5.01 - - -
2 14 2.705 1 1 1 - - - - 2.71 - - -
- - - - - - - - -
strap - - - - - - - - -
Axis 6 b/n D&C 8 1.20 26 1 26 - 31.20 - - - - - -
- - - - - - - - -
Axis 6 b/n C&B 8 1.20 19 1 19 - 22.80 - - - - - -
- - - - - - - - -
Beam on axis 8 - - - - - - - - -
Top bar 14 8.405 3 1 3 - - - - 25.22 - - -
14 2.905 3 1 3 - - - - 8.72 - - -
Bottom bar - - - - - - - - -
1 14 6.300 3 1 3 - - - - 18.90 - - -
2 14 5 3 1 3 - - - - 15.00 - - -
_Ve bar - - - - - - - - -
1 14 2.355 1 1 1 - - - - 2.36 - - -
2 16 3.23 2 1 2 - - - - - 6.46 - -
strap - - - - - - - - -
Axis 8 b/n D&C 8 1.20 26 1 26 - 31.20 - - - - - -
Axis 8 b/n C&B 8 1.20 19 1 19 - 22.80 - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - -
Total length (m) 0.00 162.00 0.00 0.00 129.61 25.59 0.00 0.00
Weight per meter (m) 0.222 0.395 0.617 0.888 1.21 1.58 2.47 3.55
Total weight (Kg) 0 63.99 0 0 156.8221 40.42 0 0.00

__________________ ___________________ _____________________


Prepared By: Checked By: Approved By:
Reinforcement bar schedule
Project: 40/60 Saving Houses No.50
Block: F1 Page -4-
Structure: Gutter(wing-2)
Length of No. of Total No. Length of bars
Location/Description Bar size shape bar No. of bar members of bars Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24
axis A b/n 4&5' - - - - - - -
1 - - - - - - - - -
e 8 2.58 31 1 31 - 79.98 - - - - - -
f 12 1.80 27 1 27 - - - 48.60 - - - -
2 - - - - - - -
e 8 3.08 41 1 41 - 126.28 - - - - - -
f 12 2.30 37 1 37 - - - 85.10 - - - -
_Ve bar - - - - - - - - -
1 8 9.30 4 2 8 - 74.40 - - - - - -
2 8 5.327 4 2 8 - 42.62 - - - - - -
3 8 4.50 4 2 8 - 36.00 - - - - - -
4 8 5.95 4 2 8 - 47.60 - - - - - -
axis 4 b/n A&B - - - - - - - - -
c 8 2.48 31 1 31 - 76.88 - - - - - -
d 10 1.70 27 1 27 - - 45.90 - - - - -
_Ve bar - - - - - - - - -
1 8 4.50 4 2 8 - 36.00 - - - - - -
2 8 4.50 4 2 8 - 36.00 - - - - - -
axis 5' b/n A&B - - - - - - - - -
c 8 2.48 35 1 35 - 86.80 - - - - - -
d 10 1.70 27 1 27 - - 45.90 - - - - -
_Ve bar - - - - - - - - -
1 8 5.00 4 2 8 - 40.00 - - - - - -
2 8 5.00 4 2 8 - 40.00 - - - - - -
axis 4' b/n A&A' - - - - - - - - -
c 8 2.48 4 1 4 - 9.92 - - - - - -
_Ve bar - - - - - - - - -
1 8 0.45 4 2 8 - 3.60 - - - - - -
axis B b/n 2'&3 - - - - - - - - -
c 8 2.48 25 1 25 - 62.00 - - - - - -
d 10 1.70 21 1 21 - - 35.70 - - - - -
_Ve bar - - - - - - - - -
1 8 3.60 4 2 8 - 28.80 - - - - - -
2 8 3.60 4 2 8 - 28.80 - - - - - -
axis B b/n 3&3' - - - - - - - - -
e 8 3.08 21 1 21 - 64.68 - - - - - -
f 12 2.30 21 1 21 - - - 48.30 - - - -
_Ve bar - - - - - - - - -
1 8 2.88 4 2 8 - 23.04 - - - - - -
2 8 2.88 4 2 8 - 23.04 - - - - - -
axis B b/n 3'&4 - - - - - - - - -
c 8 2.48 15 1 15 - 37.20 - - - - - -
d 10 1.70 15 1 15 - - 25.50 - - - - -
_Ve bar - - - - - - - - -
1 8 2.63 4 2 8 - 21.04 - - - - - -
2 8 2.63 4 2 8 - 21.04 - - - - - -
axis B b/n 5'&6 - - - - - - - - -
c 8 2.48 10 1 10 - 24.80 - - - - - -
d 10 1.70 10 1 10 - - 17.00 - - - - -
_Ve bar - - - - - - - - -
1 8 1.85 4 2 8 - 14.80 - - - - - -
2 8 1.85 4 2 8 - 14.80 - - - - - -
axis B b/n 6&8 - - - - - - - - -
1 - - - - - - - - -
e 8 3.08 21 1 21 - 64.68 - - - - - -
f 12 2.30 21 1 21 - - - 48.30 - - - -
2 - - - - - - - - -
e 8 2.68 45 1 45 - 120.60 - - - - - -
f 12 1.90 45 1 45 - - - 85.50 - - - -
3 - - - - - - - - -
e 8 3.08 26 1 26 - 80.08 - - - - - -
f 12 2.30 22 1 22 - - - 50.60 - - - -
_Ve bar - - - - - - - - -
1 8 12.65 5 2 10 - 126.50 - - - - - -
2 8 2.98 3 2 6 - 17.88 - - - - - -
3 8 3.02 3 2 6 - 18.13 - - - - - -
4 8 2.95 4 2 8 - 23.60 - - - - - -
5 8 6.55 4 2 8 - 52.40 - - - - - -
6 8 3.65 4 2 8 - 29.20 - - - - - -
- - - - - -
Total length (m) 0.00 1633.19 170.00 366.40 0.00 0.00 0.00 0.00
Weight per meter (m) 0.222 0.395 0.617 0.888 1.21 1.58 2.47 3.55
Total weight (Kg) 0.00 645.11 104.89 325.36 0.00 0.00 0.00 0.00

__________________ ___________________ _____________________

Prepared By: Checked By: Approved By:


Reinforcement bar schedule
Project: 40/60 Saving Houses No.50
Block: F1 Page -5-
Structure: Gutter(wing-2)
Length of No. of Total No. Length of bars
Location/Description Bar size shape bar No. of bar members of bars Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24
axis 6 b/n B&A - - - - - - -
c 8 2.48 5 1 5 - 12.40 - - - - - -
_Ve bar - - - - - - - - -
1 8 0.55 4 2 8 - 4.40 - - - - - -
axis 6',7' b/n B&A - - - - - - -
c 8 2.48 4 2 8 - 19.84 - - - - - -
_Ve bar - - - - - - - - -
1 8 0.35 4 4 16 - 5.60 - - - - - -
axis C b/n 2&2' - - - - - - - - -
e 8 3.26 17 1 17 - 55.42 - - - - - -
f 12 2.48 13 1 13 - - - 32.24 - - - -
_Ve bar - - - - - - - - -
1 8 2.40 7 2 14 - 33.60 - - - - - -
2 8 2.40 4 2 8 - 19.20 - - - - - -
axis 2' b/n C&B - - - - - - - - -
c 8 2.48 25 1 25 - 62.00 - - - - - -
d 10 1.70 21 1 21 - - 35.70 - - - - -
_Ve bar - - - - - - - - -
1 8 2.95 4 2 8 - 23.60 - - - - - -
2 8 2.95 4 2 8 - 23.60 - - - - - -
axis 3,3' b/n B&A - - - - - - - - -
c 8 2.48 5 2 10 - 24.80 - - - - - -
_Ve bar - - - - - - - - -
1 8 0.55 4 4 16 - 8.80 - - - - - -
axis 2 b/n D'&C' - - - - - - - - -
c 8 2.48 56 1 56 - 138.88 - - - - - -
d 10 1.70 42 1 42 - - 71.40 - - - - -
_Ve bar - - - - - - - - -
1 8 8.25 4 2 8 - 66.00 - - - - - -
2 8 8.25 4 2 8 - 66.00 - - - - - -
axis D b/n 2&3' - - - - - - - - -
e 8 2.88 64 1 64 - 184.32 - - - - - -
f 12 2.10 60 1 60 - - - 126.00 - - - -
_Ve bar - - - - - - - - -
1 8 8.8 6 2 12 - 105.60 - - - - - -
2 8 9.40 4 2 8 - 75.20 - - - - - -
axis 3' b/n D&D' - - - - - - - - -
c 8 0.35 4 1 4 - 1.40 - - - - - -
axis D b/n 3'&5 - - - - - - - - -
c 8 2.48 54 1 54 - 133.92 - - - - - -
d 10 1.70 54 1 54 - - 91.80 - - - - -
_Ve bar - - - - - - - - -
1 8 7.95 4 2 8 - 63.60 - - - - - -
2 8 7.95 4 2 8 - 63.60 - - - - - -
axis 5,6 b/n D&D' - - - - - - - - -
c 8 2.48 7 2 14 - 34.72 - - - - - -
_Ve bar - - - - - - - - -
1 8 0.85 4 4 16 - 13.60 - - - - - -
axis D' b/n 5&6 - - - - - - - - -
e 8 3.08 40 1 40 - 123.20 - - - - - -
f 12 2.30 40 1 40 - - - 92.00 - - - -
_Ve bar - - - - - - - - -
1 8 5.85 9 2 18 - 105.30 - - - - - -
2 8 5.85 4 2 8 - 46.80 - - - - - -
axis D b/n 6&6' - - - - - - - - -
c 8 2.48 23 1 23 - 57.04 - - - - - -
d 10 1.70 23 1 23 - - 39.10 - - - - -
_Ve bar - - - - - - - - -
1 8 3.25 4 2 8 - 26.00 - - - - - -
2 8 3.25 4 2 8 - 26.00 - - - - - -
axis D b/n 6'&7' - - - - - - - - -
e 8 2.88 20 1 20 - 57.60 - - - - - -
f 12 2.10 20 1 20 - - - 42.00 - - - -
_Ve bar - - - - - - - - -
1 8 2.75 6 2 12 - 33.00 - - - - - -
2 8 2.75 4 2 8 - 22.00 - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - -
Total length (m) 0.00 1737.04 238.00 292.24 0.00 0.00 0.00 0.00
Weight per meter (m) 0.222 0.395 0.617 0.888 1.21 1.58 2.47 3.55
Total weight (Kg) 0.00 686.13 146.85 259.51 0.00 0.00 0.00 0.00

__________________ ___________________ _____________________


Prepared By: Checked By: Approved By:
Reinforcement bar schedule
Project: 40/60 Saving Houses No.50
Block: F2 Page -6-
Structure: 15th floor columns (middle wing)
Length of No. of Total No. Length of bars
Location/Description Bar size shape bar No. of bar members of bars Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24
C-11, Axis D'-4'& axis D'-5 16 3.63 16 2 32 - - - - - 116.00 - -
n-n - - - - - - - - -
1 10 2.1 16 2 32 - - 67.20 - - - - -
2 10 1.7 16 2 32 - - 54.40 - - - - -
3 10 1.6 16 2 32 - - 51.20 - - - - -
m-m - - - - - - - - -
1 10 2.1 5 2 10 - - 21.00 - - - - -
2 10 1.7 5 2 10 - - 17.00 - - - - -
3 10 1.6 5 2 10 - - 16.00 - - - - -
C-12', Axis E'-4'& axis E'-5 16 3.63 12 2 24 - - - - - 87.00 - -
n-n - - - - - - - - -
4 10 1.90 16 2 32 - - 60.80 - - - - -
5 10 1.75 16 2 32 - - 56.00 - - - - -
6 10 1.40 16 2 32 - - 44.80 - - - - -
m-m - - - - - - - - -
4 10 1.90 5 2 10 - - 19.00 - - - - -
5 10 1.75 5 2 10 - - 17.50 - - - - -
6 10 1.40 5 2 10 - - 14.00 - - - - -
C-12 axis E'-6 16 3.63 16 1 16 - - - - - 58.00 - -
n-n - - - - - - - - -
1 10 1.70 16 1 16 - - 27.20 - - - - -
2 10 1.2 16 1 16 - - 19.20 - - - - -
m-m - - - - - - - - -
4 10 1.70 5 1 5 - - 8.50 - - - - -
5 10 1.2 5 1 5 - - 6.00 - - - - -
- - - - - - - - -
Lift shaft (15th floor) - - - - - - - - -
12 3.68 228 1 228 - - - 839.04 - - - -
12 1.35 9 2 18 - - - 24.30 - - - -
strap 10 4.05 18 1 18 - - 72.90 - - - - -
10 2.65 18 2 36 - - 95.40 - - - - -
10 6.55 36 1 36 - - 235.80 - - - - -
10 6.45 18 3 54 - - 348.30 - - - - -
10 1.60 7 2 14 - - 22.40 - - - - -
Fire escap stair (15th floor) - - - - - - - - -
1 16 7.2 10 1 10 - - - - - 72.00 - -
2 16 3.415 10 1 10 - - - - - 34.15 - -
3 16 3.345 10 1 10 - - - - - 33.45 - -
4 16 2.92 10 1 10 - - - - - 29.20 - -
5 16 2.765 10 1 10 - - - - - 27.65 - -
6 16 8.653 10 1 10 - - - - - 86.53 - -
7 16 4.048 10 1 10 - - - - - 40.48 - -
8 16 2.97 10 1 10 - - - - - 29.70 - -
9 16 1.68 10 2 20 - - - - - 33.60 - -
Riser 8 1.06 6 20 120 - 127.20 - - - - - -
_ve bar - - - - - - - - -
Flight 8 0.93 15 2 30 - 27.75 - - - - - -
Landing 8 2.00 44 1 44 - - - - -
Landing beam - - - - - - - - -
top bar 20 3.78 6 1 6 - - - - - - 22.65 -
bottom bar 16 3.78 3 1 3 - - - - - 11.33 - -
strap 10 1.40 18 1 18 - - 25.20 - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
Total length (m) 0.00 154.95 1299.80 863.34 0.00 659.09 22.65 0.00
Weight per meter (m) 0.222 0.395 0.617 0.888 1.21 1.58 2.47 3.55
Total weight (Kg) 61.21 801.98 766.65 0.00 1041.35 55.95 0.00

__________________ ___________________ _____________________


Prepared By: Checked By: Approved By:
Reinforcement bar schedule
Project: 40/60 Saving Houses No.50
Block: F1 Page -6-
Structure:-16th floor beam & strap (middel wing )
Length of No. of Total No. Length of bars
Location/Description Bar size shape bar No. of bar members of bars Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24
Beam on axis D' - - - - - - -
Top bar 16 10.1 2 1 2 - - - - - 20.20 - -
Bottom bar - - - - - - - - -
1 16 3.800 4 1 4 - - - - - 15.20 - -
2 20 5.800 4 1 4 - - - - 23.20 -
_Ve bar - - - - - - - - -
1 16 1.7 2 1 2 - - - - - 3.40 - -
2 16 2.95 2 1 2 - - - - - 5.90 - -
strap - - - - - - - - -
Axis D' b/n 4'&5 10 1.40 28 1 28 - - 39.20 - - - - -
Axis D' b/n 5&6 10 1.40 32 1 32 - - 44.80 - - - - -
8 1.40 19 1 19 - 26.60 - - - - - -
Beam on axis E' - - - - - - - - -
Top bar 20 7.65 2 1 2 - - - - - - 15.30 -
16 6.75 3 1 3 - - - - - 20.25 - -
Bottom bar - - - - - - - - -
1 16 3.800 3 1 3 - - - - - 11.40 - -
2 20 3.450 4 1 4 - - - - - - 13.80 -
3 16 5.850 3 1 3 - - - - - 17.55 - -
_Ve bar - - - - - - - - -
1 20 1.7 1 1 1 - - - - - - 1.70 -
2 16 2.25 1 1 1 - - - - - 2.25 - -
24 1.7 3 1 3 - - - - - - - 5.10
strap - - - - - - - - -
Axis E' b/n 4'&5 10 1.40 29 1 29 - - 40.60 - - - - -
Axis E' b/n 5&6 10 1.40 51 1 51 - - 71.40 - - - - -
Beam on axis 4' - - - - - - - - -
Top bar 16 11.5 2 1 2 - - - - - 23.00 - -
Bottom bar 16 10.50 3 1 3 - - - - - 31.50 - -
_Ve bar - - - - - - - - -
1 16 2.860 2 1 2 - - - - - 5.72 - -
2 16 3.50 1 1 1 - - - - - 3.50 - -
3 16 1.62 1 1 1 - - - - - 1.62 - -
strap - - - - - - - - -
Axis 4' b/n D'&E' 8 1.40 52 1 52 - 72.80 - - - - - -
Beam on axis 5 - - - - - - - - -
Top bar 16 11.15 2 1 2 - - - - - 22.30 - -
Bottom bar 16 10.10 3 1 3 - - - - - 30.30 - -
_Ve bar 16 4.400 1 1 1 - - - - - 4.40 - -
20 4.400 2 1 2 - - - - - - 8.80 -
strap - - - - - - - - -
Axis 5 b/n D'&E' 8 1.40 44 1 44 - 61.60 - - - - - -
10 1.40 26 1 26 - - 36.40 - - - - -
- - - - - - - - -
Beam on axis 6 - - - - - - - - -
Top bar 24 6.00 6 1 6 - - - - - - - 36.00
20 4.2 4 1 4 - - - - - - 16.80 -
Bottom bar 16 5.10 4 1 4 - - - - - 20.40 - -
16 3.300 2 1 2 - - - - - 6.60 - -
strap - - - - - - - - -
Axis 6 b/n D'"&D" 10 1.40 31 1 31 - - 43.40 - - - - -
16th floor slab (middle wing) - - - - - - - - -
on axis D'& E' b/n 4'&5 - - - - - - - - -
top bar 10 8.750 11 1 11 - - 96.25 - - - - -
bottom bar 10 8.20 49 1 49 - - 401.80 - - - - -
negative bar 10 3.45 11 1 11 - - 37.95 - - - - -
14 4.10 11 1 11 - - - - 45.10 - - -
on axis D'& E' b/n 5&6 - - - - - - - - -
top bar 10 10.250 14 1 14 - - 143.50 - - - - -
negative bar 14 10.25 27 1 27 - - - - 276.75 - - -
14 7.00 69 1 69 - - - - 483.00 - - -
on axis E' &E" b/n 4'&6 - - - - - - - - -
top bar 14 2.800 25 1 25 - - - - 70.00 - - -
bottom bar 10 5.85 8 1 8 - - 46.80 - - - - -
negative bar 10 5.85 8 1 8 - - 46.80 - - - - -
on axis D' &D" b/n 4'&6 - - - - - - - - -
top bar 14 2.800 34 1 34 - - - - 95.20 - - -
14 3.200 25 1 25 - - - - 80.00 - - -
bottom bar 10 9.15 8 1 8 - - 73.20 - - - - -
negative bar 10 9.15 8 1 8 - - 73.20 - - - - -
- - - - - -
Total length (m) 0.00 161.00 1195.30 0.00 1050.05 245.49 79.60 41.10
Weight per meter (m) 0.222 0.395 0.617 0.888 1.21 1.58 2.47 3.55
Total weight (Kg) 0.00 63.60 737.50 0.00 1270.56 387.87 196.61 145.91
0.00 1885.01 1791.21 1351.52 2129.71 2276.23 270.97 145.91
__________________ ___________________ _____________________
Prepared By: Checked By: Approved By: