Client Name :
Sl.No Description Of Work Nos Length Breadth Depth Quantity Unit
(a) Footing:
Cross Wall
Cross Wall 1 21.00 0.42 10.00 88.20
Long wall:
Long wall 1 91.50 0.75 10.00 686.25
Deduction:-
Door D -3 8.00 0.75 8.00 -144.00
Window W -4 5.00 0.75 4.00 -60.00
570.45 C.Ft
Name Of Work: Commercial Building (G.F)
Client Name :
Sl.No Description Of Work Nos Length Breadth Depth Quantity Unit
Say 16.16 m³
Name Of Work: Commercial Building (G.F)
Client Name :
Sl.No Description Of Work Nos Length Breadth Depth Quantity Unit
9 Window Supply & Fixing work
Window W 4 4.00 - 4.00 64.00
64.00 S.Ft
Say 5.95 m²
10 Door Supply & Fixing work
Main Door Shutter 2 7.00 - 3.00 42.00
42.00 S.Ft
Say 3.90 m²
Client Name :
3 Earth Refilling Work for Excavated area using excavated soil m³ 29.51 470.40 13879.86
R.C.C mix 1:2:4 using 20mm Metal for all structural elements
5 m³ 31.89 11088.00 353596.32
Excluding Shuttering, steel work
Basement wall using Chamber Brick with 9" thick in CM 1:8 for
7 m³ 21.98 10248.00 225290.57
All Basement Walls complete.
11 Wall Plastering work for internal wall in cm 1:5 with 12mm thick m² 207.24 487.20 100967.33
12 Wall Plastering work for External wall in cm 1:6 with 20mm thick m² 282.25 638.40 180188.40
14 Bare Galvolume Sheet with Supply & Fixings Sq.Ft 0.00 302.40 0.00
Total 2285000.33