Name Of Work: Commercial Building (G.

F)
Client Name :
Sl.No Description Of Work Nos Length Breadth Depth Quantity Unit

1 Earth Work Excavation for foundation:-

(a) Footing Excavation:


Footing F1 10 5.00 5.00 5.00 1250.00
(b) Earth Beam Excavation:
Cross Wall
Cross Wall 1 40.50 1.25 0.50 25.31
Long wall:
Long wall 1 91.50 1.25 0.50 57.19
1332.50 C.Ft
Say 37.74 m³
2 P.C.C Work in cm 1:5:10 using 40mm Jally
(a) P.C.C for Footing:

Footing F1 10 4.50 4.50 0.25 50.63

(b) P.C.C for Earth Beam


Cross Wall
Cross Wall 1 40.50 1.25 0.50 25.31
Long wall:
Long wall 1 91.50 1.25 0.50 57.19
(c) Flooring
Room 1 13.50 32.25 0.33 143.67
276.80 C.Ft
Say 7.84 m³
Earth Refilling Work for Excavated area using
3 excavated soil
Earth Work Qty 1 1332.50 1.00 1.00 1332.50
Deduction
P.C.C Qty -1 133.13 1.00 1.00 -133.13
RCC Column Footing & Coping -1 120.00 1.00 1.00 -120.00
Column C1 -1 37.50 1.00 1.00 -37.50
1041.88 C.Ft
Say 29.51 m³

Filling to footing pit and basement using excavted


4
and outside soil with Consolidation Work:-

Room -1 1 13.50 32.25 4.50 1959.19


1959.19 C.Ft
Say 55.49 m³

R.C.C mix 1:2:4 using 20mm Metal for all structural


5
elements Excluding Shuttering, steel work

(a) Footing:

Footing F1 10 4.00 4.00 0.75 120.00

(b) Below Basement

Column C1 10 0.75 1.00 5.00 37.50


(c) Earth Beam:
Cross Wall
Cross Wall 1 40.50 0.75 1.25 37.97
Long wall:
Long wall 1 91.50 0.75 1.25 85.78
Name Of Work: Commercial Building (G.F)
Client Name :
Sl.No Description Of Work Nos Length Breadth Depth Quantity Unit
(d) Tie Beam:
Cross Wall
Cross Wall 1 47.00 0.42 0.42 8.29
Long wall:
Long wall 1 76.50 0.75 0.42 24.10
(e) Lintel Beam:
Cross Wall
Cross Wall 1 47.00 0.42 0.42 8.29
Long wall:
Long wall 1 91.50 0.75 0.42 28.82
Sill Concrete
Window W 4 4.00 0.75 0.42 5.04
Flooring F1 1 322.00 1.00 0.32 103.04
Sunshade W 4 4.00 1.50 0.25 6.00
(f) Roof Beam:
Cross Wall
Cross Wall 1 24.00 0.42 0.42 4.23
Long wall:
Long wall 1 91.50 0.75 0.42 28.82
(g) Roof Slab:
Roof slab
Slab 1 13.50 32.25 0.42 182.86
680.75 C.Ft
Say 19.28 m³
Fabrication Of Steel including Material, Barbending
6
labour etc., Complete
R.C.C Qty Footings 1 120.00 3.40 90.00 305.86
R.C.C Qty Column 1 37.50 1.06 120.00 127.44
R.C.C Qty Grade Beam 1 123.75 3.50 120.00 420.56
R.C.C Qty Tie Beam 1 32.39 0.92 115.00 105.48
R.C.C Qty Lintel Beam 1 151.19 4.28 115.00 492.42
R.C.C Qty Roof Beam 1 33.06 0.94 115.00 107.66
R.C.C Qty Roof Slab 1 132.00 3.74 90.00 336.45
1451.77 Kg
1.45 Ton
Basement wall using Chamber Brick with 9" thick in
7
CM 1:8 for All Basement Walls complete.
Cross Wall
Cross Wall 2 27.00 0.75 5.00 202.50
Long wall:
Long wall 2 76.50 0.75 5.00 573.75
776.25 C.Ft
21.98 m³

Superstructure wall using Chamber Brick with 9" thick


8
in CM 1:6 for All Walls complete.

Cross Wall
Cross Wall 1 21.00 0.42 10.00 88.20
Long wall:
Long wall 1 91.50 0.75 10.00 686.25
Deduction:-
Door D -3 8.00 0.75 8.00 -144.00
Window W -4 5.00 0.75 4.00 -60.00
570.45 C.Ft
Name Of Work: Commercial Building (G.F)
Client Name :
Sl.No Description Of Work Nos Length Breadth Depth Quantity Unit
Say 16.16 m³
Name Of Work: Commercial Building (G.F)
Client Name :
Sl.No Description Of Work Nos Length Breadth Depth Quantity Unit
9 Window Supply & Fixing work
Window W 4 4.00 - 4.00 64.00

64.00 S.Ft

Say 5.95 m²
10 Door Supply & Fixing work
Main Door Shutter 2 7.00 - 3.00 42.00
42.00 S.Ft
Say 3.90 m²

Wall Plastering work for internal wall in cm 1:5 with


11
12mm thick

Wall cross wall 1 21.00 - 10.00 210.00


Wall Long wall 1 91.50 - 10.00 915.00
Window W Jambs 4 18.00 0.75 - 54.00
Shutter Jambs 0 24.00 0.75 - 0.00
Deduction:-
Shutter S 0 8.00 - 89.00 0.00
Window W -4 4.00 - 4.00 -64.00
1115.00 S.Ft
Say 103.62 m²
Wall Plastering work for External wall in cm 1:6 with
12
20mm thick
Wall Cross wall 1 21.00 - 10.00 210.00
Wall Long wall 1 91.50 - 14.00 1281.00
Deduction:-
Shutter S 0 8.00 8.00 0.00
Window W -4 4.00 - 4.00 -64.00
1427.00 S.Ft
Say 132.62 m²
13 Grano Flooring Finishing Work
Room 1 322.00 1.00 - 322.00
322.00 S.Ft
Say 29.93 m²
14 Bare Galvolume Sheet with Supply & Fixings

Roofing Area 0 0.00 0.00 - 0.00


0.00 S.Ft
Say 0.00 m²
15 Painting Work Sq.Ft
Electrical concealed wiring with switches Excluding
16 Points
circuit MCB fittings, light & fan fittings etc.,

17 Round Off L.S


Name Of Work: Commercial Building (G.F)
Client Name :
Sl.No Description Of Work Nos Length Breadth Depth Quantity Unit
R.C.C mix 1:2:4 using 20mm Metal for all structural
1
elements Excluding Shuttering, steel work
(a) Column
Column C1 10 0.75 1.00 10.00 75.00
(b) Lintel Beam:
Cross Wall
Cross Wall 1 47.00 0.42 0.42 8.29
Long wall:
Long wall 1 91.50 0.75 0.42 28.82
Sill Concrete
Window W 4 4.00 0.75 0.42 5.04
Flooring F1 1 322.00 1.00 0.32 103.04
Sunshade W 4 4.00 1.50 0.25 6.00

(c) Roof Beam:


Cross Wall
Cross Wall 1 24.00 0.75 0.42 7.56
Long wall:
Long wall 1 91.50 0.75 0.42 28.82
(d) Roof Slab:
Roof slab
Slab 1 13.50 32.25 0.42 182.86
445.43 C.Ft
Say 12.61 m³
Fabrication Of Steel including Material, Barbending
2
labour etc., Complete
R.C.C Qty Column 1 75.00 2.12 120.00 254.89
R.C.C Qty Lintel Beam 1 151.19 4.28 115.00 492.42
R.C.C Qty Roof Beam 1 36.38 1.03 115.00 118.49
R.C.C Qty Roof Slab 1 132.00 3.74 90.00 336.45
747.30 Kg
0.75 Ton
Superstructure wall using Chamber Brick with 9" thick
3
in CM 1:6 for All Walls complete.
Cross Wall
Cross Wall 1 21.00 0.42 10.00 88.20
Long wall:
Long wall 1 91.50 0.75 10.00 686.25
Deduction:-
Door D -3 8.00 0.75 8.00 -144.00
Window W -4 5.00 0.75 4.00 -60.00
570.45 C.Ft
Say 16.16 m³
4 Window Supply & Fixing work
Window W 4 4.00 - 4.00 64.00
64.00 S.Ft
Say 5.95 m²
5 Door Supply & Fixing work
Main Door Shutter 2 7.00 - 3.00 42.00
42.00 S.Ft
Say 3.90 m²
Name Of Work: Commercial Building (G.F)
Client Name :
Sl.No Description Of Work Nos Length Breadth Depth Quantity Unit

Wall Plastering work for internal wall in cm 1:5 with


6
12mm thick

Wall cross wall 1 21.00 - 10.00 210.00


Wall Long wall 1 91.50 - 10.00 915.00
Window W Jambs 4 18.00 0.75 - 54.00
Shutter Jambs 0 24.00 0.75 - 0.00
Deduction:-
Shutter S 0 8.00 - 89.00 0.00
Window W -4 4.00 - 4.00 -64.00
1115.00 S.Ft
Say 103.62 m²
Wall Plastering work for External wall in cm 1:6 with
7
20mm thick
Wall Cross wall 1 21.00 - 10.00 210.00
Wall Long wall 1 91.50 - 16.00 1464.00
Deduction:-
Shutter S 0 8.00 8.00 0.00
Window W -4 4.00 - 4.00 -64.00
1610.00 S.Ft
Say 149.63 m²
8 Grano Flooring Finishing Work
Room 1 322.00 1.00 - 322.00
322.00 S.Ft
Say 29.93 m²

9 Bare Galvolume Sheet with Supply & Fixings

Roofing Area 0 0.00 0.00 - 0.00


0.00 S.Ft
Say 0.00 m²
10 Painting Work Sq.Ft

Electrical concealed wiring with switches Excluding


11 Points
circuit MCB fittings, light & fan fittings etc.,

12 Round Off L.S


ABSTRACT

Name Of Work: Commercial Building (G.F)

Client Name :

Sl.NO DESCRIPTION OF WORK UNIT QTY RATE AMOUNT

1 Earth Work Excavation for foundation:- m³ 37.74 504.00 19019.54

2 P.C.C Work in cm 1:5:10 using 40mm Jally m³ 7.84 4368.00 34241.20

3 Earth Refilling Work for Excavated area using excavated soil m³ 29.51 470.40 13879.86

Filling to footing pit and basement using excavted and outside


4 m³ 55.49 705.60 39150.46
soil with Consolidation Work:-

R.C.C mix 1:2:4 using 20mm Metal for all structural elements
5 m³ 31.89 11088.00 353596.32
Excluding Shuttering, steel work

5 a Shuttering Work including labour Charges m³ 31.89 6384.00 203585.76

Fabrication Of Steel including Material, Barbending labour etc.,


6 MT 2.20 120960.00 266112.00
Complete

Basement wall using Chamber Brick with 9" thick in CM 1:8 for
7 m³ 21.98 10248.00 225290.57
All Basement Walls complete.

Superstructure wall using Chamber Brick with 9" thick in CM 1:6


8 m³ 32.32 10416.00 336645.12
for All Walls complete.

9 Window Supply & Fixing work m² 11.90 9744.00 115953.60

10 Door Supply & Fixing work m² 7.80 10248.00 79934.40

11 Wall Plastering work for internal wall in cm 1:5 with 12mm thick m² 207.24 487.20 100967.33

12 Wall Plastering work for External wall in cm 1:6 with 20mm thick m² 282.25 638.40 180188.40

13 Grano Flooring Finishing Work m² 59.86 756.00 45254.16

14 Bare Galvolume Sheet with Supply & Fixings Sq.Ft 0.00 302.40 0.00

15 Painting Work Sq.Ft 896.00 75.60 67737.60

Electrical concealed wiring with switches Excluding circuit MCB


16 Points 140.00 1092.00 152880.00
fittings, light & fan fittings etc.,

17 Rolling Shutter & Fitting and Install L.S 2.000 - 50000

18 Round Off L.S - - 564.00

Total 2285000.33

(Rupees Twenty Two Lakhs And Eighty Five Thousand Only)

Note :

This Abstract Does not include EB, Plan Aproval, Bore, Cubbord work And Interior