R.C.C. works in
cement concrete
1:2:4: mix
including the cost 6 6.00 6.00 1.25 110/cft 29700.00
of 270.00
reinforcement,cent 6 6.00 6.00 1.25 110/cft 29700.00
ring, shuttering 6 1.50 0.75 19.50 270.00 400/cft 52652.00
and curing etc,.. 1 97.75 0.75 1.50 131.63 450/cft 49486.50
a] Column 1 105.75 0.75 0.375 109.97 300/cft 8922.00
Footing 1 34.00 2.00 0.25 29.74 350/cft 5950.00
Rectangular 1 17.25 1.50 0.25 17.00 450/cft 2911.50
portion 1 105.75 0.75 1.00 6.47 400/cft 31724.00
[i] 1'6"x0'9" 1 20.25 17.25 0.50 79.31 425/cft 74230.50
b] Trapezoidal 174.66
6. portion
[i] 1'6"x0'9"
[c] Column
[d] Plinth beam 1 97.75 0.75 1.50
[e] Lintel 1 105.75 075 9.00 109.97
[f] Loft - - - - 713.81
[g]Sunshade - - - - - 110.16 120/cft 85634.40
[h] Roof beam 713.62 cft
7. [i] Roof Slab
Painting works
arrangement for
inner and outer
Provision made
for internal
electrification
works
arrangement
Provision made
for unforseen
items
C/O TOTAL
AMOUTNT
DETAILED ESTIMATE FOR THE PROPOSED CONSTRUCTION OF A GROUND
FLOOR CAR PARKING &
R.C.C. works in
cement concrete
1:2:4: mix
including the cost 6 6.00 6.00 1.25 110/cft
of 4 6.00 6.00 1.25 110/cft 29700.00
reinforcement,cent 270.00 19800.00
ring, shuttering 6 6.00 6.00 1.25 180.00 110/cft
and curing etc,.. 4 6.00 6.00 1.25 110/cft 29700.00
a] Column 270.00 19800.00
Footing 6 1.50 0.75 19.50 180.00 400/cft
Rectangular 4 1.00 0.75 19.50 350/cft 52652.00
portion 1 135.25 0.75 1.50 131.63 450/cft 20475.00
[i] 1'6"x0'9" 1 135.25 0.75 1.00 58.50 400/cft 68472.00
[ii] 1'0"x0'9" 1 33.50 17.25 0.50 152.16 40576.00
b] Trapezoidal 1 6.75 4.50 0.50 101.44
portion 1 3.00 9.00 0.50 288.94
[i] 1'6"x0'9" 1 8.25 3.00 0.50 -15.19
[ii] 1'0"x0'9" - - - - -13.50 425/cft
[c] Column -12.38 105344.75
6. [i] 1'6"x0'9" 247.87 cft
[ii] 1'0"x0'9"
[d] Plinth beam
[e] Roof beam 1 135.25 0.75 1.50
[f] Roof Slab 1 15.75 0.75 9.00
Less - Lift - - - - 152.16 120/cft
Stair area 1 106.31 31016.40
7. Stair area 2 258.47 cft
C/O
1 21.50 15.75 -
Brick work in 1 11.25 7.50 -
C.M. 1:6 for - - - - 338.63 25/sq.ft
Superstructure 84.38 10575.25
8. using chamber 423.01
bricks sq.ft
Basement
Superstructure 1 24.75 - 10.00
C/O
6 24.75 - 10.00
Ceiling plastering - - - - 247.50 20/sq.ft
in C.M. 1:3 for 9900.00
9. 12mm tk 247.50
Car parking area 1 495.00
Car parking area 2 Sq.ft
C/O 1 21.50 15.75 -
1 11.25 7.50 -
Wall plastering in - - - - 45/sq.ft
C.M 1:5 for 12 19035.45
10. mm tk, inside & 338.63
outside of the 84.38
building: Lift - - - - 423.01 35/sq.ft
Column: Sq.ft 20225.80
11. [i] 1'6"x0'9"
C/O
- - - - 500/point
Laying 577.88 9000.00
12. pavementtiles sq.ft
flooring in C.M - - - - -
1:3 for 20mm tk 569.77
13. Car parking area 1 - - - - -
Car parking area 2 18 points 6,09,000.00
C/O
Painting works -
arrangement for
inner and outer -
Provision made
for internal
electrification
works
arrangement
Provision made
for unforseen
items
C/O TOTAL
AMOUTNT
DETAILED ESTIMATE FOR THE PROPOSED CONSTRUCTION OF A FIRST
FLOOR BUILDING LOCATED IN PALLAVARAM
Brick work in
C.M. 1:6 for 1 164.50 0.75 9.00 1110.38
Superstructure - - - - -151.88
using chamber - - - - 958.50 cft 175/cft 167737.50
bricks -
3. Superstructure
Less D & W
C/O 1 21.50 15.75 - 338.63
1 19.50 15.75 - 307.13
Ceiling plastering 1 11.25 6.75 - 75.94
in C.M. 1:3 for - - - - 721.70 30/sq.ft 21651.00
12mm tk sq.ft
4. Storage area 1
Storage area 2
Passage area
C/O 1 142.00 - 10.50
1 172.00 - 10.00 1491.00
Wall plastering in - - - - 1720.00
C.M 1:5 for 12 - - - - -405.00 25/sq.ft 70150.00
mm tk, inside & 2806.00
5. outside of the Sqt
building: Outer
Inner - Storage
area 10 - 4.50 4.50 450/sq.ft 91125.00
Less D & W
6. C/O 202.50
sq.ft
Supplying and
fixing Country 1 21.50 15.75 -
wood doors and 1 19.50 15.75 -
windows 1 11.25 6.75 -
including all - - - - 338.63 50/sq.ft 36085.00
fittings - W 307.13
7. 75.94
Laying Cement 721.70
flooring works in - - - - Sq.ft 45/sq.ft 41723.55
C.M 1:3 for 20mm
8. tk
Storage area 1
Storage area 2 - - - - 927.19 600/point 27600.00
Passage area sq.ft
9. C/O
- - - - - 873.45
Painting works
10. arrangement for - - - - 46 points - 9,25,000.00
inner and outer
Provision made -
for internal
electrification -
works
arrangement
Provision made
for unforseen
items
C/O TOTAL
AMOUTNT
Brick work in
C.M. 1:6 for 1 164.50 0.75 9.00 1110.38
Superstructure - - - - -151.88
using chamber - - - - 958.50 cft 175/cft 167737.50
bricks -
3. Superstructure
Less D & W
C/O 1 21.50 15.75 - 338.63
1 19.50 15.75 - 307.13
Ceiling plastering 1 11.25 6.75 - 75.94
in C.M. 1:3 for - - - - 721.70 30/sq.ft 21651.00
12mm tk sq.ft
4. Storage area 1
Storage area 2
Passage area
C/O 1 142.00 - 10.50
1 172.00 - 10.00 1491.00
Wall plastering in - - - - 1720.00
C.M 1:5 for 12 - - - - -405.00 25/sq.ft 70150.00
mm tk, inside & 2806.00
5. outside of the Sqt
building: Outer
Inner - Storage
area 10 - 4.50 4.50 450/sq.ft 91125.00
6. Less D & W
C/O 202.50
sq.ft
Supplying and 1 21.50 15.75 -
fixing Country 1 19.50 15.75 -
wood doors and 1 11.25 6.75 -
windows - - - - 338.63 50/sq.ft 36085.00
including all 307.13
7. fittings - W 75.94
Laying Cement 721.70
flooring works in - - - - Sq.ft 45/sq.ft 41723.55
C.M 1:3 for 20mm
8. tk
Storage area 1
Storage area 2 - - - - 927.19 600/point 27600.00
Passage area sq.ft
9. C/O
Provision made
for unforseen
items
C/O TOTAL
AMOUTNT