ANNEXURE-B
S. No. Particulars Unit No L (feet) B (feet) H (feet) Quantity Rate Amount
1 Earth work in bulk excavation by mech means (hydraulic
excavator) over areas (Exceeding 30cm in depth 1.5m in width as
well as 10 sqm on plan) including disposal of excavated earth
1 37 1 0.5 18.50
in rooms,filling complete job
1 15 7 3 315.00
1 12 1 3 36.00
filling
1 37 1 1.000 37.00
1 16 7 0.500 56.00
Mudmat
1 10 4 0.500 20.00
1 6 4 0.330 7.92
2 6 1 1.000 12.00
140.43
Base of Boiler Pedistal above top level of platform
2 11 0.75 4 66.00
Tank walls
1 7.00 16 112.00
1 10.00 4 40.00
2 4.50 4 36.00
2 11.00 4 88.00
2 6.00 4 48.00
600.33
S. No. Particulars Unit No L (feet) B (feet) H (feet) Quantity Rate Amount
7
1 15.00 15.00
Total Annexure-B 101646.28