You are on page 1of 26

Take Off Sheet

Block___________________ Page No____1____________________

MEASUREMENTS
S/N NO.ITEM Description Remark
L B H/D quantity
1.SUBSTRUCTURE(cont…..
1.concrete work
1.1.concrete work for grade beams
1 2 GB-1 30 0.25 0.35 5.25
2 1 GB-2 22.2 0.25 0.35 1.94
2 GB-3 9.24 0.25 0.35 1.62
1 GB-3 7.34 0.25 0.35 0.64
1 GB-4 7.09 0.25 0.35 0.62
6 GB-5 3.95 0.25 0.35 2.07
1 GB-6 5.25 0.25 0.35 0.46
1 GB-7 3.03 0.25 0.35 0.27
Ditto but deduction for column 12.87 Total concrete work including column
25 C-1&C-3 0.25 0.25 0.35 0.55
7 C-2&C-4 0.25 0.05 0.35 0.12 circular pilars,A=∏r2 =.05
Total = 0.67
12.2 Total concrete work for grade beams
Ditto but for footing column
25 footing 1,2,4,5&6 0.25 0.25 2.1 3.28
7 footing 3 0.25 0.05 2.1 0.74 circular pilars,A=∏r2 =.05
4.02 Total concrete work for foting column
Ditto but for footing pad
4 footing 1&6 1.5 1.5 0.4 3.6
9 footing 2 1.8 1.8 0.4 11.66
7 footing 3 2.7 1.5 0.4 11.34
3 footing 4 2 2 0.4 4.8
1 footing 5 3.1 1.6 0.4 1.98
33.38 Total concrete work for foting pad
37.40 Total concrete work for foting

Contractor Site Engineer


Name______________ Name___________________
Sig_____________ Sign.___________________
Take Off Sheet
Block___________________ Page No________________________

MEASUREMENTS
S/N NO.ITEM Description Explanatory notes
L B H/D quantity
2.SUPER-STRUCTURE
2.1.Concrete work
2.1.1.columns
2 C-1&C-2 6.06 0.25 0.25 0.76
2 C-3&C-4 6.66 0.25 0.25 0.83
Ditto but for floor beams 1.59 Total volume of concrete for column
2 IB-1 30 0.25 0.3 4.5
1 IB-2 22.22 0.25 0.3 1.67
2 IB-3 9.25 0.25 0.3 1.39
2 IB-3 9 0.25 0.3 1.35
1 IB-4 7.09 0.25 0.3 0.53
6 IB-5 3.95 0.25 0.3 1.78
1 IB-6 4.5 0.25 0.3 0.34
1 IB-7 2.53 0.25 0.3 0.19
11.75 Total volume of concrete for floor beams
Ditto but for Tie beams
2 TTB-1 30 0.25 0.25 3.75
1 TTB-2 22.22 0.25 0.25 1.39
2 TTB-3 9.25 0.25 0.25 1.16
2 TTB-3 9 0.25 0.25 1.13
1 TTB-4 7.09 0.25 0.25 0.44
6 TTB-5 3.95 0.25 0.25 1.48
1 TTB-6 5.25 0.25 0.25 0.33
1 TTB-7 2.53 0.25 0.25 0.16
9.84 Total volume of concrete for Tie beams

Contractor Site Engineer


Name______________ Name___________________
Sig_____________ Sign.___________________
Take Off Sheet
MEASUREMENTS
S/N NO.ITEM Description Explanatory notes
L B H/D
2.1.2.Stair-Case
16 volume of concrete for steps 0.39 1.15 0.17 1.22 L=1.01*2.65+area of curved slab(=
1 ditto for landing A = 0.12 0
1 ditto for soffit 3.42 1.15 0.14 0.55
2.2.Masonry work 1.77 Total volume of concrete for Stair-case
SIZE
S/N num.0f location Description Explanatory notes
L Ф Number
MEASUREMENTS
S/N NO.ITEM Explanatory notes
L B H/D
MEASUREMENTS
S/N NO.ITEM Explanatory notes
L B H/D
MEASUREMENTS
S/N NO.ITEM Explanatory notes
L B H/D
MEASUREMENTS
S/N NO.ITEM Explanatory notes
L B H/D
MEASUREMENTS
S/N NO.ITEM Explanatory notes
L B H/D
MEASUREMENTS
S/N NO.ITEM Explanatory notes
L B H/D
Page No____1____________________
Page No________________________
Contract N0________________________________ Project No________________________________ Contract time ______________________________
Client Nekemte Houseing Dev. project Office Payment No______________________________ Comnencement Date _______________________
Consultant MH Engineering Month___________________________________ Compleition Date ___________________________
Contractor Damtew Getaneh BC Blocks___________________________________ Time Elapsed ______________________________

Current
Item Previous Qty Quantity of current amount material Qty Total amount
No Description Date unit unit price of material Previous amo material deduction of date deduction`
1 Cement Qunt 172.00 223.00 223.00 38,356.00 223.00 38,356.00
2 Agrigate m3 180.00 69.00 69.00 12,420.00 69.00 12,420.00
3 Steel - - - - -
a.Dia. 6 Plain kg 7.43 143.00 143.00 1,062.49 143.00 1,062.49
b. Dia. 8 Deformed kg 7.43 521.40 521.40 3,874.00 521.40 3,874.00
c. Dia. 10 Deformed kg 6.48 - - - -
d.Dia. 12 Deformed kg 6.48 202.46 202.46 1,311.97 202.46 1,311.97
e. Dia. 14 Deformed kg 6.48 2756.52 2,756.52 17,862.25 2,756.52 17,862.25
f. Dia. 16 Deformed kg 6.48 37.90 37.90 245.57 37.90 245.57
g. Dia. 20 Deformed kg 6.48 3,239.14 3,239.14 20,989.60 3,239.14 20,989.60

96,121.88

Contractor Site Engineer Logistic and Supply Cont.Admn. Head

______________________ ______________________ ______________________ ______________________


Contract N0________________________________ Project No________________________________ Contract time ______________________________
Client Nekemte Houseing Dev. project Office Payment No______________________________ Comnencement Date _______________________
Consultant MH Engineering Month___________________________________ Compleition Date ___________________________
Contractor
Iyasu Mosissa Building Contractor Blocks___________________________________ Time Elapsed ______________________________

Item Bid amount Previous Qty.this Total Qty to Previous Amount in this
No Description unit unit price Bid Qty (Birr) Qty month date amount month
1 Sub Structure
1 Excavation and earth work
1.01 Clear and remove to soil to an average depth of 200mm m2 3.09 433.63 1,339.92 #REF! #REF! #REF!
Bulck excavaation in ordinary soil to 1500 mm depth to remove
1.02 expansive siol material m3 14.98 310.90 4,657.28 #REF! #REF! #REF!
Tench excavation in ordinary soil for masonary foundation wall to
1.03 1000 mm depth starting from natural ground level m3 21.36 0.00 -
Pit excavation in ordinary soil to a depth not exceedin 1500mm from
1.04 reduced ground level m3 21.36 70.27 1,500.97 #REF! #REF! #REF!
1.05 Ditto but exceeding 1500mm not exceeding 3000mm m3 26.95 182.69 4,923.50 0.00 - -
1.06 Rock Excavation m3 0.00 - 0 - -
Back fill around foundation with selected material from the site and
1.08 compact in layers not exceeding 200 mm thick m3 22.47 182.69 4,105.04 #REF! #REF! #REF!
Fill under hard core with material from the site and compact in layers
1.09 not exceeding 200 mm thick m3 22.47 360.45 8,099.31 #REF! #REF! #REF!
1.1
0 Load and cart away all excavated materials to and appropriet tip m3 22.85 467.90 10,691.52 0 - -
250 mm thick basaltic ston hardcore well rolled consolidated and
1.11 blinded with crushed stone m2 50.09 279.69 14,009.67 0 - -
Total carried to summery 49,327.20

Contractor Site Engineer


_________________________________ _____________________________
Contract N0________________________________ Project No________________________________ Contract time ______________________________
Client Nekemte Houseing Dev. project Office Payment No______________________________ Comnencement Date _______________________
Consultant MH Engineering Month___________________________________ Compleition Date ___________________________
Contractor Damtew Getaneh BC Blocks___________________________________ Time Elapsed ______________________________

Item Bid amount Previous Qty.this Total Qty Previous Amount in this
No Description unit unit price Bid Qty (Birr) Qty mont this date Qty.(birr) month
2. Concrete work
50mm lean concret quality C-5, with minimum cement content of
2.01 150Kg/m3, of concrete
a. Footings m2 34.45 81.08 2,793.21 0.00 - -
b. Grade beam m2 34.45 48.37 1,666.35 #REF! #REF! #REF!
c. Under massonary wall m2 34.45 24.00 826.80 - -
Reinforced concret quality C-25, 360KG of cement/m3 filled in to
formwork and vibrted around rod reinforcement (formork and
2.02 reinforcemnt measured separately) - - -
a. Infooting m3 1,055.86 29.22 30,852.23 0.00 - -
b. In foundation column m3 1,055.86 7.73 8,161.80 0.00 - -
c. in Grade beam m3 1,055.86 26.94 28,444.87 #REF! #REF! #REF!
d. In intrance stape m3 - - -
e. In 100mm thick groudn slab m2 105.59 279.69 29,532.47 - -
provide, cut and fix in posistion swan zigiba sood or steel formwork
2.03 which ever appropriat - - -
a. Footing Pad m2 48.8 72.66 3,545.81 0.00 - -
b. Foundation Column m2 48.8 97.91 4,778.01 0.00 - -
c. Grade beam m2 48.8 198.79 9,700.95 #REF! #REF! #REF!
Mild Steel reinforcement acording to according to structeral
2.04 drawings, price include cutting bending placein in position tying wire - - -
a.Dia. 6 Plain kg 10.94 105.49 1,154.06 123.08 123.08 1,346.50
b. Dia. 8 Deformed kg 10.94 1370.35 14,991.63 464.5 464.50 5,081.63
c. Dia. 10 Deformed kg 9.37 0.00 - - -
d.Dia. 12 Deformed kg 9.37 204.60 1,917.10 179.02 179.02 1,677.42
e. Dia. 14 Deformed kg 9.37 2441.51 22,876.95 2449.11 2,449.11 22,948.16
f. Dia. 16 Deformed kg 9.37 25.26 236.69 25.26 25.26 236.69
g. Dia. 20 Deformed kg 9.37 2983.68 27,957.08 2995.92 2,995.92 28,071.82
10 mm thick styrofoam expantion joint filler board 100mm wide in
2.05 movment joint between edge of conceret bed and grade beams ml 9 280.34 2,523.06 -
2.06 10mm thick 200mm wide chip wood expantion joint filler ml 11 40.80 448.80 -
2.07 10mm thick 400mm wide chip wood expantion joint filler ml 13 14.50 188.50 -
2.08 10mm thick 500mm wide chip wood expantion joint filler ml 15 13.61 204.15 -
Total carried to summery 192,800.50
Contractor Site Engineer
_________________________________ _____________________________

Contractor Site Engineer


_________________________________ _____________________________
_____________
____________
_____________
_____________

Total amount
to date(birr)

#REF!

#REF!

#REF!
-
-

#REF!

#REF!

-
#REF!
_____________
____________
_____________
_____________

Total amount
to date(birr)
-

-
-
#REF!
-

-
-
-
#REF!
-
-

-
-
-
#REF!

-
1,346.50
5,081.63
-
1,677.42
22,948.16
236.69
28,071.82

-
-
-
-
#REF!
#REF!
SIZE
item description no.of location
L Ф Number
REINFORCEMENT BARS

Footing-1&6 bar-A 4 4.3 20 4


bar-B 4 4.3 20 4
BAR-G 4 2.15 14 12
bar-X 4 0.9 8 10
Footing-5
bar-A 1 4.3 20 8
bar-B 1 4.3 20 8
bar-E 1 3.75 12 6
bar-F 1 2.25 12 12
bar-X 1 0.9 8 10
Footing-4 bar-A 3 4.3 20 4
bar-B 3 4.3 20 4
bar-D 3 2.65 12 8
bar-H 3 2.15 12 8
bar-X 3 0.9 8 12
Footing-3 bar-A 7 4.3 20 8
bar-B 7 4.3 20 8
bar-D 7 2.66 14 6
bar-E 7 2.15 14 10
bar-Y 7 0.88 8 10
Footing-2 bar-A 9 4.6 20 4
bar-B 9 4.6 20 4
BAR-G 9 2.45 14 12
bar-X 9 0.9 8 10

COLUMNS
column-1 bar-F 24 3.97 20 4
bar-I 24 3.18 16 4
bar-G 24 3.97 16 4
bar-J 24 3.18 14 4
bar-X 24 0.9 8 26
column-2 bar-F 6 3.97 20 4
bar-I 6 3.18 16 4
bar-G 6 3.97 16 4
bar-J 6 3.18 14 4
bar-Y 6 0.88 8 26
column-3 bar-F 1 3.97 20 4
bar-G 1 3.97 16 4
bar-I 1 3.78 16 4
bar-J 1 3.78 14 4
bar-X 1 0.9 8 28
column-4 bar-F 1 3.97 20 4
bar-G 3.97 16 4
bar-I 3.78 16 4
bar-J 3.78 14 4
bar-Y 0.88 8 28

GRADE BEAMS
GB-1 upper bar(G) 2 32.16 16 2
middle bar(H) 2 31.56 14 2
lower bar(J) 2 31.68 16 2
bar W 2 1.1 8 130
GB-2 upper bar(G) 1 23.58 16 2
middle bar(H) 1 22.98 14 2
lower bar(J) 1 23.1 16 2
bar W 1 1.1 8 98
GB-3 upper bar(G) 2 10.55 16 2
middle bar(H) 2 9.95 14 2
lower bar(J) 2 10.07 16 2
bar W 2 1.1 8 44
GB-4 upper bar(G) 1 8.64 16 2
middle bar(H) 1 8.04 14 2
lower bar(J) 1 8.16 16 2
bar W 1 1.1 8 39
GB-5 upper bar(G) 6 5.25 16 2
middle bar(H) 6 4.65 14 2
lower bar(J) 6 4.77 16 2
bar W 6 1.1 8 24
GB-6 upper bar(G) 1 5.8 16 2
middle bar(H) 1 5.2 14 2
lower bar(J) 1 5.32 16 2
bar W 1 1.1 8 20
GB-7 upper bar(G) 1 3.58 16 2
middle bar(H) 1 2.98 14 2
lower bar(J) 1 3.1 16 2
bar W 1 1.1 8 12

INTERMEDIATE BEAMS
IB-1 bar-G 2 32.06 16 2
bar-H 2 31.56 12 2
bar-J 2 31.68 16 2
bar-V 2 1 8 130
IB-2 bar-G 1 23.58 16 2
bar-H 1 22.98 12 2
bar-J 1 23.1 16 2
bar-V 1 1 8 98
IB-3 bar-G 2 10.55 16 2
bar-H 2 9.95 14 2
bar-J 2 10.07 16 2
bar-V 2 1 8 44
IB-4 bar-G 2 8.64 16 2
bar-H 2 8.04 14 2
bar-J 2 8.16 16 2
bar-V 2 1 8 39
IB-5 bar-G 6 5.15 16 2
bar-H 6 4.65 14 2
bar-J 6 4.77 16 2
bar-V 6 1 8 24
IB-6 bar-G 1 5.8 16 2
bar-H 1 5.2 14 2
bar-J 1 5.32 16 2
bar-V 1 1 8 20
IB-7 bar-G 1 3.48 16 2
bar-H 1 2.98 14 2
bar-J 1 3 16 2
bar-V 1 1 8 12
TOP TIE BEAM
TTB-1 bar-G 2 32.11 14 2
bar-J 2 31.68 14 2
bar-V 2 0.9 8 130
TTB-2 bar-G 1 23.58 14 2
bar-J 1 23.1 14 2
bar-V 1 0.9 8 20
TTB-3 bar-G 2 10.55 14 2
bar-J 2 10.05 14 2
bar-V 2 0.9 8 44
TTB-4 bar-G 2 8.64 14 2
bar-J 2 8.16 14 2
bar-V 2 0.9 8 39
TTB-5 bar-G 6 5.15 14 2
bar-J 6 4.77 14 2
bar-V 6 0.9 8 24
TTB-6 bar-G 1 5.6 14 2
bar-J 1 5.32 14 2
bar-V 1 0.9 8 20
TTB-7 bar-G 1 3.48 14 2
bar-J 1 3 14 2
bar-V 1 0.9 8 12
STAIR CASE
bar-1 5.51 14 6
bar-2 5.01 14 6
bar-3 1.98 12 6
bar-4 2.61 12 6
bar-5 2.13 12 6
bar-6 1.83 12 6
bar-7 1.5 12 28
bar-8 2.95 12 3
bar-9 1.88 12 3
SIZE
w/m quantity(Kg) Explanatory notes
total number

16 2.468 169.7984
16 2.468 169.7984
48 1.208 124.6656
40 0.395 14.22

8 2.468 84.8992
8 2.468 84.8992
6 0.888 19.98
12 0.888 23.976
10 0.395 3.555
12 2.468 127.3488
12 2.468 127.3488
24 0.888 56.4768
24 0.888 45.8208
36 0.395 12.798
56 2.468 594.2944
56 2.468 594.2944
42 1.208 134.95776
70 1.208 181.804
70 0.395 24.332
36 2.468 408.7008
36 2.468 408.7008
108 1.208 319.6368
90 0.395 31.995

96 2.468 940.60416
96 1.578 481.73184
96 1.578 601.40736
96 1.208 368.77824
624 0.395 221.832
24 2.468 235.15104
24 1.578 120.43296
24 1.578 150.35184
24 1.208 92.19456
156 0.395 54.2256
4 2.468 39.19184
4 1.578 25.05864
4 1.578 23.85936
4 1.208 18.26496
28 0.395 9.954
4 2.468 39.19184
0 1.578 0
0 1.578 0
0 1.208 0
0 0.395 0
4 1.578 202.99392
4 1.208 152.49792
4 1.578 199.96416
260 0.395 112.97
2 1.578 74.41848
2 1.208 55.51968
2 1.578 72.9036
98 0.395 42.581
4 1.578 66.5916
4 1.208 48.0784
4 1.578 63.56184
88 0.395 38.236
2 1.578 27.26784
2 1.208 19.42464
2 1.578 25.75296
39 0.395 16.9455
12 1.578 99.414
12 1.208 67.4064
12 1.578 90.32472
144 0.395 62.568
2 1.578 18.3048
2 1.208 12.5632
2 1.578 16.78992
20 0.395 8.69
2 1.578 11.29848
2 1.208 7.19968
2 1.578 9.7836
12 0.395 5.214

4 1.578 202.36272
4 0.888 112.10112
4 1.578 199.96416
260 0.395 102.7
2 1.578 74.41848
2 0.888 40.81248
2 1.578 72.9036
98 0.395 38.71
4 1.578 66.5916
4 1.208 48.0784
4 1.578 63.56184
88 0.395 34.76
4 1.578 54.53568
4 1.208 38.84928
4 1.578 51.50592
78 0.395 30.81
12 1.578 97.5204
12 1.208 67.4064
12 1.578 90.32472
144 0.395 56.88
2 1.578 18.3048
2 1.208 12.5632
2 1.578 16.78992
20 0.395 7.9
2 1.578 10.98288
2 1.208 7.19968
2 1.578 9.468
12 0.395 4.74

4 1.208 155.15552
4 1.208 153.07776
260 0.395 92.43
2 1.208 56.96928
2 1.208 55.8096
20 0.395 7.11
4 1.208 50.9776
4 1.208 48.5616
88 0.395 31.284
4 1.208 41.74848
4 1.208 39.42912
78 0.395 27.729
12 1.208 74.6544
12 1.208 69.14592
144 0.395 51.192
2 1.208 13.5296
2 1.208 12.85312
20 0.395 7.11
2 1.208 8.40768
2 1.208 7.248
12 0.395 4.266

6 1.208 39.93648
6 1.208 36.31248
6 0.888 10.54944
6 0.888 13.90608
6 0.888 11.34864
6 0.888 9.75024
28 0.888 37.296
3 0.888 7.8588
3 0.888 5.00832