Professional Documents
Culture Documents
Regd. H.O.: 302-A, R.R. Realty, LBS Marg, Mumbai-400078 Phone : 91-22-25950065 Fax: 91-22-25953505 Email : sewri@sewriengg.com Web : http://www.sewriengg.com
Short History
Pre- Independence: Several years ago, in 1938, a group of engineers left a well-known construction organization in Bombay and formed the nucleus of Sewri Engineering. This group occupied key positions and represented the cream of engineering talent in that firm. Four of these engineers were Europeans and two were Indians. Their aim was to combine high technical services with absolute reliability. Such an aim represented a revolution by highly talented technicians. With the termination of the Second World War, the young organization had to face internal forces of turbulence. This storm was weathered successfully; but the civil and mechanical wings of the organisation parted company and the construction organization was transformed into Sewri Engineering Construction Company as a partnership firm. During the next fifteen years it grew from strength to strength. It occupied a significant place then in the construction industry in India, with a high reputation for reliability of its technical service and quality of work. Post- Independence: It was incorporated as a Limited company in 1951 by the founder members Mr. Robert Francey, Mr. C.V. Deshpande and Mr. P. Tongaonkar. This company took over the business of the then partnership firm. Nearly five decades later, a group of engineers and architects once again joined hands, as if to relive the history to take over the business in 2006. After the change of management in 2006, company is growing at a rapid pace at nearly 100% since. Company has received its ISO9001:2000 certification for Providing Civil Engineering Contract Services to customers. The Company is registered as Class I Contractors with Government of Maharashtra Public Works Department. The major thrust of its Construction activity has been in Power Stations, Bridges, Aqueducts, Irrigation Structures, Foundation Engineering, apart from its involvement in Pump Houses, Cooling Towers, Water Treatment Plants, Heavy Machine Foundation, Factory Buildings, Industrial Buildings and Hangars. The organization has successfully completed various Designs and Construction projects as well as pure Design Consultancy assignments which can be seen from the attached list of works. Keeping in mind vast experience in varied types of Civil Engineering works the expertise built up by the company over the years, it is confident of tackling any project.
3 2
9 4 2 2 6 1 2 1 1
17
10
8 2 5 1 1 3 45 2 3 1 1 67
10 i)
ii)
iii) iv) v)
11
12
13
14
15
Shirke crane with 12' boom Maruti Crane Krishna Crane with Hasti Engine Lifting & Hoisting Equipments: Maxpul lifting and pulling machine 3 MT capacity Winch 1.5 MT capacity Vehicles: Trucks: Tata trucks Ashok Leyland Truck Tata Tipper 12m3 Dumpers: Roadmac LION 1.5MT Dumper Kirlosker Make Tractors: Ford 3600 Trailers for tractors: 2 Wheeler Trailer Size 10x6x1/5 Jeeps: Mahindra make Commander MM 550 DP Mahindra make Marshall DI Mahindra Balero Pickup Electric Generator: 62.5 KVA 12.5 KVA 3 KVA 2.5 KVA 1.5 KVA Honda Portable Generator Welding set: James Triangle Mark IV 350 Amp transformer Mallik 3 phase transformer 500 TA air cooled welding machine ESAB Co2 welding machine Rocket Arc Advani Oerlikar make welding machine Electric welding machine Soil Investigation Machinery: Menard Pressuremeter Soil Investigation Instrument complete with accessories, casings, pipes, cutting bits complete. Pumps: Sump pump Kirlosker self priming pumps SP3L Grouting pumps Donkey water pumps Senco duplex reciprocating pumps Crompton 5HP electric pump Crompton 3/4HP electric pump Submerssible Pump 5HP & 6HP Diesel Engine: 2 YDA Ruston air cooled diesel engine 1500 RPM
1 1 1 1 1
2 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 1 1
2 1
3 3 1 2 2 1 1 2 3
15
16
17
18
3 YDA Ruston air cooled diesel engine 1500 RPM Miscellaneous Machinery: Pug cutting machine Block making machine Bar cutting machine Electric Angle Grinder Instruments: Theodolite Dumpy levels Weighing Machine Avery ABA Portable Platform Scale 1000 Kg Avery ABA Portable Platform Scale 300 Kg Fisa Weighing Machine 500 Kg
1 1 2 7 7 11 1 1 1
11
18
2.CLIENT WORK
:Deputy Chief Engineer (Construction) III. WESTERN RAILWAY, CHURCHGATE, MUMBAI -20. :Name of work: Construction of major bridge (3 nos.)- Br. No. 324 (5 of 12.2 metre span, PSC Girder at km 260/2-4), Br. No. 333 (4 of 12.2 metre span, PSC Girder at km 269/2-3), Br. No. 314 (13 of 18.3 metre span, Steel Girder at km 253/5-10) and minor bridge (1 no.)- Br. No. 313 (1 of 3.66 metre span RUB, at km 251/4-5 in Amalner yard) between Amalner and Dharangaon stations from km 251 to 277 in connection with Udhna - Jalgaon doubling work of Western Railway. :Rs. 1354.44 Lakhs
3.CLIENT
:Deputy Chief Engineer (Construction) III. WESTERN RAILWAY, CHURCHGATE, MUMBAI -20. WORK :Earthwork in bank/cutting, supply & spreading and compacting of quarry dust for repair of bank, construction of side drains, central drains in yard, etc. between km 251-277 in Amalner and Dharangaon Stations in connection with Doubling of Udhna - Jalgaon section in Mumbai Division of Western Railway. COST PUT TO TENDER :Rs. 455.52 Lakhs SALIENT FEATURES :
The work involves Construction of : i) Fencing around Cross Maidan ii) Interior development inside the Maidan.
:99.0%
5. CLIENT :Dy. Chief Engineer, Ghatkopar,Mumbai . Central Railway WORK :NEW MULUND - Construction of High level platformson MS-2 and MS-3 alongwith the track including formation extension of existing Highlevel goods platform for B- shed , extension of existing MS-2 and MS-3 lines and construction of road and circulating area in connection with Additional Goods Shed Facilities for Handling Cement Traffic. COST PUT TO TENDER :Rs. 695 Lakhs, Completion period: 5 months SALIENT FEATURES :
6. CLIENT
:M/s.Bharat Udyog Limited, Bharat Chamber, Plot No.69, Sector-19A, Dana Bunder Road, APMC, Vashi, Navi Mumbai - 400705. :Construction of Bridge across Kharbav creek on Mankuli-Anjur-Chinchoti Road :Rs. 618. Lakhs
Concreting of spans
Completed Projects, Sewri Engineering
The work involves Construction of : i) 600 mm dia piling. i) Construction of Underground Water Tank. ii) Extension of platform. iii) Superstructure of RRI Building housing signalling equipments. iv) Skywalk.
4. CLIENT :THE TATA POWER COMPANY LIMITED Civil Construction Division, Dharavi Receiving Station, Matunga, Mumbai 400019. WORK :Civil Works of 4x10 MW DG Power Station at Lodivali, Distt. Raigad. COST PUT TO TENDER :Rs. 318 Lakhs ( without cement , structural and reinforcing steel) ( Final Bill :474 lacs) SALIENT FEATURES :
D.G. Building consisting of Main shed 23mx 45m with maintenance bays on either side, Crane Gantry. 4x10 MW DG Foundations RCC Raw water tank. Chimney Foundation( Chilled Concrete, 560m3, single pour) Switchyard. Tank Foundations. Retaining walls.
5. CLIENT : MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION, PUNE Sina- Kolegaon Project Division Paranda. WORK : Construction of pump house for Lift irrigation Scheme No.2 ( Karmala Side of Sina- Kolegaon Project. COST PUT TO TENDER : Rs. 543.90 lacs( revised to 743 lacs) SALIENT FEATURES : The work involves Construction of : i) ii) iii) iv) v) vi) Pump house Control room Valve room Approach channel Service bay Gantry, gates.
6. CLIENT :
M/s. Nashik Vintners Limited, 3, Mathulya Centre A, Senapati Bapat Marg, Lower Parel (West), Mumbai 400013. WORK : Construction of Extension to Winery at Nasik, Maharashtra. COST PUT TO TENDER : Rs. 160 lacs
SALIENT FEATURES : The work involved Construction of : Tank Room i) ii) Storage Area. iii) Administration Bloc Effluent Treatment Plant iv) v) Cellar Bloc vi) Landscaping & Interiors. 7. CLIENT: M/s. Unity Infraprojects Ltd, Pushpanjali, Prabhadevi, Mumbai - 400025. WORK : Construction of four Span Bridge over Railway line on Panvel JNPT Road, Navi Mumbai.. PERIOD OF EXECUTION : 2002 - 2004.
Out of the four spans, 3 spans were each of 15 meter length whilst one span was of 25 meter length. The longer length span entailed support on 5 nos. Prestressed Concrete Girders which were erected using a specially designed launching scheme. The shorter length spans entailed support on 5 nos. (for each span) Precast Concrete Girders which were erected by means of Crane / launching girders. In order to avoid minimum disturbance to the railway traffic, an elaborate support scheme was put in place for the construction of the 25 meter span length which was spanning the railway line. 8. CLIENT: M/s. Unity Infraprojects Ltd, Pushpanjali, Prabhadevi, Mumbai - 400025. WORK : Construction of four Span Bridge over River Ghadi. PERIOD OF EXECUTION : 2002 - 2004.
BRIEF DESCRIPTION OF THE PROJECT The work involved construction of 4 Spans of prestressed Box Girders each of 45.0 meter on open foundation in a Creek. Completion cycle was designed in such a way that two span of the bridge deck were supported at one time. 9. CLIENT Horniman Circle Association WORK : Faade Restoration of Botawala Building Faade restoration of Zorastian Building. PERIOD OF EXECUTION : 1st Phase.2001 - 2002. 2nd Phase. 2002-2003
10. CLIENT: V. M. Salgaocar & Bros. Ltd., Salgaocar House, Francisco Luis Gomes Road, Vasco-DaGama, Goa 403802. WORK : Civil and Structural work for proposed Cyclone building and other Miscellaneous at Goa. PERIOD OF EXECUTION : 2000 - 2002.
11. CLIENT : The Executive Engineer, Tondle Bondle, Pandharpur. WORK : Ghumera Nallah Aqueduct PERIOD OF EXECUTION : 1983 - 88. BRIEF DESCRIPTION OF THE PROJECT 3 nos. span of 40m length with intermediate pier at 20m, open foundation, hollow R.C.C. cap. R.C.C. double trough clear width of each 3.4m, clear height 3.5m, overall width 8.25m overall height 4.1m. 4.1m Service road, 3.65m wide, 26.0m transition either sides.
12. CLIENT : The Executive Engineer, Arphal Canal Division, Karawadi. WORK : Construction of R.C.C. Box Aqueduct at Ch.45 of 605. PERIOD OF EXECUTION : 1997 1998. BRIEF DESCRIPTION OF THE PROJECT 3 nos. span of 16.5m each with R.C.C. piers and abutments height 12.0 m single R.C.C. trough clear dimension 5.1m x 2.25 mm. Overall size 6.3m x 3.3m height Transitions 11.5m. Downstream and 20 m understream.
13. CLIENT: The Executive Engineer, Ujjani Canal Div. No. IX, Pandharpur. WORK : Construction of Wangira Nalla Aqueduct. PERIOD OF EXECUTION : 1996 1997. BRIEF DESCRIPTION OF THE PROJECT : 6 nos. span P.C.C. piers of 19m height. 15m each Abutments. Single trough 1.8m x 1.5m height. Overall size 2.456m x 1.9m height.
14. CLIENT: The Executive Engineer, Ujjani Canal Div. No. 7, Pandharpur. WORK : Construction of Chincholli Nalla Aqueduct. PERIOD OF EXECUTION : 1996 BRIEF DESCRIPTION OF THE PROJECT : 3 nos. span of 16.5m each with Transition on either side, masonry abutments, P.C.C. piers. Piers height 15.5m. Double R.C.C height clear dimensions 3.3 no. x 3.5 ht. Overall dimensions 8.2m x 4.1m.
15. CLIENT : The Executive Engineer, Ujjani Canal Div. No. 7, Pandharpur. WORK : Construction of Bhalwani Aqueduct. PERIOD OF EXECUTION : 1993 1995. BRIEF DESCRIPTION OF THE PROJECT 3 nos. span of 16.5m each with Transition on either side, masonry abutments, P.C.C. piers. Piers height 15.5m. Double R.C.C height clear dimensions 3.3 no. x 3.5 ht. Overall dimensions 8.2m x 4.1m.
16. CLIENT : The Executive Engineer, Ujjani Canal Div. No. 7, Pandharpur. WORK :Construction of minor Bridges at Pandharpur. PERIOD OF EXECUTION : 1994 1996. 17. CLIENT: The Executive Engineer, Ujjani Canal Div. No. 7, Pandharpur. WORK : Construction of Kasal Nalla Aqueduct. PERIOD OF EXECUTION : 1989 1995. BRIEF DESCRIPTION OF THE PROJECT : 5 nos. span of 16.5m each with Transition on either side, masonry abutments, P.C.C. piers. Piers height 11.25m. Double R.C.C height clear dimensions 3.3 no. x 3.5 ht. Overall dimensions 8.2m x 4.1m. 18.CLIENT :M/S. SAMANT SOMA WINES LIMITED, 3,Mathulya Centre A, Senapati Bapat Marg, Lower Parel (West), Mumbai - 400013. WORK :Construction of Winery at Nashik, Maharashtra. PERIOD OF COMPLETION :1999 2000.
BRIEF DESCRIPTION OF THE PROJECT : The work involved construction of : 1. Administration Block. 2. Cellar Block comprising of Main Foundations for 15000 Litre to 25000 Litre capacity Wine tanks. Walkways were also constructed along the sides of the tanks for access for maintenance. 3.Storage Block comprising of basement for storage of wine bottles and bottling and handling at the ground floor. 4. D. G. Room. 5. Effluent Treatment Plant. 6. General Landscaping.
19. CLIENT: The Executive Engineer, Ujjani Canal Div. No. 7, Pandharpur. WORK : Construction of Kasal Nalla Aqueduct. PERIOD OF EXECUTION : 1989 1995. BRIEF DESCRIPTION OF THE PROJECT : 5 nos. span of 16.5m each with Transition on either side, masonry abutments, P.C.C. piers. Piers height 11.25m. Double R.C.C height clear dimensions 3.3 no. x 3.5 ht. Overall dimensions 8.2m x 4.1m.
20.CLIENT :D.B.S. Financial Services Pvt. Ltd, Fort, Mumbai. WORK:Restoration of DBS House PERIOD OF COMPLETION :1998 99. BRIEF DESCRIPTION OF THE PROJECT : HISTORY : The brick and limestone building was built in 1895, as a home for a large family. In the 1960's it was converted into an office building. This change brought about pressures of providing adequate services and transformed the building insensitively. RESTORATION OF FAADE: The red brick surface had been painted over in grey cement paint, completely transforming the old English building. The main restoration task was to remove the grey cement paint from the facade without damaging the brick surface. INTERIOR RESTORATION: The wooden structural system, and stone brackets, which were hidden behind the layers of plaster and cladding, or false ceiling were uncovered to restore the elegant ambience of timber constructed spaces.
21.CLIENT :M/S. O.V.A.L. Trust, 10, Court View, 126, Maharshi Karve Road, Mumbai-400020. WORK:Restoration of OVAL Maidan (Grade I Heritage Space) PERIOD OF COMPLETION :1998 99. BRIEF DESCRIPTION OF THE PROJECT : The work consisted of restoration of Public space OVAL Maidan in front of University Building and Bombay High Court. The New Fence was erected running into 1600m length and involved 140 MT of Structural Steel work. A new Jogging Track was laid along with the general ground filling. The old Tar road was replaced with new Sandstone Central Path with new Entrance gates and Bollards.
Central Path and View of the Fence 22.CLIENT :M/S. V. M. Salgaocar, Salgaocar House, Francisco Luis Gomes Road, Vasco-Da-Gama, Goa 403802. WORK :Construction of New Production Lines, Vagus, Goa. PERIOD OF COMPLETION :1998 1999. BRIEF DESCRIPTION OF THE PROJECT : The work consisted of Excavation work upto 6000m3 of Hard rock chiseling in Laterite. R.C.C. scrubber and Screen Framework and Foundations. Various R.C.C. Foundations for trestles for Conveyor Gantries, Hoppers, Classifiers, Retaining wall, Control Room Building, Laboratory Building, 485 MT to Structural Steel work consisted of fabrication and erection of Product Hopper, Conveyor gantries, Column Trestles, Feed Hoppers, including Sandblasting and painting the structure with epoxy paint.
Scrubber, Conveyors etc. 23. CLIENT : M/s. Bharat Forge Ltd., Mundhwa, Pune. WORK : Construction of (i) PZS 900 Forge Complex. (ii) PHS 456 Screw Press PERIOD OF COMPLETION : December 1989 to August 1990 BRIEF DESCRIPTION OF THE PROJECT: Civil works of New Forge Shop for M/s. Bharat Forge Ltd., at Mundhwa near Pune which consisted of : a) Main concrete foundation for 1600 Tons PZS 900 Forge Complex. b) Foundation for 5000 Tons PHS 4.56 Screw Press
c) d)
Foundation for furnace Other allied foundations with considerable quantity of factory flooring and control rooms.
The main foundation work was carried out including rock excavation in a record period of 140 days. The main concrete foundation of PZS 900 Press included considerable rock excavation by controlled blasting in a running factory, the concreting of the foundation block of 1700 m3 in a continuous operation maintaining strict temperature control for the chilled concrete. The foundation was provided with intricate pockets, inserts, tunnels and staircases and also was required to be 100% waterproof because of the presence of underground water. In addition to this main press foundation another small foundation totaling 800 m3 was also constructed for 5000 Tons PHS 4.56 Screw Press adopting similar strict concrete quality control methods.
VIEW OF SHOP UNDER CONSTRUCTION 24.CLIENT :M/s. Cemindia Company Limited, Apeejay House, Dinshaw Vachha Road, Bombay - 400 020. WORK : Construction of Bhira Generating Station for Tata Power 150MW - Pumped Storage Project PERIOD OF COMPLETION : 1992 to 1995 BRIEF DESCRIPTION OF THE PROJECT : This project required the building of a Power House Superstructure approximately 25 M above ground level including underground concrete work for the Generator and Turbine Foundations, the Lining of the Power House Shaft (19.5M x 23.5M oval). The total Power House Shaft was 60M deep + another 10M deep dewatering pit. The overall construction involved R.C.C. work of nearly 12000 M3 concrete and 1150 MT of reinforcing steel along with other Civil Engineering items.
As the clients stated in the brief they gave the Sewri Group, the work was of a unique nature. Its dimensions and magnitude and required several innovative construction methods and skills to ensure that it was executed within the specified time schedule and to the stringent specifications governing the work. 25.CLIENT: Maharashtra State Electricity Board, Koradi, Nagpur. WORK : Masonry and Foundation job for 2 sets of 210 MW Generating sets including the Coal Handling Plant and Cooling Water System. BRIEF DESCRIPTION OF PROJECT:
Completed masonry and foundation work for the first two sets of 210 MW for Koradi Thermal Power Station. The job involved construction of Power Station building with two Turbo Generator Foundations of capacity 210 MW each, boiler house foundations, complete C.W. R.C.C. concuit, coal handling plant foundation, including Tippler manual unloading hoppers etc. with under ground tunnels. The quantity of concrete involved was 20,000 m3, 70,000 m3 of excavation and 2000 MT of steel work. 26. CLIENT: M/s. Bharat Heavy Electricals Ltd., Jhansi, Uttar Pradesh. WORK : Civil Construction of : (i) Diesel loco factory & Administrative Building & Anallay Plant (ii)Shed for Diesel Loco Bogies (iii)School Building (iv)3700 HP A.C. Loco Shed (v)Assembly bay for A.C. Loco PERIOD OF COMPLETION : April 1985 to April 1989 BRIEF DESCRIPTION OF THE PROJECTS: The above-mentioned projects were a series of jobs executed by us for M/s. BHEL, Jhansi. The jobs involved the design and construction of various foundations in their factory to facilitate the manufacturing of diesel and A.C. locomotives for the railways. A range of several heavy duty flooring work along with various ducts, pockets were also done. In addition to the foundation work, a school building and an administrative building were also constructed. These buildings were normal R.C.C. structures located in a different part of the city. 27. CLIENT: M/s. Maharashtra State Electricity Board (M.S.E.B.) WORK : (a) Design and Construction of mechanical forced draft cooling towers for two sets of 140 MW generating sets at Nasik. (b) Water purification plant and cooling water system and construction of river pump house. River pump house of 100ft dia. deep with intake cribs for cooling water systems. PERIOD OF EXECUTION : 1968 1971 28. CLIENT : The National Newsprint & Paper Mills Ltd. Nepanagar, Madhya Pradesh. WORK : Renovation and Modernization scheme of Nepa Mills PERIOD OF COMPLETION : 48 months (August 1985 to August 1989) BRIEF DESCRIPTION OF THE PROJECT : Entire civil works for the modernization and renovation scheme for M/s. Nepa Mills Ltd. at Nepanagar in Madhya Pradesh. The work involved construction of various foundations, civil structures in a running factory with considerable space constraint. The job required the following operations. Construction of foundations and a power house building including T.G. Foundations and Boiler and other foundations for 12 M.W. captive power plant. 2.A building for the a)Switch gear and compressor. b)Ground building with a number of R.C.C. silos and a control room. 3.A Multi- storied Brown stock washer building. 4.Calcium Hypo chloride plant, and a Cold soda plant. 5.Modifications to the paper machine foundation along with other allied structures for an increase in the capacity of the existing paper making machine. 1. The work had to be carried out in congested areas in a running plant and with minimum shut down time to minimize the loss of production. CLIENT : Chief Engineer, P.W.D., Dhule (North) Division, Shahada, Distt. Dhule. WORK : Construction of Bridge across Tapi River PERIOD OF COMPLETION : April 1980 to December 1982 BRIEF DESCRIPTION OF THE PROJECT: The bridge was constructed using open foundations with solid P.C.C. piers of 17 meters height. The deck was 7.5 meter wide and consisted of 40 spans of 15 meters each with solid slab construction. The total bridge length was 600 meters. Construction was completed one year before the scheduled date with the help of 8 Nos. rolling trusses, being slipped through the gaps left in each of the piers thereby facilitating construction of the superstructure through the monsoon season. The neglected weather and conditions obtaining in the river both of which therefore, were no hindrance to the progress of the work. 29.
30. CLIENT: Chief Engineer, P.W.D., Solapur. WORK : Construction of Bridge across Sina River Madha Vaizag Road, District Solapur. PERIOD OF COMPLETION : 1980 - 1981 BRIEF DESCRIPTION OF THE PROJECT: Well foundation 7.3 m dia for abutments, 6m dia for piers, 6 nos. spans of 25m each. Masonary piers and abutments with R.C.C cap (Hammer head). 9 Girder system, 1.25m height P.S.C. Girders 7.5m clear road width overall deck width 8.1m. 31. CLIENT: Kalyan Municipal Council. WORK : Ambernath Railway-Over-Bridge (K.M.C.) : PERIOD OF COMPLETION : BRIEF DESCRIPTION OF THE PROJECT: R.C.C. Open foundations, R.C.C. Piers and abutments nine spans of 15M and two spans of 20m with R.C.C. 4 Girder system with overall width of deck 8.56m. Retaining wall in approaches the height varying from 7m to 2m.
32. CLIENT : The Executive Engineer Pune Cantonment, Pune. WORK : Construction of bridge across Pawana River. PERIOD OF COMPLETION : December 1984 to January 1987 BRIEF DESCRIPTION OF WORK: Construction of a prestressed concrete bridge with 6 meter diameter abutment wells and 4 meter dia. intermediate well with 3 spans of 31 meters each making a total length of 93 meters. The superstructure consists of three girder system prestressed concrete girders each 2.2 meter in height, and a deck slab carrying a, 7.5m road way (clear) and cantilevered foot-paths (1.5 meter wide) on both the sides, making a total width of 10.95meter. 33. CLIENT : M/s. Bharat Heavy Electricals Ltd., P.O. Piplani, Bhopal (M.P.) WORK : a) Design and construction of UHV Laboratory. b) Design and construction of Coils and Insulation bloc. c) Design and construction of bloc VI for heavy fabrication. d) Design and construction of Traction bloc for manufacturing of Traction motors. PERIOD OF COMPLETION : a) February 1977 to February 1979 b) April 1981 to September 1982 c) April 1982 to June 1982 d) May 1983 to December 1984 BRIEF DESCRIPTION OF THE PROJECTS: The above four string of projects were executed by us for M/s. BHEL, Bhopal. a) The Ultra High Voltage Laboratory was a unique structure of its kind in Asia, involving a number of sub laboratories attached to the main testing hall having dimensions 40 m by 40 m and 40 high. Since one end of the laboratory was used for high voltage transformer testing, the floor was required to be constructed in M400 concrete with an epoxy surface. Also, an isolated staircase having a tower like structure of 50 meters height was required to be constructed. b) The Coils and Insulation block consisted of a huge shed with 5 bays each 18 m wide and 240 m long. The main feature of the structure was that it had to have positive air pressure and hence the roof was comprised of precast concrete panels instead of the usual A.C/G.I. Sheets associated with Industrial Buildings. The structure was constructed using a combination of R.C.C. and Structural Steel. c) Block VI was an extension of an existing building and hence was a combination of R.C.C. and Structural Steel and was a normal industrial building.
d)
The Traction block is, a separate industrial structure, was especially designed for manufacturing of traction motors. This was again an industrial structure being a combination of both R.C.C. and Structural Steel work.
General: All the above structures were designed and constructed by us for M/s. BHEL to suit their particular needs and design requirements. The planning and design of the structures was evolved jointly with the client M/s. BHEL, and represent a unique requirement of a Heavy Electrical Engineering Industry. 34.CLIENT:The Executive Engineer, PWD Ahmednagar. WORK :Bridge over Dhora river Well sinking foundation with 8.2m dia for abutment, 6m dia for piers, 6 nos. spans of 25m each. Spill through R.C.C. abutments masonry piers, R.C.C. piers and abutment caps. Three Girder R.C.C. prestressed Girders 2.165m height. 7.5m clear Road way and over all deck width 8.25m. PERIOD OF EXECUTION : 1975 35. CLIENT: The Executive Engineer, PWD Pune. WORK : Bridge across river Meena near Junnar with well sinking foundation and superstructure consisting of R.C.C. beams and slabs, 3 spans of 20m each. PERIOD OF EXECUTION : 1980 36. CLIENT : The Executive Engineer, PWD Aurangabad. WORK : Bridge across river Purna near Borgaon in Aurangabad district with well foundations in 4 spans of 20m each. The superstructure being of R.C.C. beams and deck slab construction. PERIOD OF EXECUTION : 1978 37. CLIENT: The Executive Engineer, PWD Pune. WORK : Submersible bridge across river Ghod near Ghodegaon with well sinking foundation and 6 spans of 18 m each. The superstructure being of R.C.C. beams and deck slab construction. PERIOD OF EXECUTION : 1976 38. CLIENT: Milatary Engineering Services, Goa. WORK : Civil construction of two helicopter hangars. PERIOD OF EXECUTION : 1982 39. CLIENT: M/s. Asian Cables Ltd., Pokharan Road, Thane WORK : XLPE Plant and various Civil Works. PERIOD OF EXECUTION : 1977 - 1981 40. CLIENT: M/s. Asian Cables Ltd., Pokharan Road, Thane. WORK : Design and construction of : i)Cross Link Polythene Cables Factory Expansion/Refilling ii)Buss Kneader. iii)Shielded Room. PERIOD OF EXECUTION : 1989 - 1991 41. CLIENT: M/s. Richardson & Cruddas ( 1972 ) Ltd., Bombay. WORK : Civil Construction of machine foundations of tubular PERIOD OF EXECUTION : 1989
project.
42. CLIENT: Tata Electric Companies, Dharavi, Mumbai. WORK : Construction of Type II-A and I-D Building at Bhivpuri in Maharashtra PERIOD OF EXECUTION : 1997-1998