(MRTJ.

Electric Power System Concept and Philosophy)


MRTJ Electricity System Phase 1(one)

(Channel 150 KV)

(SubStation)

(Channel 20 KV)

(Traction Substation MRTJ)


(Operation Pattern)
(Operation Pattern) (Lost One Power Supply)
(Operation Pattern)
(The burder Covered)
When the DEG Blackout
the station automatically
operates and is Ready
to be loaded inless than
18 seconds
(Backup Scheme by PLTD Senayan for Phase 1)
(2A Phase Electrical System)

Plan
Capacity
Connector
Connector
Backup Scheme by PLTD Senayan for Phase 2

Estimated time of electricity


from PLN. ready to be loaded on
RSS MRTJ : 15-20 minutes

Estimated time when electricity is ready at each


traction substation and station system 60-90minutes
Power Transformer Media Comparison
Use of Multi Cable Transit
Potential development and utilization of new and renewable energy at MRT Jakarta
Centrally based MRT Jakarta Power Plant
MRT Jakarta as a PLATFORM
Renewable energy implementation challenges
Implementation Plan
Stability classification