Completion Schedule - MUWALEH
Completion Schedule - MUWALEH
Phase 3 G floor External building wall Repairing of the lower part of the wall (the base) around
damaged at floor level Repairing of the wall around the External building Wall damaged at floor level
1 LS the building. Commencemnt Date 15 Days - 8 100% 0%
building Quantity: approx 27 panels and 5 columns
Phase 1 Ground floor External building
2 wall damaged at G level LS Need to repaired Need to repaired Commencemnt Date 10 Days - 4 100% 0% External building Wall damaged at G level
Need to build a ramp as per the Provide ramp with proper slope including the side wall, Provide ramp with proper slope including the side wall,
Phase 2 Ground floor Reception ,New
5 ramp LS opposite side ; requested by Principal required backfilling, concrete screed finish with granite on Commencemnt Date 5 Days - 4 100% 0% required backfilling, concrete screed finish with granite
to enhance pick up & drop of kids top on top