You are on page 1of 20

1

CITY OF AUSTIN
DAVENPORT RANCH FIRE/EMS STATION
DESIGN COMMISSION | SEPTEMBER 27, 2021
14

AERIAL RENDERING CITY OF AUSTIN


DAVENPORT RANCH FIRE/EMS STATION
DESIGN COMMISSION | SEPTEMBER 27, 2021
15

RENDERING: VIEW FROM DRIVEWAY CITY OF AUSTIN


DAVENPORT RANCH FIRE/EMS STATION
DESIGN COMMISSION | SEPTEMBER 27, 2021
16

RENDERING: VIEW FROM PROPERTY LINE CITY OF AUSTIN


DAVENPORT RANCH FIRE/EMS STATION
DESIGN COMMISSION | SEPTEMBER 27, 2021
PREVIOUS COA FIRE/EMS STATIONS 2
DEL VALLE FIRE/EMS STATION TRAVIS COUNTRY FIRE/EMS STATION
- 12,700 square feet - 15,000 square feet
- Single story structure - 2 story structure due to site size
-4 pull-through apparatus bays - 4 back-in apparatus bays
-Completed July 2020 -Completed July 2021

CITY OF AUSTIN
DAVENPORT RANCH FIRE/EMS STATION
DESIGN COMMISSION | SEPTEMBER 27, 2021
DAVENPORT RANCH FIRE/EMS STATION 3
GOAL:
PROVIDE EMERGENCY RESPONSE SERVICES TO DAVENPORT RANCH AREA

PROJECT ELEMENTS:
- 13,500 square feet; 4 apparatus bays
- 24 staff parking
- 2 visitor parking
- Compact design due to site limitation
- Water treatment pond
- Site retaining wall
- Staff exterior space (accessible from Day Room)
- Day Room, Kitchen, Gym, gear storage rooms, 14 sleep rooms

PROJECT OVERVIEW CITY OF AUSTIN


DAVENPORT RANCH FIRE/EMS STATION
DESIGN COMMISSION | SEPTEMBER 27, 2021
DAVENPORT RANCH FIRE/EMS STATION 4
SITE & CONTEXT:
-On St. Stephen’s property
-No public transport within 1/4 mile
-Located in the ETJ
-Site has steep, rocky terrain

Legend

Addresses
Contours Year- 2017
2 Ft Contours

10 Ft Contours

1: 1,200
Notes

0.0 0 0.02 0.0 Miles


This product is for informational purposes and may not have been prepared for or be suitable for
legal, engineering, or surveying purposes. It does not represent an on-the-ground survey. This
NAD_1983_StatePlane_Texas_Central_FIPS_4203_Feet product has been produced by the City of Austin for the sole purpose of geographic reference. No
warranty is made by the City of Austin regarding specific accuracy or completeness.
Date Printed:

CITY OF AUSTIN
DAVENPORT RANCH FIRE/EMS STATION
DESIGN COMMISSION | SEPTEMBER 27, 2021
PRIVATE RESIDENCES
5
VE
DRI
E
AK
TL
ES
W
SITE

L
AI
TR
G
IN
GG

WESTLAKE
JO

APARTMENTS

ST STEPHENS PROPERTY

ST STEPHENS DR

AERIAL SITE IMAGE CITY OF AUSTIN


DAVENPORT RANCH FIRE/EMS STATION
DESIGN COMMISSION | SEPTEMBER 27, 2021
6

SITE

WESTLAKE DRIVE

WESTLAKE PRIVATE RESIDENCES


APARTMENTS

SITE BIRDSEYE VIEW CITY OF AUSTIN


DAVENPORT RANCH FIRE/EMS STATION
DESIGN COMMISSION | SEPTEMBER 27, 2021
7

SITE PHOTOS: WESTLAKE DRIVE CITY OF AUSTIN


DAVENPORT RANCH FIRE/EMS STATION
DESIGN COMMISSION | SEPTEMBER 27, 2021
8

SITE PHOTO: FUTURE DRIVE LOCATION CITY OF AUSTIN


DAVENPORT RANCH FIRE/EMS STATION
DESIGN COMMISSION | SEPTEMBER 27, 2021
9

SITE PHOTO: LOOKING NORTH CITY OF AUSTIN


DAVENPORT RANCH FIRE/EMS STATION
DESIGN COMMISSION | SEPTEMBER 27, 2021
ARCHITECTURAL CONTEXT 10
ST. STEPHEN’S EXISTING ARCHITECTURE:
-Natural Stone
-Metal low-slope roofing
-Large architectural overhangs
-Large glazing units

CITY OF AUSTIN
DAVENPORT RANCH FIRE/EMS STATION
DESIGN COMMISSION | SEPTEMBER 27, 2021
11

R.
EDAK
STL
WE
PROPERTY LINE

25' SETBACK

RECYCLING / GENERATOR TRANSFORMER


TRASH PAD

50' SETBACK

SECURE GATE

WATER TREATMENT POND

SECURE PARKING
24 SPACES

ARCHITECTURAL SITE PLAN CITY OF AUSTIN


DAVENPORT RANCH FIRE/EMS STATION
DESIGN COMMISSION | SEPTEMBER 27, 2021
12

VISITOR
PARKING

ELEC TOOL
UP 113 114
STAIR
S2
BARBEQUE AREA KITCHEN LOBBY RESTRM
105 100 100A
PANTRY PANTRY
105A 105B

DW

CORRIDOR
110

APPARATUS BAY A
OUTDOOR 112A
DINING PANTRY PANTRY RESTRM
SPACE 105C 105D 103

DECON
111

STOR
107A
SHIFT CHANGE
102
ELEV
E101
DAY ROOM
104B
APPARATUS BAY B
112B

FIRE GEAR
117

LANDSCAPING
GYM
106

MECH
M1 APPARATUS BAY C
112C
RISER PUMP CORRIDOR
M2 M4 109

MED
116A

OFFICE
108

STAIR
S1

OUTDOOR EXERCISE SPACE EMS GEAR


115

CTM APPARATUS BAY D


M3 112D

LANDSCAPING
MAINTENANCE ALLEY

GROUND LEVEL FLOOR PLAN CITY OF AUSTIN


DAVENPORT RANCH FIRE/EMS STATION
DESIGN COMMISSION | SEPTEMBER 27, 2021
13

STAIR
S2
ROOF BELOW

DN

DORM DORM JAN


DORM DORM DORM DORM DORM
201 206 222
202 203 204 205 207

CORRIDOR
200A

RESTRM TRAINING
218 219
EL
E201 BATHRMBATHRM (ADA) BATHRM BATHRM
214 215 216 217

CORRIDOR
200B

DORM DORM DORM DORM


BALCONY 208 209 210 DORM DORM
211
B1 212 213

CHIEF OFFICE
220

STAIR STORAGE LOFT


S1

CHIEF BDRM
221

SECOND LEVEL FLOOR PLAN CITY OF AUSTIN


DAVENPORT RANCH FIRE/EMS STATION
DESIGN COMMISSION | SEPTEMBER 27, 2021
POND ACCESS
SCREENED TRASH
ENCLOSURE
SCREENED UTILITY
AREA
17
LIMESTONE BLOCK
BIKE RACKS BENCH

BIOFILTRATION
POND

IVE
AKE DR
FLAG POLE
MONUMENT
SIGN

WESTL
2-STORY FIRE/EMS STATION
4-BAY DOORS

SECURED
PARKING LOT

TERRACED RETAINING
WALL

LEGEND
CONCRETE CELEBRATION BERMUDA SOD
OVERALL LANDSCAPE PLAN PROPOSED SHADE TREE EX. TREE TO REMAIN
1 XXX
SCALE: 1/16" = 16'
0 10' 20' 40'

ARTIFICIAL TURF NON-IRRIGATED XERIC


ROW PLANTING
PROPOSED UNDERSTORY
TREE EX. TREE TO BE REMOVED
1
- 1 2" WASHED GRANITE
4 NATIVE SEEDING
GRAVEL

1-2.5" CALICO DRAINAGE SITE-SALVAGED BOULDERS


SHADE TREE SEEDLINGS
GRAVEL

1
PROPERTY LINE
4" MINUS CRUSHED
LIMESTONE IN GEOGRID LIMITS OF CONSTRUCTION
UNDERSTORY TREE
FIRELANE SEEDLINGS
NATIVE & ADAPTED PLANTING
1
4" RAW MILD STEEL EDGING

SECURITY FENCING
BIOFILTRATION POND
PLANTING PRIVACY FENCING

LANDSCAPING SITE PLAN CITY OF AUSTIN


DAVENPORT RANCH FIRE/EMS STATION
DESIGN COMMISSION | SEPTEMBER 27, 2021
18

RENDERING: PLANTING MATERIALS CITY OF AUSTIN


DAVENPORT RANCH FIRE/EMS STATION
DESIGN COMMISSION | SEPTEMBER 27, 2021
19

RENDERING: PLANTING MATERIALS CITY OF AUSTIN


DAVENPORT RANCH FIRE/EMS STATION
DESIGN COMMISSION | SEPTEMBER 27, 2021
SUSTAINABILITY OVERVIEW 20
Certification Goal: LEED v4 for BD+C: New Construction and Major Renovation
Project Checklist
Project Name: Davenport Ranch Fire EMS Station
Date: 08.02.2021

LEED 4.0 Silver


Y ? N
1 Credit Integrative Process 1

6 0 0 10 Location and Transportation 16 4 2 2 5 Materials and Resources 13


LEED for Neighborhood Development Location 16 Y Storage and Collection of Recyclables Required
Location and Transportation: site location
Credit Prereq

1 Credit Sensitive Land Protection 1 Y Prereq Construction and Demolition Waste Management Planning Required

challenging for credits. 10 of 16 credits are NO. 1


2
1
3
Credit

Credit
High Priority Site - project does not qualify
Surrounding Density and Diverse Uses
2
5 1
1 2 2
1
Credit

Credit
Building Life-Cycle Impact Reduction
Building Product Disclosure Optimization - Environmental Product Declarations
5
2
5 Credit Access to Quality Transit 5 1 1 Credit Building Product Disclosure and Optimization - Sourcing of Raw Materials 2

Sustainable Sites: concrete pavement key for 1 Credit Bicycle Facilities 1 1 1 Credit Building Product Disclosure and Optimization - Material Ingredients 2
1 Credit Reduced Parking Footprint - zoning requirements? 40% reduction required 1 1 1 Credit Construction and Demolition Waste Management 2

Heat Island reduction. 1 Credit Green Vehicles - v4.1 allow 6% infrastructure 1


6 2 3 5 Indoor Environmental Quality 16
5 3 2 0 Sustainable Sites 10 Y Prereq Minimum Indoor Air Quality Performance Required

Water Efficiency: water use reduction & Y


1
Prereq

Credit
Construction Activity Pollution Prevention
Site Assessment
Required
1
Y
1 1
Prereq

Credit
Environmental Tobacco Smoke Control
Enhanced Indoor Air Quality Strategies
Required
2

additional metering 2 Credit Site Development - Protect or Restore Habitat 2 2 1 Credit Low-Emitting Materials 3
1 Credit Open Space 1 1 Credit Construction Indoor Air Quality Management Plan 1
1 2 Credit Rainwater Management 3 1 1 Credit Indoor Air Quality Assessment - flushout or testing 2

Energy and Atmosphere: enhanced 2


1
Credit

Credit
Heat Island Reduction
Light Pollution Reduction - BUG
2
1
1
1 1
Credit

Credit
Thermal Comfort - controllability
Interior Lighting - 90% individual occupant spaces - 3 levels
1
2
commissioning, photovoltaic panels, and 3 Credit Daylight 3
4 0 0 7 Water Efficiency 11 1 Quality Views 1
increased energy performance through
Credit

Y Prereq Outdoor Water Use Reduction Required 1 Credit Acoustic Performance 1

envelope design Y Prereq Indoor Water Use Reduction Required


Y Prereq Building-Level Water Metering Required 5 1 0 0 Innovation 6
1 1 Credit Outdoor Water Use Reduction 2 4 1 Credit Innovation - LED Lighting, Innovation, Pilot, Educational, EP, Composting 5

Materials and Resources: building product 2 4 Credit Indoor Water Use Reduction 6 1 Credit LEED Accredited Professional 1
2 Credit Cooling Tower Water Use 2

disclosures and waste management 1 Credit Water Metering 1 2 0 1 3 Regional Priority 4


1 1 Credit Regional Priority: Renewable Energy Production 1
23 0 1 9 Energy and Atmosphere 33 1 Credit OutdoorCredit
Regional Priority: Specific Water Use Reduction 1

Indoor Environmental Quality: low-emitting Y


Y
Prereq

Prereq
Fundamental Commissioning and Verification
Minimum Energy Performance
Required
Required 1
1 1 Credit

Credit
Rainwater
Regional Priority: Specific
Optimize
Regional Priority: Specific
Management
Credit
Energy Performance
Credit
1
1

materials & indoor air quality management Y Prereq Building-Level Energy Metering Required
Y Prereq Fundamental Refrigerant Management Required 56 8 9 39 TOTALS Possible Points: 110
5 1 Credit Enhanced Commissioning - before end of DD, measurement 6 Certified: 40 to 49 points, Silver: 50 to 59 points, Gold: 60 to 79 points, Platinum: 80 to 110

Innovation: IPM, Green Housekeeping, 13


1
5 Credit

Credit
Optimize Energy Performance
Advanced Energy Metering - systems >10% whole building + data
18
1
education outreach, Pilot 2 Credit Demand Response 2
3 Credit Renewable Energy Production - programming requirement 3
1 Credit Enhanced Refrigerant Management 1

Regional Priority: Additional points for using 1 1 Credit Green Power and Carbon Offsets 2

photovoltaic panels
1

SUSTAINABILITY OVERVIEW CITY OF AUSTIN


DAVENPORT RANCH FIRE/EMS STATION
DESIGN COMMISSION | SEPTEMBER 27, 2021

You might also like