CITY OF AUSTIN
DAVENPORT RANCH FIRE/EMS STATION
DESIGN COMMISSION | SEPTEMBER 27, 2021
14
CITY OF AUSTIN
DAVENPORT RANCH FIRE/EMS STATION
DESIGN COMMISSION | SEPTEMBER 27, 2021
DAVENPORT RANCH FIRE/EMS STATION 3
GOAL:
PROVIDE EMERGENCY RESPONSE SERVICES TO DAVENPORT RANCH AREA
PROJECT ELEMENTS:
- 13,500 square feet; 4 apparatus bays
- 24 staff parking
- 2 visitor parking
- Compact design due to site limitation
- Water treatment pond
- Site retaining wall
- Staff exterior space (accessible from Day Room)
- Day Room, Kitchen, Gym, gear storage rooms, 14 sleep rooms
Legend
Addresses
Contours Year- 2017
2 Ft Contours
10 Ft Contours
1: 1,200
Notes
CITY OF AUSTIN
DAVENPORT RANCH FIRE/EMS STATION
DESIGN COMMISSION | SEPTEMBER 27, 2021
PRIVATE RESIDENCES
5
VE
DRI
E
AK
TL
ES
W
SITE
L
AI
TR
G
IN
GG
WESTLAKE
JO
APARTMENTS
ST STEPHENS PROPERTY
ST STEPHENS DR
SITE
WESTLAKE DRIVE
CITY OF AUSTIN
DAVENPORT RANCH FIRE/EMS STATION
DESIGN COMMISSION | SEPTEMBER 27, 2021
11
R.
EDAK
STL
WE
PROPERTY LINE
25' SETBACK
50' SETBACK
SECURE GATE
SECURE PARKING
24 SPACES
VISITOR
PARKING
ELEC TOOL
UP 113 114
STAIR
S2
BARBEQUE AREA KITCHEN LOBBY RESTRM
105 100 100A
PANTRY PANTRY
105A 105B
DW
CORRIDOR
110
APPARATUS BAY A
OUTDOOR 112A
DINING PANTRY PANTRY RESTRM
SPACE 105C 105D 103
DECON
111
STOR
107A
SHIFT CHANGE
102
ELEV
E101
DAY ROOM
104B
APPARATUS BAY B
112B
FIRE GEAR
117
LANDSCAPING
GYM
106
MECH
M1 APPARATUS BAY C
112C
RISER PUMP CORRIDOR
M2 M4 109
MED
116A
OFFICE
108
STAIR
S1
LANDSCAPING
MAINTENANCE ALLEY
STAIR
S2
ROOF BELOW
DN
CORRIDOR
200A
RESTRM TRAINING
218 219
EL
E201 BATHRMBATHRM (ADA) BATHRM BATHRM
214 215 216 217
CORRIDOR
200B
CHIEF OFFICE
220
CHIEF BDRM
221
BIOFILTRATION
POND
IVE
AKE DR
FLAG POLE
MONUMENT
SIGN
WESTL
2-STORY FIRE/EMS STATION
4-BAY DOORS
SECURED
PARKING LOT
TERRACED RETAINING
WALL
LEGEND
CONCRETE CELEBRATION BERMUDA SOD
OVERALL LANDSCAPE PLAN PROPOSED SHADE TREE EX. TREE TO REMAIN
1 XXX
SCALE: 1/16" = 16'
0 10' 20' 40'
1
PROPERTY LINE
4" MINUS CRUSHED
LIMESTONE IN GEOGRID LIMITS OF CONSTRUCTION
UNDERSTORY TREE
FIRELANE SEEDLINGS
NATIVE & ADAPTED PLANTING
1
4" RAW MILD STEEL EDGING
SECURITY FENCING
BIOFILTRATION POND
PLANTING PRIVACY FENCING
1 Credit Sensitive Land Protection 1 Y Prereq Construction and Demolition Waste Management Planning Required
Credit
High Priority Site - project does not qualify
Surrounding Density and Diverse Uses
2
5 1
1 2 2
1
Credit
Credit
Building Life-Cycle Impact Reduction
Building Product Disclosure Optimization - Environmental Product Declarations
5
2
5 Credit Access to Quality Transit 5 1 1 Credit Building Product Disclosure and Optimization - Sourcing of Raw Materials 2
Sustainable Sites: concrete pavement key for 1 Credit Bicycle Facilities 1 1 1 Credit Building Product Disclosure and Optimization - Material Ingredients 2
1 Credit Reduced Parking Footprint - zoning requirements? 40% reduction required 1 1 1 Credit Construction and Demolition Waste Management 2
Credit
Construction Activity Pollution Prevention
Site Assessment
Required
1
Y
1 1
Prereq
Credit
Environmental Tobacco Smoke Control
Enhanced Indoor Air Quality Strategies
Required
2
additional metering 2 Credit Site Development - Protect or Restore Habitat 2 2 1 Credit Low-Emitting Materials 3
1 Credit Open Space 1 1 Credit Construction Indoor Air Quality Management Plan 1
1 2 Credit Rainwater Management 3 1 1 Credit Indoor Air Quality Assessment - flushout or testing 2
Credit
Heat Island Reduction
Light Pollution Reduction - BUG
2
1
1
1 1
Credit
Credit
Thermal Comfort - controllability
Interior Lighting - 90% individual occupant spaces - 3 levels
1
2
commissioning, photovoltaic panels, and 3 Credit Daylight 3
4 0 0 7 Water Efficiency 11 1 Quality Views 1
increased energy performance through
Credit
Materials and Resources: building product 2 4 Credit Indoor Water Use Reduction 6 1 Credit LEED Accredited Professional 1
2 Credit Cooling Tower Water Use 2
Prereq
Fundamental Commissioning and Verification
Minimum Energy Performance
Required
Required 1
1 1 Credit
Credit
Rainwater
Regional Priority: Specific
Optimize
Regional Priority: Specific
Management
Credit
Energy Performance
Credit
1
1
materials & indoor air quality management Y Prereq Building-Level Energy Metering Required
Y Prereq Fundamental Refrigerant Management Required 56 8 9 39 TOTALS Possible Points: 110
5 1 Credit Enhanced Commissioning - before end of DD, measurement 6 Certified: 40 to 49 points, Silver: 50 to 59 points, Gold: 60 to 79 points, Platinum: 80 to 110
Credit
Optimize Energy Performance
Advanced Energy Metering - systems >10% whole building + data
18
1
education outreach, Pilot 2 Credit Demand Response 2
3 Credit Renewable Energy Production - programming requirement 3
1 Credit Enhanced Refrigerant Management 1
Regional Priority: Additional points for using 1 1 Credit Green Power and Carbon Offsets 2
photovoltaic panels
1