Professional Documents
Culture Documents
INITIAL DATE : Feb 26, 2015 FINAL DATE : March 05, 2015
TIME : ,09.00 TIME : 10.00
DRAFT FORE MID AFT FORE MID AFT
PORT : 12.72 12.58 12.54 4.38 5.22 6.06
STBD : 12.70 12.59 12.52 4.41 5.24 6.04
MEAN : 12.710 12.585 12.530 4.395 5.230 6.050
Stem Corr : 0.001 0.000 -0.007 -0.008 -0.004 0.060
Corr'd Draft : 12.711 12.585 12.523 4.387 5.226 6.110
Fore&Aft Mean : 12.6170 5.2485
Mean of Mean : 12.60100 5.23725
Quarter Mean : 12.593000 dm 0.50 5.231625 dm 0.50
DISPLACEMENT : 75,995.500 df 1.00 30,045.750 df 1.00
1st Trim Corr : -2.924 da 7.50 -330.360 da 7.50
2nd Trim Corr : 0.267 Trim 1 -0.180 10.983 Trim 1 1.655
Corr'd Displ Trim : 75,992.843 Trim 2 -0.188 29,726.373 Trim 2 1.723
Density Corr : -518.976 -58.003
CORR'D DISPL : 75,473.867 29,668.370
DEDUCTABLE DEDUCTABLE
Fresh Water : 150.000 Fresh Water 115.000
Ballast : 1,500.000 Ballast 19,200.000
Fuel Oil : 610.000 Fuel Oil 575.000
Diesel Oil : 85.000 Diesel Oil 79.000
Lub Oil : 60.000 Lub Oil 59.000
OTHER : 0.000 OTHER 0.000
Total : 2,405.000 Total 20,028.000
LINGGA HAMZAH
Chief Officer Surveyor