01
OIL & GAS EXPLORATION VIDEO
02
“ Technical Inspection are
activities to conduct a review,
verification, witness and
visual of an equipment and
facilities.
04
TYPE OF EQUIPMENT & FACILITIES
ELECTRICAL EQUIPMENT
Generator, Transformer, MCC & Switchgear
ROTATING EQUIPMENT
Compressor & Pump
METERING SYSTEM
& INSTRUMENT
05
TYPE OF EQUIPMENT & FACILITIES
STORAGE TANK
CRANE
Mobile Crane, Overhead Crane & Pedestal Crane
PIPELINE
06
TYPE OF EQUIPMENT & FACILITIES
PLATFORM
FACILITY/INSTALLATION/PLANT
OTHERS
CALIBRATION
07
DETAILS OF ELECTRICAL EQUIPMENT (GENERATOR)
Source: mnes-us.com
08
DETAILS OF ROTATING EQUIPMENT (PUMP)
Source: cceonlinenews.com
09
DETAILS OF METERING SYSTEM
Source: krohne.com
10
DETAILS OF PRESSURE VESSEL
Source: Arvengtraining.com
12
DETAILS OF PRESSURE SAFETY VALVE
Source: cdn.shopify.com
13
DETAILS OF PEDESTAL CRANE
Lifting
Equipment /
Crane, that is
equipment to
remove, lift up
goods and
person,
vertically and /
or horizontally
at a distance,
among others
Source: seatrax.com
14
DETAILS OF PLATFORM
An oil platform,
offshore platform,
or offshore drilling
rig is a large
structure with
facilities for well
drilling to explore,
extract, store, and
process
petroleum/oil and
natural gas that lies
in rock formations
beneath the seabed
Source: slideplayer.com
15
DETAILS OF PIPELINE
Source: https://sites.google.com/site/metropolitanenvironmental/
1. Data Sheet
2. Client Specification
3. Procedures
4. Mill/Material Cert. 1. Transfer Heat No.
5. Design Calc. 2. Check Mechanical
6. Welder & NDT Level 2 Cert. Properties
1. ITP 7. Draw ing 3. Check Chemical
(Inspection & Test Plan) 8. Environmental Documents Compositions
2. Schedule 9.Etc 4. Visual Check
Kick of Meeting /
Review & verify Material
1. Hydrostatic Test
(Pipeline & Tank)
PROJECT Pre-Inspection
document verification
Meeting
2. Settlement (Tank)
3. Levelling jacket and
final measurement
of elevation (Platform)
4. Performance Test SAT (Site Witness fabrication/
FAT (Fabrication Final check
(Electrical, Rotating Acceptance Test) manufacturing &
& Metering) Acceptance Test) (visual &dimension)
& commissioning testing
17
PROJECT OVERVIEW
18
UPSTREAM PROJECT ONSTREAM IN 2020
19
PROJECT DESCRIPTION
20
CLOSING
”TO BE THE M OST VALUED PARTNER OF COLLEAGUES”