You are on page 1of 1

RED PLANET HOTELS

THE FORT
10TH AVENUE, CORNER 40TH STREET, BONIFACIO GLOBAL CITY,
TAGUIG CITY

25060 25060
400 7285 5714 2420 3900 900 4340 100 400 7285 5715 2420 3900 900 4340 100
400

400
ARCHITECTURE + INTERIORS + PLANNING
2865 Finlandia St. Makati City 1234 Philippines

Fax: 02 893 5975


Tel: 02 844 2848 . 844 2701 . 369 9353 to 54
Email: rmda.architects@gmail.com

694

694
Web: www.rmdaarchitects.com
1378 1378
FL FL

4366

4366
ROLANDO B. MERCADO
6210

6210
ARCHITECT

PRC No.: 5295 PTR No.: 6617546


OPEN OPEN VALIDITY: 12/07/2020 DATE: 01 / 04 / 2018
SPACE SPACE IAPOA No.: 01361 PLACE: MAKATI CITY
3542 6400 3542 6400
O.R. No. / DATE: 197138 072017 TIN: 113-398-644

1378 1378
FL FL

1106
1106

5595
5595

5060
5060

ROLANDO SAN ANDRES, MsCE


PROFESSIONAL CIVIL/STRUCTURAL ENGINEER

PRC No.: DATE:


VALIDITY: PLACE:
6403 6617 6403 6617
O.R. No. / DATE: TIN:
PTR No.:

EBCRUZ & PARTNERS


5282

5282

5282

5282
5800

5800
EFREN B. CRUZ
PROFESSIONAL ELECTRICAL ENGINEER

PRC No.: DATE:


VALIDITY: PLACE:
O.R. No. / DATE: TIN:
PTR No.:
PIPE CHASE PIPE CHASE
2833

2833

2833

2833

2833

2833
38970
38970

OPEN
ABOVE

5800
5800

2912

2912

2912
2912

2912

2912
MAXIMO T. ECLEO
PROFESSIONAL SANITARY ENGINEER

PRC No.: DATE:


VALIDITY: PLACE:
OPEN
O.R. No. / DATE: TIN:
ABOVE PTR No.:

3178

3178

3178
3178

3178

3178

L. R. PUNSALAN & ASSOCIATES

2900
2900

694 1088 694 1088


5581 2020 5581 2020
MECHANICAL ENGINEERS DESIGNS CONSULTATIONS ESTIMATES

1375

1375
1375

1375

FL

FL
FL

FL

2/F LAUREMAR BLDG. 1458 NEWTON ST. BGY. SAN ISIDRO, MAKATI CITY, 1234 PHILIPPINES
TEL. NOS. 844-9124 TO 25 / 843-0718 FAX NO. (632) 844-9122 E-MAIL ADD.: lrpa@pldtdsl.net

3178
3178

1803

1372
FL

CEZAR P. PUNSALAN

634
2600

2600

5125

5125
5125

5125

PROFESSIONAL MECHANICAL ENGINEER


694
PRC No.: DATE:
1803 VALIDITY: PLACE:

FL
FL

O.R. No. / DATE: TIN:

663
PTR No.:

3540 6403 6616 3540 6403 6616 REVISED LAYOUT 7/16/18

4750
4750

REVISED LAYOUT 7/25/18


REFLECTED SPRINKLER HEADS, SPEAKERS, WIFI
ROUTERS, SMOKE DETECTORS AND CCTV CAMERAS 9/17/18
REVISED COLUMN SIZE AT GRID LINE 3/A

5406

5406
5406

MOVED WALL ALONG GRID LINE A/3-1 TO


ACCOMMODATE BUILD-UP FOR WALL GROOVE
PATTERN
10/3/18
REMOVED SMOKE DETECTORS AT DRIVE RAMPS AND
PARKING SLOTS 10/16/18

850
850

ADDED SLAB AT LEFT PIPE CHASE.


REFLECTED CEILING FINISH
LINE OF CANOPY ABOVE LINE OF CANOPY ABOVE REVISED SPRINKLER LAYOUT BASED
ON FIRE PROTECTION DRAWINGS 11/14/18
3135 MOVED SPRINKLER HEADS BASED ON
5/16/19
2050

CSD (300MM FROM LIGHT FIXTURE)

LINE OF CANOPY ABOVE


ADDED CEILING FINISH FOR CANOPIES; CF-9
LINE OF CANOPY ABOVE

3492 3540 5360 DARK GRAY PAINT FINISH 5/20/19


4500
4500

OPEN 925 CHANGED LEGEND USED FOR UPRIGHT SPRINKLER


SD OPEN OPEN HEADS
ABOVE

3148
3148

3148

SPACE SPACE

2103
100
100

REFLECTED CEILING PLAN REFLECTED CEILING PLAN


6TH FLOOR
SIXTH FLOOR PLAN 7TH FLOOR PLAN 7TH FLOOR
REFLECTED CEILING PLAN
1 : 100 M 1 : 100 M

DESIGNED BY: RBM/JBV


ISSUED AS: DATE ISSUED:
CHECKED BY: JBV
FOR CONSTRUCTION JUNE 20, 2019 AR-111 REV-8
CAD BY: MLP

You might also like