Jerome Lesecq
28/07/2010
Agenda
1. Introduction
2. R99 CE Analysis
1. Introduction
The goal of this document is to provide an overview of the main NodeB resources usage: R99 CE, MCPA, Iub
interface…
When the network was opened commercially, two issues main issues were met due to the application of
Capacity Licensing parameters:
- R99 CE shortage
- Lack of DL Power (Rrm_Refusal)
These Capacity Licensing parameters (NodeB), discussed with OML during the RFP, have been under
estimated and this causes degradation: Call Setup Success Rate and Call Drop.
Since the Capacity Licensing feature is not yet T6, the feature has been deactivated and parameters set so that
issues are no more impacting the KPIs.
2. R99 CE Study
This study has made from the 22nd to the 26th of July.
The reason is that since the 21st, all NodeB have been configured with 256 CE (Hw limit of the xCEM card).
- VS_CEMAlloc_Success(U10309_0)(Event)
- VS_CEMUsedDCH_Max(U10301_Max)(%)
- VS_R99CECapacity_CumHWcapacity
- VS_R99CECapacity_CumLicensing
- VS_R99CECapacity_AllocSuccess
- CEMUsedDCH_Max (%)
- Averaged CE used
- Max CE Used
This concerns NodeB 065BKO1 (26/07/2010 at 5pm) and 0142BKO1 (26/07/2010 at 10:35pm).
NodeBs with Number of CE lower than 16 are not integrated (Kaye or sites shifted to Phase 1bis)
Below are the NodeB having a R99 number of CE hgiher that the one estimated in PND:
Microsoft Excel
Worksheet
A similar study will have to be carried out before the T6 of Capacity Licensing (traffic will probably increase until
then) to review the number of R99 CE necessary, to share the CE over the different NodeBs, to keep a maring
and anticipate R99 CE shortage.
In any case, the issue was not due to NodeB or RNC hardware capacity.
The goal of this analysis is to explain the reason of the increase of the MCPA Maximum power increase from
30W to 45W.
After the removal of the ARD flag (01/07/2010) for the commercial launch, the Call Setup Success Rate (CS &
PS) has decreased significantly. The most visible consequence was the raised of Radio Link unsuccess due to
Rrm_Refusal.
Main dates:
26/05/2010 Marketing Launch
01 to 03/07/2010 ARD flag Removal => traffic increase
15/07/2010 maxPowerAmplification set from 30w to 45W
In order to identify the root cause of this issue, traces and indicators analysis have been performed.
As they both find the same root cause, the focus will be made on indicators analysis.
RNC Level
NodeB Level
Sum of RAB_FailEstab_PS_DLPwr and RAB_FailEstab_CS_DLPwr
The change of behaviour is obvious after the 15/07/2010.
- VS_IrmcacPowerDist_Rng0to40pcTotPwr
Here is the repartition of Number of seconds per range of power considered by the CAC algorithm for that cell.
After the 15/07/2010 the CAC is considering rarely range of Power higher than 70%.
The increase to 45W has been possible because the Capacity Licensing feature is not T6 and so there are no
software limitation to 30W.
Our recommendation is that OML should increase the maximumPowerAmplification 45W on the NodeBs.
This means additional RTUs: 60 x 6 x 15w RTU for phase 1 + 30 x 6 x 15w RTU for Phase1 bis.