RESUME LAPORAN SMW

Bulan : April 2021 Departemen Operasi 1

Proyek Pangkalan Susu Proyek Tol Pekanbaru - Padang


892
95.92% 902 854
2.70 91.67% 832 869
90% 820 2.40 820 860 90% 820 814 2.40 2.4 820 860

TARGET Ri TARGET Ri TARGET Ri TARGET Ri TARGET Ri


90% 95.92% 820 902 <2.4 2.7 820 854 860 892 TARGET Ri TARGET Ri TARGET Ri TARGET Ri TARGET Ri
QPASS QMSL RCA SHE LEVEL 5R 90% 91.67% 820 814 <2.4 2.4 820 832 860 869
QUALITY SHE QPASS QMSL RCA SHE LEVEL 5R
QUALITY SHE

Proyek IPAL Pekanbaru Proyek Bendungan Lau Simeme

Proyek Bendung dan Saluran Supplesi D.I 1 Sei Silau Proyek Jembatan Aek Tano Ponggol

Proyek Belawan Fase 1 (Sheet Pile) Proyek Jalan Batas Sidikalang - Panji
831 860 886
90% 820 821 2.40 820
89.47%
2.20

TARGET Ri TARGET Ri TARGET Ri TARGET Ri TARGET Ri


90% 89% 820 821 <2.4 2.2 820 831 860 886
QPASS QMSL RCA SHE LEVEL 5R
QUALITY SHE