DETERMINATION OF OBC FOR BC

REF:ASPER MS2 CLAUSENO:5.15

Contract :ALLAHABAD BYPASS PROJECT ABP-3

Client :NATIONAL HIGHWAY AUTHORITY OF INDIA

Engineer
Contractor

TOO LOW PASSING TOO HIGH

Passes all criteria

% OF VMA 11 12 12 14 13.5 14 14.5 16 16.5 17 17.5 18 18.5 19 19.5 20 21.5 22.5 23.5 24 24.2 25.3 26.2 27.2

27.5

% OF VFB 56 58 61 63 65 68 70 72 74 76 79 80 82 84 86 88 89 90 91 92 93 94 95 96

97

% OF VIM 2.2 2.5 2.7 3 3.1 3.2 3.5 3.9 4 4.2 4.3 4.8 5.2 5.6 6 6.5 6.8 7.02 7.3 7.5 7.9 8.2 8.4 8.6

8.8

STABILITY (Kgs) 600 650 920 930 950 910 950 980 1000 1050 1060 1100 1190 1200 1250 1150 1100 1000 950 910 860 840 820 760

710

% OF BITUMEN
4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 6.0 6.1 6.2 6.3 6.4 6.5
CONTENT

MIN MAX
ACCEPTABLE RANGE
4.4 4.9

AVARAGE % OF BITUMEN CONTENT 4.4+4.9/2 4.65

OBC (%) 4.7

_______________________ _______________________
OSE-KMC(JV) BCEOM-LASA(JV)