MTF will be the initiative from the ULB’s to tackle the problems
which create havoc during Rainy Season for most of the ULB’s
around the Nation. This MTF solution is not only unique but also
develops customized innovative solution for the INDIAN
conditions and to the international city like Bangalore and its
prestigious Governing Body i.e. BBMP
7/8/2009
What is the necessity of MTF
4
7/8/2009
5 Problem Identification Tool
7/8/2009
How to find out the Problems ? And
what tool to use to identify the
Problems ?
6 7/8/2009
Problems are identified though “Fish Bone Diagram” / Ishikawa Diagram
7
At tail of the fish bone we take ULB/BBMP (the governing body of the city) and at head of the fish
bone is the Goal or Vision of BBMP/ULB which is to be achieved i.e the citizens satisfaction and
providing world class services. The intermediate fish bones are be used to identify the elements
involved in the ULB/BBMP which are not responding and are causing problems to achieve the Goal
/ Vision of ULB / BBMP. 7/8/2009
Problems are identified though “Fish Bone Diagram” / Ishikawa Diagram
8
Monsoon
BBMP Havoc
If you want to know the elements which causes issues to achieve the
Goal and Vision of the Organization
just click next
7/8/2009
Problems are identified though “Fish Bone Diagram” / Ishikawa Diagram
9
SYSTEM
MACHINES
MEN
Monsoon
BBMP Havoc
METHODS
TECHNOLOGY MATERIAL
7/8/2009
Problem identification contd..
10
MACHINE
TECHNOLOGY
MATERIAL
METHODS
SYSTEM
MEN
7/8/2009
11 Working out a Solution for Monsoon
Problems can be divided into two elements, one is called as low end problems and
other can be called as High end problems
7/8/2009
Problem solving model for BBMP - MTF
12
Low End
Problems
BBMP One
MTF Solution
High End
Problems
7/8/2009
One shot solution
13
7/8/2009
Cause & Effect Diagram: one of the approaches for generating solution
14
BBMP
MTF
Solutions to the Problems can be worked out though “Fish Bone Diagram / Ishikawa
Diagram “ 7/8/2009
BBMP
MTF
15 7/8/2009
BBMP
MTF
17 7/8/2009
• Adopting TQM for the whole process
• QA need to be implemented at every stage of the work
• feed back from citizens and customer services centre to
help out citizens
• adopting KIAZEN technique i.e. continuous improvement
in the process will always help
• Documentation has to be made compulsory and MTF
people need to maintain a mandatory field book which is
up-to-date
BBMP
MTF
18 7/8/2009
• First aid box & safety tools (helmets, belts)
• construction equipment like arre, gudhli, shawls , bandli etc
• sign boards, diversion boards, tapers (all of which should be made
of radium/ glowing material)
• Ropes & cables, net, ladder, Big lamps, Glow lights, torches
• safety jackets, Radium jackets for BBMP workers & staff, rubber
shoe and hand glows
• Loud speaker and hand signal lights
• Gas welding, fire extinguishers and other tools and equipments
BBMP which are necessary
MTF
19 7/8/2009
• Implementing Management Information System (MIS) on daily,
weekly and monthly basis at different verticals
• implementation of ERP to BBMP will help at a large extent.
• Call centre for citizen’s help
• through Call centre reverting back to citizens to confirm the state
of works being done and especially calling back to citizens who
had complained to take their feed-back.
• adopting Project Management software to have a track on
projects.
• Creating a bulk e-mail ID for all its engineers and officers for
BBMP easy interaction
• Giving the blackberry to MTF staff to send online messages and
MTF complaints
• implementation of GPS , GIS and vehicle tracking system
20 7/8/2009
Suggestions for MTF Helpline vehicle
21
BBMP
7/8/2009
Suggestions for MTF vehicles
22
7/8/2009
On the top a hydrolic crane need to attached to lift vehicles or
Danger & heavy materials from floods
glow light
should be
there for
the MTF
vehicle
23 7/8/2009
This vehicle will become citizen’s delight and BBMP’s PRIDE
Can accommodate
all the 4 to 5 staff
members in side
easily
The MTF vehicle should be light in weight, compact, powerful and which
24 can easily enter small lanes as well 7/8/2009
Suggestions for MTF Vehicles - showing the
inner and outer body of a customised vehicle
25
7/8/2009
Low End
we have discussed Problems
solutions only for the low
end Problems i.e. for
residential & townships. BBMP
MTF
High End
Problems
• High End problems include Strom water drains & Nala, Lakes over flow, Rain water
harvesting plan for city
• VIP Route to be kept out from flooding
• Tech Parks and Industrial Units & industrial Parks
• Shops, Markets and shopping malls etc
26 7/8/2009
Disaster management Plan
27
7/8/2009
About BIG
28
7/8/2009
Thank You
For more details Contact : Farook A Azam (MBA-IM,PGDIM,BE)
E-mail : farook.a.azam@gmail.com
Mobile : +91-9739860495 | Telephone: +91 80 2666 9318 (W) / 65687618 (R)
Address: BIG, # 72, 4th A cross, Ilyas Nagar, J.P.Nagar Post, Bangalore 560 078 , INDIA
29 7/8/2009